Bid Sheet 2026 Bag Wall District 11 and 12.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- RFB 605 2600000683 4
- Issued by
- Kentucky
About this file
This is a bid sheet for RFB 605 2600000683 issued by the State of Kentucky for polypropylene barrier wall construction in Districts 11 and 12. The project involves mobilization, site preparation, installation of polypropylene bags in multiple heights (2 feet through 6 feet), concrete placement, traffic control, materials supply, erosion control, and equipment rental. District 11 requires 2,215 linear feet of bag installation across various heights (1,000 LNFT of 2-foot bags, 200 LNFT of 3-foot bags, 600 LNFT of 4-foot bags, 200 LNFT of 5-foot bags, and 200 LNFT of 6-foot bags), while District 12 requires 2,400 linear feet across various heights (1,000 LNFT of 2-foot bags, 500 LNFT of 3-foot bags, 500 LNFT of 4-foot bags, and 200 LNFT of 5-foot bags and 200 LNFT of 6-foot bags). Additional work items include 1,500 tons of 6-inch minus stone aggregate, 1,000 cubic yards of Class B concrete, 150 tons of Class III channel lining, traffic control, concrete placement via transfer pump or pump truck, and long reach trackhoe equipment rental with 8-hour minimums per delivery order.
Vendors must submit actual bid prices and response times through the e-procurement system and may elect to bid one or both districts. The bid sheet requires vendors to guarantee their years of experience in providing similar barrier wall services. Vendors must bid all line items for any district in which they wish to provide services. All work must comply with current KYTC specifications, MUTCD standards, and Kentucky standard drawings. Concrete must meet the most current edition of KYTC Standard Specifications, and traffic control must be certified. The bid sheet indicates that the Kentucky Transportation Cabinet reserves the right to supply fill material using other master agreements rather than accepting vendor-supplied materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFB 605 2600000683 Polypropylene Barrier Wall Construction | |
| Vendor: | Vendor Rep: |
Instructions: Actual bid prices and response time must be entered on this bid sheet and uploaded into the e-procurement system. Vendors shall bid all line items for each district for which they wish to provide services. A vendor is not required to bid all districts.
| Vendor guarantees ___ years of experience in providing similar services as requested in this solicitation. | ||||||||||
| District 11 | District 12 | |||||||||
| Bid Item | Extended Description | Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | |
| Line 1 | Mobilization | This item will be for mobiliizing all materials and equipment to construct barrier wall as required in the specs. | 15 | LS | 15 | LS | ||||
| Line 2 | Foundation Preparation-Non-Yeilding | This item includes all equipment, labor and materials needed to excavate project site necessary to install barrier wall. If a hoe ram is needed, it will be incidental to this bid item. Any tree removal will be incidental to this bid item. | 10 | LNFT | 10 | LNFT | ||||
| Line 3 | Foundation Preparation-Yeilding | This item includes all equipment, labor and materials needed to excavate project site necessary to install barrier wall. If a hoe ram is needed, it will be incidental to this bid item. Any tree removal will be incidental to this bid item. | 5 | LNFT | 5 | LNFT | ||||
| Line 4 | 2' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 1000 | LNFT | 1000 | LNFT | ||||
| Line 5 | 3' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 500 | LNFT | ||||
| Line 6 | 4' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 600 | LNFT | 500 | LNFT | ||||
| Line 7 | 5' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 200 | LNFT | ||||
| Line 8 | 6' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 200 | LNFT | ||||
| Line 9 | Concrete Placement-Transfer Pump or Other Mechanical Support | This item is for any mechanical means of support to place Class B Concrete such as a transfer line truck, conveyor belt or other mechanical. A pump truck will be paid as a separate line item. Minimum of 8 hours per delivery order. | 75 | HR | 100 | HR | ||||
| Line 10 | Concrete Placement-Pump Truck | This item will be for a pump truck to place Class B Concrete. This item also includes all material, labor, and oversight necessary for operating the pump truck and discharging the material into the polypropylene barrier wall apparatus. Minimum of 8 hours per delivery order will be paid. | 75 | HR | 75 | HR | ||||
| Line 11 | Traffic Control | Provide traffic control that meets most current standards in the KYTC Specifications, MUTCD and Standard Drawing. Flaggers will be incidental to this bid item. Any flaggers must have flagger certification. While traffic is still driving through workzone, vendor shall keep roadway clear of debris. | 15 | DAY | 25 | DAY | ||||
| Line 12 | 6" Minus Stone | aggregate that must pass through a six inch opening. | 1500 | TON | 1500 | TON | ||||
| Line 13 | Class III Channel Lining | Will be used for erosion control. Item includes material, labor and equipment to install channel lining. | 150 | TON | 150 | TON | ||||
| Line 14 | Class B Concrete | Must meet most current edition of KYTC Standard Specifications. Item will include materal and coordination for supplying concrete to project site. KYTC still reserves the right to opt to supply the fill material using other master agreements. | 1000 | CY | 1000 | CY | ||||
| Line 15 | Long Reach Trackhoe | Shall be a CAT 320 or equivalent. Shall be capable of reaching at least 40 feet. 8 hour minimum per delivery order will be paid. | 50 | HR | 50 | HR | ||||
| TOTAL | $0.00 | TOTAL | $0.00 |
# of Days to Start Work: # of Days to Start Work: