Bid_Schedule_Wiggins_and_Doctors_Pass.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Wiggins and Doctors Pass Dredge 2026 - Grant Funded
Solicitation number
26-8661
Issued by
Collier County, Florida

About this file

This is a bid schedule for Collier County, Florida's Wiggins and Doctors Pass Dredge 2026 project (ITB 26-8661), a grant-funded maintenance dredging initiative. The project encompasses hydraulic dredging operations at two separate locations: Wiggins Pass, involving dredging and beach disposal of approximately 81,200 cubic yards of sand, and Doctors Pass, involving dredging and beach disposal of approximately 34,400 cubic yards of sand. Wiggins Pass work includes mobilization and demobilization, channel dredging with beach disposal, installation of 15 navigational channel markers and 1 manatee marker, environmental controls including turbidity testing, pre-, post-, and interim construction surveys, final tilling and grading, debris removal from one 20-cubic-yard container, and restoration of construction access. Doctors Pass work includes similar components with 34,400 cubic yards of dredging in the settling basin, turning basin, and west channel, temporary removal and reinstallation of 5 navigational channel markers, interim and post-construction surveys only, and the same environmental and site restoration requirements. Sealed bids are due March 30, 2026, at 3:00 p.m. local time through the county's online procurement portal. The selected contractor must commence work within five calendar days of receiving the Notice to Proceed (estimated April 24, 2026) and achieve substantial completion within 90 calendar days from commencement, with final completion required within 120 days total; liquidated damages of $2,667.00 per calendar day apply for failure to meet the substantial completion deadline.

The bid schedule includes owner allowances of $171,025.00 for Wiggins Pass maintenance dredging and $75,900.00 for Doctors Pass maintenance dredging, designated for the owner's use as directed to accomplish work due to unforeseen conditions. These allowances are not guaranteed payments and will be expended only through change orders with proper time and materials documentation. The anticipated project budget is $2,800,000.00. Key specifications include measures to ensure beach-compatible sand placement with no more than 5 percent material exceeding 0.5 inches in diameter, achieved through screening boxes, raking, or other contractor-determined methods. The County will provide navigational channel markers for Wiggins Pass, while the contractor must provide manatee marker materials. Dredged material quantities are estimated, with final quantities determined by pre-construction survey results. The project is subject to federal oversight under FEMA Public Assistance and requires compliance with 2 CFR Part 200, prevailing wage standards, Department of Environmental Protection monitoring standards, and all applicable permit requirements including marine turtle and shorebird protection protocols.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

2026 COLLIER COUNTY MAINTENANCE WIGGINS PASS AND DOCTORS PASS DREDGING PROJECT
CONSTRUCTION ITB: 26-8661
BID SCHEDULE

A. Wiggins Pass Maintenance Dredging

Item Item Description Estimated Quantity Unit Unit Cost Total Cost

1 Mobilization and Demobilization 1 Lump Sum $ - 0

2 Dredge Wiggins Pass Channel with Beach Disposal (See Note I & V) 81,200 CY $ - 0

3a Navigational Channel Marker Install (See Note II) 15 Each $ - 0

3b Manatee Marker Installation (See Note III) 1 Each $ - 0

4 Environmental Control including Turbidity Testing 1 Lump Sum $ - 0

5 Construction Surveys (Pre, Post and Interim) 1 Lump Sum $ - 0

6 Final Tilling and Grading 1 Lump Sum $ - 0

7 Debris Removal (See Note VI) 1 20 cy container $ - 0

8 Restoration of Construction Access 1 Lump Sum $ - 0

Subtotal $ - 0

Subtotal Bid Item A. Wiggins Pass $ - 0

B. Doctors Pass Maintenance Dredging

Item Item Description Estimated Quantity Unit Unit Cost Total Cost

1 Mobilization and Demobilization 1 Lump Sum $ - 0

2 Dredge Doctors Pass Settling Basin, Turning Basin, and West Channel with Beach Disposal (See Note I & V) 34,400 CY $ - 0

3 Temporary Removal and Re-Install Navigational Channel Marker Install (See Note IV) 5 Each $ - 0

4 Environmental Control including Turbidity Testing 1 Lump Sum $ - 0

5 Construction Surveys (Interim & Post-Construction, See Note IV) 1 Lump Sum $ - 0

6 Final Tilling and Grading 1 Lump Sum $ - 0

7 Debris Removal (See Note VI) 1 20 cy container $ - 0

8 Restoration of Construction Access 1 Lump Sum $ - 0

Subtotal $ - 0

Subtotal Bid Item B. Doctors Pass$ - 0
Total Bid (Section A + Section B + Allowances$ - 0

* Staff has allocated $171,025.00 for section A (Wiggins Pass Maintenance Dredging)- for Owners Use as Directed.

Staff has allocated $75,900.00 for section b (Doctors Pass Maintenance Dredging) - for Owners Use as Directed. These Allowances will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change.

Notes:
I. Quantity is estimated; final quantity based on results of the pre-construction survey.
II. Includes replacement of removed markers or installation of new makers at Wiggins Pass (OWNER to provide materials).
III. Includes replacement of removed manatee markers or installation of new makers at Wiggins Pass (CONTRACTOR to provide materials).
IV. Includes removal and re-installation of markers temporarily removed for construction purposes at Doctors Pass
V. Includes measures to ensure sand placed on the beach greater than 0.5" diameter does not exceed 5% through the use of

screen boxes, raking, and/or other means as determined by the contractor. (Ref. Technical Spec. 11.4)

VI. Potential debris from storms. (Re. Technical Spec. 8.3)