BID_SET_New_Hope_Road_Bridge_-_Plans.pdf

PDF 15 MB Posted

Attached to
New Hope Road Bridge at Grizzly Slough Replacement Project
Solicitation number
4664
Issued by
Sacramento County, San Francisco City, California

About this file

This is a bid set of plans and specifications for the New Hope Road Bridge Replacement project, prepared by the Sacramento County Department of Transportation and Community Services Agency in coordination with San Joaquin County. The project involves the complete replacement and widening of an existing bridge over Grizzly Slough, which is more than 90 years old and located on the southern border of Sacramento County. The work includes furnishing all necessary labor, materials, equipment, and incidental work to complete the project in strict conformance with specifications and applicable regulatory permits. The new bridge will feature 11-foot travel lanes bounded by bike lanes on both the north and south sides, with associated roadwork including shoulder work, rock slope protection (RSP) placement, and pavement striping. The project is funded under the Federal Highway Bridge Program (Project No. BRLS-5924 [190]) and includes construction of four access roads (northeast, northwest, southeast, and southwest) connecting to the main New Hope Road alignment, with work extending from station 14+98.9 to approximately station 21+00.

The bid set documents include comprehensive design plans spanning 29 sheets, containing cover sheets, detour plans, plan and profile views, typical sections, pavement delineation plans, tree stump removal plans, utility relocation details, and complete bridge structural plans including general plans, deck contours, foundation layouts, abutment details, pier layouts, slab reinforcement details, drainage systems, and utility support details. Geotechnical investigations are documented through logs of test borings at four locations (RW-13-001, RW-13-002, RW-13-003, and RW-13-006) with soil classifications and groundwater elevations established using NAVD88 vertical datum and NAD83 horizontal datum. The project specifications reference Caltrans standards for soil logging and classification, with Standard Penetration Tests performed in accordance with ASTM D 1586-99. Actual quantities of work are identified as approximations subject to variation at the discretion of the County, and bidders should note that groundwater elevations are subject to seasonal fluctuations that may affect construction conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAN JOAQUIN COUNTY

SACRAMENTO COUNTY

EL DORADO CO

TACOS

TRA

CON

CO

CO

SOLANO

CO

QU

IN

JO

A

SAN

YO

LO

220 CO

SAN JOAQUIN COUNTY

CO

SUTTER CO PLACER CO

SAC

RAM

ENT

O CO

UNT

Y

AMA

DOR

COU

NTY

SACRAMENTO COUNTY

PAYPHONEPEDESTRIAN PUSH BUTTONLIGHT POLESECURITY LIGHT

BOLLARDBUSH/SHRUBFLAGPOLEFIRE HYDRANT

FIRE DEPT 'Y' CONNECT

GAS METERGAS VALVEGAS BLOWOFF VALVE

SPRINKLER VALVE

SPRINKLER

TRAFFIC SIGNALUTILITY POLEWATER VALVEWATER METERWATER BLOWOFF VALVE

HEDGETS PULLBOXPULLBOX GUY ANCHORSEWER MANHOLESEWER CLEANOUTDRAIN INLETDRAIN MANHOLE

TELE MANHOLE TS CABINETTELE RISER HOSE BIBMONITOR WELL

YARD LIGHT

ELEC CABINET

SIGN MAILBOX

PROJECT

AT GRIZZLY SLOUGH

BRIDGE NO. 24C0624

CS1 CS1

CO

VE

R

SH

EE

T

LOCATION

PROJECT

LOCATION

D E

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

DEPARTMENT OF TRANSPORTATION

COMMUNITY SERVICES AGENCY

NEW HOPE ROAD

BRIDGE REPLACEMENT

BID SET

FEDERAL HIGHWAY BRIDGE PROGRAM

PROJECT NO. BRLS-5924 (190)

SAN JOAQUIN COUNTY

SACRAMENTO COUNTY

PROJECT

LOCATION

PROJECT LOCATION

PLAN LEGEND:

SIGN LEGEND:

M4-10 (LT)

SC

R11-4

R1 1-

2B

M 4-

(R

T)

S1+ S2C

S1+ S2C

R1 1-

2B

R1 1-

S1+S2B+SC3

M 4-

(L

T) S2

B

M4-10 (LT)

S2C

S1W20-2

W

-2 S3

C

S1+S2A+M4-10 (LT)

SC3

S1+S2C

S1 +S

2C

M4-10 (RT)

M 4-

(L

T) S2

A

M4-10 (RT)

S2C S2

B M

4-

(R T)

