Bid Ref. #22-043R Airport
149 KB Posted
- Attached to
- Airport Runway Rubber Removal & Painting
- Solicitation number
- 22-043R
- Issued by
- Dawson County, Georgia
About this file
This is an Invitation to Bid issued by the City of Albany, Georgia's Procurement Division for airport runway rubber removal and painting services at the Southwest Georgia Regional Airport. The project requires removal of rubber deposits from approximately 275,000 square feet of runway surface using either chemical application or high-pressure water methods, followed by repainting of all runway markings to maintain FAA compliance. Painting work includes approximately 108,306 square feet of white paint, 3,000 square feet of yellow paint, and 23,837 square feet of black paint, with specific markings including centerlines, edge lines, threshold markings, touchdown zone markings, and designator markings. A pre-bid conference is scheduled for February 10, 2022, at 10:00 a.m. via Zoom meeting, and sealed bids must be received by 2:30 p.m. on February 28, 2022. The contract must be completed within 90 calendar days following issuance of the Notice to Proceed, with work restricted to daylight hours between 8:00 a.m. and 8:00 p.m. EST daily. Questions must be submitted by email to the Interim Procurement Manager, Joshua Williams, by February 16, 2022.
The project will be awarded on a lump-sum basis to the lowest responsive and responsible bidder. A bid bond equal to 5 percent of the total bid amount is required, and if the contract value exceeds $100,000, performance and labor/material payment bonds equal to 100 percent of the contract amount will be required. The City of Albany requires contractors to maintain comprehensive general liability insurance of at least $1,000,000, vehicle liability coverage of at least $500,000, and worker's compensation insurance in statutory limits, with the City named as additional insured on all policies. All paint and materials must comply with FAA Advisory Circulars 150/5200-18C and 150/5370-10H, using only FAA-approved Type I or Type III glass beads on white and yellow surfaces and Federal Specification TT-P-1952F waterborne paint meeting specific color standards. Contractors must be registered with the Federal E-Verify program in compliance with Georgia's Security and Immigration Compliance Act, and a one-year warranty on all materials and workmanship is required. Liquidated damages of $50 per day will be assessed for work not completed within the specified contract period.
Text of this file
February 1, 2022
INVITATION TO BID
Airport Runway Rubber Removal and Painting Bid Reference No. 22-043R
Sealed bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite 260, Albany, Georgia 31701, until 2:30 p.m. on February 28, 2022, for Airport runway rubber removal and painting. Bids will be opened and publicly read aloud at the above stated time and place. The scope of work and requirements are contained in the bid documents.
A Pre-Bid conference will be held on February 10, 2022, at 10:00 a.m. via Zoom meeting. All interested vendors are strongly encouraged to attend.
The City of Albany strongly encourages Small Business firms to participate in this bid.
This project will be bid on a lump sum basis for all specified work and will be awarded to the responsive and responsible bidder submitting the lowest total bid in the manner that best benefits the City of Albany.
5% Bid Bond is required of all bidders. Bid bond must be present for bid to be read or considered. A Contract Performance Bond, and Labor and Material Payment Bond each in an amount equal to 100% of the contract amount may be required of the successful bidder.
All Corporations should provide corporate seal, a copy of the Secretary of State’s Certificate of Incorporation, and a listing of the principals of the corporation with the bid.
Bid documents are available at the Procurement Division, www.albanyga.gov and on the Georgia Procurement Registry.
For additional information, contact Joshua Williams, Interim Procurement Manager, at (229) 431-3211. Submit all questions via email to jswilliams@albanyga.gov and tewilliams@albanyga.gov. The deadline for questions is February 16, 2022.
| City of Albany, |
| Joshua Williams |
| Joshua Williams, CPPB |
| Interim Procurement Manager |
C E N T R A L S E R V I C E S
P.O. BOX 447 ALBANY, GA 31702 | PHONE: 229.431.3211 | FAX: 229.431.2184 | www.albanyga.gov
CITY OF ALBANY
PROCUREMENT DIVISION
CENTRAL SERVICES DEPARTMENT
ALBANY, GEORGIA
INSTRUCTIONS TO BIDDERS
These instructions will bind bidders to terms and conditions herein set forth, except as specifically qualified in special bid and contract terms issued with any individual bid.
1. The following criteria are used in determining low responsible bidder.
(a) The ability, capacity and skill of bidder to perform required service.
(b) Whether bidder can perform service promptly or within specified time.
(c) The character, integrity, reputation, judgment, experience and efficiency of bidder.
(d) The performance of previous contracts.
(e) The suitability of equipment or material for City use.
(f) The ability of bidder to provide future maintenance and parts service.
2. Payment terms are Net 30 unless otherwise specified. Favorable term discounts may be offered and will be considered in determining low bids if they are deemed advantageous to The City.
3. Unless otherwise specified all materials, supplies or equipment quoted herein must be delivered within thirty (30) days from date of notification of award or by exception noted on bid sheet.
