Bid_Scope_Materials_List.docx

DOCX document 18 KB Posted

Attached to
NED Home Rehab - 703 Montclair Rd
Solicitation number
NED-S-703-110926
Issued by
Escambia County, Florida

About this file

This is a Bid Scope Materials List document for a residential rehabilitation project located at 703 Montclair Road in Escambia County, Florida. The project is managed by NED (Northeast Florida Community Development Corporation), with Scott Sanchez serving as the primary contact for inquiries at 850-595-0827 or jssanchez@myescambia.com. The scope of work encompasses residential rehabilitation services, and only licensed, insured general contractors in good standing with Escambia County are eligible to submit bids. New contractors must provide a letter of insurability demonstrating compliance with county requirements. Bids must be submitted through the OPENGOV platform, and all submissions received through other channels will not be accepted. Escambia County reserves the right to award line items individually for emergency situations, specifically limited to roofing and septic or sewer services.

The document does not specify pricing terms, contract duration, renewal options, site visit dates, bidders' conferences, response deadlines, or award dates within the materials list. No set-asides are identified in this file. Funding sources, amounts, and other financial details are not provided in this scope materials documentation. Contractors should contact the project manager directly for additional information regarding specific materials required, quantities, specifications, and any other project requirements not contained within this file.

View the file

Other files

File Type Posted
NED_Home_Rehab_-_703_Montclair_Rd.pdf PDF
SCOPE_-_SHIP_-_703_Montclair_Rd_-_Vance_M.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.

File details come from the government source that posted it. Updated .