S1

M4-8A

S1+S2B

S1 +S

2B

S1 -S

2A W

-2

W

-2 S1

-S 2C

W

-3

M4-8A W20-3

D E

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

DP1 DP1

DE

TO

UR

P

LA

N

NOTES:

D E

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

TO

K

OS

T-O

RR

R

OA

D

/ C

ITY

O F G

AL

T /

C A-

TO

TH

OR

NT

ON

R

OA

D

/ S

AN

JO

AQ

UI

N

CO

UN

TY

I-5

16+00 17+0015+00 18+00

PP1 PP3

PL

AN

P

RO

FIL

E

CONSTRUCTION NOTES

21+00

NOTES LEGEND

12+00 13+0011+00 14+00 19+00 20+00

NEW HOPE ROAD

CL ELEV

GRIZZLY SLOUGH

NEW HOPE ROAD

NE

A

CC

ES

S

RO

AD

NW

A

CC

ES

S

RO

AD

SW

ACCESS ROAD

SE ACCESS ROAD

Dw y 1

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

10+00

PP2 PP3

PL

AN

P

RO

FIL

E

10+20 10+40 10+60

DW1 SOUTHWEST ACCESS ROAD NORTHWEST ACCESS ROAD

10+00 10+20 10+40 10+60 10+00 10+20 10+40 10+60

ALIGNMENT

CURVE TABLE

CURVE � RADIUS DELTA LENGTH

C1 19.00 2�.13 9.00

C2 16.00

41.08 11.4�

EDGE OF PAVEMENT

CURVE TABLE

CURVE � RADIUS DELTA LENGTH

C� 13.00

16.02 3.64

C6 2�.00 2�.13 11.84

C� 10.00 2�.�8 4.81

C10 10.00 ��.20 9.98

C11 1�.00 �1.4� 13.4�

C12 22.00 �.92 3.04

C13 1�.00 30.2� �.92

SW ACCESS ROAD

NE

W

H

OP

E R

OA

D

NW ACCESS ROAD

NE

W

H

OP

E R

OA

D

Dwy 1

NE

W

H

OP

E R

OA

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

10+00

PP3 PP3

PL

AN

P

RO

FIL

E

10+20 10+40 10+60

SOUTHEAST ACCESS ROAD NORTHEAST ACCESS ROAD

10+00 10+20 10+40 10+60 10+80

ALIGNMENT

CURVE TABLE

CURVE � RADIUS DELTA LENGTH

C3 8.00

25.88 3.61

C4 25.00

9.83 4.29

EDGE OF PAVEMENT

CURVE TABLE

CURVE � RADIUS DELTA LENGTH

C8 15.00

25.88 6.�8

C9 10.00 �3.53 12.83

SE ACCESS ROAD

NE

W

H

OP

E R

OA

D

NE ACCESS ROAD

NE

W

H

OP

E R

OA

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

TS1 TS2

TY

PI

CA

L S

EC

TIO

NS

NOTES

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

TS2 TS2

TY

PI

CA

L S

EC

TIO

NEW HOPE ROAD

NW

A

CC

ES

S

RO

AD

SW

ACCESS ROAD

Dw y 1

GRIZZLY SLOUGH

NE

A

CC

ES

S

RO

AD

SE ACCESS ROAD

D E

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

LEGEND

M

AT

CH

LIN

E:

SE

E B

EL

OW

, S

TA

6+

M

AT

CH

LIN

E:

SE

E A

BO

VE

, S

TA

6+

PD1 PD1

PA

VE

M

EN

T D

EL

IN

EA

TIO

N

PL

AN

GENERAL STRIPING & PAVEMENT MARKING NOTES:

Docusign Envelope ID: 28A13BB8-34AE-4449-8658-A40DC5B038ED

12/15/2025

1 2 3 5 7 8

17 214

18 19 33

40B

9 10 11

13 14 25 26 27

31 32

2322 24 30

48 49 50 53

89 94

96 97

90 92

GRIZZLY SLOUGH

NEW HOPE ROAD

NE

A

CC

ES

S

RO

AD

NW

ACCESS ROAD

SW

ACCESS ROAD

SE ACCESS ROAD

Dw y 1

95A 96A

53A

21A 33A

37A 40A

13A 27A 78A

74C

74A

74B 88A

94A

88686663

73A

D E

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

P U

B

LI

C W

O R

K S

IN

FR

A

S

TR

U C

TU

R

E A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

CO

UN

TY

O

F S

AC

RA

M

EN

TO

C

OM

M

UN

ITY

S

ER

VI

CE

S

AG

EN

CY

TI1 TI1

TR

EE

S

TU

M P

RE

M

OV

AL

P

LA

N

TO

O

RR

R

OA

D

(C

ITY

O F G

AL

T)

TO

S

AN

JO

AQ

UI

N

CO

UN

TY

LI

NE

LEGEND:

TREE INVENTORY:

GRIZZLY SLOUGH

NEW HOPE ROAD

NE

A

CC

ES

S

RO

AD

NW

ACCESS ROAD

SW

ACCESS ROAD

SE ACCESS ROAD

Dw y 1

D E

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

UR1 UR1

UT

ILI

TY

R

EL

OC

AT

IO

N

TO

O

RR

R

OA

D

(C

ITY

O F G

AL

T)

TO

S

AN

JO

AQ

UI

N

CO

UN

TY

LI

NE

1 1

1 1

1 1 2 1

1 1 1

LEGEND CONSTRUCTION NOTES

2 1

1 11

2 1

RO

CK

S

LO

PE

P

RO

TE

CT

IO

N

RP1

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

RP1

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

GE

NE

RA

L P

LA

N

S1

12 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

DE

CK

C

ON

TO

UR

S

S2

13 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

FO

UN

DA

TIO

N

PL

AN

S3

14 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

AB

UT

M

EN

T L

AY

OU

T

S4

15 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

AB

UT

M

EN

T D

ET

AI

LS

N O.

S5

16 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

AB

UT

M

EN

T D

ET

AI

LS

N O.

S6

17 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

PI

ER

LA

YO

UT

S7

18 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

TY

PI

CA

L S

EC

TIO

N

S8

19 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

LO

NG

ITU

DI

NA

L S

EC

TIO

N

S9

20 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

SL

AB

R

EI

NF

OR

CE

M

EN

T D

ET

AI

LS

S10

21 29

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

DR

AI

NA

GE

D

ET

AI

LS

S11

22 29

(P) 6" GT

PIPE

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

C0

4)

S15

UT

ILI

TY

S

UP

PO

RT

D

ET

AI

LS

S12

23 29

3.5

3.7

3.7

3.7

RW-13-006

RW-13-001 RW-13-003

RW-13-002

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

CX

XX

X)

S15NorthPLAN

SCALE: 1" = 20'

NOTES:

1. Field classification of soils was in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010). See Log of Test Borings No. 2, "Soil Legend".

2. Standard Penetration tests were performed in accordance with ASTM D 1586-99 using a hammer operated with an automated drop system. Drill rods were 1 5/8-inch diameter "A"-rods; sampler was driven with brass liners.

3. "2.4 inch sampler": ID=2.4 inch, OD=2.9 inch. "2.0 inch sampler": ID=2.0 inch, OD=2.5 inch. Both driven in same manner as SPT ("1.4 inch") sampler.

4. If laboratory tests are not shown as being performed, the soil descriptions presented on the LOTB are based solely on the visual practices described in this Manual.

5. The length of each sampled interval is shown graphically on the boring log. Whole number blow counts ("N") represent the "standard penetration resistance" interval in accordance with the Caltrans Soil & Logging, Classification, and Presentation Manual (June 2010). Where less than 0.5 feet of penetration is achieved, the blow count shown is for that fraction of the "standard penetration resistance" interval actually penetrated.

6. Consistency of soils shown in ( ) where estimated.

7. Groundwater surface (GWS) elevations in the borings indicated on the Log of Test Boring Sheets reflect the fluid level in the borings on the specified date.

8. Groundwater elevations are subject to seasonal fluctuations and may occur at higher or lower elevations depending on the conditions at any particular time.

9. This LOTB sheet was prepared in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010)

BENCH MARK

N.G.S. PT. New Hope (AE9878) Vertical Datum: NAVD88 Horizontal Datum: NAD83

N 1849784.8 E 6729881.3

N 1849681.8 E 6729881.3

N 1849681.8 E 6730247.9

N 1849784.8 E 6730247.9

Borehole Location Table Hole ID Alignment Name Station and Offset

RW-13-001 "NHR" Line 15+75, Rt. 5.03' RW-13-002 "NHR" Line 16+50, Lt. 5.03' RW-13-003 "NHR" Line 17+46.8, Rt. 7.78' RW-13-006 "NHR" Line 14+98.9, Lt. 6.22'

LO

G

OF

TE

ST

B

OR

IN

GS

O F 3

S13

24 29

-60

-20

-40

-30

-50

-80

-100

-90

-110

-70

-10

-20

-40

-30

-50

-10

-60

-80

-100

-90

-110

-70

-120-120

NOTES:

1. Field classification of soils was in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010). See Log of Test Borings No. 2, "Soil Legend".

