Summary

This is a Bid Specifications document for the Village of Tuxedo Park, New York's Water Treatment Plant Clearwell Upgrades project (Bid No. DPW 2026-04). The project involves installation of baffles in two existing rectangular clearwells at the water treatment plant located at 1 Chastellux Lane, Tuxedo Park, New York, to reduce hydraulic short-circuiting and improve disinfection effectiveness. Scope includes baffle installation in one clearwell at a time while maintaining plant operations through the other clearwell, clearwell drain down and power washing, concrete crack repairs on a time-and-materials basis, piping and valve modifications, replacement of clearwell effluent valves, and water quality testing prior to return to service. Additional work includes upgrade of the existing chlorine feed system to be flow-paced with installation of an ultrasonic flow meter, chemical feed pump and controller upgrades, modifications to the water treatment plant control program and panel to provide clearwell level controls, and in-kind replacement of filter backwash pumps as a bid alternate. Sealed bids must be received at the Village Administration Office, 80 Lorillard Road, Tuxedo Park, New York 10987, by 10:30 a.m. prevailing time on December 9, 2026. A non-mandatory pre-bid meeting will be held on November 10, 2026, at 10:00 a.m. at the water treatment plant. Contract documents are available beginning November 4, 2026. The contractor must achieve substantial completion within 180 consecutive days and full completion within 210 consecutive days from the Notice to Proceed, with liquidated damages of $1,200 per calendar day for delays.

Bidders must submit bid security equal to the amount specified in the bid form, which will be returned to all but the three lowest responsible and eligible bidders within five days of bid opening. The contract will be awarded to the lowest responsible bidder as determined by the Village Board. New York State prevailing wage rates apply to this project. Bidders must comply with sexual harassment prevention certification requirements under New York State Finance Law 139-l, non-collusion affidavits, Iran Divestment Act certification, and federal labor standards including OSHA 10-hour Construction Safety and Health Course requirements for all personnel. All workers and mechanics must be certified as having successfully completed a minimum of 10 hours of construction and health safety training approved by OSHA prior to performing work. The project is funded by the Village of Tuxedo Park. A Service-Disabled Veteran-Owned Business (SDVOB) goal of 2.00 percent applies; no Disadvantaged Business Enterprise (DBE) goal is specified. The contractor must maintain performance and payment bonds in the amount of 100 percent of the bid and must guarantee the work for one year from completion and acceptance.

View the file

Other files

File Type Posted
Bid Drawing Set - 11.2.2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Weston & Sampson PE, LS, LA, ARCHITECTS, PC 1 Winners Circle

Suite 130 Albany, NY 12205 tel: 518-463-4400 www.westonandsampson.com

Contract Documents

Water Treatment Plant Clearwell Upgrades

1 Chastellux Lane

Tuxedo Park, New York

Contract No. DPW 26-04

November 2, 2026

Bid Set zongolj Image

THIS PAGE INTENTIONALLY BLANK

i

Division

Section

Number

0 BIDDING AND CONTRACT REQUIREMENTS

Notice to Bidders 00100

Instructions to Bidders 00200

Form of General Bid (Unit Price)

Sexual Harassment Certification – Attachment A

00410

00410A

Bidders Qualification Form 00420

Non-Collusion Affidavit 00430

Iran Divestment Act 00440

Agreement 00520

Performance Bond 00610

Payment Bond 00615

General Conditions 00700

Supplementary Conditions 00800

Wage Determination Schedule

Permits

00830

00890

1 GENERAL REQUIREMENTS

Scope and Sequence of Work 01014

Control of Work and Materials 01110

Special Provisions 01140

Measurement and Payment 01270

Construction Scheduling 01310

Submittals 01330

Shop Drawing Transmittal Form 01330

Health and Safety Plan 01380

Contractor Quality Control 01451

Product Substitution Procedures 01630

Substitution Request Form – Att. A 01630

Cutting, Coring & Patching 01735

Cleaning Up 01740

Equipment Checkout and Testing 01750

Startup and Testing 01752

Operation and Maintenance Manuals 01760

Project Closeout 01770

2 SITE WORK

Ductile Iron Pipe and Fittings for Water Mains 02080

3 CONCRETE

Repair of Structural Concrete 03930

Repair of Existing Concrete Structures 03931 ii

Division

Section

Number

11 EQUIPMENT

Clearwell Baffles 11209

Chemical Feed Systems 11241

13 SPECIAL CONSTRUCTION

Process Control Strategies 13410

Field Instruments and Equipment 13420

15 MECHANICAL

Process Valves and Appurtenances for Potable Water 15111

Interior Plastic Valves and Appurtenances 15113

Plastic Process Pipe and Fittings 15320

16 ELECTRICAL

Electrical Work General Provisions 16050

Grounding and Bonding 16060

Hangers and Supports 16070

Electrical Identification 16075

Building Conductors and Cables 16123

Raceways 16130

Sleeves and Seals for Raceways and Cabling 16134

Wiring Devices 16140

Enclosed Switches and Circuit Breakers 16410

Fuses 16415

END OF SECTION

\\wse03.local\WSE\Projects\NY\Tuxedo Park, NY\24-0884-VOTP-WTP Clearwell Upgrades\05-Specifications\CSI Sections to use\Table of

Contents.docx

VILLAGE OF TUXEDO PARK

NOTICE TO BIDDERS

BID NO. DPW 2026-04

Sealed bids for the Water Treatment Plant Clearwell Upgrades, Bid #DPW2026-04, for the Village of Tuxedo Park, New York, will be received at the Village Administration Office at 80 Lorillard

Road, Tuxedo Park, NY 10987 United States until 10:30 AM prevailing time, on December 9, 2026 at which time and place said bids will be publicly opened and read aloud.

TUXEDO PARK WATER TREATMENT PLANT CLEARWELL UPGRADES

The Village of Tuxedo Park’s water treatment plant is located at 1 Chastellux Lane, Tuxedo Park, NY 10987. Modifications to the existing clearwells are required to increase the disinfection effectiveness in the treatment plant. Baffles are to be installed in existing two (2) rectangular clear wells to reduce hydraulic short-circuiting in the clear wells. Minor modifications to the clearwell influent piping / valves are specified to reduce short circuiting and optimize flow characteristics.

The clearwell effluent valves are also to be replaced to allow complete isolation of the clearwells.

Baffles are to be installed in one (1) clearwell at a time, allowing the water treatment plant to remain in service through the other clearwell for the duration of the project.

The scope of work for each baffle installation shall include clearwell drain down, power wash / inspect walls and floor, install baffles, disinfect, drain, and collect water quality samples prior to returning clearwells to service to confirm they are free of bacteria and organic contaminants.

Sealing of any cracks noted in the clearwell walls is to be done on a time and materials basis.

In addition to the clearwell baffle work, concrete crack repairs and modifications to plant operational controls and the chemical feed system are required to ensure disinfection control and stability. The existing chlorine feed system will be upgraded to be flow paced, which will require the addition of an ultrasonic flow meter on the clearwell influent pipe, a chemical feed pump / controller upgrade and modifications to the WTP control program.

The existing WTP control panel will require program / hardware modifications as needed to:

- Provide control of clearwell level using the existing level indicator. Details of the level controls required are provided in the contract documents.

- Ensure clearwell level controls are in place and functional before either clearwell is taken out of service for baffle installation. Orange County Department of Health requires

“during the time period when only one (1) clearwell is in service, the clearwell shall maintain a minimum depth of 11.5 feet before a backwash may take place. A lockout shall be provided through the control system.”

- Allow other plant control conditions / operating modifications noted in contract documents.

The existing filter backwash (BW) pumps are at the end of their service life and are in need of replacement. In- kind replacement of the BW pumps is to be included in this contract as a bid-alternate.

The Contract Documents may be examined, and copies obtained at the Office of the Village Clerk during usual business hours beginning on November 4, 2026. Copies of the Contract Documents may be obtained upon request at no charge. Alternately, a pdf of the contract documents may be obtained by contacting John Ledwith, at jledwith@tuxedopark-ny.gov.

A non-mandatory Pre-Bid meeting will be held on Tuesday, November 10, 2026 at 10:00 AM at

Tuxedo Park Water Treatment Plant at 1 Chastellux Lane, Tuxedo Park, NY 10987.

All proposals must meet the requirements of the General Municipal Law of the State of New York and all other applicable federal, state, and local statutes. Strict compliance with all Federal Labor

Standards is mandatory. Minority and Women Owned Businesses are encouraged to submit bids.

The successful bidder will be required to comply with all pertinent federal regulations.

The Contract will be awarded to the lowest responsible bidder offering a proposal response that best meets the terms, conditions and criteria stated in the bidding documents and as will best promote the public interest, taking into consideration the reliability of the bidder and the quality of the services to be furnished.

Statement of Non-Collusion

Bidders on the Contract are required to execute non-collusion bidding certificates pursuant to

Section 103d of the General Municipal Law of the State of New York. Attention of bidders is particularly called to the requirement as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facilities, Section 109 and

Executive Order 11246. The requirements for Bidders and Contractors under this order, which concerns non-discrimination in employment, are explained in the Contract Documents. Bidders are also required to comply the provisions of Section 291-299 of the Executive Law of the State of New York.

Please take further Notice that The Village Board reserves the right to accept or reject any or all portions of the proposal, as determined to be in the best interest of the Village.

