Bid_Schedule_140L6421Q0058.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
ESTRELLA WAYSIDE REC AREA PHASE 1 CONSTR
Solicitation number
140L6421Q0058
Issued by

About this file

This document contains a bid schedule and item details for the ESTRELLA WAYSIDE REC AREA PHASE 1 CONSTRUCTION project solicited by the Bureau of Land Management Arizona State Office. The bid schedule provides pricing for existing conditions assessment, concrete work, earthwork, and exterior improvements required to support development of the first phase of the Sonoran Desert National Monument Estrella-Wayside Recreation Area. Pricing is requested for various construction items including low water crossings, site clearing, road compaction, picnic tables, fire rings, and signage. The solicitation number for this small business set-aside opportunity is 140L6421Q0058, with a response due date not provided. The total estimated construction cost is to be included.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Summary

UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
SONORAN DESERT NATIONAL MONUMENT
ESTRELLA-WAYSIDE RECREATION AREA - PHASE ONE
CONTRACTOR BID SCHEDULE
Solicitation No.:
Date:
SHORT ELLIOTT HENDRICKSON, INC.
Div.DescriptionTotal
02Existing Conditions$
03Concrete$
31Earthwork$
32Exterior Improvements$
Subtotal$
General Contractor Fees
General Contractor Overhead$
General Contractor Profit$
Sub Total$
Bonds and Insurance$
Sub Total$

Phase One Total $

&"Arial Narrow,Regular"Project Summary &"Arial Narrow,Regular"&P

Item Details

UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
SONORAN DESERT NATIONAL MONUMENT
ESTRELLA-WAYSIDE RECREATION AREA - PHASE ONE
CONTRACTOR BID SCHEDULE
Solicitation No.: 140L6421Q0058
Date:
02Existing ConditionsQuantityUnitCost / UnitTotalRS Means Cost / Unit (Hide)RS Means % Increase (Hide)Line Number (Hide)Notes (Hide)
1Mobilization1LS$$$ 50.00$ 75.00
Total$`
03ConcreteQuantityUnitCost / UnitTotalRS Means Cost / UnitRS Means % IncreaseLine Number (Hide)Notes (Hide)
1Low Water Crossing - (1 major crossing)75CY$$$ 305.00$ 335.50
Total$
31EarthworkQuantityUnitCost / UnitTotalRS Means Cost / UnitRS Means % IncreaseLine Number (Hide)Notes (Hide)
1Site Clearing5ACRE$ 97.84$ 107.62
2Blading, Roadway Grading56HR$ - 0
3Temporary Erosion Control1LS$ - 0
Total$
32Exterior ImprovementsQuantityUnitCost / UnitTotalRS Means Cost / UnitRS Means % IncreaseLine Number (Hide)Notes (Hide)
1Road Compaction35,800SY$$$ - 0
2Concrete Picnic Table5EA$$
336-inch Diameter Fire Ring5EA$$
4Identification Sign Installation1EA$$
5Roadway Guide Sign Installation2EA$$
6Trail Marker Installation5EA$$
Total$
Construction Cost Sub-Total$

&"Arial Narrow,Regular"Item Details &"Arial Narrow,Regular"&P image1.png