Bid Sheet Paint Platte Valley DYS.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
FDYS Painting Platte Valley Youth Service Center IFB
Solicitation number
IFB1 IHHA 2026000161 1
Issued by
Pueblo County, Colorado

About this file

This is a bid sheet for an interior painting project at the Platte Valley Youth Service Center in Greeley, Colorado, submitted under the FDYS Painting Platte Valley Youth Service Center Invitation for Bid. The project encompasses two base bid items: interior painting of five residential pods with all labor and materials, and painting of all hallways and common areas except the gymnasium with all labor and materials. A bid option is available for gymnasium painting as a separate line item. The project location is 2200 O Street, Greeley, Colorado 80631, with a bid date of March 24, 2026.

The bid sheet is structured to capture unit prices for the residential pods on an each basis and the hallway and common areas on a lump-sum basis, with separate line items for general conditions, overhead, profit, and payment and performance bond percentages to be applied as markups to the administration subtotal. All pricing fields remain unfilled in this template, indicating this is a blank bid form awaiting contractor completion. The gymnasium painting option is similarly structured as an alternative lump-sum item with applicable overhead, profit, and bonding percentages to be determined by the bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet

PROJECT:Platte Valley Interior PaintingInstructions: Fill out Unit Price Items Dollar Amount; and Administration Item Percentages in Yellow Highlighted Cells Only
LOCATIONPlatte Valley Youth Service Center, 2200 O St, Greeley, CO 80631
DATE:3/24/26
ITEM NO.SPECIFICATION
REFERENCEITEM DESCRIPTIONQUANTITYUNITUNIT PRICETOTAL COST
BASE BID ITEMS
1N/AResidential Pods - All Labor and Materials (Five PODS)5EA$ - 0$ - 0
2N/AAll Hallways and Common Areas EXCEPT Gymnasium - All Labor and Materials1LS$ - 0$ - 0
ADMINISTRATION
SUBTOTAL$ - 0
GENERAL CONDITIONS (%)0%$ - 0
OVERHEAD (%)0%$ - 0
SUBTOTAL$ - 0
Profit (%)0%$ - 0
Payment and Performance Bond (%)0%$ - 0

TOTAL - BASE BID $ - 0

BID OPTIONS ITEMS
(BID OPTION)
ALT 1N/AGymnasium - All Labor and Materials1LS$ - 0$ - 0
ADMINISTRATION
SUBTOTAL$ - 0
GENERAL CONDITIONS (%)0%$ - 0
OVERHEAD (%)0%$ - 0
SUBTOTAL$ - 0
Profit (%)0%$ - 0
Payment and Performance Bond (%)0%$ - 0

TOTAL - BID OPTIONS $ - 0

GRAND TOTAL - BASE AND BID OPTIONS $ - 0