JOHN LEDWITH, IV, BUILDING & LAND USE OFFICER

VILLAGE OF TUXEDO PARK

Dated: November 4, 2026

07/11/2017 00200-1

SECTION 00200

INSTRUCTIONS TO BIDDERS

1. Receipt and Opening of Bids

2. Location and Work to be Done

3. Deposit on Documents

4. Preparation of Bid

5. Modification of Bids

6. Obligation of Bidder

7. Information not Guaranteed

8. Bid Security

9. Time for Completion

10. Addenda and Interpretations

11. Bid Opening Procedure

12. Comparison of Bids

13. Right to Reject Bid

14. Ability and Experience of Bidder

15. Conditions of Work

16. Security for Faithful Performance

17. Power of Attorney

18. Laws and Regulations

19. Liquidated Damages for Failure to Enter into Contract

20. Items and Indeterminate Items

21. Prevailing Wage Rates

22. Guarantee

23. Safety and Health Regulations

24. Efficiency Guarantee Bond

25. OSHA 10 Hour Construction Safety and Health Course Requirements

1. Receipt and Opening of Bids

The Village of Tuxedo Park herein called the OWNER, acting by and through its Clerk will receive sealed Bids for the Water Treatment Plant Clearwell Upgrades.

Such bids addressed to the Village of Tuxedo Park and endorsed Bid Security will be received at the Village Office, 80 Lorillard Road, Tuxedo Park, NY until 10:30 AM. on 9th day of December, 2026 at which time and place said bids will be publicly opened and read aloud. The bidder assumes the risk of any delay in the mail or in the handling of the mail by OWNER employees. The bidder assumes all responsibility for having the proposal deposited on time at the place specified.

If the building at which bids are to be received is closed for any reason on the date and time that bids are due, receipt of bids by the Owner will be postponed until the next business day at the time originally stated for receipt of bids.

Any bid may be withdrawn prior to the above scheduled time for the opening of bids or

07/11/2017 00200-2 authorized postponement thereof. Any bid received after the time and date specified will not be considered. By submission of a bid, the bidder agrees that this bid shall be good and may not be withdrawn for a period of 45 calendar days, after the opening of bids.

2. Location and Work to be Done

The location, general characteristics, and principal details of the Work are indicated on a set of construction drawings titled "Water Treatment Plant Clearwell Upgrades”.

Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the ENGINEER and shall then become a part of the Contract Documents.

The CONTRACTOR shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.

The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item.

3. Deposit on Documents

A non-refundable deposit, in the amount as specified in Section 00100, ADVERTISEMENT FOR BIDS, in check or money order payable to Village of Tuxedo Park, will be required on each set of Contract Documents taken.

4. Preparation of Bid

Each bid must be submitted on the prescribed form in Section 00410. All blank spaces for bid prices must be filled in, in ink or typewritten, in both words and figures.

Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and endorsed with the name of the project as specified in Receipt and Opening of Bids, above.

If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in Receipt and Opening of Bids, above.

5. Modification of Bids

Any bidder may modify its bid by written communication at any time prior to the scheduled closing time for receipt of bids. Any telegraphic communication must be received by the OWNER prior to the closing time, and provided further, for any telegraphic communication that modifies a bid the OWNER is satisfied that a written confirmation of the modification over the signature of the bidder was mailed prior to the closing time. The modification communication shall not reveal the bid price but shall provide the addition or

07/11/2017 00200-3 subtraction or other modification so that the final prices or terms will not be known by the OWNER until the sealed bid is opened. If written confirmation is not received within two days from the closing time, no consideration will be given to the facsimile transmission.

6. Obligation of Bidder

At the time of the opening of bids each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of his bid.

In submitting a bid, bidder agrees to all of the terms and conditions set forth in the Contract attached to this request for bids and all additional information necessary for the Contract will be completed based upon the proposal.

7. Information not Guaranteed

All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the OWNER. All such information is furnished only for the information and convenience of bidders and is not guaranteed.

It is agreed and understood that the OWNER does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents.

It is further agreed and understood that no bidder or CONTRACTOR shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or grounds for any claim or demand against the OWNER or the ENGINEER, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other conditions, natural phenomena, existing pipes or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.

8. Bid Security

Each bid must be accompanied by a certified check, a bid bond, a treasurer's or cashier's check, payable to the OWNER, in the amount stated in Section 00100, ADVERTISEMENT FOR BIDS. Such deposits will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining deposits will be returned promptly after the OWNER and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to any bidder within 45 calendar days, after the date of the opening of bids, upon demand of the bidder at any time thereafter.

07/11/2017 00200-4

9. Time for Completion

The bidder must agree to commence work on or before a date to be specified in the written "Notice to Proceed" from the OWNER and to fully complete the project within the time limit stated in Section 00410, FORM OF GENERAL BID.

10. Addenda and Interpretations

No interpretation of the meaning of the plans, specifications or other prebid documents will be made to any bidder orally, and if provided orally, shall not be relied upon by bidders unless confirmed in a written addendum. All information given to bidders other than by means of the plans, specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the OWNER or the ENGINEER.

Every request for such interpretation should be in writing (typed, not handwritten) addressed to Joseph Roccaro, at roccaro.joseph@wseinc.com or Joe Zongol, PE zongolj@wseinc.com and to be given consideration must be received at least ten working days prior to the date fixed for the opening of bids. Bidders desiring clarification or interpretation of the bid documents shall make a written request at least seven (7) days prior to the closing date for receipt of bids.

Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, when issued will be emailed to all prospective bidders to email addresses furnished by them for such purposes. Bidders picking up sets of bid documents will be given all addenda issued to date and will be required to sign for all documents, acknowledging receipt. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under its bid as submitted. All addenda so issued shall become part of the Contract Documents. It will be the bidder’s responsibility to ascertain that they have received all addenda. The OWNER is in no way liable for a bidder not having all addenda and cannot be held accountable in any respect for noncompliance or financial or physical loss due to proposer not having required addenda.

11. Bid Opening Procedure

The following list of requirements shall be met by each filed bid.

Bids shall be filed at the place and before the time specified in Receipt and Opening of Bids, above.

The bid and all accompanying documents so required shall be signed by the Bidder or its authorized representative before submission.

All bidders shall include with their bids written acknowledgment of receipt of all addenda.

Refer to acknowledgment form provided in Section 00410, FORM OF GENERAL BID.

The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further consideration. These three apparent low bids will be read aloud for the

07/11/2017 00200-5 benefit of the other bidders and the bid opening procedure will be closed. All those present at the bid opening may examine all bids after the bid opening and after the reading of the three apparent low bids.

12. Comparison of Bids

Bids will be compared on the basis of the quantities and unit and lump sum prices stated in the bid forms.

In the event that there is a discrepancy in Section 00410, FORM OF GENERAL BID between the lump sum or unit prices written in words and figures, the prices written in words will govern.

The OWNER agrees to examine and consider each FORM OF GENERAL BID submitted in accordance with the terms and conditions set forth herein and as set forth in Section

00410, FORM OF GENERAL BID.

Award of the contract will be made only to the lowest responsible bidder as will best promote the public interest, taking into consideration the reliability of the bidder, the quality of the materials, equipment, supplies or services to be furnished, conformity with specifications, all for the purpose for which they are required and the terms of delivery of the materials or services.

All prices quoted by various proposers must be firm prices for a period of forty-five (45) days to allow acceptance by the OWNER. If awarded the contract, the prices will then be firm during the time period indicated by the bidder.

13. Right to Reject Bid

The OWNER may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids, should the OWNER deem it to be in the public interest to do so.

The OWNER reserves the right to reject any and all proposals upon its sole discretion. The OWNER may also reject bids which in its sole judgment are either incomplete, conditional, obscure or not responsive or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities, and may reject bids for any other reason permitted by law, or the OWNER may waive such non-material omissions, conditions or irregularities. The OWNER may either give a proposer an opportunity to cure any deficiency resulting from a technicality or minor irregularity in its proposal, or waive such deficiency where it is advantageous to the OWNER to do so.

Grounds for rejection of proposals include, but shall not be limited to:

(a) Submission of an incomplete proposal.

(b) Failure of a proposal to conform to the specifications contained or referenced in the bidding documents.

(c) Failure of a proposal to conform to the delivery or completion dates

07/11/2017 00200-6 established in the specifications.

(d) Submission of a proposal that imposes conditions that would modify the terms and conditions of the bidding documents or limit the bidder’s liability to the OWNER on the contract awarded on the basis of such proposal.

(e) Submission of a proposal determined by the OWNER to be unreasonable as to price.

(f) Submission of a proposal determined not to be from a responsible bidder.

(g) Failure of a proposal to meet guarantees, where required.

(h) Bidder whose performance on any previous contract with the OWNER has been determined to be poor or unsatisfactory.

(i) Bidder whose performance on any contract for similar services has been determined to be poor or unsatisfactory.

14. Ability and Experience of Bidder

No award will be made to any bidder who cannot satisfy the OWNER that it has sufficient ability and experience in this class of work and sufficient capital and plant to enable it to prosecute and complete the work successfully within the time named. The OWNER's decision or judgment on these matters will be final, conclusive, and binding to the fullest extent permitted by law.

The OWNER may make such investigations as it deems necessary, and the bidder shall furnish to the OWNER, under oath if so required, all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any bid if any additional information requested from the bidder, or the investigation of such bidder, fails to demonstrate that the bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein within the time frame designated.

15. Conditions of Work

Each bidder must inform himself fully of the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the CONTRACTOR, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other contractor.

16. Security for Faithful Performance

Simultaneously with its delivery of the executed Contract, the CONTRACTOR shall furnish a surety bond or bonds as security for faithful performance of this Contract and for the payment of all persons performing labor and materials under this Contract as specified in Section 00700, GENERAL CONDITIONS included herein each in the amount of 100 percent of its bid. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the State of New York and satisfactory to the OWNER.

The bonds shall remain in force for one year after final acceptance of the work by the OWNER, unless the OWNER, in writing, releases the CONTRACTOR from the obligation

07/11/2017 00200-7 sooner.

17. Power of Attorney

Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

18. Laws and Regulations

Applicable provisions of the Laws of New York and Regulations and/or the United States Code and Code of Federal Regulations govern this Contract and any provision in violation of the foregoing shall be deemed null, void and of no effect. Where conflict between Code of Federal Regulations and Laws of New York and Regulations exist, the more stringent requirement shall apply.

The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.

