Bid_Schedule.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
CTC ROOF REPLACEMENT Federal contract opportunity
Solicitation number
140L3925Q0084
Issued by
Department of the Interior Bureau of Land Management Nevada Region

About this file

The provided file is a Bid Schedule for a roofing replacement project at the California Trail Center in Hunter, Nevada, issued by the Department of the Interior Bureau of Land Management Nevada Region. The bid schedule details a comprehensive roof replacement scope, including 1,245 square feet of roofing work involving multiple layers and components such as air/vapor barrier, rigid insulation, gypsum roof board, and a 60-mil PVC roof membrane in tan color.

Key bid items include removal of the existing roof system, installation of new roofing materials, parapet wall flashing, metal drip edge, PVC drainable walkway, and a cricket installation at the southeast Corner. The bid schedule offers a base roof replacement and an optional Bid Option 1 for drainage cricket replacement, with line items for mobilization/demobilization and various installation components. The solicitation number is 140L3925Q0084, and the total project cost is currently unpriced (all line items show $0), suggesting this is a preliminary bidding document awaiting contractor pricing.

View the file

Other files for this federal contract opportunity

Other files attached to CTC ROOF REPLACEMENT, newest first.
File Type Posted
Sol_140L3925Q0084_Amd_0001.pdf PDF
B09_Updated_Eval_Criteria_0001.docx DOCX document
B03_DBA_Wage_Determination.pdf PDF
Sol_140L3925Q0084.pdf PDF
A06_Drawings.pdf PDF
A04_SOW.docx DOCX document
A06_Specifications.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Items

Project:Roofing Replacement (furnish and install new roofing materials)
Site:California Trail Center, Hunter Nevada
Item No.DescriptionQty.UnitUnit CostTotal
1Mobilization/De-Mobilization1Lump Sum$ - 0
2Removal of Entire Existing Roof System (including but not limited to Parapet Wall Coping, Roof Membrane, Roof Cover Board, Roof Insulation, Standing Seam Metal Roof, and Roof Air Barrier)1Lump Sum$ - 0
3Installed Air/Vapor Barrier (Labor and Materials)1245SF$ - 0
4Installed Rigid Insulation (Labor and Materials)1245SF$ - 0
5Installed noncombustible gypsum roof board (Labor and Materials)1245SF$ - 0
6Installed New Single Ply TAN 60-MIL PVC Roof Membrane including seam welding and incidental work (Labor and Materials)1245SF$ - 0
7Installation of Parapet Wall Flashing & Metal Drip Edge including coping and necessary tie-ins (Labor and Materials)80LF$ - 0
8PVC Drainable Walkway (Labor and Materials)850SF$ - 0
9Southeast Corner Cricket Installation (Labor and Materials)44SF$ - 0
10BID OPTION 1: Drainage Cricket Replacement280SF$ - 0

Furnish and Install New Roof Total $ - 0

Tonopah FO Roofing Replacement