2. Standard Penetration tests were performed in accordance with ASTM D 1586-99 using a hammer operated with an automated drop system. Drill rods were 1 5/8-inch diameter "A"-rods; sampler was driven with brass liners.

3. "2.4 inch sampler": ID=2.4 inch, OD=2.9 inch. "2.0 inch sampler": ID=2.0 inch, OD=2.5 inch. Both driven in same manner as SPT ("1.4 inch") sampler.

4. If laboratory tests are not shown as being performed, the soil descriptions presented on the LOTB are based solely on the visual practices described in this Manual.

5. The length of each sampled interval is shown graphically on the boring log. Whole number blow counts ("N") represent the "standard penetration resistance" interval in accordance with the Caltrans Soil & Logging, Classification, and Presentation Manual (June 2010). Where less than 0.5 feet of penetration is achieved, the blow count shown is for that fraction of the "standard penetration resistance" interval actually penetrated.

6. Consistency of soils shown in ( ) where estimated.

7. Groundwater surface (GWS) elevations in the borings indicated on the Log of Test Boring Sheets reflect the fluid level in the borings on the specified date.

8. Groundwater elevations are subject to seasonal fluctuations and may occur at higher or lower elevations depending on the conditions at any particular time.

9. This LOTB sheet was prepared in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010)

PROFILE

HORIZ. SCALE: NO SCALE

VERT. SCALE: 1" = 10'

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

CX

XX

X)

S15

LO

G

OF

TE

ST

B

OR

IN

GS

O F 3

S14

25 29

-60

-20

-40

-30

-50

-80

-100

-90

-110

-70

-10

-20

-40

-30

-50

-10

-60

-80

-100

-90

-110

-70

NOTES:

1. Field classification of soils was in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010). See Log of Test Borings No. 2, "Soil Legend".

2. Standard Penetration tests were performed in accordance with ASTM D 1586-99 using a hammer operated with an automated drop system. Drill rods were 1 5/8-inch diameter "A"-rods; sampler was driven with brass liners.

3. "2.4 inch sampler": ID=2.4 inch, OD=2.9 inch. "2.0 inch sampler": ID=2.0 inch, OD=2.5 inch. Both driven in same manner as SPT ("1.4 inch") sampler.

4. If laboratory tests are not shown as being performed, the soil descriptions presented on the LOTB are based solely on the visual practices described in this Manual.

5. The length of each sampled interval is shown graphically on the boring log. Whole number blow counts ("N") represent the "standard penetration resistance" interval in accordance with the Caltrans Soil & Logging, Classification, and Presentation Manual (June 2010). Where less than 0.5 feet of penetration is achieved, the blow count shown is for that fraction of the "standard penetration resistance" interval actually penetrated.

6. Consistency of soils shown in ( ) where estimated.

7. Groundwater surface (GWS) elevations in the borings indicated on the Log of Test Boring Sheets reflect the fluid level in the borings on the specified date.

8. Groundwater elevations are subject to seasonal fluctuations and may occur at higher or lower elevations depending on the conditions at any particular time.

9. This LOTB sheet was prepared in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010)

PROFILE

HORIZ. SCALE: NO SCALE

VERT. SCALE: 1" = 10'

P

A R

TM

E

N T

O F

TR

A

N S

P O

R

TA

TI

O

N C

O U

N

TY

O F

S A

C R

A M

E N

TO

P

U B

LI

C

W O

R K

S

IN

FR

A S

TR

U

C

TU

R E

A G

E N

C Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H (B

R

CX

XX

X)

S15

LO

G

OF

TE

ST

B

OR

IN

GS

O F 3

S15

26 29

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

XS1 XS3

IN

TE

RV

AL

S

EC

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

XS2 XS3

IN

TE

RV

AL

S

EC

P A

R

TM

E N

T O

F

TR

A N

S P

O R

TA

TI

O N

C O

U N

TY

O

F S

A C

R A

M E

N

TO

C O

M M

U N

IT

Y

S E

R V

IC

E

S A

G E

N C

Y

SCALE

DRAWING

DA

TE

RE

VI

SI

ON

S

PREPARED BY

AP

PR

SHEET

DATE

POCKET NO. FOLDER NO. PLANFILE NO.

NE

W

H

OP

E R

OA

D

BR

ID

GE

R

EP

LA

CE

M

EN

T

NEW HOPE ROAD BRIDGE REPLACEMENT

AT

G

RI

ZZ

LY

S

LO

UG

H

XS3 XS3

IN

TE

RV

AL

S

EC

Sheets and Views
CS1

File details come from the government source that posted it. Updated .