Bid Package 2 Plans 1 14068.pdf
PDF 6 MB Posted
- Solicitation number
- RFQ 171 230000000058 4
- Issued by
- Houghton County, Lansing City, Michigan
About this file
This is a civil engineering bid package document prepared by OHM Advisors for the State of Michigan Department of Technology, Management and Budget (DTMB), Facilities and Business Services Administration, Design and Construction Division, in coordination with the Department of Natural Resources. The project involves the restoration of the Dollar Bay to Lake Linden Trail (Project No. 7136-20-0040) located in Houghton County, Michigan. Bid Package 2 encompasses trail restoration work across multiple stations from STA 631+00 to STA 503+00, spanning approximately 128,000 feet. The plans consist of 75 sheets containing removal plans, construction plans, profiles, typical details, and structural details that specify requirements for aggregate surface construction, culvert installation and removal, slope restoration, erosion and sedimentation control, and grading operations. The document establishes the technical specifications and design standards that contractors must follow, including compliance with the 2020 MDOT Standard Specifications for Construction, AASHTO's 2011 Policy on Geometric Design, and Michigan DNR guidelines.
The contractor is responsible for securing all permits and bonds prior to construction, verifying field dimensions, protecting all existing utilities by contacting Miss-Dig at least three working days before excavation, and implementing comprehensive soil erosion and sedimentation control (SESC) measures throughout the project. All work must comply with Michigan OSHA guidelines, comply with state and local codes regarding noise and hours of operation, and maintain public streets and adjacent areas free of debris and sediment. The contractor must complete permanent erosion control measures within five calendar days of final grading and restore all disturbed areas to the owner's satisfaction. Aggregate materials must meet MDOT Class 23A specifications for trail surfaces and Class 22A or 21AA for base materials. Culvert backfill within the zone of influence must be compacted to at least 95% of maximum unit weight. Surplus excavated material may be used for slope flattening, with any remaining unsuitable material becoming the contractor's responsibility for disposal. No permanent stockpiles are permitted within the right-of-way without engineer approval.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S I
Q U
E
R E
I
S P
E N
I N
S U
L A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\M isc
\20
CO
V Bi d S et
2.d wg
N ov
, 2
2 - 5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
7136-20-0040
CHICAGO
MILWAUKEE
LAKE
MICHIGAN
DETROIT
LAKE
HURON
SAULT
STE
MARIE
MARQUETTE
HOUGHTON
LAKE
SUPERIOR
DULUTH
MINNEAPOLIS
GREEN BAY
ESCANABA
TRAVERSE
CITY
GRAND RAPIDS
LANSING
PROJECT
LOCATION
DOLLAR BAY TO LAKE LINDEN TRAIL
BID PACKAGE 2
AREA LOCATION MAP
DEPARTMENT OF NATURAL RESOURCES
I Certify That The Civil Plans Were Prepared Under My Direct Supervision
OHM PROJECT No.
DATE:
DTMB File No.
7136-20-0040 11/10/2022
BID SET
751/14068.TAP
ENGINEER:
OHM ADVISORS
424 HANCOCK STREET
HANCOCK, MI 49930
906.482.0535
PROJECT CONTACT - ZANE HYRKAS, PE
APPLICATION
DATE
PERMITS APPROVAL DATE
HOUGHTON COUNTY
REGION LOCATION MAP
Sheet
Number
Sheet Title
1 TITLE SHEET
2 BID SET 2 MAP
3 NOTES
4 LEGEND
5 STA 631-STA 628 REMOVAL PLAN
6 STA 631-STA 628 CONSTRUCTION PLAN
7 STA 631-STA 628 PROFILE
8 STA 628-STA 622 REMOVAL PLAN
9 STA 628-STA 622 CONSTRUCTION PLAN
10 STA 628-STA 622 PROFILE
