This is a Bid Notice issued by Pottawatomie County, Kansas for a Surface Recycle and Chip Seal project on K-99 highway. The project encompasses a 25.90-mile stretch of K-99 extending from the K-99/US-24 Junction to the Pottawatomie/Marshall County Line in Pottawatomie County. The work is tied to project KA 8057-01 and involves resurfacing and chip sealing of the existing roadway. The latest project start date is July 05, 2027. Specific details regarding bidder meeting dates, site visit requirements, response deadlines, and award timelines should be referenced within the bid notice documentation.
The bid notice establishes the procurement parameters for qualified contractors to submit proposals for the highway surface improvement project. Additional information regarding pricing terms, bid submission requirements, contractor qualifications, funding sources, and project specifications would be detailed in the complete bid notice and associated scope of work documents. Interested bidders should review all documentation thoroughly to understand bonding requirements, insurance obligations, and any prevailing wage or set-aside provisions that may apply to this state and local contract opportunity.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745
Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org
Bureau of Construction and Materials
STATE PROJECT NUMBER: K099-075 KA 8080-01
CALL ORDER NUMBER: 613
PROPOSAL NUMBER: 526106131
LETTING DATE 10/21/2026
COUNTY: POTTAWATOMIE
FUND TYPE: STATE
WAMEGOKDOT CONSTRUCTION OFFICE:
PROJECT DESCRIPTION
SURFACE RECYCLE AND CHIP SEAL. K-99; FR K-99/US-24 JCT TO
PT/MS CL IN PT CO. LGTH 25.90 MI. TIED TO KA 8057-01.
RESTRICTED DAYS
(60)
TOTAL CONTRACT DAYS
(80)
TIED TO: 526102201 KA 8057-01
JULY 05, 2027
Earliest Start Date:
Latest Start Date:
1:11:00PM9/16/2026 @
Letting 10/21/2026 Kansas Department of Transportation Project No. K099-075 KA 8080-01
Contract No. 526106131
K099-075 KA 8080-01 K099-075 KA 8080-01
CONTRACT PROPOSAL
DOT Form No. 202 Rev. 02/19
Contract ID: 526106131
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:
K099-075 KA 8080-01 / K099-075 KA 8080-01
The general scope, location and net length are:
SURFACE RECYCLE AND CHIP SEAL. K-99; FR K-99/US-24 JCT TO
PT/MS CL IN PT CO. LGTH 25.90 MI. TIED TO KA 8057-01.
2. This is the Proposal of [Contractor] to complete the Project for the amount set out in the accompanying
Unit Prices List.
3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:
4. Contractors and other interested entities may examine the Bidding Proposal Form/Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the
Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office
Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal
Form/Contract Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal
Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above. Contractors shall furnish this notice no later than 5:00 P.M. on the
Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".
5.Contractors shall use the Bidx.com website to complete and submit the bid form. Project bid forms are available on Bid Express' website at http://www.bidx.com.
6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website.
7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using
Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the
Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the
Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.
8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.
9. The contractor shall complete work to open the project to unrestricted traffic within _60_ Restricted Days and shall complete the work within the total Contract Working Days of _80_.
Contractor: Check: Page 1
10. The Contractor shall complete the Project according to the plans, Standard Specifications, provisions identified in the Special Provision List and all other Contract Documents identified in Standard
Specifications subsection 101.3
11. The undersigned declares that the Contractor has carefully examined the Bidding Proposal Form for the
Project. The Contractor understands the following:
A. The Bidding Proposal Form consists of the following documents: the Bidx bid form on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid
Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).
B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.
C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the Bidx bid form, electronically signs the Proposal where required on DOT Form 202, and submits the completed Bidx bid form documents and bid bond to KDOT using Bid Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the Contractor's Proposal.
D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.
12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.
13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions (I-XVII) require the
Contractor to furnish information. The current versions of these provisions are contained in the Bidx bid form. Some or all of these apply to the Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the Bidx bid form file. When these documents are required, the
Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the Bidx bid form.
