Bid Plans_Frisco Water Tank Access Road_7-10-24.pdf
PDF 10 MB Posted
- Attached to
- Frisco Water Tank Access Road
- Solicitation number
- 4040004444
- Issued by
- Summit County, Colorado
About this file
The provided document is a set of bid plans for the Frisco Water Tank Access Road project, prepared by the Town of Frisco, Colorado, dated July 10, 2024. The project involves constructing an unpaved access road to a water tank, spanning approximately 0.38 acres with comprehensive engineering specifications. The scope includes clearing and grubbing, embankment material placement, topsoil management, drainage waterbar installation, erosion control, seeding, soil retention, aggregate base course construction, and installation of a 24-inch plastic pipe. The project requires construction surveying, mobilization, and includes performance and payment bonding.
The bid documents detail precise engineering requirements, with specific attention to stormwater management, erosion control, and coordination with existing utilities, particularly an XCEL high-pressure gas line. The project will require careful site restoration, revegetation of disturbed areas, and compliance with Colorado state stormwater discharge permitting processes. Earthwork quantities are precisely calculated, with 1,188 cubic yards of embankment material, 145 cubic yards of topsoil, and 157 cubic yards of aggregate base course. The construction is subject to strict environmental and operational constraints, including work hours between 7:00 AM and 7:00 PM, requirements for a migratory bird survey, and United States Forest Service (USFS) approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
COVER SHEETWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/10/2024
Project Number:
4040004444
Sheet Number:
SHEET 1 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_C O
VE
R
S H
EE
T_
W T
AC
C
ES
S
R D
.d w g
7/10/2024 4:30 PM
01_COVER SHEET_WT ACCESS RD.dwg
CMM
DILLON DAM RD
C1
TOWN OF FRISCO
WATER TANK ACCESS ROAD
PROJECT #4040004444
SHEET INDEX
SHEET NO.
C1 COVER SHEET
C2 GENERAL NOTES
C3 SUMMARY OF APPROXIMATE QUANTITIES
C4 TYPICAL SECTIONS
C5 EXISTING CONDITIONS PLAN
C6 STORMWATER MANAGEMENT PLAN
C7 STORMWATER MANAGEMENT PLAN
C8 SITE PLAN OVERVIEW
C9 PLAN & PROFILE
C10 PLAN & PROFILE
C11 PLAN & PROFILE
C12 PLAN & PROFILE
SHEET TITLE
CDOT STANDARD PLANS
M-208-1 TEMPORARY EROSION CONTROL
M-216-1 SOIL RETENTION COVERING
M-603-4 CORRUGATED POLYETHYLENE PIPE
M-603-10 CONCRETE AND METAL END SECTIONSPROJECT AREA
102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
GENERAL
NOTESWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/10/2024
Project Number:
4040004444
Sheet Number:
SHEET 2 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_G
EN
ER
AL
C O
N D
IT
IO
N S_
W T
AC
C
ES
S
R D
.d w g
8/21/2024 2:02 PM
02_GENERAL CONDITIONS_WT
ACCESS RD.dwg
CMM
DILLON DAM RD
C2
1. ALL MATERIALS, WORKMANSHIP, EQUIPMENT, INSTALLATION, AND CONSTRUCTION SHALL
BE IN ACCORDANCE WITH THE LATEST EDITION OF THE FOLLOWING STANDARD
REFERENCES AS APPLICABLE
1.1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (2023
EDITION)
1.2. TOWN OF FRISCO STREET STANDARDS
1.3. UNITED STATES FOREST SERVICE STANDARDS (SPECIFICATIONS FOR CONSTRUCTION
OF ROADS AND BRIDGES)
1.4. XCEL ENERGY HIGH PRESSURE GAS STANDARDS
2. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS OF USFS DECISION MEMO AND ALL
OTHER USFS PROJECT REQUIREMENTS.
3. CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL TOWN COMPLETES MIGRATORY
BIRD SURVEY.
4. THE TYPE, SIZE LOCATION, AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION, VERTICALLY AND
HORIZONTALLY, OF ALL UNDERGROUND UTILITIES ALONG ROUTE OF WORK.
5. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT
ALL UTILITIES TO COORDINATE SCHEDULE AND TO HAVE UTILITIES LOCATED WITHIN THE
PROJECT LIMITS.