11 STA 622-STA 616 REMOVAL PLAN
12 STA 622-STA 616 CONSTRUCTION PLAN
13 STA 622-STA 616 PROFILE
14 STA 616-STA 612 REMOVAL PLAN
15 STA 616-STA 612 CONSTRUCTION PLAN
16 STA 612-STA 607 REMOVAL PLAN
17 STA 612-STA 607 CONSTRUCTION PLAN
18 STA 612-STA 607 PROFILE
19 STA 607-STA 604 REMOVAL PLAN
20 STA 607-STA 604 CONSTRUCTION PLAN
21 STA 607-STA 604 PROFILE
22 STA 604-STA 598 REMOVAL PLAN
23 STA 604-STA 598 CONSTRUCTION PLAN
24 STA 604-STA 598 PROFILE
25 STA 598-STA 592 REMOVAL PLAN
26 STA 598-STA 592 CONSTRUCTION PLAN
27 STA 598-STA 592 PROFILE
28 STA 592-STA 586 REMOVAL PLAN
29 STA 592-STA 586 CONSTRUCTION PLAN
30 STA 592-STA 586 PROFILE
31 STA 586-STA 580 REMOVAL PLAN
32 STA 586-STA 580 CONSTRUCTION PLAN
33 STA 580-STA 574 REMOVAL PLAN
34 STA 580-STA 574 CONSTRUCTION PLAN
STA 580-STA 574 PROFILE
STA 574-STA 568 REMOVAL PLAN
37 STA 574-STA 568 CONSTRUCTION PLAN
38 STA 574-STA 568 PROFILE
39 STA 568-STA 561+50 REMOVAL PLAN
40 STA 568-STA 561+50 CONSTRUCTION PLAN
41 STA 568-STA561+50 PROFILE
42 STA 561+50-STA 555+50 REMOVAL PLAN
43 STA 561+50-STA 555+50 CONSTRUCTION PLAN
44 STA 555+50-STA 549+50 REMOVAL PLAN
45 STA 555+50-STA 549+50 CONSTRUCTION PLAN
46 STA 549+50-STA 544+00 REMOVAL PLAN
47 STA 549+50-STA 544+00 CONSTRUCTION PLAN
48 STA 549+50-STA 544+00 PROFILE
49 STA 544-STA 538 REMOVAL PLAN
50 STA 544+00-STA 538+00 CONSTRUCTION PLAN
51 STA 544+00-STA 538+00 PROFILE
52 STA 538-STA 533 REMOVAL PLAN
53 STA 538+00-STA 533+00 CONSTRUCTION PLAN
54 STA 538+00-STA 533+00 PROFILE
55 STA 533-STA 527 REMOVAL PLAN
56 STA 533+00-STA 527+00 CONSTRUCTION PLAN
57 STA 533+00-STA 527+00 PROFILE
58 STA 527-STA 521 REMOVAL PLAN
59 STA 527+00-STA 521+00 CONSTRUCTION PLAN
60 STA 527+00-STA 521+00 PROFILE
61 STA 521-STA 515 REMOVAL PLAN
62 STA 521+00-STA 515+00 CONSTRUCTION PLAN
63 STA 521+00-STA 515+00 PROFILE
64 STA 515-STA 509 REMOVAL PLAN
65 STA 515+00-STA 509+00 CONSTRUCTION PLAN
66 STA 515+00-STA 509+00 PROFILE
67 STA 509+00-STA 503+00 REMOVAL
68 STA 509+00-STA 503+00 CONSTRUCTION PLAN
69 STA 509+00-STA 503+00 PROFILE
70 TYPICAL DETAILS
71 TYPICAL DETAILS
72 TYPICAL DETAILS
73 STRUCTURAL DETAILS 563+36
74 STRUCTURAL DETAILS 563+36
75 HEADWALL DETAILS
OWNER:
DEPARTMENT OF NATURAL RESOURCES
MARQUETTE CUSTOMER SERVICE CENTER
1990 US-41
MARQUETTE, MI 49855
Know what's below.
before you dig.Call
R
POB 631+00.00
N: 860662.2113
E: 25878529.9475
POE 503+00.00
N: 870365.7941
E: 25886520.6001 feetGRAPHIC SCALE: FULL feetHALF
18001200600300
P
L U
R I
B U
E
S U
N
U
M
C
I
R
C U
M
S P
I
C
E
S I
Q U
E R
E I
S
P E
N I
N S
U
L A M
A M
O E
N
A M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\M isc
\O
VE
RA
LL
M
AP
S\
OV
ER
AL
L M
AP
.dw g
N ov
, 2
2 -
5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
7136-20-0040
GENERAL NOTES
1. SITE STATIONING IS BASED ON HISTORIC SITE ID'S AND MAY NOT MATCH ALIGNMENT STATIONS
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL PERMITS AND POST ALL BONDS PRIOR
TO CONSTRUCTION, OR ENSURE THAT ALL REQUIRED PERMITS AND BONDS HAVE BEEN OBTAINED
PRIOR TO CONSTRUCTION.
3. CONTRACTOR SHALL KEEP ALL PUBLIC STREETS ADJACENT TO THE SITE FREE OF CONSTRUCTION
DEBRIS AND SEDIMENT. DUST SHALL BE CONTROLLED ON SITE AT ALL TIMES BY WATERING OR
OTHER NECESSARY MEANS.
4. THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGE TO STREETS, SIDEWALKS OTHER
STRUCTURES AND ADJACENT AREAS CAUSED BY DEMOLITION, HAULING, OR OTHER PERFORMANCE
OF THE WORK.
5. THE CONTRACTOR SHALL TAKE ALL NECESSARY ACTIONS TO ENSURE WORKER SAFETY AND
COMPLIANCE WITH MI-OSHA GUIDELINES.
6. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS PRIOR TO CONSTRUCTION.
