This is a bid pricing document for the City of Philadelphia's Department of Water, for Project 2479 related to the replacement of switchgear and motor control centers at the Northeast Water Pollution Control Plant (WPCP). The project involves the removal of existing outdoor transformers, 480V switchgear, and 480V motor control centers (MCCs) at three buildings—the Digester building, Sludge Gas Burner building, and Sludge Gas Compressor building—and the furnishing, installation, and testing of new outdoor substation equipment, 480V switchgear, 480V motor control centers, and battery power systems at these same locations. The scope additionally includes conducting short circuit and coordination studies and arc flash analysis as specified in Division 16-Electrical of the contract drawings. The work is specified as lump sum items with a quantity of one unit each for the removal and installation tasks.
The bid pricing page reflects an aggregate amount bid of $50,000.00, which represents only the Engineer's Field Office Maintenance allowance (Line Item E-3). Line items E-1 and E-2, which constitute the primary removal and installation work, show zero dollar amounts on the pricing page, indicating that the contractor (PWD ID) did not provide pricing for these critical scope elements. The overall project is estimated at $3,000,000 to $4,000,000, and the City of Philadelphia requires submission of a $400.00 bid processing fee through its online payment portal. This bid document represents a significant disconnect between the stated project value and the submitted pricing, suggesting either an incomplete bid submission or a data entry error requiring clarification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 2479 Amendment 1~1.pdf | ||
| AD 2454 2474 2479~3.pdf | ||
| Zoom Link for Bid Opening Bid~15.pdf | ||
| Bid 2479 Seller_Quote_Checklist.pdf | ||
| Bid 2479 Specs~1.pdf | ||
| Bid 2479 Ref Dwgs.pdf | ||
| Consent Authorization Form 1~25.pdf | ||
| Bid 2479 ABL~1.pdf | ||
| Bid 2479 Contract Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Data
| Bid 2479 - 71138 | |||||
| Contractor: | |||||
| PWD ID | Description | UOM | Quantity | Unit Price | Total |
| E-1 | The price bid shall include all the work and materials necessary to remove existing outdoor transformers, 480V switchgear, 480V MCC at Digester building, Sludge Gas Burner building, and Sludge Gas Compressor building as shown in the Contract Drawings and/or as specified under Division 16-Electrical. | Lump Sum | 1.0 | $ - 0 | |
| E-2 | The price bid shall include all the work and materials necessary to furnish, install and test new outdoor substation (transformer and associated equipment), 480V switchgear, 480V motor control center, battery power system at Digester building, 480V motor control centers at Sludge Gas Burner building, and Sludge Gas Compressor building, and conduct short circuit and coordination studies and arc flash study, as shown in the Contract Drawings and/or as specified under Division 16-Electrical. | Lump Sum | 1.0 | $ - 0 | |
| E-3 | The assigned amount shall include labor, equipment, materials, and appurtenant work as specified in Section 01500, Part 1.13 - Engineer’s Field Office Maintenance. | Allowance | 1.0 | $ 50,000.00 | $ 50,000.00 |
AGGREGATE AMOUNT BID......................................................................................................................... $ 50,000.00