This document is a Bid Package Submittal Requirements specification issued by the Connecticut Department of Energy and Environmental Protection (CT DEEP), Engineering, Safety and Sustainability Division, for the Wooster Mountain Shooting Range project in Portland, Connecticut. The project involves renovation of four trap fields with new trap houses and associated site work, as well as construction of a new shooting shed and office facility. All bidders must submit their bid package documents through the CT DAS CTSource website portal prior to the official bid opening date and time. The specification establishes two tables of submittal requirements: Table 1 specifies documents required from all bidders prior to bid opening, and Table 2 outlines additional documents required from the apparent lowest qualified bidder within ten calendar days or ten business days of receiving the Letter of Intent from the DEEP Project Manager. Failure to submit Table 1 documents by the bid opening deadline results in automatic bid rejection and cannot be considered a minor irregularity. Delays in submitting Table 2 documents extend the bid validity period by the same number of days delayed, up to the maximum bid hold period of sixty calendar days.
Submittal requirements vary based on bid amount, with projects valued at less than $1,000,000 and those $1,000,000 or greater having different documentation thresholds. All bidders must provide a Bid Proposal Form, bid bond or certified check, affidavits, certifications, and a Campaign Contribution Certification from the Office of the State Ethics Commission. The apparent lowest bidder must additionally submit named subcontractor qualification statements, prequalification certificates, Good Faith Effort documentation filed with the Commission on Human Rights and Opportunities, prevailing wage certification from the Department of Labor, liability insurance certificates, performance and labor and material bonds, and various other compliance documents including stormwater pollution control certification if applicable. Nonresident contractors must provide verification of status from the Connecticut Department of Revenue Services. The Project Manager is Alex Curry, PE, reachable at 860-424-3407 or alexander.curry@ct.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plan Set_ Wooster Mountain Shooting Range.pdf | ||
| Bid Proposal Form.pdf | ||
| DEEP101926CM_Oct_20_26_solicitation_doc.pdf | ||
| Invitation to Bid.pdf | ||
| Instructions to Bidders.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 21 30
BID PACKAGE SUBMITTAL REQUIREMENTS
CT DEEP PROJECT MANUAL
Bid Package Submittal Requirements:
DEEP • Engineering, Safety and Sustainability Division• Engineering Unit
163 Great Hill Rd • Portland, CT 06480
1.1 Bidding:
1.1.1 All Bidders shall send their Bid Package Documents to the CT DAS CTSource Website:
https://portal.ct.gov/DAS/CTSource/ctsource
1.1.2 For questions, call the Project Manager, at
or email at
1.2 Bid Package Submittal Requirements:
All Bidders are required to send Bid Package Documents to CTSource prior to the date and time of the Bid Opening. Additional documents must be uploaded to CTSource prior to the date and time of the bid opening. See Tables 1 and 2 for specific submittal requirements.
1.2.1 All Bidders: See Table 1.
1.2.2 Apparent Low Bidder: See Table 2.
1.3 Deadlines for Receipt of Bid Package Documents:
1.3.1 Table 1: Bid Package Documents must be sent to CTSource prior to the date and time of the Bid
Opening. Failure to send any of the items in Table 1 prior to the Bid Opening shall cause rejection of the bid and shall not be considered a minor irregularity under Connecticut General Statutes (C.G.S.) 4b-95.
1.3.2 Table 2: See the tables for additional deadlines. Failure to submit the documents before the stated deadlines may result in rejection of the bid at the sole discretion of the DEEP Project Manager.
1.4 Delays in Receipt of Supportive Documents from the Apparent Lowest Bidder:
1.4.1 If there are any delays in the receipt of the supportive documents specified in Table 2, then the Bids shall remain valid for the same additional number of days.
.1 For example, since the Apparent Lowest Bidder is required to hold the bid price for sixty (60) calendar days, if supportive documents are submitted four (4) calendar days later, then the bid shall remain valid for sixty-four (64) calendar days.
1.4.2 Failure to submit the documents before the stated deadline may result in rejection of the bid at the sole discretion of the DEEP Project Manager.
Alex Curry, PE 860-424-3407 alexander.curry@ct.gov
DEPA00013203951
CT DEEP PROJECT MANUAL PROJECT #
TABLE 1
ALL BIDDERS
Bid Amount: The Bid Proposal Form, Other Bid Package Documents, Affidavits, and Certifications shall be electronically sent to the DEEP Engineering Unit by all Bidders prior to the Date and Time of the Bid Opening.
Form Location Less Than
$1,000,000 Greater Than or Equal to $1,000,000
Bid Proposal Form and Other Bid Package Documents
X X Section 00 21 20 Bid Proposal Form Project Manual
X X Section 00 43 16 Standard Bid Bond or Certified Check Project Manual
X X Section 00 45 14 General Contractor Bidder’s Qualification Statement Project Manual
X DAS Prequalification Certificate DAS website
X DAS Update (Bid) Statement DAS Website
X X Section 00 40 14 Certificate (of authority) Project Manual
X X Section 00 73 74 Build America Buy America Acknowledgment Form (if applicable)
Project Manual
Affidavits and Certifications
X X Campaign Contribution Certification – OPM Ethics Form 1 OPM Website
CT DEEP PROJECT MANUAL PROJECT #
TABLE 2
APPARENT LOWEST QUALIFIED BIDDER
Bid Amount: WHEN APPLICABLE:
Submit within ten (10) Calendar Days after receipt of the “Letter of Intent” from the DEEP Engineering Unit:
Form Location Less Than $1,000,000
Greater Than or Equal to $1,000,000
X Section 00 45 17 Named Subcontractor Bidder’s Qualification
Statements for each Named Subcontractor listed in the Bid Proposal Form.
Project Manual
X DAS Prequalification Certificate(s) and Update (Bid) Statement(s) for each Named Subcontractor listed in the Bid Proposal Form with Subcontracts greater than $1,000,000.
Submit to DEEP Engineering Unit: Copy of Transmittal Letter to confirm the Good Faith Effort Short Form Plan was filed with CHRO. (For bids between $150,000 and $1,000,000)
(copy of transmittal letter)
X Submit to DEEP Engineering Unit: Copy of Transmittal Letter to confirm the Good Faith Effort Long Form was filed with CHRO.
(copy of transmittal letter)
Submit to CT Department of Labor: Contractors Wage Certification Form.
See Section 00 73 44 Prevailing Wage Rates/Contractor’s Wage Certification/Payroll Certification.
CT DEEP PROJECT MANUAL
TABLE 2
APPARENT LOW QUALIFIED BIDDER
(continued) Bid Amount:
Submit within ten (10) business days after receipt of the “Letter of Intent” from the DEEP Engineering Unit: Form Location Less Than
$1,000,000 Greater Than or Equal to $1,000,000
Section 00 40 14 Certificate (of authority) Project Manual
Section 00 52 03 Project Agreement Project Manual
Section 00 52 73 Subcontract Agreement Form (Named & Listed) Email From DEEP Engineering Unit
Certificate of Liability Insurance Acord® form (See Section 00 62 16 Insurance Certificate Form for details)
Project Manual
Certificate of Asbestos Abatement Liability Insurance (for asbestos abatement only) (See Section 00 62 16.1 Asbestos Abatement Liability Insurance for details)
Email From DEEP Engineering Unit
Additional Forms
Performance Bond
Labor & Material Bond
Surety Sheet
Power of Attorney from the Surety Company Surety Company
Nonresident (Out of State) Contractors:
Verified Nonresident General/Prime Contractors must submit a copy of their “Notice of Verified Status” (Verification Letter) from the CT Department of Revenue Services (DRS).
Unverified Nonresident General/Prime Contractors must submit a copy of Form AU-965 “Acceptance of Surety Bond” from the DRS.
(See Section 00 92 30 Procedures Regarding Taxation for Nonresident General/Prime Contractor and Subcontractors for additional details.)
CT Department of Revenue Services
NEW: General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities:
For projects disturbing one or more total acres of land area, submit a copy of the signed Stormwater Pollution Control Plan “Contractor Certification Statement” and License Transfer Form, as directed by the DEEP Project Manager, prior to commencement of any construction activities.
DEEP Engineering Unit
SEEC Form 10 SEEC Website
Certificate of Legal Existence from Corporations Secretary of the State
End of Section 00 21 30 Bid Package Submittal Requirements
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
Email From DEEP Engineering Unit
Bidders Certification: Financial Position and Corporate Structure
DEPA00013203951