Bid_Scope_Materials_List.docx
DOCX document 18 KB Posted
- Attached to
- NED Home Rehab - 421 Petty Dr
- Solicitation number
- NED-S-421-021826
- Issued by
- Escambia County, Florida
About this file
This Bid Scope Materials List document outlines the specific materials and installation requirements for a residential rehabilitation project at 421 Petty Drive in Pensacola, sponsored by Escambia County, Florida through the State Housing Improvement Program (SHIP). The scope encompasses comprehensive home improvements including kitchen fixtures (Delta faucet, GE range and cooktop, GE microwave and hood vent, and Whirlpool refrigerator), bathroom fixtures (Delta and American Standard faucets, American Standard toilet, and Sterling tub surround), flooring (Shaw luxury vinyl plank and carpet with pad), HVAC systems, roofing materials (CertainTeed Landmark), windows, lighting fixtures (Hampton Bay and Commercial Electric), a 50-gallon A.O. Smith hot water heater, and Hunter ceiling fan. The mandatory pre-quote meeting is scheduled for February 25, 2026, at 11:00 AM on-site, with questions due by March 4, 2026, at 1:00 PM, and quotes due March 5, 2026, by 1:00 PM through the OpenGov Procurement portal. The project must be completed within 60 days from notice to proceed.
The bid scope establishes specific installation standards requiring new braided supply lines for plumbing fixtures, proper finishing for trim work including putty, caulk, and paint, complete drywall finishing with tape, mud, texture, and paint, square-edged laminate countertops with 4-inch backsplash, and cabinetry constructed from plywood or better with solid hardwood fronts and no particle board. All electrical appliances must be Energy Star approved with LED bulbs, and contractors are obligated to use like, similar, or equal valued products as specified. Eligible bidders must be licensed, insured, and in good standing with Escambia County, possess EPA RRP Renovator certification, and maintain $1,000,000 Commercial General Liability insurance naming Escambia County as certificate holder. Projects valued at $25,000 or higher require 100% Performance and Payment Bonds. Pricing is structured as lump sum payment at project completion for bids under $15,000, with 40% draw available for bids exceeding $15,000 once 50% work completion is confirmed. Liquidated damages are assessed at $150.00 per day for schedule delays, and Escambia County reserves the right to award emergency line items for roofing and septic/sewer services separately.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NED_Home_Rehab_-_421_Petty_Dr.pdf | ||
| Bid_Scope_Materials_List.docx | DOCX document | |
| SCOPE_-_421_Petty_Dr_-_Johnston_T.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Scope Materials List
| Kitchen Sink | Double bowl aluminum drop-in. | ||
| Kitchen Faucet | Delta, Savile pull-down | ||
| Range | GE, JB645RKSS | ||
| Cooktop | GE, JP3030DJBB | ||
| Micro-Vented | GE, JVM3160RFSS | ||
| Hood Vent | Broan, BCSEK 30-in, 250cfm | ||
| Refrigerator | Whirlpool, WRT348FMES | ||
| Vanity Sink | Round ceramic drop-in | ||
| Bathroom Faucet | Delta, Woodhurst 1.5-gpm centerset | ||
| Tub Faucet | Delta, T13420-SS | ||
| Shower Faucet | Delta, T13220-SS | ||
| Tub | American Standard Solar, (60x30) | ||
| Tub Surround | Sterling, 61044100-0 (60x31.5) with corresponding tub | ||
| Shower | Aquatic, AX160304PS-WH | ||
| Toilet | American Standard Cadet 3, comfort height, elongated 1.28-GPF | ||
| Bathroom Fan | Broan QK60s, 60cfm | ||
| Flooring – LVP | Shaw, Torino Plus Floorte 500RG | ||
| Carpet | Shaw, Burghley 2 - 60oz. – 6lbs. Pad | ||
| Hot Water Heater | A.O. Smith Signature 900, 50-gallon | ||
| Ceiling Fan | Hunter, Anisten 52-in | ||
| Kitchen Light | Commercial Electric, 54663141 | ||
| Bathroom Light | Hampton Bay, V1124-79 | ||
| Hall Light | Hampton Bay, FZP8012-A | ||
| Coach Light | Hampton Bay, 245 746 | ||
| Ext. Ceiling Light | Hampton Bay, WB0325 | ||
| Light Bulbs | LED | ||
| Roofing | CertainTeed, Landmark | ||
| Gutter | 6” Aluminum with 4” downspouts |
Windows HVAC seer
· When repairing or replacing plumbing fixtures always use new braded supply lines.
· When repairing or replacing trim always putty, caulk, and paint.
· When repairing or replacing drywall always tape, mud, texture, and paint.
· When repairing or replacing electrical wiring always repair the drywall.
· Counter tops are to be square-edged, laminate with a 4” backsplash.
· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.
· Moving furniture is the contractor’s responsibility, its contents are the homeowners.
· All electrical appliances are to be EnergyStar approved with LED bulbs.
· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.
“Contractors are obligated to use like, similar, or equal valued products”.
File details come from the government source that posted it. Updated .