19. Liquidated Damages for Failure to Enter into Contract

The successful bidder, upon his failure or refusal to execute and deliver the Contract, Bonds and Certificates of Insurance required within 10 days after receipt of notice of the acceptance of the bid, shall except as otherwise provided by applicable law, forfeit to the OWNER, as liquidated damages for such failure or refusal, the security deposited with his/her bid, provided that the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder. In case of death, disability, bonafide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, his/her bid deposit will be returned.

Should the successful bidder refuse to enter into the Contract or fail to furnish the required Bonds and Certificates of Insurance within 10 days after it has received notice of the acceptance of its bid, the OWNER in its sole discretion, without waiver or prejudice to any other right or remedy of the OWNER, may also rescind the contract award and deem the contract award null and void; the successful bidder agrees that it will not be entitled to and waives any right to payment resulting from rescinding the contract award, including, but not limited to, any right to payment under state law or the contract terms as described in the bidding documents, including payment for any items of work partially completed, bond premiums, insurance costs, or any other costs claimed to be associated with the Project.

20. Indeterminate Items and Estimated Quantities

The work to be done under this Contract has been divided into parts or items, if applicable, to enable each bidder to bid on different portions of the work in accordance with its estimate of their cost and so that the actual quantity of work executed under each item may be paid

07/11/2017 00200-8 for at the price bid for that particular item, even though each bidder may have judged that such quantity may be greater or less than the estimated quantity stated in Section 00410, FORM OF GENERAL BID.

21. Prevailing Wage Rates

Applicable provisions of the New York State Department of Labor and/or the United States

Code and Code of Federal Regulations govern this Contract and any provision in violation of the foregoing shall be deemed null, void and of no effect. Where conflict between the Code of Federal Regulations and State Laws and Regulations exist, the more stringent requirement shall apply.

Prevailing Wage Rates as determined by the Commissioner of the New York State

Department of Labor and/or the United States Code and Code of Federal Regulations apply to this project. It is the responsibility of the contractor, before bid opening, to request from the Bureau of Public Work, if necessary, any additional information on Prevailing Wage Rates for those trades people who may by employed for the proposed work under this contract.

This project is funded by Village of Tuxedo Park, therefore New York State Prevailing

Wages apply. Rate schedule is included within these bid documents.

22. Guarantee

The Contractor shall guarantee that the Work and Services to be performed under the

Contract, and all workmanship, materials and equipment performed, furnished, used or installed in the construction of the same shall be free from defects and flaws, and shall be performed and furnished in strict accordance with the Drawings, Specifications, and other contract documents, that the strength of all parts of all manufactured equipment shall be adequate and as specified and that the performance test requirements of the contract shall be fulfilled. This guarantee shall be for a period of one year from and after the date of completion and acceptance of the Work as stated in the final estimate. If part of the Work is accepted in accordance with that subsection of this AGREEMENT titled “Partial Acceptance”, the guarantee for that part of the Work shall be for a period of one year from the date fixed for such acceptance.

If at any time within the said period of guarantee any part of the Work requires repairing, correction or replacement, the Owner may notify the Contractor in writing to make the required repairs, correction or replacements. If the Contractor neglects to commence making such repairs, corrections or replacements to the satisfaction of the Owner within seven (7) days from the date of receipt of such notice, or having commenced fails to prosecute such Work with diligence, the Owner may employ other persons to make said repairs, correction or replacements, and charge the costs, including compensation for additional professional services, to the Contractor.

07/11/2017 00200-9

23. Safety and Health Regulations

This Project is subject to the Safety and Health Regulations of the U.S. Department of

Labor set forth in Title 29 CFR, Part 1926 and to all subsequent amendments, and to the New York State Department of Labor, Division of Safety & Health, Official Compilation of Codes, Rules & Regulations (NYCRR) of the State of New York. Contractors shall be familiar with the requirements of these regulations.

24. Efficiency Guarantee Bond

Whenever it is written that an equipment manufacturer must have a specified period of experience with his product, equipment which does not meet the specified experience period can be considered if the equipment supplier or manufacturer is willing to provide an “Efficiency Guarantee Bond” or cash deposit for the duration of the specified time period which will guarantee replacement of that equipment in the event of failure.

25. OSHA 10 Hour Construction Safety and Health Course Requirements

Under Article 8 of the New York State Labor Law, for any public works project of at least $250,000 in value, all laborers, workers and mechanics working on the construction site shall be certified as having successfully completed a minimum of 10 hours of Construction and Health Safety Training, as approved by OSHA. The Contractor, subcontractor, or other person doing or contracting to do the whole of part of the work contemplated by the contract, shall provide proof to the Engineer of certification for successfully completing the course for each employee, prior to performing any work on the project.

SECTION 00410

ATTACHMENT A

CERTIFICATION OF COMPLIANCE FOR THE

PREVENTION OF SEXUAL HARASSMENT

CERTIFICATION OF COMPLIANCE FOR THE

PREVENTION OF SEXUAL HARASSMENT

Pursuant to State Finance Law §139-l of the State of New York, effective January 1, 2019, where competitive bidding is required for certain public contracts, every bid must contain the following statement affirming that the bidder has implemented a written policy addressing sexual harassment prevention and that the bidder provides annual sexual harassment prevention training, which statement must be signed by the bidder and affirmed by such bidder under the penalty of perjury:

[Please Check One]

BIDDER’S CERTIFICATION

By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that the bidder has and has implemented a written policy addressing sexual harassment prevention in the workplace and provides annual sexual harassment prevention training to all of its employees. Such policy shall, at a minimum, meet the requirements of section two hundred one-g of the labor law.

I am unable to certify that I, or my employer, have implemented a written policy addressing sexual harassment prevention in the workplace. The reason(s) why neither I nor my employer can make such certification is/are: ______________________________

Dated: _____________, 20___.

STATE OF )

COUNTY OF ) ss:

The undersigned, being duly sworn, says: (a) I am duly authorized to execute this Certification and

(b) I hereby certify, under penalty of perjury, that the forgoing Certification is in all respects true and accurate.

Signature

Printed Name

Title

Subscribed and sworn to before me this ____ day of __________________, 20___.

Notary Public

00420-1

SECTION 00420

BIDDER'S QUALIFICATION FORM

This form should be submitted upon request of Owner by the three lowest Bidders after opening of the bids, in accordance with Paragraph 3.1 of Section 00200 -

INSTRUCTIONS TO BIDDERS.

1. Name of Contractor _________________________________________________

2. How many years experience have you had in construction work of the same general type as this Contract? _________________________________________

3. Give information about the construction experience of the principals of your present organization who will be involved in the Contract (Add additional sheets if necessary):

Present Years of Proposed

Individual’s Position in Construction Size and Position for

Name Organization Experience Type of Work This Contract

4. Give information about your present contract workload, or contracts to which you are committed:

Name and

Contract Type of Location Percentage Expected Address of

Price Construction of Work Completed Completion Date Owner

5. Has your organization or any other partner thereof, failed to complete a construction contract? _______________________________________________

6. References. Give only engineers, architects or owner's representatives who are directly familiar with your work on similar projects.

00420-2

Name Business Address Telephone Project

7. Is any litigation pending against your organization? ________________________

8. Has your organization been denied any construction project where it was the lowest bidder? _____________________________________________________

If yes, give details: __________________________________________________

9. Give as reference a surety company or companies regarding your organization's financial responsibility and general reliability:

Name of Surety Company:____________________________________________

Name of Local Agent (if different):_____________________________________

Local Address: _____________________________________________________

Telephone:________________________________________________________

Person familiar with Bidder's account: __________________________________

10. Attach a financial statement, audited if available, including your organization's latest balance sheet and income statement, prepared in accordance with generally accepted accounting principles. (This statement shall be for the local firm submitting the Bid, unless the local firm is a branch or subsidiary for which separate accounts are not available, in which case the statement shall be for the organization(s) which will contract to be a guarantor of any contract resulting from this Bid. Attach a notarized statement of an officer of that organization describing the relationship to the local firm, and stating that the organization will act as guarantor of the local firm's contracts.) Any financial statement shall include:

00420-3

A. Assets: list

1. Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses)

2. Net Fixed

Assets

3. Other

Assets

4. Total Assets (the sum of A1, A2 and A3)

B. Liabilities: list

1. Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provisions for income taxes, advances, accrued salaries and accrued payroll taxes)

2. Other Liabilities (e.g., capital, capital stock, authorized and outstanding share par values, earned surplus and retained earnings)

3. Total Liabilities (the sum of B1 and B2)

C. Net Worth (A minus B)

D. Billings: State the firm's average annual billings for the five years prior to the date of this Bid and the total billings for the six months prior to the date of this

Bid.

E. State the name and address of the person or firm preparing this financial statement.

F. State the name and address of the person or firm (if any) auditing this financial statement. If this statement was not audited, state "not audited".

00430-1

SECTION 00430

NON-COLLUSION AFFIDAVIT

Made pursuant to Article 5-A, Section 103-d of the General Municipal Law of the State of New York as amended by the Laws of 1966.

A. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of his knowledge and belief:

1. The prices in this Bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor; and

2. Unless otherwise required by law, the prices which have been quoted in this Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the bidder prior to the opening, directly or indirectly, to any other Bidder or to any competitor; and

3. No attempt has been made or will be made by the Bidder to induce any other person, partnership or corporation to submit or not to submit a Bid for the purpose of restricting competition.

B. A Bid shall not be considered for award nor shall any award be made where A.-

1, 2 and 3 above have not been complied with; provided however, that if in any case the Bidder cannot make the foregoing certification, the Bidder shall so state and shall furnish with the bid a signed statement which sets forth in detail the reasons therefore. Where A.-1, 2 and 3 above have not been complied with, the

Bid shall not be considered for award nor shall any award be made unless the head of the purchasing unit of the political subdivision, public department, agency or official thereof to which the Bid is made, or his designee, determines that such disclosure was not made for the purpose of restricting competition.

00430-2

The foregoing statement is affirmed as true under penalty of perjury.

Date __________ ,20__.

Legal Name of

Person, Firm or

Corporation

(Seal of Corporation)

Business Address of

Person, Firm or

Corporation

By

Signature

00440-1

SECTION 00440

IRAN DIVESTMENT ACT CERTIFICATION

As a result of the Iran Divestment Act of 2012 (Act), Chapter 1 of the 2012 Laws of New

York, a new provision has been added to the State Finance Law (SFL), § 165-a, effective

April 12, 2012. Under the Act, the Commissioner of the Office of General Services

(OGS) will be developing a list (prohibited entities list) of “persons” who are engaged in

“investment activities in Iran” (both are defined terms in the law). Pursuant to SFL § 165-a(3)(b), the initial list is expected to be issued no later than 120 days after the Act’s effective date, at which time it will be posted on the OGS website.

By submitting a bid in response to this solicitation or by assuming the responsibility of a

Contract awarded hereunder, Bidder/Contractor (or any assignee) certifies that once the prohibited entities list is posted on the OGS website, it will not utilize on such Contract any subcontractor that is identified on the prohibited entities list.

Additionally, Bidder/Contractor is advised that once the list is posted on the OGS website, any Contractor seeking to renew or extend a Contract or assume the responsibility of a Contract awarded in response to the solicitation, must certify at the time the Contract is renewed, extended or assigned that it is not included on the prohibited entities list.

During the term of the Contract, should the Village of Tuxedo Park (Village) receive information that a person is in violation of the above-referenced certification, the Village will offer the person an opportunity to respond. If the person fails to demonstrate that it has ceased its engagement in the investment which is in violation of the Act within 90 days after the determination of such violation, then the Village shall take such action as may be appropriate including, but not limited to, imposing sanctions, seeking compliance, recovering damages, or declaring the Contractor in default.

The Village reserves the right to reject any bid or request for assignment for an entity that appears on the prohibited entities list prior to the award of a contract, and to pursue a responsibility review with respect to any entity that is awarded a contract and appears on the prohibited entities list after contract award.

Signature:

Print Name:

Title:

Company Name:

Date: _________________________________________________________

06/13/2018 00520-1

SECTION 00520

AGREEMENT

THIS AGREEMENT, made this day of , 20__, by and between

The Village of Tuxedo Park hereinafter called "OWNER," acting herein through its DPW

Superintendent, and doing business as (a corporation) (a limited liability company) (a partnership) (a joint venture) (an individual)* located in the (City) (Town)* of , County of

, and State of , hereinafter called "CONTRACTOR."

WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the project described as follows:

WATER TREATMENT PLANT CLEARWELL UPGRADES

hereinafter called the Project, for the sum of Dollars and Cents ($ ) and all extra work in connection therewith, under the terms as stated in the Contract Documents; and at its own proper cost and expense to furnish superintendence, labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, bailing, shoring, removal, and all other things necessary to complete the said project in accordance with the conditions and prices stated in Section 00410, FORM OF GENERAL BID, Section 00700, GENERAL CONDITIONS, Section 00800, SUPPLEMENTARY CONDITIONS, the plans, which include all maps, plates, drawings, blue prints, and the specifications and all other contract documents therefor as prepared by Weston & Sampson, PE, LS, LA, Architects, PC, including all bid documents.

The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary, and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement, and other modifications issued after execution of this Agreement, all of which form the Agreement, and are as fully a part of the Agreement as if attached to this Agreement or repeated herein. The Contract Documents also include the advertisement or invitation to bid, Instructions to Bidders, forms, other information furnished by the Owner in anticipation of receiving bids or proposals and addenda relating to bidding requirements and all such forms executed by the Contractor as part of its bid response to the same and accepted by the Owner.

06/13/2018 00520-2

The CONTRACTOR hereby agrees to commence work under this contract on or before a date to be fixed in the written Notice to Proceed given by the OWNER to the CONTRACTOR and to substantially complete the project within 180 consecutive days and fully complete the project within 210 consecutive days of the start date fixed in the Notice to Proceed. The CONTRACTOR further agrees to pay as liquidated damages the sum of $1,200 for each consecutive calendar day thereafter during which the work has not been fully completed, as provided in the Liquidated Damages provisions of Section 00800 SUPPLEMENTARY CONDITIONS. If the Owner terminates the CONTRACTOR’s right to proceed, other than a termination by Owner for convenience, liquidated damages will continue to accrue until the work meets the criteria for Substantial Completion. The OWNER’s right to recover such liquidated damages shall in no way limit (a) the OWNER’s entitlement to damages for any other breach, injury, damage or loss, other than for delay, (b) right to indemnification, or (c) other non-monetary remedies (e.g. the right to terminate the Agreement) to which the OWNER may be entitled pursuant to the terms of this Contract or applicable law.

The CONTRACTOR shall not discriminate against or exclude any person from participation herein on grounds of race, color, religious creed, national origin, sex, sexual orientation, ancestry, or age; and that it shall take affirmative actions to insure that applicants are employed, and that employees are treated during their employment, without regard to race, color, religious creed, national origin, sex, sexual orientation, ancestry, age, or handicapped status.

The CONTRACTOR shall not participate in or cooperate with an international boycott, as defined in Section 999 (b)(3) and (4) of the Internal Revenue Code of 1986, as amended, or engage in conduct declared to be unlawful by New York State General Laws.

Applicable provisions of New York General Laws and Regulations and/or the United States Code and Code of Federal Regulations govern this Agreement and any provision in violation of the foregoing shall be deemed null, void and of no effect. Where conflict between Federal and State Laws and Regulations exists, the more stringent requirement shall apply.

The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the Agreement, subject to additions and deductions, as provided in Section 00700, GENERAL CONDITIONS, and to make payments on account thereof as provided in Section 00700, GENERAL CONDITIONS and Section 00800, SUPPLEMENTARY CONDITIONS

The Contractor shall submit, and shall require all of its subcontractors required to keep a record of hours and wages paid to laborers employed on the project to submit, to the awarding authority within thirty day after issuance of its first payroll, and every thirty days thereafter, a transcript of the original payroll records, subscribed and affirmed to be true.

06/13/2018 00520-3

MISCELLANEOUS PROVISIONS:

This Agreement shall be governed by the laws of the State of New York and CONTRACTOR agrees to comply with all Federal and New York State laws and regulations which may be applicable to this Agreement, and to require similar compliance from its subcontractors and consultants.

The OWNER and CONTRACTOR, respectively, bind themselves, their agents, successors, assigns and legal representatives to this Agreement. Neither the OWNER nor the CONTRACTOR shall assign this Agreement without the written consent of the other.

Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against the OWNER.

Nothing contained in this Agreement shall be construed as creating any personal liability on the part of any officer, employee or agent of the OWNER.

The CONTRACTOR, in accordance with its status as an independent contractor, covenants and agrees that it shall conduct itself in a manner consistent with such status, that it will neither hold itself nor its employees out as, nor claim to be an officer or employee of the OWNER, and that it will not by reason hereof, make any claims, demand or application for any right or privilege applicable to an officer of employee of the OWNER, including but not limited to workmen's compensation coverage, unemployment insurance benefits, Social Security coverage and retirement membership or credit.

The CONTRACTOR agrees to maintain sufficient on-site records and information necessary for the documentation of any and all facets of program operation specified by this Agreement.

CONTRACTOR agrees to permit on-site inspection of all records, books, papers and documents associated with this Agreement by authorized representatives of the OWNER, and further agrees to provide necessary staff support in the performance of such inspection. CONTRACTOR agrees to maintain for a period of five (5) consecutive years following termination of this Agreement, any and all records, reports and other documentation arising from the performance of this Agreement;

however, this period shall be extended beyond five years for any and all records and information pertaining to unresolved contract claims or disputes which have been brought to CONTRACTOR’s attention by written notice.

CONTRACTOR agrees to pay, when due, all claims for labor and/or materials furnished for work, and to prevent the filing of any liens, attachments, garnishments or suits involving the title of the property on which the Work is performed or the Project contract funds. CONTRACTOR agrees to cause the effect of any such suit or lien to be removed from the premises within fifteen (15) days after written demand from the OWNER.

06/13/2018 00520-4

IN WITNESS WHEREOF, the parties to these presents have executed this Agreement in six (6) counterparts, each of which shall be deemed an original, in the year and day first above mentioned.

AGREED:

Village of Tuxedo Park , New York (Owner)

(Name)

(Title)

(Contractor)

(Title)

(Address)

(City and State)

Approved as to Form:

(Owner's Counsel)

This is to certify that an appropriation in the amount of this Contract is available therefor and that the Mayor has been authorized to execute the Contract and approve all requisitions and change orders.

(Owner's Accountant)

06/13/2018 00520-5

CERTIFICATE OF VOTE

(to be filed if Contractor is a Corporation)

I, , hereby certify that I am the duly qualified and acting Secretary of (Secretary of Corporation) and I further certify that a meeting of the Directors of said company, duly called and held on , at which all members were present and voting, the (Date of Meeting) following vote was unanimously passed:

VOTED: To authorize and empower

Anyone acting singly, to execute Forms of General Bid, Contracts or Bonds on behalf of the Corporation.

I further certify that the above vote is still in effect and has not been changed or modified in any respect.

By:

(Secretary of Corporation)

A True Copy:

Attest:

(Notary Public)

My Commission Expires:

(Date)

06/13/2018 00520-6

Contractor's Certification

A Contractor will not be eligible for award of a contract unless such Contractor has submitted the following certification, which is deemed a part of the resulting contract:

CONTRACTOR'S CERTIFICATION

Name of the General Contractor certifies that it:

1. Will not discriminate in their employment practices;

2. Intends to use the following listed construction trades in the work under the contract:

and

3. Will make good faith efforts to comply with the minority employee and women employee workforce participation ratio goals and specific affirmative action…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .