Bid Sheet.xlsx

XLSX spreadsheet 9 KB Posted

Attached to
Courts Post 911 Security Upgrades - Package 1 Jury Assembly Break Room Upgrades
Solicitation number
6087A
Issued by
Arapahoe County, Colorado

About this file

The document is a Bid Sheet for the Courts Post 911 Security Upgrades - Package 1 Jury Assembly Break Room Upgrades project located in Colorado. The project scope involves selective demolition and renovation of the Jury Assembly Room and Break Room, including creating a new cased opening, installing a structural header, renovating the kitchen area for ADA compliance, reconstructing two single-user restrooms to meet ADA standards, upgrading security camera systems, adding fire alarm devices, and replacing break room flooring. The bid is structured across multiple divisions including General Requirements, Existing Conditions, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Furnishings, Plumbing, HVAC, Electrical, Communications, and Electronic Safety and Security.

The bid sheet provides a detailed breakdown of divisional work with base bid pricing, though specific dollar amounts are not populated in the provided document. The bid explicitly notes that any alteration to the bid breakdown sheet will result in bid disqualification, and all questions or clarification requests must be submitted prior to the Questions Deadline. The project appears to be a comprehensive renovation focused on improving accessibility, security, and functionality of the court facility's jury assembly and break room areas, with careful attention to ADA compliance and integrated system upgrades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 Date:

Bidder (Name of Firm):

Bidder (Representative):

Division #Division NameDivision DescriptionBase Bid PriceAllowance
Division 1General RequirementsSite Access, Badging and Security Requirements, Storage, Temporary Facilities and Controls, Execution, Cleaning, Starting and Adjusting, Substitution Procedures, Contract Modification Procedures ,Payment Procedures, Project Management and Coordination, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Quality Control and Requirements, Product Requirements, Execution, Construction Waste Management and Disposal, Closeout Procedures, Operation and Maintenance Data, Project Record Documents, Demonstration and TrainingNA
Division 2Existing ConditionsMaintenance of Existing Conditions, Assessment, Demolition, Removal and Diversion of Construction Materials, etc.NA
Division 6Wood, Plastics, and CompositesMiscellaneous Rough Carpentry, Plastic-Laminate-Clad
Architectural CabinetsNA
Division 7Thermal and Moisture ProtectionThermal Insulation, Penetration Firestopping, Joint Sealants,
Acoustical Joint SealantsNA
Division 8OpeningsHollow Metal Doors and Frames, Flush Wood Doors, Access
Doors and Frames, Door Hardware, MirrorsNA
Division 9FinishesNon-Structural Metal Framing, Gypsum Board, Ceramic Tiling, Acoustical Tile Ceilings, Resilient Base and Accessories, Resilient Tile Flooring, Interior Painting, Moisture Vapor
Emission ControlNA
Division 10SpecialtiesModular Signage, Fire Protection Cabinets, Fire ExtinguishersNA
Division 12FurnishingSolid Surfacing CountertopsNA
Division 22PlumbingCommon Work Results for Plumbing, Plumbing Insulation, Plumbing Piping, Plumbing Fixtures, Plumbing Project
CloseoutNA
Division 23Heating, Ventilating, and Air Conditioning (HVAC)Mechanical and Electrical Coordination, Basic Mechanical Requirements, Basic Mechanical Materials and Methods, Pipe and Pipe Fittings, Piping Accessories, Valves, Pipe Supports and Anchors, Mechanical Identification, Mechanical Insulation, Project CloseoutNA
Division 26ElectricalMechanical and Electrical Coordination, Electrical Requirements, Electrical Demolition and Relocation, Basic
Material and MethodsNA
Division 27CommunicationsBasic Communications Systems Requirements, Interior Communication Pathways, Identification for Communication Systems, Horizontal Cabling Requirements, Testing, Structured Cabling System Warranty
Division 28Electronic Safety and SecurityAddressable Fire-Alarm Systems
Note: Any alteration to the bid breakdown sheet shall result in disqualification of the bid. All questions or requests for clarification regarding the bid sheet must be submitted prior to the Questions Deadline.Total Base Bid$
Total Allowances$
Total Base Bid plus Allowances$