Bid Pricing Page 2484 71147.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- B2727964
- Issued by
- Pennsylvania
About this file
This is a bid pricing page for a prequalification solicitation issued by Pennsylvania for HVAC and glycol system betterment work at the Northeast Water Pollution Control Plant. The project involves improvements to heating, ventilation, air conditioning, and glycol systems at the facility. This is a prequalification-only solicitation, meaning approved sellers will receive separate notice and invitation to participate in a subsequent closed bid process. The estimated project value exceeds $5,000,000. Specific details regarding project scope, timeline, site visits, bidders' meetings, response deadlines, and contract term are not contained within this pricing page document.
The bid pricing page itself does not contain detailed information regarding pricing terms, payment structures, set-asides, incumbent contractor information, funding sources, or other financial requirements. Additional documentation such as the complete scope of work, project description, and bidding instructions would be necessary to determine the full pricing structure, any small business or disadvantaged business set-asides, and specific funding allocations for this prequalification phase and subsequent contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data
| Bid 2484 - 71147 | |||||
| Contractor: | |||||
| PWD ID | Description | UOM | Quantity | Unit Price | Total |
| GC-1 | Engineer’s Field Office Maintenance and Janitorial Services.The assigned amount shall include labor, equipment, materials, and appurtenant work necessary as specified in Section 01500 1.13 - Engineer’s Field Office Maintenance at $125,000.00 | Allowance | 1.0 | $ 125,000.00 | $ 125,000.00 |
| GC-2 | Underground glycol piping replacement; cut, cap, and fill piping to be abandoned in place. | Lump Sum | 1.0 | $ - 0 | |
| GC-3 | Remove and replace AHUs; new electric boilers in Compressor Building, Access Building 2, and Electrical Building; provide temporary cooling and power during construction to maintain continuity of operations; remove and replace electrical wiring for new mechanical equipment; and remove and replace MCCs in Scum Disposal Building and Electrical Building.Removal and safe disposal of lead pain found in mechanical rooms of the Compressor, Waste Gas Burner, and Digester Buildings. | Lump Sum | 1.0 | $ - 0 | |
| GC-4 | Recover glycol from existing system; provide new 30% propylene glycol solution for Digester temporary piping; and refill system with glycol after completion of piping replacement (assume 20000 gallons). | Lump Sum | 1.0 | $ - 0 | |
| GC-5 | Test pits to verify piping location, depth, and interference. (assume 10) | Lump Sum | 1.0 | $ - 0 | |
| GC-6 | For supplying all labor, material and equipment necessary to provide miscellaneous work associated with unforeseen conditions. The quantity and type of work shall be determined in the field and approved by the Owner and the Engineer in advance of said work at $500,000.00 | Allowance | 1.0 | $ 500,000.00 | $ 500,000.00 |
| GC-7 | Construction Trailer | Lump Sum | 1.0 | $ - 0 | |
| AGGREGATE AMOUNT BID............................................................................................................................ | $ 625,000.00 |