Bid Sheet 2026 Bag Wall District 1-10 IDIQ.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- RFB 605 2700000040 1
- Issued by
- Kentucky
About this file
This is a bid sheet for Request for Bid (RFB) 605 2700000040 issued by the Commonwealth of Kentucky for polypropylene barrier wall construction services across ten districts on an Indefinite Delivery/Indefinite Quantity (ID/IQ) basis. The project encompasses the construction and installation of polypropylene bag walls in varying heights (2 feet through 6 feet) across all ten districts, with estimated quantities including 50 linear feet of 2-foot bags, 50 linear feet of 3-foot bags, 250 linear feet of 4-foot bags, 100 linear feet of 5-foot bags, and 100 linear feet of 6-foot bags per district. The scope of work includes installation equipment operation, on-site technician services, mobilization of heavy equipment and bag deployment, labor, specialized equipment operation (concrete pump trucks, trackhoes, long-reach trackhoes, loaders, and dump trucks), traffic control, concrete and stone materials, and concrete transfer truck services. Vendors are permitted to bid on all line items for each district individually and are not required to bid all districts. Each district section requires vendors to provide unit prices, extended prices, and the number of days to start work.
The bid sheet format requires vendors to complete pricing for 19-20 line items across Districts 1 through 10, with estimated quantities remaining consistent across districts. Unit of measure specifications include linear feet for polypropylene bags, hours for labor and equipment operation, each for mobilization activities, days for traffic control, cubic yards for concrete, and tons for stone materials. Vendors must submit their actual bid prices and response times through the e-procurement system along with vendor identification and representative information. The bid sheet includes total cost fields for each district, allowing evaluation of costs on a district-by-district basis for ID/IQ contract formation and award decisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to Submit an Online Response - March 2023.pdf | ||
| Final_RFB_605_2700000040_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFB 605 2700000040 Polypropylene Barrier Wall Construction Districts 1-10 ID/IQ | |
| Vendor: | Vendor Rep: |
Instructions: Actual bid prices and response time must be entered on this bid sheet and uploaded into the e-procurement system. Vendors shall bid all line items for each district for which they wish to provide services. A vendor is not required to bid all districts.
| District 1 | District 2 | District 3 | |||||||||||
| Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | ||
| Line 1 | 2' Bags | 50 | LNFT | 50 | LNFT | 50 | LNFT | ||||||
| Line 2 | 3' Bags | 50 | LNFT | 50 | LNFT | 50 | LNFT | ||||||
| Line 3 | 4' Bags | 250 | LNFT | 250 | LNFT | 250 | LNFT | ||||||
| Line 4 | 5' Bags | 100 | LNFT | 100 | LNFT | 100 | LNFT | ||||||
| Line 5 | 6' Bags | 100 | LNFT | 100 | LNFT | 100 | LNFT | ||||||
| Line 6 | Installation Equipment | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 7 | On Site Technician | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 8 | Routine Mobilization Heavy Equipment | 2 | EA | 2 | EA | 2 | EA | ||||||
| Line 9 | Routine Mobilization Bag Deployment | 2 | EA | 2 | EA | 2 | EA | ||||||
| Line 10 | Laborer | 50 | HR | 50 | HR | 50 | HR | ||||||
| Line 11 | Concrete Pump Truck w/operator | 40 | HR | 40 | HR | 40 | HR | ||||||
| Line 12 | Trackhoe w/operator | 50 | HR | 50 | HR | 50 | HR | ||||||
| Line 13 | Long Reach Trackhoe w/operator | 30 | HR | 30 | HR | 30 | HR | ||||||
| Line 14 | Loader w/operator | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 15 | Traffic Control | 16 | DAY | 16 | DAY | 16 | DAY | ||||||
| Line 16 | Dump Truck w/operator | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 17 | Class B Concrete | 150 | CUYD | 150 | CUYD | 150 | CUYD | ||||||
| Line 18 | 6" Minus Stone | 250 | TON | 250 | TON | 250 | TON | ||||||
| Line 29 | Concrete Transfer Truck | 16 | HR | 16 | HR | 16 | HR |
TOTAL TOTAL TOTAL
# of Days to Start Work: # of Days to Start Work: # of Days to Start Work:
| District 4 | District 5 | District 6 | |||||||||||
| Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | ||
| Line 1 | 2' Bags | 50 | LNFT | 50 | LNFT | 50 | LNFT | ||||||
| Line 2 | 3' Bags | 50 | LNFT | 50 | LNFT | 50 | LNFT | ||||||
| Line 3 | 4' Bags | 250 | LNFT | 250 | LNFT | 250 | LNFT | ||||||
| Line 4 | 5' Bags | 100 | LNFT | 100 | LNFT | 100 | LNFT | ||||||
| Line 5 | 6' Bags | 100 | LNFT | 100 | LNFT | 100 | LNFT | ||||||
| Line 6 | Installation Equipment | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 7 | On Site Technician | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 8 | Routine Mobilization Heavy Equipment | 2 | EA | 2 | EA | 2 | EA | ||||||
| Line 9 | Routine Mobilization Bag Deployment | 2 | EA | 2 | EA | 2 | EA | ||||||
| Line 10 | Laborer | 50 | HR | 50 | HR | 50 | HR | ||||||
| Line 11 | Concrete Pump Truck w/operator | 40 | HR | 40 | HR | 40 | HR | ||||||
| Line 12 | Trackhoe w/operator | 50 | HR | 50 | HR | 50 | HR | ||||||
| Line 13 | Long Reach Trackhoe w/operator | 30 | HR | 30 | HR | 30 | HR | ||||||
| Line 14 | Loader w/operator | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 15 | Traffic Control | 16 | DAY | 16 | DAY | 16 | DAY | ||||||
| Line 16 | Dump Truck w/operator | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 17 | Class B Concrete | 150 | CUYD | 150 | CUYD | 150 | CUYD | ||||||
| Line 18 | 6" Minus Stone | 250 | TON | 250 | TON | 250 | TON | ||||||
| Line 19 | Concrete Transfer Truck | 16 | HR | 16 | HR | 16 | HR |
TOTAL TOTAL TOTAL
# of Days to Start Work: # of Days to Start Work: # of Days to Start Work:
| District 7 | District 8 | District 9 | |||||||||||
| Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | ||
| Line 1 | 2' Bags | 50 | LNFT | 50 | LNFT | 50 | LNFT | ||||||
| Line 2 | 3' Bags | 50 | LNFT | 50 | LNFT | 50 | LNFT | ||||||
| Line 3 | 4' Bags | 250 | LNFT | 250 | LNFT | 250 | LNFT | ||||||
| Line 4 | 5' Bags | 100 | LNFT | 100 | LNFT | 100 | LNFT | ||||||
| Line 5 | 6' Bags | 100 | LNFT | 100 | LNFT | 100 | LNFT | ||||||
| Line 6 | Installation Equipment | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 7 | On Site Technician | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 8 | Routine Mobilization Heavy Equipment | 2 | EA | 2 | EA | 2 | EA | ||||||
| Line 9 | Routine Mobilization Bag Deployment | 2 | EA | 2 | EA | 2 | EA | ||||||
| Line 10 | Laborer | 50 | HR | 50 | HR | 50 | HR | ||||||
| Line 11 | Concrete Pump Truck w/operator | 40 | HR | 40 | HR | 40 | HR | ||||||
| Line 12 | Trackhoe w/operator | 50 | HR | 50 | HR | 50 | HR | ||||||
| Line 13 | Long Reach Trackhoe w/operator | 30 | HR | 30 | HR | 30 | HR | ||||||
| Line 14 | Loader w/operator | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 15 | Traffic Control | 16 | DAY | 16 | DAY | 16 | DAY | ||||||
| Line 16 | Dump Truck w/operator | 16 | HR | 16 | HR | 16 | HR | ||||||
| Line 17 | Class B Concrete | 150 | CUYD | 150 | CUYD | 150 | CUYD | ||||||
| Line 18 | 6" Minus Stone | 250 | TON | 250 | TON | 250 | TON | ||||||
| Line 20 | Concrete Transfer Truck | 16 | HR | 16 | HR | 16 | HR |
TOTAL TOTAL TOTAL
| # of Days to Start Work: | # of Days to Start Work: | # of Days to Start Work: | |||||
| District 10 | |||||||
| Estimated Qty | UOM | Unit Price | Ext Price | ||||
| Line 1 | 2' Bags | 50 | LNFT | ||||
| Line 2 | 3' Bags | 50 | LNFT | ||||
| Line 3 | 4' Bags | 250 | LNFT | ||||
| Line 4 | 5' Bags | 100 | LNFT | ||||
| Line 5 | 6' Bags | 100 | LNFT | ||||
| Line 6 | Installation Equipment | 16 | HR | ||||
| Line 7 | On Site Technician | 16 | HR | ||||
| Line 8 | Routine Mobilization Heavy Equipment | 2 | EA | ||||
| Line 9 | Routine Mobilization Bag Deployment | 2 | EA | ||||
| Line 10 | Laborer | 50 | HR | ||||
| Line 11 | Concrete Pump Truck w/operator | 40 | HR | ||||
| Line 12 | Trackhoe w/operator | 50 | HR | ||||
| Line 13 | Long Reach Trackhoe w/operator | 30 | HR | ||||
| Line 14 | Loader w/operator | 16 | HR | ||||
| Line 15 | Traffic Control | 16 | DAY | ||||
| Line 16 | Dump Truck w/operator | 16 | HR | ||||
| Line 17 | Class B Concrete | 150 | CUYD | ||||
| Line 18 | 6" Minus Stone | 250 | TON | ||||
| Line 20 | Concrete Transfer Truck | 16 | HR |
TOTAL
# of Days to Start Work:
Sheet2
Sheet3