4. Prospective bidders are responsible for examining the location of the proposed work or delivery and determining, in their own way, the difficulties, which are likely to be encountered in the execution of same.
5. The ESTIMATED QUANTITY given in the specifications or advertisement is for the purpose of bidding only. The City may purchase more or less than the estimated quantity, and the bidder must not assume that such estimated quantity is part of the contract.
6. All bids should be tabulated, totaled and checked for accuracy. The unit price will prevail in case of errors.
7. All requested information should be included in the sealed bid envelope. All documents and information must be signed and included for your bid to receive full consideration. Failure to submit any required information or document will be cause for bid to be rejected as non-responsive.
8. Failure of the bidder to sign the bid document or have the signature of any authorized representative or agent on the bid in the space provided will be cause for rejection of the bid. Signature(s) must be written in ink.
9. Failure to enclose bid bond, where required, will result in rejection of the bid. Bond may be in the form of cash, certified check, cashier’s check or Surety Bond issued by a Surety Company licensed to conduct business in Georgia.
10. All bidders should provide their tax identification number with the bid.
11. All bidding Corporations should provide the corporate seal, a copy of the Secretary of State’s Certificate of Incorporation, and a listing of the principals of the corporation with the bid.
12. Quote all prices F.O.B. Albany or our warehouse or as specified in bid documents.
13. If the bidder proposes to furnish any item of a foreign make or product, he/she should write “Foreign” together with the name of the originating country opposite such item on the bid.
14. When requested, SAMPLES will be furnished free of expense, properly marked for identification and accompanied by list where there is more than one sample. The City reserves the right to mutilate or destroy any samples submitted whenever it may be in the best interests of The City to do so for the purpose of testing.
15. The City will reject any material, supplies or equipment that do not meet the specifications, even though bidder lists the trade name or names of such materials on the bid or price quotation form.
16. Any alterations, erasures, additions or omissions of required information or any changes of specifications, or bidding schedule are done at the risk of the bidder. Any bid will be rejected that has a substantial variation, such as a variation that affects the price, quality or delivery date (when delivery is required by a specific time).
17. Each bid or proposal will be submitted in a SEALED ENVELOPE. Additionally, that envelope shall be clearly marked on the outside as a Sealed Bid with the Bid Number clearly printed.
18. Bids must be received and stamped by the Procurement Office before the date and time stipulated in bid documents. The City of Albany assumes no responsibility for submittals received after the advertised deadline or at any office or location other than that specified herein, whether due to mail delays, courier mistake, mishandling, or any other reason. No responsibility will attach to any City representative or employee for premature opening of bids not properly addressed or identified.
19. If only one bid is received, the bid may be rejected and/or re-advertised, except in the case of only one known source of supply.
20. Bids received late will not be accepted, and The City will not be responsible for late mail delivery.
21. Should a bid be misplaced by The City and found later it will be considered.
22. The unauthorized use of patented articles is done entirely at the risk of the bidder.
23. All bidders must be recognized and authorized dealers in the materials or equipment specified and be qualified to instruct in their application or use. A bidder at any time requested must satisfy the Procurement Office and City Commission that he has the requisite organization, capital, plant, stock, ability and experience to satisfactorily execute the contract in accordance with the provisions of the contract in which he is interested.
24. Only the latest model equipment as evidenced by the manufacturer’s current published literature will be considered. Obsolete models of equipment not in production will not be acceptable. Equipment shall be composed of new parts and materials. Any unit containing used parts or having seen any service other than the necessary tests will be rejected. In addition to the equipment specifically called for in the specifications, all equipment catalogued by the manufacturer as standard or required by the State of Georgia shall be furnished with the equipment. Where required by the State of Georgia Motor Vehicle Code, vehicles shall be inspected and bear the latest inspection sticker of the Georgia Department of Revenue.
25. All materials, equipment and supplies shall be subject to rigid inspection, under the immediate supervision of the Procurement Officer and/or the Department to which they are delivered. If defective material, equipment or supplies are discovered, the contractor, upon being instructed by the Procurement Officer, shall remove, or make good such material, equipment or supplies without extra compensation. It is expressly understood and agreed that the inspection of materials by The City will in no way lessen the responsibility of the contractor or release him from his obligation to perform and deliver to The City sound and satisfactory materials, equipment or supplies. The contractor agrees to pay the cost of all tests on defective material, equipment or supplies or allow the cost to be deducted from any monies due him by The City.
26. For multi-year contracts the following clauses pursuant to OCGA 36-60-13 apply: (1) The contract shall terminate absolutely and without further obligation on the part of The City or County at the close of the calendar year in which it was executed and at the close of each succeeding calendar year for which it may be renewed; (2) The contract may provide for automatic renewal unless positive action is taken by The City or County to terminate such contract, and the nature of such action shall be determined by The City or County and specified in the contract; (3) The contract shall state the total obligation of The City or County for the calendar year of execution and shall further state the total obligation which will be incurred in each calendar year renewal term, if renewed; and (4) The contract shall provide that title to any supplies, materials, equipment, or other personal property shall remain in the vendor until fully paid for by The City.
