Bid Schedule 00010A BALHARBOUR2025 (draft).pdf

PDF 661 KB Posted

Attached to
BEACH EROSION CONTROL AND HURRICANE PROTECTION PROJECT BEACH RENOURISHMENT - BAL HARBOUR 2025 MIAMI-DADE COUNTY, FLORIDA
Solicitation number
W912EP24Z0040
Issued by

About this file

This document is a draft Bid Schedule for the Beach Erosion Control and Hurricane Protection Project - Beach Renourishment in Bal Harbour, Miami-Dade County, Florida. The project will renourish the shoreline between FDEP Range Monuments R-27 and R-31.5 and includes construction of a beach berm. Bidders must choose to either dredge material from an offshore borrow area or truck all material from an upland mine. The project has an estimated value between $5-10 million and an estimated period of performance of 165 calendar days for dredging or 240 calendar days for truck haul. The applicable NAICS code is 237990 with a $45 million size standard. The solicitation is expected to be issued on or about October 16, 2024 with a bid opening on or about November 15, 2024. Responses to the current sources sought notice are due by June 23, 2024. Respondents must provide information on their interest, capability, and qualifications, as well as their small business status and bonding capacity.

View the file

Other files

File Type Posted
Drawings prior contracts (2013).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

BEACH EROSION CONTROL AND HURRICANE PROTECTION PROJECT

BEACH RENOURISHMENT - BAL HARBOUR 2025

MIAMI-DADE COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 BEACH FILL (ESTIMATED QUANTITY) 180,000 CUBIC YARD $_____________ $______________

0002 BEACH TILLING (ESTIMATED QUANTITY) 10 ACRE $_____________ $______________

0003 CONSTRUCTION/VIBRATION CONTROL

AND MONITORING JOB $______________

0004 ENVIRONMENTAL SPECIES MONITORING JOB $______________

0005 LEATHERBACK TURTLE MONITORING 130 DAY $_____________ $______________

0006 TURBIDITY MONITORING JOB $______________

0007 PARTNERING REGROUP 1 EACH $_____________ $______________

0008 CONTRACTING OFFICER'S FIELD OFFICE JOB $______________

TOTAL BID (LINE ITEMS 0001 THROUGH 008): $______________

CONSTRUCTION METHODOLOGY - DREDGING

(SEE NOTE 2)

0009 MOBILIZATION AND DEMOBILIZATION JOB $______________

0010 TRANSPORTATION AND DISPOSAL OF

UNACCEPTABLE MATERIAL

(ESTIMATED QUANTITY) 150 CUBIC YARD $_____________ $______________

0011 STANDBY TIME (DREDGING ONLY, SEE NOTE 3) 24 HOUR $_____________ $______________

0012 REMEDIATION OF NONCOMPLIANT MATERIAL

(ESTIMATED QUANTITY) 1 ACRE $_____________ $______________

0013 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY) (SEE NOTE 4) JOB $______________

0014 SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY) (SEE NOTE 4) DAY $_____________ $______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0014): $______________

NOTES: (1) BID MUST PRICE ALL LINE ITEMS.

(2) WORK CAN BE COMPLETED BY EITHER DREDGING THE MATERIAL FROM THE IDENTIFIED IN-WATER SOURCE OR VIA TRUCK HAUL FROM AN UPLAND MINE. PRICE LINE ITEMS ASSOCIATED WITH DREDGING AS ZERO IF TRUCK HAUL IS SELECTED. CONTRACT

INCLUDES ALL REQUIREMENTS FOR EITHER METHODOLOGY.

(3) STANDBY TIME IS DEFINED AS WHEN, AT THE DIRECTION OF THE CONTRACTING OFFICER, THE DREDGE IS PUT OUT OF

OPERATION FOR REASONS OUTSIDE THE REQUIREMENTS IN THE CONTRACT.

(4) SEA TURTLE TRAWL SWEEPING AND RELOCATION IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER.

SEE SECTION 01 57 2- ENVIRONMENTAL PROTECTION.