This bid schedule outlines pricing requirements for a water line repair project at Chiricahua National Park. The schedule lists 15 line items under the base bid including general requirements, site preparation, piping installation and removal, valves, bedding material, restraints, service connections, permits, as-built drawings, and mobilization/demobilization. It also contains two additive line items for flush hydrants, piping, and bollards. Offerors are required to provide unit pricing and extended totals for each item. The solicitation specifies the contract will be awarded based on best value and allows the government to exercise any combination of options.

View the file

Other files

File Type Posted
Sol_140P1522Q0109.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

CONTRACT PRICE SCHEDULE
REQUEST FOR PROPOSAL:
PARK : CHIR - Water Line Break
Project Name: REPAIR LEAKING WATER LINE SECTION AT MAINTENANCE YARD
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)Faraway Ranch House Roof Replacement Project - Schedule AQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1General Requirements from Division I - Management, Quality Control, Temporary Barricades, Flagging, Testing, Inspection, Waster Management and Commissioning1LS$______________$______________
2Site Preparation, Restoration and Erosion Control1LS$______________$______________
38-inch C-900 PVC CL 200, installed300LF$______________$______________
48-inch HDPE Removal & Disposal300LF$______________$______________
58-inch gate valves, installed2EA$______________$______________
6Bedding Material for all new piping1LS$______________$______________
7Mechanical Restraint for connection of the HDPE to PVC2EA$______________$______________
82-inch HDPE CL 200, installed100LF$______________$______________
9Utility box complete w/pressure regulator and curb stop3EA$______________$______________
106-inch AC By-Pass Connection500LF$______________$______________
11Water service connection3EA$______________$______________
12Permits (Including ADEQ Design Report and Fee)1LS$______________$______________
13As-build Drawing1LS$______________$______________
14Safety Plan1LS$______________$______________
15Mobilization/Demobilization1LS$______________$______________
Total Cost of Base Bid (Line Items 1-15)$______________
CONTRACT LINE ITEM NUMBER (CLIN)Additive line items for the Re-roofing Project - Schedule BQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Two inch Flush Hydrant and installation with Curb Stop and Box shut off1EA$______________$______________
2Pipe bollard3EA$______________$______________
Total Cost of Schedule B (Line Items 1 -2)$______________
Total Cost Schedule A & B$______________