This is a bid pricing document for a construction project managed by the Public Works Department (PWD) that encompasses significant infrastructure rehabilitation work on water filtration basins. The project involves 26 line items covering comprehensive maintenance and repair services, including field office and janitorial support, water basin de-watering, sediment removal totaling 3,234 cubic feet, basin cleaning and disinfection, ladder and ventilator cover installation, facade replacement on six units, installation of multiple effluent valves ranging from 16 to 60 inches, and extensive crack repair work. The scope includes epoxy injection of approximately 7,749 linear feet of structural cracks, chemical grout injection of approximately 67,851 linear feet of cracks, and masonry joint grinding and repointing work covering 3,234 square feet of existing facades. The project requires manufacturer and third-party engineering representation for 42 days each during injection work.
The bid pricing structure reflects a single line item with assigned cost (GC-1 for field office maintenance at $20,000.00) while the remaining 25 line items are priced at zero dollars, resulting in an aggregate bid amount of $20,000.00. This pricing structure suggests that the contractor has elected to bid a lump sum or allowance approach for the majority of work items, with detailed unit prices and quantities specified for potential adjustment during contract execution. The document does not specify contract award dates, term length, renewal options, funding sources, or set-aside provisions within the pricing pages provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 2454 Seller_Quote_Checklist.pdf | ||
| Bid 2454 ABL~1.pdf | ||
| Zoom Link for Bid Opening Bid~14.pdf | ||
| Consent Authorization Form 1~25.pdf | ||
| AD 2454 2474 2479~1.pdf | ||
| Bid 2454 Specs~1.pdf | ||
| Bid 2454 Amendment 1.pdf | ||
| Bid 2454 Ref Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data
| Bid 2454 - 61160 | ||||||
| Contractor: | ||||||
| PWD ID | Description | UOM | Quantity | Unit Price | Total | |
| GC-1 | GC-1 includes field office maintenance and janitorial services. | Allowance | 1.0 | $ 20,000.00 | $ 20,000.00 | |
| GC-2 | GC-2 includes all labor, equipment and material necessary to drain water and maintain the basin in a de-watered state throughout construction, as herein specified. | Each | 21.0 | $ - 0 | ||
| GC-3 | GC-3 includes all labor, equipment and material necessary to remove all sediment sludge from the basin floor(s), as herein specified. | Cubic Ft | 3,234.0 | $ - 0 | ||
| GC-4 | GC-4 includes all labor, equipment, and material necessary to clean and disinfect the basin(s), as herein specified. | Each | 21.0 | $ - 0 | ||
| GC-5 | GC-5 includes all labor, material, and equipment necessary for ladder installation, as herein specified | Each | 21.0 | $ - 0 | ||
| GC-6 | GC-6 includes all labor, material, and equipment necessary for ventilator cover installation, as herein specified | Each | 66.0 | $ - 0 | ||
| GC-7 | GC-7 includes all labor, material, and equipment necessary to remove and install new facades, as herein specified. | Each | 6.0 | $ - 0 | ||
| GC-8 | GC-8 includes all labor, material, and equipment necessary to install new 48 inch effluent valve, as herein specified. | Each | 1.0 | $ - 0 | ||
| GC-9 | GC-9 includes all labor, material and equipment required to repair spalls, as herein specified. | Cubic Ft | 105.0 | $ - 0 | ||
| GC-10 | GC-10 includes all labor, material, and equipment necessary for epoxy injection of structural cracks, as herein specified. | Linear Ft | 2,583.0 | $ - 0 | ||
| GC-11 | GC-11 includes all labor, material, and equipment necessary for epoxy injection of structural cracks, as herein specified. | Linear Ft | 2,583.0 | $ - 0 | ||
| GC-12 | GC-12 includes all labor, material, and equipment necessary for epoxy injection of structural cracks, as herein specified. | Linear Ft | 2,583.0 | $ - 0 | ||
| GC-13 | GC-13 includes Manufacturer’s on-site representation for epoxy injection and grout injection, as herein specified. | Days | 42.0 | $ - 0 | ||
| GC-14 | GC-14 includes third party on-site Engineering representation to classify cracks as structural or non-structural. | Days | 42.0 | $ - 0 | ||
| GC-15 | GC-15 includes all labor, material, and equipment necessary to inject cracks with chemical grout, as herein specified. | Linear Ft | 22,617.0 | $ - 0 | ||
| GC-16 | GC-16 includes all labor, material, and equipment necessary to inject cracks with chemical grout, as herein specified. | Linear Ft | 22,617.0 | $ - 0 | ||
| GC-17 | GC-17 includes all labor, material, and equipment necessary to inject cracks with chemical grout, as herein specified. | Linear Ft | 22,617.0 | $ - 0 | ||
| GC-18 | GC-18 includes all labor, material, and equipment necessary to replace all existing drainage piping, including all required fittings and hangers, flexible tubing, and rodding of all roof drains, in Filtered Water Basins | Each | 21.0 | $ - 0 | ||
| GC-19 | GC-19 includes all labor, material, and equipment necessary to remove and install new 16 inch effluent valve, as herein specified. | Each | 10.0 | $ - 0 | ||
| GC-20 | GC-20 includes all labor, material, and equipment necessary to remove and install new 18 inch effluent valve, as herein specified. | Each | 11.0 | $ - 0 | ||
| GC-21 | GC-21 includes all labor, material, and equipment necessary to install new 60 inch effluent valve, as herein specified. | Each | 1.0 | $ - 0 | ||
| GC-22 | GC-22 includes furnishing chemical grout material as necessary to seal and inject cracks | Gallons | 2,268.0 | $ - 0 | ||
| GC-23 | GC-23 includes furnishing chemical grout material as necessary to seal and inject cracks | Gallons | 2,268.0 | $ - 0 | ||
| GC-24 | GC-24 includes furnishing chemical grout material as necessary to seal and inject cracks | Gallons | 2,268.0 | $ - 0 | ||
| GC-25 | GC-25 includes all labor, material, and equipment necessary to chemical grout cracks exhibiting active and excessive water leakage, as herein specified. | Linear Ft | 315.0 | $ - 0 | ||
| GC-26 | GC-26 includes all labor, material, and equipment necessary to grind existing masonry joints, repoint, and clean existing facades, as herein specified. | Sq Ft | 3,234.0 | $ - 0 | ||
| AGGREGATE AMOUNT BID......................................................................................................................... | $ 20,000.00 |