6. TOWN OF FRISCO TO LOCATE AND SURVEY HIGH PRESSURE GAS LINES PRIOR TO START
OF CONSTRUCTION.
7. CONTRACTOR SHALL CONTACT XCEL HIGH PRESSURE GAS AND MEET ALL XCEL
REQUIREMENTS FOR POTHOLING, CROSSING OF UTILITIES, AND OTHER CONSTRUCTION
REQUIREMENTS NEAR HIGH PRESSURE GAS.
8. NO VIBRATORY COMPACTION ALLOWED WITHIN 7 FEET OF HIGH PRESSURE GAS LINES.
9. PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION, CONTRACTOR SHALL NOTIFY TOWN
OF FRISCO PUBLIC WORKS DIRECTOR.
10. CONTRACTOR AND TOWN OF FRISCO SHALL RECEIVE APPROVAL FROM USFS AND XCEL
PRIOR TO BEGINNING WORK.
11. MUD AND DEBRIS ON DILLON DAM ROAD SHALL BE REMOVED BY THE END OF EACH
WORKING DAY BY AN APPROPRIATE MECHANICAL METHOD.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON
A SET OF RECORD DRAWINGS KEPT ON THE PROJECT SITE.
13. ALL EXISTING IMPROVEMENTS THAT ARE DAMAGED AS A RESULT OF CONSTRUCTION
ACTIVITY SHALL BE REPAIED TO EXISTING OR BETTER CONDITION PRIOR TO ACCEPTANCE
OF COMPLETED IMPROVEMENTS.
14. EXISTING SURVEY INFORMATION IS BASED ON GIS AND LIDAR INFORMATION FROM TOWN
OF FRISCO.
15. CONTRACTOR SHALL PROTECT AND PRESERVE ALL TREES TO THE EXTENT POSSIBLE.
CONTACT THE TOWN REPRESENTATIVE PRIOR TO SCHEDULE A SITE INSPECTION AND
MARK TREE REMOVALS PRIOR TO START OF CONSTRUCTION.
16. ALL REMOVED WATERLINE FITTINGS AND VALVES SHALL BE TURNED OVER TO THE
OWNER.
17. CONTRACTOR SHALL RESTORE SITE TO PRE-CONSTRUCTION GRADES AND CONDITIONS
UNLESS OTHERWISE NOTED IN THESE PLANS.
18. CLEARING AND GRUBBING SHALL INCLUDE REMOVAL AND DISPOSAL OF TRASH, DEBRIS,
ROCKS, BUSHES, GRASS, AND LANDSCAPING. ALL REMOVED MATERIAL SHALL BE HAULED
OFF SITE TO CONTRACTOR'S DISPOSAL SITE.
19. CONTRACTOR SHALL COMPLETE REVEGETATION OF ALL DISTURBED AREAS.
20. EXCESS DIRT UNSUITABLE FOR STRUCTURAL FILL SHALL BE PLACED ON ABANDONED
SECTION OF ROAD. OTHER UNSUITABLE MATERIALS, NOT SUITABLE FOR PLACEMENT ON
ABANDONED ROAD, SHALL BE HAULED OFF SITE AND AT A DISPOSAL SITE OF THE
CONTRACTOR.
21. HOURS OF WORK SHALL BE BETWEEN 7:00 AM AND 7:00 PM. NO WORK SHALL BE
PERFORMED ON HOLIDAYS AND WEEKENDS UNLESS APPROVED BY PUBLIC WORKS
DIRECTOR.
22. FIELD ADJUSTMENTS MAY BE MADE WITH THE APPROVAL OF THE TOWN REPRESENTATIVE.
23. ALL CONSTRUCTION ACTIVITY MUST COMPLY WITH THE STATE OF COLORADO PERMITTING
PROCESS FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION
ACTIVITIES.
24. ALL ROADWAY FILL SHALL BE COMPACTED TO 95% STANDARD PROCTOR MAXIMUM
DENSITY IN 8" MAX LIFTS.
25. CONTRACTOR TO CONTACT SUMMIT COUNTY ROAD AND BRIDGE DEPARTMENT TO NOTIFY
OF CONSTRUCTION WORK AND HAULING ONTO DILLON DAM ROAD (COUNTY ROAD).