ADJUST WORK AS REQUIRED TO MEET FIELD DIMENSIONS AT NO ADDITIONAL COST TO THE OWNER.
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AS SOON AS POSSIBLE.
7. THE IMPROVEMENTS COVERED BY THESE PLANS SHALL BE DONE IN ACCORDANCE WITH THE
PROPOSAL AND ACCOMPANYING SPECIFICATIONS FOR THIS PROJECT INCLUDING THE 2020 MDOT
STANDARD SPECIFICATIONS FOR CONSTRUCTION, AASHTO'S 2011 POLICY ON GEOMETRIC DESIGN
OF HIGHWAYS AND STREETS, THE 2011 MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES AND THE MICHIGAN DNR & DTMB.
8. THE CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER AS TO COMPLY WITH ALL
FEDERAL, STATE, AND LOCAL CODES FOR NOISE LEVELS, HOURS OF OPERATION FOR
CONSTRUCTION ACTIVITY, VIBRATIONS, OR ANY OTHER RESTRICTIONS. NO ADDITIONAL
COMPENSATION WILL BE DUE TO THE CONTRACTOR FOR ANY WINTER PROTECTION MEASURES
THAT MAY BE REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS.
9. COORDINATION BY THE CONTRACTOR; NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE
CONTRACTOR FOR ANY DELAY OR INCONVENIENCE DUE TO MATERIAL SHORTAGES OR DELAYS DUE
TO THE OPERATIONS OF SUCH OTHER PARTIES DOING WORK INDICATED OR SHOWN ON THE PLANS
OR IN THE PROPOSAL OR FOR ANY DELAYS IN CONSTRUCTION DUE TO THE ENCOUNTERING OF
EXISTING UTILITIES THAT MAY OR MAY NOT BE SHOWN ON THE PLANS.
10. ANY QUANTITIES AND DIMENSIONS SHOWN IN PLANS ARE PROVIDED FOR INFORMATION ONLY, CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION.
ADJ ADJUST
APPROX APPROXIMATELY
ASPH ASPHALT
B/BANK BOTTOM OF BANK
CONC CONCRETE
CT CURB TRANSITION
C&G CURB AND GUTTER
CVT CITY, VILLAGE, TOWNSHIP
DIA DIAMETER
DW DOMESTIC WATER
EA EDGE OF ASPHALT
ELEC ELECTRIC
ELEV ELEVATION
EX EXISTING
F/C FACE OF CURB
FF FINISH FLOOR
FG FINISHED GRADE
FT FEET
HDCP HANDICAP
INV INVERT ELEVATION
OB OBSERVATION WELL
OBS OBSERVED
OH OVERHEAD
OT OVER TOPPING
PROP PROPOSED
R RADIUS
RES RESET
RIM TOP OF UTILITY/DRAINAGE STRUCTURE
ROW RIGHT-OF-WAY
SAN SANITARY
SP SPRING WATER
SQFT SQUARE FEET
STM STORM
SYD SQUARE YARD
TC TOP OF CURB
TELE TELEPHONE
TP TRAVERSE POINT
TS&M TOPSOIL, SEED & MULCH
TYP TYPICAL
T/BANK TOP OF BANK
UG UNDER GROUND
UNO UNLESS NOTED OTHERWISE
WEL WELL LINES
W# WELL LINE
WM WATER MAIN
WTR WATER
YBT YELLOW BENCH LINE
D50 RIPRAP SIZE WHERE 50% OF STONES
ARE LARGER
DMAX MAX STONE SIZE/AVG DEPTH OF
RIPRAP
ABBREVIATIONS:
UTILITY NOTES
1. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL
EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO
CONSTRUCTION BY CALLING MISS-DIG (811) AT LEAST 3 WORKING DAYS PRIOR TO EXCAVATION.
2. THE UTILITY LOCATIONS ARE BASED ON FIELD OBSERVATIONS AND A CAREFUL REVIEW OF UTILITY
RECORDS. HOWEVER, IT IS NOT POSSIBLE TO DETERMINE THE PRECISE SIZE, LOCATION, DEPTH, PRESSURE, OR ANY OTHER CHARACTERISTICS OF UNDERGROUND UTILITIES, TANKS OR SEPTIC FIELDS
WITHOUT EXCAVATION. THEREFORE, WE CANNOT GUARANTEE THE ACCURACY OR COMPLETENESS OF
THE BURIED UTILITY INFORMATION HEREON SHOWN. THE CONTRACTOR SHALL HIRE A PRIVATE UTILITY
LOCATOR TO LOCATE UTILITIES ON SITE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY THESE UTILITY LOCATIONS PRIOR TO CONSTRUCTION AND MAKE EVERY EFFORT TO PROTECT
AND/OR RELOCATE THEM AS REQUIRED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER/SURVEYOR
AS SOON AS POSSIBLE IN THE EVENT A DISCREPANCY IS FOUND.