27. Unless otherwise specified The City reserves the right to award each item separately or on a lump sum basis, whichever is in the best interest of The City.
28. The successful bidder shall secure all permits, license certificates, inspections (permanent and temporary) and occupational tax certificate, if applicable, before any work can commence. Contractor as well as any and all known subcontractors must possess or will be required to obtain a City of Albany Occupational Tax Certificate or Registration.
29. The successful bidder on motor vehicle equipment shall be required to furnish with delivery of vehicle, Certificate of Origin and Georgia vendors shall provide Georgia Motor Vehicle form MV1.
30. The City reserves the right to reject any and all bids, to waive any informalities in the bid process, and to award the contract as may be in the best interest of the City and/or re-advertise for bids.
31. Local bidder (domiciled in Albany City Limits) will receive bid in the event of tie bids. In the case of tie bids between out of town companies or between local concerns, evaluated as equal, bid will be recommended or awarded by chance coin toss, or drawing straws. The Board of Commissioners passed a local preference ordinance on January 27, 2015. Where applicable, this ordinance will govern. Local preference will not be a basis for award on bids that are federally funded.
32. No bidder writing restrictive specifications for The City will be allowed to bid on the project.
33. Reasonable grounds for supposing that any bidder is interested in more than one bid for the same item will be considered sufficient cause for rejection of all bids in which he/she is interested.
34. A contract will not be awarded to any corporation, firm or individual who is, from any cause, in arrears to The City/County or who has failed in any former contract with The City to perform work satisfactorily, either as to the character of the work, the fulfillment of the guarantee, or the time consumed in completing the work.
35. It is mutually understood and agreed that if any time the Procurement Officer shall be of the opinion that the contract or any part thereof is unnecessarily delayed or that the rate of progress or delivery is unsatisfactory, or that the contractor is willfully violating any of the conditions or covenants of the agreement, or is executing the same in bad faith, the Procurement Officer shall have the power to notify the aforesaid contractor of the nature of the complaint. Notification shall constitute delivery of notice, or letter, to address given in bid/proposal. If after three working days of notification the conditions are not corrected to the satisfaction of the Procurement Officer, he shall thereupon have the power to take whatever action he may deem necessary to complete the work or delivery herein described, or any part thereof, and the expense thereof, so charged, shall be deducted from any paid by The City out of such monies as may become due to the said contractor, under and by virtue of this agreement. In case such expense shall exceed the last said sum, then and in that event, the bondsman or the contractor, his executors, administrators, successors, or assigns, shall pay the amount of such excess to The City on notice by the Procurement Officer of the excess due.
36. Contracts may be cancelled by The City with or without cause with 30-day written notice.
37. Any complaint from bidders relative to the Invitation to Bid or any attached specifications should be made prior to the time of opening of bids, otherwise such complaint cannot be properly considered.
38. Any bidder may withdraw his bid at any time before the time set for opening of bids. No bid may be withdrawn without cause in the 60-day period after bids are opened.
39. All questions, inquiries and requests for clarification shall be directed to Procurement.
40. Prior to submission, all bidders are encouraged to check the website at www.albanyga.gov or call the Procurement Office at 229-431-3211 for any addendums.
PROCUREMENT FORM - Revised 11/18/2021
SPECIAL INSTRUCTIONS
Airport Runway Rubber Removal & Painting Bid Ref. #22-043R
1. General Information: The Southwest Georgia Regional Airport is seeking to have rubber removal services on the Airport runway along with restriping to maintain compliance with FAA standards. A detailed scope of work and specifications is contained within this document.
2. Bid shall include all necessary labor, materials, tools, equipment, and all other items necessary to complete the contract requirements in accordance with Bid Documents, Specifications, General Conditions, Special Instructions to Bidders and all other provisions included in this Invitation to Bid.
3. Bidder shall be responsible to visit the job site and familiarize himself with the local conditions.
4. No bid may be withdrawn for a period of sixty (60) days from the bid opening date.
5. The owner of this project is the City of Albany (Georgia). The Owner reserves the right to accept or reject any or all bids and to waive any informalities in the bid process. The Owner reserves the right to eliminate roadways or add additional roadways using the bid's unit prices.
6. Contract Time: Contract must be completed within ninety (90) calendar days following the issuance of the Notice to Proceed. An allowance may be granted for rain days. Performance will be monitored and documented by the Project Manager. Not completing this contract within the time specified may hamper the contractor’s ability to secure future contracts with the City/County.
7. Bid Form: Bid must be submitted on the bid form provided by the City of Albany. Bid is for a lump sum contract and will be awarded to the responsive and responsible bidder submitting the lowest total bid.
8. Project Management: The contractor is required to contact the Project Manager, Shaun Cookson, Superintendent of Operations at 229-302-1500, within five (5) days of completion for a final inspection.
9. Liquidated Damages: Should the Vendor, or, in case of default, the Surety fail to complete the work within the time stipulated in the contract or within such extra time that may be allowed, charges shall be billed to the contractor or assessed against any money due or that may become due the Vendor at a rate of $50.00 for each day that expires after the allowed contract time for the completion and readiness of final payment until the Work is complete and ready for payment.
10. Bid Bond: Each bid shall be accompanied by a certified check, cashier’s check, cash, or bid bond (surety) acceptable to the Owner, in an amount equal to at least five (5%) percent of the bid, payable without condition to the Owner as a guaranty that the bidder, if awarded the contract, will promptly execute the Agreement in accordance with the bid and other contract documents, and will furnish good and sufficient bond for the faithful performance of the same, and for the payment to all persons supplying labor and material for the work. The bid bond must be presented in its original form. Copies are not acceptable.
11. Performance Bond and Payment Bonds: Contracts of $100,000.00 or more, a 100% Performance Bond and 100% Labor and Materials Payment Bond will be required of awarded bidder. All bonds must be submitted to the Procurement Office before work can commence.
12. General Insurance Requirements: Contractor shall maintain insurance with companies licensed to do business in the State of Georgia acceptable to the City for the protection of the City and name it as an additional insured, against all claims, losses, costs or expenses arising out of injuries or death of persons whether or not employed by contractor, whether arising from the acts or omission, negligence or otherwise of contractor or any of its agents, employees, patrons, or other persons, and growing out of work being done by Contractor on behalf of City, such policies to provide for a liability limit on account of each accident resulting in the bodily injury or death of not less than One Million ($1,000,000) Dollars, a liability limit of not less than One Million ($1,000,000) Dollars for each accident for property damage. Contractor shall also carry product/completed operations liability insurance for personal injuries and/or death in the amount not less than One Million ($1,000,000) Dollars for any one person. Contractor shall maintain a combined single liability limit of One Million ($1,000,000) Dollars covering owned, non-owned, leased, and hired vehicles. Contractor shall furnish to the City satisfactory evidence that it carries Worker’s Compensation Insurance in the statutory limits of Georgia and Employers’ Liability with limits of liability of no less than One Hundred Thousand ($100,000) Dollars of each accident/disease. These polices must also contain a waiver of subrogation in favor of the City of Albany. Contractor shall furnish evidence to the City of the continuance in force of said policy’s declaration page (s) to the Procurement Agent. Acceptable proofs of insurance: (i) a Certificate of Insurance with Additional Insured Endorsement (a Certificate of Insurance by itself is not acceptable) or (ii) Declaration Pages of the insurance policies listed below which show the City of Albany as additional insured. All insurance policies must provide that the City of Albany will be notified within 30 days of any changes, restrictions, and/or cancellation. The City’s sole judgment shall control as to the sufficiency of the coverage.
13. Superintendent: The contractor shall have a superintendent or representative on site at all times while work is being performed. He will represent the vendor and all communications given to him shall be binding as if given to the vendor.
14. Manufacturer’s Warranty: Bidder should include with his bid complete Manufacturer’s Specification and Installation criteria of all materials proposed for use on the job.
| Vendor’s Warranty: Vendor shall guarantee all specified work performed for a period of one (1) year from the date of written acceptance of the work by the Owner’s designated representative that all materials, labor, and workmanship provided under this contract are free from defects of any kind. At no expense to the City of Albany, the vendor shall make repairs to any defects found and reported during the warranty period. Final inspection, final acceptance, and final payment shall not be construed as a waiver of this warranty. The following are excluded from this warranty: | |
| a. | Defects or failures resulting from abuse by the owner. |
| b. | Damage caused by fire, tornadoes, hail, hurricane, Acts of God, wars, riots, civil commotion or vandalism. |
| c. | The vendor is not an insurer nor is he a guarantor of the suitability of or adequacy of work. Any other provisions of this warranty to the contrary notwithstanding, the contractor shall not be required to remedy any unsuitable or inadequate work. |
15. Preservation of Property: The vendor shall carry out his work with such care and by the proper methods to prevent damage to the property adjacent to the work or within streets, easement locations to the extent the owner may have rights therein, or other property of the owners or of others, whether adjacent to the work site or not, the removal, relocation, or destruction of which is not called for by the provisions of the contract documents; it being a condition of the execution of the contract that the work be performed in such manner that the property of others and other property of the owner shall not be damaged in any way. The word PROPERTY, as used, is intended to include among other types of property, public street improvements, storm and sanitary sewers, water lines and appurtenances, or other structures. Should any property be damaged or destroyed, the vendor at his own expense shall promptly, or within reasonable time, repair or make such restoration as is practical and acceptable to the owner of the damaged or destroyed property. In case of failure on the part of the vendor to repair or restore such property, or make good such damage or injury, the Building Inspector may within forty-eight (48) hours’ notice, proceed to repair, rebuild, or otherwise restore such property as may be necessary, and the cost thereof will be deducted from any monies due, or which may become due the vendor under this contract agreement. The vendor shall, always in performance of the work, employ approved methods and exercise reasonable care and skill so as to avoid delay, damage, injury or destruction of existing public service installations and structures; and shall at all times in the performance of the work avoid interference with, or interruption of, public utilities services, and shall cooperate fully with the owners thereof to the end.
16. Termination for Convenience: This contract may be terminated in whole or in part by the City of Albany with the consent of the contractor in which case the two parties shall agree upon the termination conditions, including the effective date in the case of partial termination, the portion to be terminated or by the contractor upon written notification to the City of Albany setting forth the reasons for such termination, the effective date, and in the case of partial termination, the portion to be terminated. However, if in the case of partial termination, the City of Albany determines that the remaining portion of the award will not accomplish the purposes for which the contract was awarded, the City of Albany may terminate the contract in its entirety.
17. Barricades and Warnings: The vendor shall provide, erect and maintain all necessary barricades, suitable and sufficient number of watchmen to direct traffic, and take all necessary precautions for the protection of the work and safety of the public. Barricades and obstructions shall be illuminated at night and lights shall be burning from sunset to sunrise.
18. Removal of Trash and Rubbish: The vendor shall be responsible for the removal and legal disposal of all waste, trash, and rubbish resulting from the work under this contract. Work site shall be kept clean and orderly during construction; trash shall be removed from the site or adequately containerized daily.
19. Compliance: The vendor is responsible for knowledge of and compliance with all laws, codes, ordinances, and regulations that are applicable to this type of work.
20. Indemnity Agreement: An executed copy of this form should accompany your bid and must be completed for contract award. (See attached)
21. Certificate of Non-Collusion: An executed copy of this form should accompany your bid and must be completed for contract award. (See attached)
22. Governing Law & Venue: An executed copy of this form should accompany your bid and must be completed for contract award. (See attached)
23. Debarred Bidders/ Integrity Certification: An executed copy of this form should accompany your bid and must be completed for contract award. (See attached)
24. Drug Free Workplace: An executed copy of this form should accompany your bid and must be completed for contract award. (See attached)
25. Corporations: All Corporations must provide corporate seal, a copy of the Secretary of State’s Certificate of Incorporation, and a listing of the principals of the corporation with the bid.
26. Georgia Security and Immigration Compliance Act: The successful contractor will provide certification that he is in compliance with the Georgia Security and Immigration Compliance Act, certifying that the provisions of GA Law, O.C.G.A 13-10-91, Chapter 300-10-1, per the Georgia Department of Labor, if applicable, have been complied with in full. Pursuant to O.C.G.A 13-10-90(2), all subcontractors entering into a contract or agreement for hire on this Project must be registered and participate in the Federal Work Authorization Program. Complete and submit a copy of the form with your bid.
27. Bid Submittals (All items listed below must be submitted with bid)
A. Bid Form B. Bid Bond
The following items should be submitted with bid:
C. Indemnity Agreement D. Governing Law and Venue Form E. Certificate of Non-Collusion Form F. Debarred Bidders/ Integrity Certification G. Drug Free Workplace H. Corporate Seal I. Secretary of State’s Certificate of Incorporation J. Listing of the principals of Corporation K. Affidavit to Comply with OCGA § 13-10-91
28. For additional information, please contact Joshua Williams, Interim Procurement Manager, at (229) 431-3211. Submit all questions via email to jswilliams@albanyga.gov and tewilliams@albanyga.gov.
SCOPE OF WORK
Bid Ref. #22-043R
The selected vendor will provide rubber removal per FAA Advisory Circular 150/5320-12C and painting per FAA 150/5200-18C for the Airport runway. The paint fades as it is continually exposed to sun and weather elements and needs to be replaced frequently to be in compliance with FAA requirements. When painting, all markings on the runway surface should be re-painted to ensure uniformity on the paint.
Specifications
1. All rubber removal should comply with FAA Advisory Circular 150/5320-12C. Rubber removal will be by either chemical application or high-pressure water of approximately 275,000 Sq. Ft. with an area of 2,634 ft. long X 60 ft. wide off the Runway 5 approach end and 1,930 ft. long X 60 ft. wide on the Runway 23 approach end.
2. All paint used should comply with FAA Advisory Circular 150/5200-18C. Totals for all paint areas is as follows: White – 108,306 sq. ft., Yellow – 3,000 sq. ft. and Black – 23,837 sq. ft.
Approximate breakdown of each marking to be removed and replaced is as follows:
1. 3,000 Sq. Ft. of Yellow taxiway lead-in/off lines (6” width)
2. 6,000 Sq. Ft. of Black outlines for taxiway lead-in/off lines (6” width)
3. 10,800 Sq. Ft. of White runway centerlines (30 standard dimension runway centerlines (120’ X 3’)
4. 3,690 Sq. Ft. of Black outlines for runway centerlines (6” width on each side)
5. 39,606 Sq. Ft. of White runway edge lines (2 standard lines – 6,601’ X 3’)
6. 6,601 Sq. Ft. of Black outlines for runway centerlines (6” width)
7. 18,000 Sq. Ft. of White runway aiming point markings (4 standard aiming points – 150’ X 30’)
8. 720 Sq. Ft. of Black outlines for runway aiming point markings (6’ width)
9. 3,000 Sq. Ft. of White runway threshold bar markings (2 standard 150’ wide X 10’ long)
10. 320 Sq. Ft. of Black outlines for runway threshold bar (6” width)
11. 20,700 Sq. Ft. of White runway threshold markings (24 standard 150’ long X 5.75’ wide)
12. 3,738 Sq. Ft. of Black outlines for runway threshold markings (6’ width)
13. 12,600 Sq. Ft. of White runway touchdown markings (28 standard 75’ long X 6’ wide)
14. 2,268 Sq. Ft. of Black outlines for runway touchdown markings (6” width)
15. 3,600 Sq. Ft. of White runway designator markings (3 standard 60’ long X 20’ wide)
16. 500 Sq. Ft. of Black outlines for runway designators (6” width)
3. Only FAA approved type 1 or type 3 glass beads MUST be used on all white and yellow paint based upon application rate and type of waterborne paint and glass beads used as per FAA guidance listed in Advisory Circular 150/5370-10H. Glass beads are NOT to be applied to black paint.
4. Only Type I, Type II, or Type III Waterborne paint meeting Federal Specification TT-P-1952F may be used per FAA Guidance listed in Advisory Circular 150/5370-10H (item P-620).
5. Only paint colors meeting Fed Std. No 595 color numbers per FAA guidance listed in Advisory Circular 150/5370-10H may be used (Item p-620 - White=37925, Black =37038, Yellow=33538 or 33655). Paint must be infused with a FAA approved Algaecide, fungicide, and rust prohibitor.
6. All paint and glass beads must be installed per manufacturer and FAA specifications and take into consideration adverse weather conditions prior to application (wind speeds, pavement surface temperature, moisture present on pavement, etc). All paint and/or glass beads spilled or otherwise not infused into an approved and FAA compliant permanent marking must be collected and removed by the contractor prior to daily runway openings.
7. Vendor must be willing to perform work during daylight hours only, beginning no sooner than 0800 EST (8am local) and must conclude daily activities no later than 2000 EST (8pm local) daily. Airport will be responsible for phasing the work and issuing NOTAMs as appropriate. Contractor will be responsible for placing and ensuring operation of FAA approved low profile barricades and Runway Closure Markers in accordance with FAA Advisory Circular 150/5370-2G. The Airport can supply two (2) Runway Closure Markers and thirty (30) Low-Profile Barricades for use during this project if desired by contractor at a discount to the bid price.
8. Vendor must follow all FAA guidelines listed in applicable Advisory Circulars, Cert Alerts, Engineering briefs, or orders, or other publications, primarily including, but not limited to FAA AC 150/5320-12C, FAA AC 150/5370-10H, FAA AC 15/5370-2G, FAA AC 150/5340-1M, and FAA AC 150/5210-20A.
BID FORM
Bid Ref. #22-043R
| ________________________________ | ___________________ | |
| Vendor Name | Date |
The undersigned hereby declares that field inspection has been made of the work required and has carefully read the Instructions to Bidders, Special Instructions to Bidders, and all other Contract Documents, and hereby proposes to perform thermoplastic striping & markings, and replacement of raised pavement markers at the following location, in accordance with bid documents, specifications, and all other contract provisions as follows:
1. Airport Runway Rubber Removal Rubber removal by chemical application or high-pressure water of 275,000 Sq. Ft.: $ ____
2. Paint Removal and Replacement by use of high-pressure water
White – 108,306 sq. ft.: $________________________ Yellow – 3,000 sq. ft.: $________________________ Black – 23,837 sq. ft.: $_______________________
Select one:
Type I Glass Beads (For White and Yellow paint only): $_____________________ Type III Glass Beads (For White and Yellow paint only): $_______________________
3. Airport Barricades and Runway Closure Markers FAA approved low-profile Barricades and Runway Closure Markers: $_____________________ Discount if using the Airport’s low-profile barricades and runway closure markers: $____________________
4. Mobilization and Demobilization Mobilization: $______________________ Demobilization: $_____________________
BID TOTAL (Totals for 1-4) $_____________________
Bid shall be made on a Lump Sum basis for all specified work. Work shall begin within 30 (thirty) calendar days after issuance of Notice to Award and shall be completed in accordance with contract time stated herein. This bid complies with the Instruction to Bidders contained herein, (including all Contract Documents referenced therein, and all Addenda, hereinafter listed and acknowledged as received), which are hereby made a part hereof and which shall govern in all matters of the work hereby proposed. We acknowledge receipt of the following Addenda: (Bidder to list all revisions received, or, if none, state "NONE RECEIVED")
Addendum # ____, dated ________ Addendum # ____, dated ________ Addendum # ____, dated ______
CERTIFICATION: The undersigned being duly sworn hereby declares and affirms that they are an authorized representative of the above-named firm and further declares and affirms that the bid provided herein, and the statements provided herein are true and correct and are sufficiently complete so as not to be misleading.