26. THE CONTRACTOR SHALL KEEP ALL EQUIPMENT OPERATION A MINIMUM OF 10' FROM
EXISTING OVERHEAD ELECTRIC LINES. IF THIS IS NOT FEASIBLE, OR
CONDITIONSWARRANT ADDITIONAL PROTECTION FROM THE ELECTRIC LINES, THE
CONTRACTOR MUST CALL PUBLIC SERVICE COMPANY OF COLORADO AT (970) 262-4040 TO
ARRANGE PROTECTIVE COVERING. A MINIMUM OF 48 HOURS NOTICE IS REQUIRED.
27. CONTRACTOR SHALL OBTAIN ALL ADDITIONAL PERMITS AS REQUIRED.
28. ALL WORK SHALL BE INSPECTED BY TOWN OF FRISCO. ANY WORK INSPECTED THAT DOES
NOT MEET PLANS OR SPECIFICATIONS WILL BE REPLACED BY CONTRACTOR. ALL COSTS
OF REPLACEMENT WORK SHALL BE INCURRED BY CONTRACTOR.
29. WHEN THERE IS A CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATION OR ANY
OTHER STANDARDS, THE MORE RESTRICTIVE STANDARD SHALL APPLY.
30. CONTRACTOR SHALL DISPOSE OF ALL TIMBER FLAGGED FOR REMOVAL WITHIN PROJECT
LIMITS. CONTRACTOR SHALL SUBMIT A TIMBER MANAGEMENT PLAN PRIOR TO TOWN
ISSUING NOTICE TO PROCEED.
31. CONSTRUCTION SHALL NOT COMMENCE UNTIL TOWN COMPLETES MIGRATORY BIRD
SURVEY.
32. CONSTRUCTION SHALL NOT COMMENCE UNTIL USFS ISSUES DECISION MEMO AND ALL
USFS REQUIREMENTS ARE MET.
102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
SAQWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/10/2024
Project Number:
4040004444
Sheet Number:
SHEET 3 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_S
AQ
_W T
AC
C
ES
S
R D
.d w g
7/10/2024 5:43 PM
03_SAQ_WT ACCESS RD.dwg
CMM
DILLON DAM RD
C3
SUMMARY OF APPROXIMATE QUANTITIES
SUMMARY OF EARTHWORK
12.00'
3" C
LA
SS
A
BC
FI
LL
D
EP
TH
V
AR
IE
S
(S
EE
P
LA
N A
N D
P R
O
FI
LE
S)
CLASS 1 STRUCTURAL FILL COMPACTED TO 95% STP IN 8" MAX LIFTS
1.5
EG (EXISTING ACCESS ROAD)
ROAD SECTION 1
12.00'
3" C
LA
SS
A
BC
FI
LL
D
EP
TH
V
AR
IE
S
(S
EE
P
LA
N A
N D
P R
O
FI
LE
S)
CLASS 1 STRUCTURAL FILL COMPACTED TO 95% STP IN 8" MAX LIFTS
EG
ROAD SECTION 2
2.00'
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
TYPICAL
SECTIONSWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/1/2024
Project Number:
4040004444
Sheet Number:
SHEET 4 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_T
YP
IC
AL
S
EC
TI
O
N S_
W T
AC
C
ES
S
R D
.d w g
7/11/2024 2:51 PM
04_TYPICAL SECTIONS_WT ACCESS RD.dwg
CMM
DILLON DAM RD
C4
EXISTING WATERLINE AND EASEMENT
EXISTING WATER TANK
EXISTING HIGH PRESSURE GAS
EXISTING OVERHEAD ELECTRIC
EXISTING ACCESS ROAD
NORTH SCALE: 1" = 100'
100'50'0
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
EXISTING
CONDITIONSWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/11/2024
Project Number:
4040004444
Sheet Number:
SHEET 5 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_E
XI
ST
IN
G C
O N
D
IT
IO
N
S_ W
T
AC
C
ES
S R
D .d w g
7/11/2024 2:58 PM
05_EXISTING CONDITIONS_WT ACCESS RD.dwg
CMM
DILLON DAM RD
C5
102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
STORMWATER
MANAGEMENT PLANWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/11/2024
Project Number:
4040004444
Sheet Number:
SHEET 6 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_D
EM
O A
N D
E R
O
SI
O N
C O
N
TR
O L_
W T
AC
C
ES
S
R D
.d w g
8/21/2024 12:37 PM
06_DEMO AND EROSION CONTROL_WT ACCESS RD.dwg
CMM
DILLON DAM RD
Print Date:
C6
SWMP NOTES
1. SITE DESCRIPTION
The Contractor shall comply with CDOT and USFS stormwater requirements.
1.1. Project Site Location
The site is located on USFS property located near Frisco Colorado, between Dillon Dam Road and Interstate 70.
1.2. Project Site Description
Regrading and relocation of a dirt access road to a Town water tank facility. The site contains steep slopes and natural vegetation including evergreen trees and native grasses.
1.3. Proposed Sequencing for Major Construction
Activities Installation of BMPs, removal of trees, clearing and grubbing, storm pipe installation, grading, topsoil, seeding, installation of erosion control blankets.
1.4. Acres of Disturbance
Less than 1 acre of proposed disturbance.
1.5. Existing Vegetation
Existing vegetation includes evergreen trees and native grasses. During the pre-construction meeting, the percentage of vegetation cover shall be observed and documented.
2. STORMWATER MANAGEMENT
CONTROLS FOR FIRST CONSTRUCTION
ACTIVITIES
2.1. Potential Pollution Sources
Contractor shall visit site during pre-construction meeting and identify and document all potential pollution sources and add any appropriate BMPs.
2.2. Vehicle Tracking Control
Contractor shall install vehicle tracking control in accordance with specifications.
2.3. Perimeter Control
Contractor shall install wattles and any other required perimeter control to restrict any sediment or pollutants from leaving site and discharging to state waters.
3. QUALIFIED STORMWATER MANAGER
3.1. SWMP Designer
SWMP Designer responsible for SWMP plan sheets is Christopher McGinnis, chrism@townoffrisco.com.
3.2. SWMP Administrator for Construction.
Contractor shall designate and submit to Town a SWMP adiminstrator for construction.
4. DURING CONSTRUCTION
The SWMP is a living document that requires the Contractor to continously review and modify the SWMP during construction.
4.1. Materials Handling and Spill Prevention
Prior to commencing construction, the Contractor shall submit a materials handling and spill prevention plan.
4.2. Stockpile Management
Contractor shall install bmps around all stockpiles and complete stockpile management in accordance with specifications.
4.3. Street Sweeping
Contractor shall remove any sediment tracked onto Dillon Dam Road daily.
5. CONTROL MEASURE MAINTENANCE
Maintenance shall be in accordance with with subsection 208.04 of CDOT specifications.
6. INTERIM AND PERMANENT
STABILIZATION
The contractor shall comply with all interim stabilization and permanent stabilization requirements in accordance with subsection
208.04 of CDOT specifications.
6.1. Seeding Plan
The following seed mix and rates are for drill seeding method.
6.2. Seeding Application
Drill seeding shall be shall be used for all areas.
Soil compaction shall be minimized in seeding areas.
6.3. Soil Retention Blankets
Soil retention blankets shall be installed per specifications in all disturbed areas.
6.4. Soil Amendments
Topsoil and amendments shall meet CDOT specifications. Topsoil generated on site shall be amended per specifications.
7. PRIOR TO PROJECT FINAL ACCEPTANCE
7.1. When directed by the Engineer, removal and
disposal of temporary control measures shall be included in the cost of the work.
7.2. At the end of the project, all ditch checks shall
consist of either temporary erosion logs or permanent riprap.
8. CONTROL MEASURES DURING
CONSTRUCTION
Control measures during construction shall consist of the following items installed per CDOT specifications
8.1. Straw Wattle (12")
8.2. Check Dam (12" Straw Wattle)
8.3. Vehicle Tracking Pad
8.4. Stockpile Protection
8.5. Seeding
8.6. Soil Retention Blankets
8.7. Sweeping
1+00 2+00
3+00
4+00
5+00
6+00
7+00
8+00
8+50
1+00
2+00
3+00 4+00
5+00
6+00
7+00
8+00
9+00 9+28
EROSION CONTROL WATTLE, TYP.
RE: CDOT M-208-1 FOR INSTALLATION
STRAW WATTLE CHECK DAM EVERY 50', TYP.
RE: CDOT M-208-1 FOR INSTALLATION
CLEAR AND GRUB LIMITS
REMOVE TREE, TYP.
VEHICLE TRACKING PAD
NORTH SCALE: 1" = 100'
100'50'0
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
STORMWATER
MANAGEMENT PLANWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/11/2024
Project Number:
4040004444
Sheet Number:
SHEET 7 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_D
EM
O A
N D
E R
O
SI
O N
C O
N
TR
O L_
W T
AC
C
ES
S
R D
.d w g
8/21/2024 12:38 PM
06_DEMO AND EROSION CONTROL_WT ACCESS RD.dwg
CMM
DILLON DAM RD
C7
NOTES:
1. CONTRACTOR TO LOCATE ALL UTILITIES,
HORIZONTALLY AND VERTICALLY, PRIOR TO
BEGINNING WORK.
2. EROSION CONTROL TO BE INSTALLED PRIOR TO
BEGINNING DEMOLITION WORK.
3. CONTRACTOR TO MARK ALL TREES FOR REMOVAL
AND VERIFY WITH TOWN REPRESENTATIVE.
4. CONTRACTOR SHALL PRESERVE TREES TO THE
EXTENT POSSIBLE.
0.000
1+00 2+00 3+00
4+00
5+00
6+00
7+00
8+00
8+50
1+00
2+00
3+00 4+00
5+00
6+00
7+00
8+00
9+00 9+28
STA 2+40.00
BEGIN LOWER ROAD REGRADING
STA 8+50.00
END LOWER ROAD REGRADING
STA 1+00
BEGIN UPPER ROAD REALIGNMENT
DRAINAGE WATER BAR, TYP.
EXISTING ROAD BETWEEN STA 1+50 AND STA 8+50 TO BE
ABANDONED AND REVEGETATED. WASTE EXCESS FILL/SPOILS
AND CONSTRUCT DRAINAGE WATER BARS EVERY 50' STA 9+27.47
END UPPER ROAD. MATCH EXISTING
NORTH SCALE: 1" = 30'
30'15'0
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
SITE PLANWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/11/2024
Project Number:
4040004444
Sheet Number:
SHEET 8 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_O
VE
R
VI
EW
S
IT
E
PL
AN
_W T
AC
C
ES
S
R D
.d w g
8/21/2024 12:07 PM
07_OVERVIEW SITE PLAN_WT ACCESS RD.dwg
CMM
DILLON DAM RD
C8
= CLASS 6 AGGREGATE BASE COURSE
= TOPSOIL, NATIVE SEED, AND SOIL
RETENTION BLANKET (CLASS 1)
LOWER ROAD PROFILE
HORIZ. SCALE: 1" = 30'
VERT. SCALE: 1" = 15'
1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00
7.19%
9.93%
8.90%
ST
A:
2+
.0
EL
=9
3.
19 ST
A:
3+
.7
EL
=9
2.
ST
A:
4+
.5
EL
=9
4.
ST
A.
+9
4.
EL
=9
7.
2+
3+
4+00 5+00 6+00
PI: 2+06.52
PC: 3+09.84
PT
: 3
+9 4.
PI
: 5
+4 0.
STA 2+40.00
BEGIN SECTION 1 GRADING AND BASE COURSE
ROAD TO REMAIN IN CURRENT ALIGNMENT
XCEL HP GAS
NO REMOVAL OF FILL
CONTRACTOR TO COORDINATE WITH XCEL
ON HP GAS CROSSING REQUIREMENTS AND
TEMPORARY METHODS TO MINIMIZE LOADING
ON GAS LINE FOR CROSSING OF EQUIPMENT
7.2
8.9% 2.0% 12.2%
1.
5:
2.
0:
M
AT
C H
LI
N
E
ST
A
5+
NORTH
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
File Name:
Designed By:
Project Address:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
PLAN &
PROFILEWATER TANK ACCESS ROAD
Issue:
FOR BID - NOT FOR CONSTRUCTION
Issue Date:
7/10/2024
Project Number:
4040004444
Sheet Number:
SHEET 9 OF 12
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_P
LA
N
P R
O
FI
LE
_W
T
AC
C
ES
S R
O
AD
.d w g
8/21/2024 11:57 AM
08_PLAN & PROFILE_WT ACCESS ROAD.dwg xxx xxx
C9
SCALE: 1" = 30'
30'15'0
NOTES:
1. CONTRACTOR TO LOCATE ALL UTILITIES,
HORIZONTALLY AND VERTICALLY, PRIOR TO
BEGINNING WORK.
2. CONTRACTOR TO POTHOLE HP GAS EVERY 25'
WHERE ROAD CROSSES GAS LINE. CONTRACTOR TO
COMPLETE WORK IN ACCORDANCE WITH XCEL AND
FEDERAL HP GAS REGULATIONS.
3. NO VIBRATORY COMPACTION ALLOWED WITHIN 7' OF
HP GAS LINE.
4. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH
USFS STANDARDS.
LOWER ROAD PROFILE
VERT. SCALE: 1" = 15'
5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00
ST
A:
6+
.5
EL
=9
2.
ST
A:
8+
.3
EL
=9
6.
ST
A.
+7
0.
EL
=9
4.
ST
A.
+7
9.
EL
=9
6.
2.04%
12.19%
7.22%
11.50%
5+00 6+00 7+00
8+00 8+50PI
: 5
+4 0.
PI
: 7
+0 5.
2.0% 12.2% 7.2%
11.5%
1.
5:
2.
0:
M
AT
C H
LI
N
E
ST
A
5+
STA 8+50.00
END GRADING AND BASE COURSE
MATCH EXISTING
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
Project Address:
UPPER ROAD
Issue:
Issue Date:
Project Number:
Sheet Number:
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_P
LA
N
P R
O
FI
LE
_W
T
AC
C
ES
S R
O
AD
.d w g
8/21/2024 11:55 AM
08_PLAN & PROFILE_WT ACCESS ROAD.dwg
CMM
DILLON DAM RD
NORTH
File Name:
Designed By:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
WATER TANK ACCESS ROAD
C10
SCALE: 1" = 30'
30'15'0
NOTES:
1. CONTRACTOR TO LOCATE ALL UTILITIES,
HORIZONTALLY AND VERTICALLY, PRIOR TO
BEGINNING WORK.
2. CONTRACTOR TO POTHOLE HP GAS EVERY 25'
WHERE ROAD CROSSES GAS LINE. CONTRACTOR TO
COMPLETE WORK IN ACCORDANCE WITH XCEL AND
FEDERAL HP GAS REGULATIONS.
3. NO VIBRATORY COMPACTION ALLOWED WITHIN 7' OF
HP GAS LINE.
4. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH
USFS STANDARDS.
FOR BID - NOT FOR CONSTRUCTION
7/10/2024
4040004444
SHEET 10 OF 12
UPPER ROAD PROFILE
VERT. SCALE: 1" = 15'
1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00
ST
A:
1+
.1
EL
=9
9.
ST
A:
2+
.2
EL
=9
3.
ST
A:
4+
.2
EL
=9
9.
8.84%
-0.24%
-9.97%
1+00 2+00
3+00
4+00
5+00
6+00
PC
: 1
+0 5.
PT: 2+33.31
PC: 2+75.26
PT
: 4
+2 5.3
9114 9115
91209119
91309129
2.
0:
2.
0:
2.0:1
2.0:1
2.0 :1
MAT
CHLIN
E
ST
A 5+
STA 1+00
BEGIN ROAD SECTION 2
XCEL HP GAS
NO REMOVAL OF FILL
CONTRACTOR TO COORDINATE WITH XCEL ON
HP GAS CROSSING REQUIREMENTS AND
TEMPORARY METHODS TO MINIMIZE LOADING
ON GAS LINE FOR CROSSING OF EQUIPMENT
70 LF 24" HDPE STORM PIPE
12" DEEP SWALE
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
Project Address:
UPPER ROAD
Issue:
Issue Date:
Project Number:
Sheet Number:
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_P
LA
N
P R
O
FI
LE
_W
T
AC
C
ES
S R
O
AD
.d w g
8/21/2024 11:53 AM
08_PLAN & PROFILE_WT ACCESS ROAD.dwg xxx xxx
NORTH
File Name:
Designed By:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
WATER TANK ACCESS ROAD
C11
SCALE: 1" = 30'
30'15'0
NOTES:
1. CONTRACTOR TO LOCATE ALL UTILITIES,
HORIZONTALLY AND VERTICALLY, PRIOR TO
BEGINNING WORK.
2. CONTRACTOR TO POTHOLE HP GAS EVERY 25'
WHERE ROAD CROSSES GAS LINE. CONTRACTOR TO
COMPLETE WORK IN ACCORDANCE WITH XCEL AND
FEDERAL HP GAS REGULATIONS.
3. NO VIBRATORY COMPACTION ALLOWED WITHIN 7' OF
HP GAS LINE.
4. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH
USFS STANDARDS.
FOR BID - NOT FOR CONSTRUCTION
7/10/2024
SHEET 11 OF 12
UPPER ROAD PROFILE
VERT. SCALE: 1" = 15'
5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+28
ST
A:
5+
.8
EL
=9
6.
ST
A:
7+
.1
EL
=9
5.
ST
A:
9+
.4
EL
=9
5.
-7.96%8.22%
6.77%
9.98%
5+00 6+00
7+00 8+00
9+
9+
PC
: 7
+5 6.
PT
: 7
+6 4.
PC
: 7
+8 2.
PT: 8+93.66
40 91
9160 9163
2.
0:
2.
0:
M
AT
C H
LI
N
E
ST
A
5+
XCEL HP GAS
NO REMOVAL OF FILL
CONTRACTOR TO COORDINATE WITH XCEL
ON HP GAS CROSSING REQUIREMENTS
AND TEMPORARY METHODS TO MINIMIZE
LOADING ON GAS LINE FOR CROSSING OF
EQUIPMENT
Town of Frisco P.O. Box 4100 102 School Road Frisco, CO 80443
(970) 668-4579 www.townoffrisco.com
Print Date:
Project Address:
UPPER ROAD
Issue:
Issue Date:
Project Number:
Sheet Number:
P:
\C ap ita l P ro je ct s\
\W at er
T an k Ac ce ss
R oa d\
_D ra w in gs \A
C
AD
\0 4_
SH
EE
T\
_P
LA
N
P R
O
FI
LE
_W
T
AC
C
ES
S R
O
AD
.d w g
8/21/2024 11:51 AM
08_PLAN & PROFILE_WT ACCESS ROAD.dwg
CMM
DILLON DAM RD
NORTH
File Name:
Designed By:
Date# Description Sheet Revisions Sheet Name:
Sheet Number:
WATER TANK ACCESS ROAD
C12
SCALE: 1" = 30'
30'15'0
NOTES:
1. CONTRACTOR TO LOCATE ALL UTILITIES,
HORIZONTALLY AND VERTICALLY, PRIOR TO
BEGINNING WORK.
2. CONTRACTOR TO POTHOLE HP GAS EVERY 25'
WHERE ROAD CROSSES GAS LINE. CONTRACTOR TO
COMPLETE WORK IN ACCORDANCE WITH XCEL AND
FEDERAL HP GAS REGULATIONS.
3. NO VIBRATORY COMPACTION ALLOWED WITHIN 7' OF
HP GAS LINE.
4. ALL WORK TO BE COMPLETED IN ACCORDANCE WITH
USFS STANDARDS.
FOR BID - NOT FOR CONSTRUCTION
7/10/2024
SHEET 12 OF 12
| 01_C1_COVER SHEET_WT ACCESS RD |
| Sheets and Views |
| 11x17 Plan |
| 02_C2_GENERAL NOTES_WT ACCESS RD |
| Sheets and Views |
| 11x17 Plan |
| 03_C3_SAQ_WT ACCESS RD |
| Sheets and Views |
| 11x17 Plan |
| 04_C4_SECTION VIEW_WT ACCESS RD |
| Sheets and Views |
| 11x17 Plan |
| 05_C5_EXISTING CONDITIONS_WT ACCESS RD |
| Sheets and Views |
| 11x17 Plan |
| 06_C6_SWMP_WT ACCESS RD |
| Sheets and Views |
| C6 |
| 07_C7_SWMP_WT ACCESS RD |
| Sheets and Views |
| C7 |
| 08_C8_SITE PLAN_WT ACCESS RD |
| Sheets and Views |
| 11x17 Plan |
| 09_C9_PLAN & PROFILE_WT ACCESS ROAD |
| Sheets and Views |
| C9 |
| 10_C10_PLAN & PROFILE_WT ACCESS ROAD |
| Sheets and Views |
| C10 |
| 11_C11_PLAN & PROFILE_WT ACCESS ROAD |
| Sheets and Views |
| C10 |
| 12_C12_PLAN & PROFILE_WT ACCESS ROAD |
| Sheets and Views |
| C12 |