3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR THE PROTECTION OF ALL EXISTING UTILITIES
DURING CONSTRUCTION. ALL UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED WITH
LIKE MATERIAL. THE EXACT LOCATION OF EXISTING UTILITIES SHALL BE LOCATED BY HAND DIGGING.
DTMB: SOIL EROSION AND SEDIMENTATION CONTROL
1. ALL WORK SHALL COMPLY WITH THE APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL (SESC)
RULES AND REGULATIONS (SOIL EROSION AND SEDIMENTATION CONTROL - 1994 PA 451, PART 91, AS
AMENDED, MCL 324.9101 ET SEQ.).
2. ALL EARTH CHANGES OF ONE ACRE OR MORE OR WITHIN 500 FEET OF WATERS OF THE STATE REQUIRE A
SESC PERMIT. IF A SESC PERMIT IS REQUIRED THE PROFESSIONAL SERVICES CONTRACTOR (DESIGN
CONSULTANT) SHALL PREPARE AN SESC PLAN. THE SESC PLAN SHALL ADDRESS BOTH WIND AND WATER
EROSION AND SEDIMENTATION.
3. THE CONTRACTOR SHALL REVIEW THE DESIGN CONSULTANT'S SESC PLAN IN ORDER TO PREPARE AND
ISSUE FOR APPROVAL AN “SESC IMPLEMENTATION PLAN”, WHICH INDICATES THE CONTRACTOR'S
INTENDED IMPLEMENTATION OF THE SESC PLAN FOR THE PROJECT, INCLUDING A SCHEDULE.
4. THE DTMB SESC PROGRAM, UPON APPROVAL OF THE IMPLEMENTATION PLAN, WILL ISSUE THE
CONTRACTOR AN “AUTHORIZATION TO PROCEED WITH EARTH CHANGE”, WHICH IS TO BE POSTED AT THE
JOB SITE. THIS DOCUMENT IS ISSUED IN LIEU OF A PERMIT FROM THE COUNTY OR OTHER LOCAL
ENFORCING AGENCY.
5. THE CONTRACTOR SHALL IMPLEMENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AS
REQUIRED BY THE PROJECT'S SESC PLAN, SESC IMPLEMENTATION PLAN, DTMB'S SOIL EROSION AND
SEDIMENTATION CONTROL GUIDEBOOK, DATED JULY 2019, AND AS
DIRECTED BY THE PROFESSIONAL SERVICES CONTRACTOR, DTMB SESC INSPECTOR, AND/OR DTMB
PROJECT DIRECTOR. THE DTMB SESC INSPECTOR SHALL INSPECT THE SITE WEEKLY AND AFTER
SIGNIFICANT RAIN EVENTS.
6. THE CONTRACTOR SHALL INSTALL TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES
PRIOR TO OR UPON COMMENCEMENT TO EARTHWORK ACTIVITIES.
7. THE CONTRACTOR WILL PERFORM SWEEPING AS NEEDED TO REMOVE ANY SEDIMENT TRACKED OFF SITE.
FREQUENCY OF SWEEPING WILL BE BASED ON SITE CONDITIONS.
8. THE CONTRACTOR WILL PERFORM DUST CONTROL AS NEEDED BASED ON SITE CONDITIONS.
9. DISTURBED AREAS THAT WILL REMAIN IDLE DURING CONSTRUCTION MUST BE TEMPORARILY STABILIZED, INCLUDING SOIL STOCKPILES, USING DTMB SESC BEST MANAGEMENT PRACTICES.
10. THE CONTRACTOR SHALL MAINTAIN AND INSPECT SESC MEASURES THROUGHOUT THE COURSE OF THE
PROJECT. THE DTMB RECOMMENDS INSPECTING AND MAINTAINING EROSION AND SEDIMENTATION
CONTROLS ON A DAILY BASIS. AT A MINIMUM, THE CONTRACTOR SHALL INSPECT AND MAINTAIN SESC
MEASURES ONCE A WEEK AND AFTER RAIN EVENTS.
11. THE CONTRACTOR SHALL CORRECT NON-CONFORMING SESC MEASURES WITHIN 24 HOURS, IF WATERS OF
THE STATE ARE BEING IMPACTED, OR, WITHIN 48 HOURS FOR ROUTINE MAINTENANCE ITEMS. OTHER SESC
MAINTENANCE SHALL BE COMPLETED AS SOON AS POSSIBLE BUT NEVER MORE THAN FIVE (5) DAYS AFTER
DETECTION. NON COMPLIANCE COULD RESULT IN $500/DAY FINES BY THE AGENCY AND ASSESSMENT OF
ACTUAL DAMAGE COSTS.