Authorized Signature Company Name
Address City State Zip
Seal (If Incorporated) Telephone # Fax #
Tax ID # Date
***END OF BID FORM***
22-043R Airport Runway Rubber Removal & Painting
*COMPLETE AND SUBMIT*
GOVERNING LAW AND VENUE
Contractor agrees that as to any actions or proceedings arising out or related to this agreement, any such proceedings shall be governed and determined by Georgia Law.
Contractor further agrees that as to any actions or proceedings arising out of or related to this agreement, any such action or proceeding shall be resolved only in an appropriate court located in Dougherty County, Georgia.
DATE: _____________________
COMPANY NAME: __________________________________________
AUTHORIZED REPRESENTATIVE NAME: ________________________________________
TITLE: ________________________________________
SIGNATURE: ___________________________________
CERTIFICATION OF NON-COLLUSION
The bidder being sworn, disposes and says, _____________________________________
The Contractor submitting this and its agents, officers or employees have not directly or indirectly entered into any agreements, participated in any collusion or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
AUTHORIZED REPRESENTATIVE NAME: ________________________________________
DEBARRED BIDDERS/INTEGRITY CERTIFICATION
Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion (49 CFR, Part 29):
The Contractor must certify that neither it nor its principals are presently debarred, suspended, proposed for disbarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. Further, the Contractor certifies that he or she shall obtain an identical certification from all its sub-contractors. The Contractor also agrees that when a sub-contractor is unable to certify to any of the statements in this certification, the prospective participant shall submit an explanation to the Contractor.
AUTHORIZED REPRESENTATIVE NAME: ________________________________________
Drug Free Workplace Certification
DRUG FREE WORKPLACE REQUIREMENTS: The Contractor will provide the following certification that a Drug Free Workplace will be provided on the Project.
The undersigned certifies that the provisions of Code Sections 50-24-1 through 50-24-6 of the Official Code of Georgia Annotated, relating the "Drug Free Workplace Act", have been complied with in full. The undersigned further certifies that:
1. A drug free workplace will be provided for the Contractor’s employees during the performance of the Contract; and
2. Each Contractor who hires a Subcontractor to work in a drug free workplace shall secure from that Subcontractor the following written certification:
AUTHORIZED REPRESENTATIVE NAME: ________________________________________
INDEMNITY AGREEMENT
This indemnity agreement made and entered into in favor of CITY OF ALBANY (“ALBANY”), a municipal corporation, by ______________________________.
WHEREAS __________________________ has submitted a bid to ALBANY so as to provide [describe the service, products(s)] .
NOW, THEREFORE, as an additional consideration in ALBANY awarding the bid to ___________________________, ____________________________ agrees to indemnify and hold harmless, ALBANY, its agents, principals, officers, and employees, their successors and assigns, individually and collectively, with respect to all third party claims, demands or liability for any injuries to any person (including death) or damage to any property arising out of any alleged negligence of its officers, agents, or employees in connection with the product or services involved in the bid; provided this indemnity shall not extend to any damage, injury or loss due to ALBANY’s sole negligence or willful injury.
_____________________________shall reimburse ALBANY for reasonable attorney fees and expenses of ALBANY in defending all such claims and shall also be responsible for payment of all judgements.
WITNESS THE HAND AND SEAL of the undersigned pursuant to proper corporate authority this, ____ day of _________, 20___.
[CORPORATE NAME]
By:
Title ____________________________
| Attest: | ||
| Title | ||
| [Affix Corporate Seal] |
CONTRACT
Airport Runway Rubber Removal and Painting Bid Reference Number 22-043R
THIS AGREEMENT, made as of the _______ day of_____________20____, by and between The City of Albany, Ga., (Party of First Part, hereinafter called the Owner) and _______________________________________, (Party of the Second Part, hereinafter called the Contractor).
WITNESSETH: That the said Contractor has agreed, and by these present does agree with the said Owner, for the consideration herein mentioned in his bid and under the penalty expressed in bid document, hereto attached, to furnish all equipment, tools, and materials, skill and labor of every description necessary to carry out and complete in good, firm, and substantial workmanlike manner, the specified work in strict conformity with the drawings and specifications hereinafter set forth which together with the foregoing bid made by the Contractor, the Notice to Contractors, Instructions to Bidders, General Conditions, Addenda, Special Provisions and this Agreement, shall all form essential parts of the Agreement. The work covered by this Agreement includes all work shown on drawings and specifications and listed in the attached bid.
