Bid Sludge Table FY 2028 to FY 2032- Protected.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Sewage Sludge & Wastewater Hauling and Disposal
Solicitation number
GL-2027-14
Issued by
Hartford County, Connecticut

About this file

This is a bid sludge table form for the Town of Glastonbury, Connecticut's Water Pollution Control Division, which is soliciting bids for the transportation and disposal of sewage sludge from its facility located at 2149 Main Street, Glastonbury, Connecticut, and wastewater transportation from the Eastbury Pump Station located at 35 Roaring Brook Plaza, Glastonbury, Connecticut. The solicitation, identified as GL-2027-14, covers a five-year contract period from fiscal year 2028 through fiscal year 2032, with annual contract periods running from July through June. Bidders are required to submit responses online through the Town's secure e-Procurement portal at https://glastonburyct.bonfirehub.com/, and no late bids will be accepted.

The pricing structure requires bidders to enter unit costs per gallon for sludge disposal across six solids percentage categories (3.0 percent through 9.9 percent) and for wastewater hauling services. For sludge calculations, bidders must provide annual unit costs for the 5.0 percent through 7.9 percent solids categories, which are then averaged annually and across the five-year period; this five-year average unit cost is multiplied by 2,585,250 gallons to determine the total sludge cost. For wastewater calculations, the unit cost is averaged across the five-year period and multiplied by 685,700 gallons to determine the total wastewater cost. The total bid amount is the sum of both the five-year sludge and wastewater costs, and unit costs must include all costs to the Town with no additional fees assessed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

YEAR 1YEAR 2YEAR 3YEAR 4YEAR 5
% SolidsCost/Gal. 7/27 - 6/28Cost/Gal. 7/28 - 6/29Cost/Gal. 7/29 - 6/30Cost/Gal. 7/30 - 6/31Cost/Gal. 7/31 - 6/325 YEAR Avg Unit CostGal. Multiplier5 Year Total Sludge Cost (C,D,E)
A.3.0 - 3.9%$$$$$
B.4.0 - 4.9%$$$$$
C.5.0 - 5.9%$$$$$
D.6.0 - 6.9%$$$$$
E.7.0 - 7.9%$$$$$
C,D&E Avg/yr$$$$$$0.00002,585,250$0.00
F.8.0 - 8.9%$$$$$
G.9.0 - 9.9%$$$$$

Eastbury Wastewater Cost/Gal. 7/27 - 6/28 Cost/Gal. 7/28 - 6/29 Cost/Gal. 7/29 - 6/30 Cost/Gal. 7/30 - 6/31 Cost/Gal. 7/31 - 6/32 5 YEAR Avg Unit Cost Gal. Multiplier 5 year Total Wastewater Cost

A. Wastewater $ $ $ $ $ $ 685,700 $

1. Bidders shall enter unit costs for line items A through H
2. Sludge calculation: The unit costs for items C,D,E shall then be averaged by year to determine the average unit cost by year.The average unit cost by year shall then be totaled to determine the 5 year average unit cost to be used for sludge calculation. The 5 year average unit cost shall be mutiplied by gallon multiplier to determine 5 Year Total Sludge Cost (based upon line items C,D,E).
3. Wastewater calculation: The unit costs for item H shall be averaged to determine the 5 year average unit cost to be used in wastewater calculation. The 5 year average unit cost shall be mutiplied by gallon multiplier to determine the 5 Year Total Wastewater cost.Sludge & Wastewater Total Costs$
4. The sum of both 5 year totals (sludge & wastewater) shall equal total bid amount.(Numeric Total Bid Amount)
5. Unit costs shall include the total cost to the Town. The Town shall not be assessed additional fees.
/100
(Sludge and Wastewater Total costs Written Total Bid Amount)
Bidder's Company Name_______________________________________________

BP-1