12. THE CONTRACTOR SHALL COMPLETE PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY
DISTURBED LAND AREA WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR THE FINAL EARTH CHANGE
HAS BEEN COMPLETED. THE CONTRACTOR SHALL MAINTAIN TEMPORARY CONTROL MEASURES UNTIL
PERMANENT SOIL EROSION CONTROL MEASURES ARE IN PLACE AND THE AREA IS STABILIZED.
13. THE CONTRACTOR SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER PERMANENT SOIL
EROSION MEASURES ARE IN PLACE AND THE AREA IS STABILIZED. CARE SHALL BE TAKEN DURING REMOVAL
TO PREVENT SOIL EROSION AND SEDIMENTATION.
14. AFTER THE COMPLETION OF THE PROJECT, PERMANENT SESC MEASURES WILL BE MAINTAINED BY THE
PROPERTY OWNER.
REMOVAL
1. ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR
TO STARTING REMOVALS.
2. REMOVALS SHALL BE DONE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER.
3. SAW CUTTING FOR PAVEMENT REMOVAL AS SHOWN ON THE PLANS OR AS DIRECTED BY THE
ENGINEER SHALL BE TO THE DEPTH REQUIRED FOR NEAT REMOVAL OF PAVEMENT OR CONCRETE. DO
NOT OVERCUT PAST ENDS OR CORNERS. REPAIR/RESTORE ALL DAMAGED AREAS.
4. SAW CUTTING DEPTH SHALL BE ADEQUATE TO PREVENT SPALLING, CHIPPING, OR DAMAGE TO
EXISTING PAVEMENT EDGES LEFT IN PLACE AS DIRECTED.
5. CLEARING OF ALL VEGETATION WHERE PROPOSED CONSTRUCTION WARRANTS SHALL BE PAID FOR BY
CLEARING THE BRUSH AND TREES. CONTRACTOR SHALL REVIEW CLEARING LIMITS WITH THE
ENGINEER PRIOR TO THE CLEARING OPERATION.
6. ANY ADDITIONAL TREE REMOVALS, CLEARING, GRADING, ETC. NEEDED FOR THE CONTRACTOR'S
STAGING AND/OR WORK OPERATIONS SHALL BE COMPLETED AND AREA RESTORED TO THE
SATISFACTION OF THE OWNER WITHOUT ADDITIONAL COMPENSATION.
7. ADDITIONAL WORK OUTSIDE OF THE LIMITS AS SHOWN ON THE PLAN SHALL BE SUBMITTED TO THE
ENGINEER FOR APPROVAL PRIOR TO STARTING THE ADDITIONAL WORK.
8. MATERIALS REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE PROPERLY
DISPOSED OF AT AN OFF SITE LOCATION.
AGGREGATE SURFACE CONSTRUCTION
1. NEW AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL MEET THE REQUIREMENTS OF SECTION
902 OF THE 2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION AND SHALL BE MDOT CLASS 23A
OR AS APPROVED BY THE ENGINEER.
2. AGGREGATE MATERIAL FOR ROAD AND TRAIL SURFACE SHALL BE CONSTRUCTED PER SECTION 306 OF THE
2020 MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION.
AGGREGATE CONSTRUCTION
1. AGGREGATE USED FOR PAVEMENT BASE SHALL MEET THE REQUIREMENTS OF SECTION 902 OF THE 2020
MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION AND SHALL BE MDOT CLASS 22A OR 21AA OR AS
APPROVED BY THE ENGINEER.
2. AGGREGATE BASE CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH SECTION 302 OF THE 2020 MDOT
STANDARD SPECIFICATIONS FOR CONSTRUCTION.
CULVERT TRENCH
1. BEDDING UNDER THE CULVERT SHALL BE AS SPECIFIED AND THE UNDERCUT MATERIAL REPLACED WITH
GRANULAR MATERIAL CLASS IIIA. BACKFILLING SHALL BE IN ACCORDANCE TO THE PROJECT SPECIFICATIONS
AND MANUFACTURER'S REQUIREMENTS.
2. BACKFILL FOR CULVERT TRENCHES ABOVE GRANULAR MATERIAL CLASS II SHALL BE PLACED AS FOLLOWS:
2.1. SUITABLE SOILS SHALL BE USED TO BACKFILL TRENCHES UNDER ROADS/TRAILS AND SHALL BE
COMPACTED TO NOT LESS THAN 95% OF ITS MAXIMUM UNIT WEIGHT.
2.2. SUITABLE SOILS SHALL BE USED TO BACKFILL CULVERT TRENCHES OUTSIDE THE ROADS/TRAILS BUT
WITHIN THE 1:1 ZONE OF INFLUENCE AND SHALL BE COMPACTED TO NOT LESS THAN 95% OF ITS
MAXIMUM UNIT WEIGHT.
2.3. SATISFACTORY MATERIAL EXCAVATED FROM THE CULVERT TRENCHES SHALL BE USED TO BACK FILL
CULVERT TRENCHES OUTSIDE THE LIMITS OF THE 1:1 ZONE OF INFLUENCE AND COMPACTED TO NOT
LESS THAN 95% OF ITS MAXIMUM UNIT WEIGHT.
STEWARDSHIP/ARTIFACT NOTE
1. IF ANY ARTIFACTS ARE DISCOVERED DURING THE CONSTRUCTION PROCESS, ALL WORK IS TO STOP AND
THE OWNER'S REPRESENTATIVE/PROJECT MANAGER SHALL BE NOTIFIED. ARTIFACTS OR ARCHEOLOGICAL
MATERIALS ARE DEFINED AS: ABORIGINAL ANTIQUITIES AND OTHER RECORDS ON ANTIQUITY, INCLUDING
MOUNDS, MINES, EARTHWORKS, VILLAGE SITES, CAMP SITES, BURIALS, HUMAN OR OTHER BONES, SHELLS, STONE IMPLEMENTS, BONE OR COPPER IMPLEMENTS, POTTERY OR SHARD OF POTTER, OR OTHER OBJECTS
RELATING TO NATIVE AMERICAN OCCUPATION; AND MODERN ARTIFACTS, SUCH AS FORTS, RELICS, AND
OTHER ARTIFACTS RELATING TO THE HISTORIC, COLONIAL, TERRITORIAL AND EARLY STATEHOOD PERIODS.
EARTHWORK, GRADING & RESTORATION
1. THE CONTRACTOR SHALL RESTORE ALL ADJACENT AREAS UPON COMPLETION OF THE PROJECT.
2. ALL DISTURBED AREAS SHALL BE BROUGHT TO FINAL GRADE AND STABILIZED AS SOON AS POSSIBLE AFTER
BEING DISTURBED. PERMANENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTALLED
WITHIN FIVE CALENDAR DAYS OF COMPLETING FINAL GRADING.
3. ALL PERMANENT SLOPES LESS THAN 3:1 SHALL BE STABILIZED USING TOPSOIL & MULCH BLANKETS.
4. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED USING HIGH VELOCITY MULCH BLANKET.
5. CONTRACTOR SHALL PLACE SALVAGED AND TOPSOIL, SEED AND MULCH ON ALL DISTURBED AREAS NOT UNDER
PAVEMENT OR OTHERWISE LABELED, AS DIRECTED BY THE ENGINEER TO PROVIDE A MINIMUM 3" THICKNESS.
SEED MIX DESIGN FOR ALL SLOPE RESTORATION SHALL BE PER THE SPECIFICATIONS.
6. ALL FILL SHALL BE CLEAN INERT MATERIAL.
7. ALL EXCAVATIONS UNDER OR WITHIN 3 FEET OF PUBLIC PAVEMENT, EXISTING OR PROPOSED, SHALL BE
BACKFILLED AND COMPACTED WITH SAND (MDOT CLASS II).
8. SURPLUS EXCAVATED MATERIAL MAY BE USED TO FLATTEN FILL SLOPES AS DIRECTED BY THE ENGINEER. ANY
SURPLUS OR UNSUITABLE MATERIAL, INCLUDING PEAT EXCAVATION, UNABLE TO BE USED SHALL BECOME THE
PROPERTY OF THE CONTRACTOR FOR DISPOSAL.
9. CONTRACTOR SHALL SUBMIT LOCATIONS OF MATERIAL STOCKPILES TO THE ENGINEER FOR APPROVAL.
PROTECT ADJACENT AREAS WITH SILT FENCE AS REQUIRED.
9. EXCAVATED SOILS MAY BE PERMANENTLY STOCKPILED WITHIN THE TRAIL RIGHT OF WAY FOR THE
BID PACKAGE.
BID PACKAGE 2: NO PERMANENT STOCKPILES WITHIN ROW WITHOUT APPROVAL FROM THE
ENGINEER.
ALL STOCKPILE LOCATIONS SHALL BE LOCATED IN AREAS THAT ARE NOT DETRIMENTAL TO
DRAINAGES. ALL LOCATIONS SHALL BE SUBMITTED AND APPROVED BY THE ENGINEER PRIOR TO
UTILIZATION.
10. STOCKPILES SHALL HAVE SLOPES NOT EXCEEDING 1V:3H OR THE ANGLE OF REPOSE FOR THE
STOCKPILED SOIL.
11. PROVIDE TEMPORARY AND PERMANENT SESC MEASURES FOR STOCKPILED SOILS UNTIL GROWTH IS
ESTABLISHED.
12. PERMANENT AND TEMPORARY SESC MEASURES FOR PERMANENT STOCKPILE LOCATIONS ARE
NCIDENTAL TO REMOVAL ITEMS AND SHALL NOT BE PAID FOR SEPARATELY.
13. PERFORM EXCAVATIONS TO ALLOW SHEET FLOW OF STORMWATER TO BE DIRECTED TO THE
DOWNSTREAM SIDE OF SITE.
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S I
Q U
E
R E
I
S P
E N
I N
S U
L A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\M isc
\20
NO
T2 .dw g N ov
, 2
2 - 2:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
U
R
I B
U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S
I
Q
U E
R E
I S
P E
N I
N S
U L
A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\M isc
\20
LE
G.
dw g N ov
, 2
2 - 5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
7136-20-0040
CURB AND GUTTER, REM
ADA SIDEWALK RAMP
FLAMMABLE MATERIAL
HAZARDOUS OR
CONTIGUOUS PROPERTY SYMBOL
PARCEL NUMBER BOX
XXXX
MISCELLANEOUS UTILITY SYMBOLS
GUY WIRE
CABLE TV RISER
CONIFEROUS TREE
CONIFEROUS SHRUB
DECIDUOUS TREE
DECIDUOUS SHRUB
ELECTRIC RISER
ELECTRIC METER
FLAG POLE
FLOOD LIGHT
GAS METER
GAS RISER
GAS VALVE
GUY POLE
HAND HOLE
IRON ROD/PIPE
LIGHT/DECOR LAMP POLE
MAIL/NEWSPAPER BOX
GAS VENT
MONUMENT
MONITORING WELL
PHONE BOOTH
PK NAIL
POST
SOIL BORING
SECTION CORNER
SIGN
STUMP
TRAFFIC SIGNAL
TRANSFORMER PAD
TRAVERSE POINT
UNDERGROUND MARKER
PRIVATE UTILITY MANHOLE
UTILITY POLE
RAILROAD CROSSING
MISCELLANEOUS SYMBOLS
RIPRAP
WETLAND
BENCHMARK
USED WITH UNDERGROUND GAS &
ELECTRICAL LINES
USED WITH TELEPHONE &
UTILITY PATTERN
ELECTRICAL *
GAS\OIL
WATER
FIBER OPTIC *
ROW PATTERN
ROW
SECTION
ROW
TOPO PATTERN
HEDGE/TREE
FENCE
GUARDRAIL
CENTERLINE OF DITCH
GRADING LIMIT
RAILROAD
REMOVAL LEGEND
SALVAGE
BULKHEAD
ABANDON
CLEARING
REMOVE
SALVAGE
BULKHEAD
ABANDON
REMOVE
ADJUST
RELOCATE
ADJUST BY OTHERS
RELOCATE BY OTHERS
SANITARY
STORM
PROPERTY/PARCEL
(SLOPE STAKE)
UNDERGROUND UTILITY
CAUTION - CRITICAL
SPECIAL LEGEND
NO ROW IMPACTS
XXXX
FLOW DIRECTION
REMOVE BY OTHERS
SIDEWALK REMOVAL
COLD MILLING HMA SURFACE
PAVEMENT REMOVAL
HMA BASE CRUSHING AND SHAPING
HMA SURFACE REMOVAL
WETLAND/EDGE OF WATER
CENTERLINE OF DITCH
GUARDRAIL
FENCE
ROW
PROPOSED
CABLE/TELEPHONE *
PROPOSED
STORM/SANITARY/WATER
12"
RIPRAP
SIGN
FLOW DIRECTION
FIBER OPTIC LINES
STRUCTURE NUMBER
WM SAN STM
UTILITY POLE W/LIGHT
PEDESTRIAN RISER
TRAFFIC SIGNAL CONTROLLER
TELEPHONE RISER
WATER & SEWER UTILITY SYMBOLS
STORM MANHOLE
ROUND CATCH BASIN
SQUARE CATCH BASIN
SANITARY MANHOLE
FIRE HYDRANT
INLET/CATCH BASIN
STORM MANHOLE
SANITARY MANHOLE
CULVERT
GATE VALVE & WELL
METER PIT
CULVERT END SECTION
GATE VALVE & WELL
CLEAN OUT
CULVERT W/O END SECTION
SPRINKLER HEAD
WATER METER
IRRIGATION VALVE
CULVERT W/END SECTION
WATER STOP BOX
GATE VALVE & BOX
GATE VALVE & BOX
TAPPING SLEEVE VALVE & WELL
TAPPING SLEEVE VALVE & BOX
FIRE HYDRANT
RELOCATE
RECONSTRUCT
RELOCATE BY OTHERS
ADJUST BY OTHERS
IF NECESSARY FOR CLARITY
S
B
A
C
R
REL
REC
REL B/O
ADJ B/O
12"
PRIMARY UTILITY WILL HAVE A CONTINUOUS
LINESTYLE, WITH THE SECONDARY UTILITY
MATCHING ITS RESPECTIVE EXISTING
UTILITY LINESTYLE
CL 1
CL 2
CL 3
1" TO 5"
6" TO 17"
18" TO 35"
CL 4 36" AND UP
EXCAVATION, EARTH
RECONSTRUCT
XXXXXX
XXXXXX
XXXXXX
XXXXXX
XXXXXX
XXXXXX
XXXXXX
XXXXXX
XXXXXX
XXXXXX
R-
A-
B-
ADJ-
ADJ B/O-
REL B/O-
S-
REL-
REC-
R B/O-
TREE, REM
TOPSOIL, SEED AND MULCH
TRAIL AGGREGATE
SF SF SF SF SF
SILT FENCE
CLEARING LIMITS
CULVERT, REM
SEDIMENT BASIN
TSV&B
TSV&W
GV&B
GV&W
PROTECT
SF
S
F
S F
S
F
S
F
S
F
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
60402010
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S I
Q U
E
R E
I
S P
E N
I N
S U
L A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\R em ov al\
RE
M_
SE
G2 _4
.dw g
N ov
, 2
2 -
5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
7136-20-0040
(60' R.O.W.)