The Owner shall pay, and the Contractor shall receive the LUMP SUM BASIS stipulated in the Bid for Airport Runway Rubber Removal and Painting as full compensation for everything furnished and done by the Contractor under this Contract. The full unit price sum of $__________ shall be paid in thirty (30) day increments in the manner and according to the terms specified in the Contract Documents, included in the Contractor's periodic estimate. If the Contractor shall not have submitted evidence satisfactory to the Owner that all payrolls, material bills, and other indebtedness connected with the work have been paid, the Owner may withhold, in addition to the retained percentages, such amount or amounts as may be necessary to pay just claims for labor, services rendered and materials in and about the work, and such amount or amounts withheld or retained may be applied by the Owner, to the payment of just claims.
Contractor is required to provide acceptable proof of insurance coverage. Acceptable proofs are a Certificate of Insurance with Additional Insured Endorsement (a Certificate of Insurance by itself is not acceptable) or Declaration Pages of the insurance policies listed which show the City of Albany as additional insured. The insurance company must be authorized to provide insurance in the State of Georgia. Required Insurance Policies and Endorsements are: Commercial General Liability of at least $1,000,000 for bodily injury and property damage with the City of Albany as additional insured, Automobile/Vehicle Liability of at least $500,000 each occurrence for bodily injury and property damage covering owned, non-owned, leased and hired autos/vehicles with the City of Albany as additional insured and Worker’s Compensation in the statutory limits of Georgia and Employers’ Liability with limits of liability of no less than $100,000 of each accident/disease. These policies must also contain a waiver of subrogation in favor of the City of Albany. All insurance policies must provide that the City of Albany will be notified within 30 days of any changes, restrictions and/or cancellation. If applicable, Professional Liability in addition to above requirements, of at least $500,000 each claim. Proof of insurance must be submitted to the Procurement Division and approved by Risk Management prior to performance of any work.
Contractor agrees that as to any actions or proceedings arising out of or related to this agreement, any such proceedings shall be governed and determined by Georgia Law.
Contractor further agrees that as to any actions or proceedings arising out of or related to this agreement, any such action or proceeding shall be resolved only in an appropriate court located in Dougherty County, Georgia.
Contractor agrees to indemnify and hold harmless the City, its agents, officers, and employees, their successors and assigns, individually and collectively, with respect to all claims, demands or liability for any injuries to any person (including death) or damage to any property arising out of the activities of contractor or based on alleged negligence of contractor, its officers, agents, or employees and contractor shall defend against all such claims and pay all expenses of such defense, including attorney fees, and all judgments based thereon; provided that this obligation shall not extend to any damage, injury or loss due to the negligence of the City.
IN WITNESS WHEREOF the parties hereto have executed this Agreement in quadruplicate this ____ day of ________________, 20___.
| CITY OF ALBANY, GA. |
| (Owner) |
| BY: ____________________________ | |
| AUTHORIZED SIGNATURE |
| ____________________________ | |
| (Title) |
| _______________________________ |
| (Contractor) |
(SEAL)
By: ____________________________
| ________________________________ |
| (Title) |
(Witness) (Witness)
VIDEO CONFERENCING INSTRUCTIONS
Joshua Williams is inviting you to a scheduled Zoom meeting.
Join Zoom Meeting https://us06web.zoom.us/j/82954474093?pwd=Sk9zcTdYSnN1NWxyeDRCUzY5dndFdz09
Meeting ID: 829 5447 4093 Passcode: 000665 One tap mobile +16465588656,,82954474093# US (New York) 13017158592,,82954474093# US +(Washington DC)
Dial by your location +1 646 558 8656 US (New York) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 720 707 2699 US (Denver) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) Meeting ID: 829 5447 4093 Find your local number: https://us06web.zoom.us/u/kcZysvZFVL
Join by SIP 82954474093@zoomcrc.com
GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
Contractor’s Name:
Address:
Solicitation/Contract No.:
Solicitation /Contract Name:
CONTRACTOR AFFIDAVIT
I understand that the City of Albany may not enter into a contract with ___________________________________ (Name of Corporation) unless it has registered and does participate in the Federal Work Authorization Program defined in O.C.G.A. § 13-10-90(2), to-wit” (2) “Federal work authorization program” means any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), D.L. 99-603.
By executing this affidavit, the undersigned Contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, entity or corporation which is engaged in the physical performance of services on behalf of the City of Albany has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.
Furthermore, the undersigned Contractor will continue to use the federal work authorization program throughout the contract period and the undersigned Contractor will contract for the physical performance of services in satisfaction of such contract only with sub-Contractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13- 10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification No. Date of Authorization (EEV/E-Verify Company Identification Number)
Name of Contractor
I hereby declare under penalty of perjury that the foregoing is true and correct.
Printed Name (of Authorized Officer or Agent of Contractor) Title (of Authorized Officer or Agent Contractor)
Signature (of Authorized Officer or Agent) Date
Signed SUBSCRIBED AND SWORN BEFORE ME ON
[NOTARY SEAL]
Notary Public
My Commission Expires:
image1.jpeg
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .