Bid_Schedule.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- CTC ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L3925Q0084
About this file
The provided file is a Bid Schedule for a roofing replacement project at the California Trail Center in Hunter, Nevada, issued by the Department of the Interior Bureau of Land Management Nevada Region. The bid schedule details a comprehensive roof replacement scope, including 1,245 square feet of roofing work involving multiple layers and components such as air/vapor barrier, rigid insulation, gypsum roof board, and a 60-mil PVC roof membrane in tan color.
Key bid items include removal of the existing roof system, installation of new roofing materials, parapet wall flashing, metal drip edge, PVC drainable walkway, and a cricket installation at the southeast Corner. The bid schedule offers a base roof replacement and an optional Bid Option 1 for drainage cricket replacement, with line items for mobilization/demobilization and various installation components. The solicitation number is 140L3925Q0084, and the total project cost is currently unpriced (all line items show $0), suggesting this is a preliminary bidding document awaiting contractor pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3925Q0084_Amd_0001.pdf | ||
| B09_Updated_Eval_Criteria_0001.docx | DOCX document | |
| B03_DBA_Wage_Determination.pdf | ||
| Sol_140L3925Q0084.pdf | ||
| A06_Drawings.pdf | ||
| A04_SOW.docx | DOCX document | |
| A06_Specifications.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Items
| Project: | Roofing Replacement (furnish and install new roofing materials) |
| Site: | California Trail Center, Hunter Nevada |
| Item No. | Description | Qty. | Unit | Unit Cost | Total |
| 1 | Mobilization/De-Mobilization | 1 | Lump Sum | $ - 0 | |
| 2 | Removal of Entire Existing Roof System (including but not limited to Parapet Wall Coping, Roof Membrane, Roof Cover Board, Roof Insulation, Standing Seam Metal Roof, and Roof Air Barrier) | 1 | Lump Sum | $ - 0 | |
| 3 | Installed Air/Vapor Barrier (Labor and Materials) | 1245 | SF | $ - 0 | |
| 4 | Installed Rigid Insulation (Labor and Materials) | 1245 | SF | $ - 0 | |
| 5 | Installed noncombustible gypsum roof board (Labor and Materials) | 1245 | SF | $ - 0 | |
| 6 | Installed New Single Ply TAN 60-MIL PVC Roof Membrane including seam welding and incidental work (Labor and Materials) | 1245 | SF | $ - 0 | |
| 7 | Installation of Parapet Wall Flashing & Metal Drip Edge including coping and necessary tie-ins (Labor and Materials) | 80 | LF | $ - 0 | |
| 8 | PVC Drainable Walkway (Labor and Materials) | 850 | SF | $ - 0 | |
| 9 | Southeast Corner Cricket Installation (Labor and Materials) | 44 | SF | $ - 0 | |
| 10 | BID OPTION 1: Drainage Cricket Replacement | 280 | SF | $ - 0 |
Furnish and Install New Roof Total $ - 0
Tonopah FO Roofing Replacement
File details come from the government source that posted it. Updated .