CLEARING LIMITS
CLEARING
KEY PLAN
F
O
R
S
M
A
R
D
S
A
F
A
T
M
NTS
628+00
629+00
630+00
631+00
631+00
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
60402010
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S I
Q U
E
R E
I
S P
E N
I N
S U
L A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\P lan s_ Co ns t\2
0C
ON
_S
EG
2_ 4.d
, 2
2 -
5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
7136-20-0040
(60' R.O.W.)
AGGREGATE SURFACE CSE, 8 INCH (TYP)
SLOPE RESTORATION, TYPE D
CULVERT, CL A, 12 INCH
PLUNGE POOL,
SEE STANDARD DETAIL
ON SHEET 72
BARRICADE, TYPE III, HIGH
INTENSITY, DOUBLE SIDED
KEY PLAN
F
O
R
S
M
S
A
A
M
NTS
AGGREGATE SURFACE CSE, 8 INCH (TYP)
PLUNGE POOL,
SEE STANDARD DETAIL
ON SHEET 72
CULV, CL A, 24 INCH
CULV, END SECT, 24 INCH (TYP)
CULVERT, END SECT, 12 INCH (TYP)
628+00629+00630+00631+00631+00
P V
C
S
T A
P V
C
E
L E
V
628+00629+00630+00631+00631+00
-1.18%
1.42% -1
.9 0%
-0.73%
L.P. STA = 629+02.27
L.P. ELEV = 633.97
PVI STA = 628+91.27
PVI ELEV = 634.05
K: = 49.02
22.01' VC
A.D. = 0.45%
H.P. STA = 628+29.69
H.P. ELEV = 634.73
PVI STA = 628+54.69
PVI ELEV = 634.48
K: = 291.89
50.00' VC
A.D. = 0.17%
P V
T
S
T A
P V
T
E
L E
V
P V
C
S
T A
P V
C
E
L E
V
P V
T
S
T A
P V
T
E
L E
V
PROP GRADE @ ℄
34 Ft 24" CULV, CL A, @4.83%
APPROX EXC LIMITS
42 Ft 24" CULV, CL A, @1.00%
APPROX EXC LIMITS
1.0'1.0'
1.0'
1.0'
Know what's below.
before you dig.Call
R
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S I
Q U
E
R E
I
S P
E N
I N
S U
L A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\P ro file s\2
0P
RF
_S
EG
2_ 3.d
, 2
2 -
5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
STA 631 - STA 628 PROPOSED TRAIL CENTERLINE PROFILE
S F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
Know what's below.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
60402010
P
L
U
R I
B U
E
S
U
N
U
M
C
I
R
C
U M
S
P
I
C
E
S I
Q U
E
R E
I
S P
E N
I N
S U
L A
M A
M O
E N
A
M
ARCHITECTS. ENGINEERS. PLANNERS
OHM-ADVISORS.COM
P:
\71
_7
0\7
0_ La ke _L ind en
_T ra il_ Re sto ra tio n_
\D ra wi ng s\C ivi l\T ra il\R em ov al\
RE
M_
SE
G2 _3
.dw g
N ov
, 2
2 -
5:
pm
D
EP
A
RT
M
EN
T O
F
TE
CH
N
O
LO
G Y
, M A
N A
G
EM
EN
T
A N
D B
U D
G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
FA
CI
LI
TI
ES
A
N D
B U
SI
N
ES
S
SE
RV
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
424 HANCOCK STREET
HANCOCK, MICHIGAN 49930
PH. 906.482.0535
F 906.482.6453
7136-20-0040
(100' R.O.W.)
REMOVE AND REPLACE
CULVERT, SEE CULVERT STANDARD
PLAN ON SHEET 70
CLEARING LIMITS
CLEARING LIMITS
CLEARING LIMITS
CLEARING
CLEARING
CLEARING
KEY PLAN
F
O
R
S
M
S
A
A
M
NTS
File details come from the government source that posted it. Updated .