Bid_Schedule_Wiggins_and_Doctors_Pass.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- 26-8661
- Issued by
- Collier County, Florida
About this file
Bid Schedule Summary for Wiggins and Doctors Pass Dredging Project
This is a bid schedule document for Collier County, Florida's Wiggins and Doctors Pass Dredge 2026 project (Bid No. 26-8661), a grant-funded maintenance dredging initiative. The project encompasses hydraulic dredging operations at two separate locations: Wiggins Pass, involving the dredging and placement of approximately 81,200 cubic yards of sand on beaches, and Doctors Pass, involving the dredging and placement of approximately 34,400 cubic yards of sand along Naples Beach. The scope of work for Wiggins Pass includes mobilization and demobilization, dredging with beach disposal, installation of 15 navigational channel markers and 1 manatee marker, environmental control with turbidity testing, construction surveys, final tilling and grading, debris removal, and restoration of construction access. The Doctors Pass scope includes similar work with 5 temporary marker removals and reinstallations, dredging of 34,400 cubic yards, and comparable support services. Sealed bids are due March 30, 2026, at 3:00 p.m. local time. The selected contractor must commence work within five calendar days of receiving the Notice to Proceed (estimated April 24, 2026) and achieve substantial completion within 90 calendar days, with final completion within 120 days total.
The bid schedule identifies owner allowances of $171,025.00 for Wiggins Pass and $75,900.00 for Doctors Pass to address unforeseen conditions, with the total anticipated project budget at $2,800,000.00. These allowances will be expended only at the owner's direction through change orders with proper documentation of time and materials. The county will provide navigational channel markers for Wiggins Pass, while the contractor must provide manatee marker materials for the same location. Qualified bidders must demonstrate prior experience with hydraulic dredging and coastal inlet dredging, provide five project references of similar magnitude completed within the past five years, identify specific hydraulic dredge equipment (minimum 14-inch dredge capable of pumping at least 6,000 feet with certified Draft Quality Management equipment), possess current Florida contractor licenses, and comply with the Florida Trench Safety Act. Award will be made to the lowest responsive and responsible bidder, with the contract subject to federal oversight and FEMA Public Assistance requirements, including prevailing wage standards and compliance with 2 CFR Part 200.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| 2026 COLLIER COUNTY MAINTENANCE WIGGINS PASS AND DOCTORS PASS DREDGING PROJECT |
| CONSTRUCTION ITB: 26-8661 |
| BID SCHEDULE |
A. Wiggins Pass Maintenance Dredging
Item Item Description Estimated Quantity Unit Unit Cost Total Cost
1 Mobilization and Demobilization 1 Lump Sum $ - 0
2 Dredge Wiggins Pass Channel with Beach Disposal (See Note I & V) 81,200 CY $ - 0
3a Navigational Channel Marker Install (See Note II) 15 Each $ - 0
3b Manatee Marker Installation (See Note III) 1 Each $ - 0
4 Environmental Control including Turbidity Testing 1 Lump Sum $ - 0
5 Construction Surveys (Pre, Post and Interim) 1 Lump Sum $ - 0
6 Final Tilling and Grading 1 Lump Sum $ - 0
7 Debris Removal (See Note VI) 1 20 cy container $ - 0
8 Restoration of Construction Access 1 Lump Sum $ - 0
Subtotal $ - 0
Subtotal Bid Item A. Wiggins Pass $ - 0
B. Doctors Pass Maintenance Dredging
Item Item Description Estimated Quantity Unit Unit Cost Total Cost
1 Mobilization and Demobilization 1 Lump Sum $ - 0
2 Dredge Doctors Pass Settling Basin, Turning Basin, and West Channel with Beach Disposal (See Note I & V) 34,400 CY $ - 0
3 Temporary Removal and Re-Install Navigational Channel Marker Install (See Note IV) 5 Each $ - 0
4 Environmental Control including Turbidity Testing 1 Lump Sum $ - 0
5 Construction Surveys (Interim & Post-Construction, See Note IV) 1 Lump Sum $ - 0
6 Final Tilling and Grading 1 Lump Sum $ - 0
7 Debris Removal (See Note VI) 1 20 cy container $ - 0
8 Restoration of Construction Access 1 Lump Sum $ - 0
Subtotal $ - 0
| Subtotal Bid Item B. Doctors Pass | $ - 0 |
| Total Bid (Section A + Section B + Allowances | $ - 0 |
* Staff has allocated $171,025.00 for section A (Wiggins Pass Maintenance Dredging)- for Owners Use as Directed.
Staff has allocated $75,900.00 for section b (Doctors Pass Maintenance Dredging) - for Owners Use as Directed. These Allowances will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.
| Notes: |
| I. Quantity is estimated; final quantity based on results of the pre-construction survey. |
| II. Includes replacement of removed markers or installation of new makers at Wiggins Pass (OWNER to provide materials). |
| III. Includes replacement of removed manatee markers or installation of new makers at Wiggins Pass (CONTRACTOR to provide materials). |
| IV. Includes removal and re-installation of markers temporarily removed for construction purposes at Doctors Pass |
| V. Includes measures to ensure sand placed on the beach greater than 0.5" diameter does not exceed 5% through the use of |
screen boxes, raking, and/or other means as determined by the contractor. (Ref. Technical Spec. 11.4)
VI. Potential debris from storms. (Re. Technical Spec. 8.3)