I. 08-10-66 Certification-Noncollusion & History of Debarment
II. 04-30-82 Certification-Financial Prequalification Amount
III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying
IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm
V. 10-10-00 Price Adjustment for Fuel
VI. 06-01-06 Price Adjustment for Asphalt
VII. 08-31-09 Price Adjustment for Emulsified Asphalt
VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost
IX. 05-18-07 Repair (Structures) Unit Cost
X. 11-15-17 Electric Lighting System Unit Cost
XI. 04-06-09 ITS Unit Cost
XII. 08-17-16 Water System Unit Cost
XIII. 06-19-19 Sanitary Sewer System Unit Cost
XIV. 01-01-18 Smart Work Zone System Unit Cost
XV. 08-12-24 CORS Unit Cost
XVI. 04-06-26 Federal Restrictions on Foreign Drones
XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate
Contractor: Check: Page 2
14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.
15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.
I. 11-03-80 Affirmative Action For EEO
II. 11-15-96 Affirmative Action & EEO Policies
III. 09-06-94 U.S. DOT Fraud Hotline
IV. FHWA-1273 Federal-Aid Required Contract Provisions
16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.
17. SIGNATURE SECTION:
A. Electronic Internet Proposal
The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this
Proposal and binds the named individual to the certification in paragraph B.
B. Certification
I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING THIS PROPOSAL. I
CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT LIMITED TO THE INFORMATION CONTAINED
IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH 13) IS TRUE AND CORRECT.
EXECUTED ON
C. Signature
Number of company or joint venture:
Name of company or joint venture:
Name of person signing:
Title of the person signing:
Signature: Electronic Internet Proposal
RELEASED FOR CONSTRUCTION:
Date:____________________________________
Chief of Construction and Materials
Contractor: Check: Page 3
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
09/09/26
STATE PROJECT NO: K099-075 KA 8080-01 STATE CONTRACT NO: 526106131
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: POTTAWATOMIE1
SURFACE RECYCLE AND CHIP SEAL. K-99; FR K-99/US-24 JCT TO PT/MS CL IN PT
CO. LGTH 25.90 MI. TIED TO KA 8057-01.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05
REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07
REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03
REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR FUEL10-10-00-R09
REQUIRED CONTRACT PROVISION-EMULSIFIED ASPHALT ADJUSTMENT08-31-09-R01
REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06
REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1
MINIMUM WAGE RATE (POTTAWATOMIE COUNTY)KS20260145
REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01
POLICY AGAINST SEXUAL HARASSMENT03-01-18
ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23
REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003
WORKING DAYS AND LIQUIDATED DAMAGES15-01006-R02
FUEL ADJUSTMENT15-01008-R02
EMULSIFIED ASPHALT ADJUSTMENT15-01010
ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06
SEASONAL LIMITATIONS15-01012-R01
PROSECUTION AND PROGRESS15-01016-R04
CONTROL OF WORK15-01019-R02
BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03
SCOPE OF WORK15-01022-R04
BIDDING REQUIREMENTS AND CONDITIONS15-01023
AWARD AND EXECUTION OF CONTRACT15-01024
ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501
ASPHALT PAVEMENT SMOOTHNESS15-06006-R01
HOT MIX ASPHALT CONSTRUCTION QC/QA15-06007-R03
CHIP SEALS15-06011
WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04
WORK ZONE TRAFFIC CONTROL & SAFETY15-08019-R04
FIELD OFFICE AND LABORATORY15-08023-R01
WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029
STORMWATER POLLUTION MANAGEMENT15-09002-R05
AGGREGATE FOR HMA15-11002-R01
GENERAL REQUIREMENT DIVISION 120015-12001-R01
PERFORMANCE GRADED ASPHALT BINDER15-12002-R01
SPECIAL PROVISION LIST
PAGE:
DATE:
09/09/26
STATE PROJECT NO: K099-075 KA 8080-01 STATE CONTRACT NO: 526106131
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: POTTAWATOMIE1
SURFACE RECYCLE AND CHIP SEAL. K-99; FR K-99/US-24 JCT TO PT/MS CL IN PT
CO. LGTH 25.90 MI. TIED TO KA 8057-01.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
ASPHALT REJUVENATING AGENT15-12003
STEEL SIGN POSTS15-16002-R03
RELEASE COMPOUND FOR ASPHALT MIXES15-17004-R05
PAVEMENT MARKING PAINT15-22004-R02
IMAGE SYSTEMS15-22005-R03
RETROREFLECTIVE SHEETING15-22006-R01
ROLL-UP SIGNS15-22011
RAISED PAVEMENT MARKERS15-22015
TEMPORARY PAVEMENT MARKING TAPE15-22016
WOOD POSTS15-23001-R03
FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02
PART V15-25001-R07
MATERIALS CERTIFICATIONS15-26001-R13
COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS15-PS0018
END OF SPECIAL PROVISION LIST
REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)
CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT
K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322
Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's
Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
NONCOLLUSION
I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.
HISTORY OF DEBARMENT
I certify that, except as noted below, the Contractor submitting this bid and any person associated with this
Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:
1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;
2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;
3. Do not have a proposed debarment pending;
4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, antitrust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.
Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.
◯ Yes ◯ No
The exceptions, if any, are:
Contractor: Check: Page 4
REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)
CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT
Select the appropriate response below to indicate whether this Proposal exceeds the Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form
202) supplies the necessary signature for this Certificate.
I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.
I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas
Department of Transportation plus the unearned amount of all other contracts in this state or other states
◯ exceeds ◯ does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.
If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).
KDOT Approval Granted by:
KDOT Approval Date:
Contractor: Check: Page 5
REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)
CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT
LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM
Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT
Form 202) supplies the necessary signature for this Certificate.
Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:
This Contract ◯ is ◯ is not with a legislator or a firm in which a legislator is a member. That Legislator is:
Name:
Address:
City State Zip:
Business Telephone:
Contractor: Check: Page 6
REQUIRED CONTRACT PROVISION - 10-10-00-R09 (Rev. 01/20)
PRICE ADJUSTMENT FOR FUEL
The Contractor may accept or reject the application of Special Provision 15-01008 (latest revision) "Price
Adjustment for Fuel". Any items listed on Special Provision 15-01008 (latest revision) that are included in this project are eligible for the fuel price adjustment unless otherwise stated in the contract documents.
Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.
◯ Accept ◯ Reject
If the Contractor accepts 15-01008 (latest revision), the Contractor shall mark the checkboxes below for the eligible items/sections listed in Special Provision 15-01008 (latest revision). Then they should indicate their desire for the specific fuel price adjustment by selecting the 'Yes' or 'No' option.
◯ Road Items (Earthwork)
◯ Concrete Surfacing Items
◯ Asphalt Surfacing Items
Contractor: Check: Page 7
REQUIRED CONTRACT PROVISION - 08-31-09-R01 (Rev. 03/15)
PRICE ADJUSTMENT FOR EMULSIFIED ASPHALT
The Contractor may accept or reject the application of Special Provision 15-01010 (latest revision)
"Emulsified Asphalt Price Adjustment."
Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.
◯ Accept ◯ Reject
Contractor: Check: Page 8
REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)
TAX CLEARANCE CERTIFICATE
Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.
◯ Yes ◯ No
Insert the Tax Clearance Confirmation Number if available at the time of bidding:
Contractors shall have a current Tax Clearance Certificate from the Kansas Department of Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the
Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The
Secretary will reject the Contractor's Proposal as non-responsive if the Contractor does not have a current
Tax Clearance Certificate at the time of the contract award.
To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for
Tax Clearance obtained from KDOR's website at http://www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.
After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required
Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the
Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the
Certificate submitted.
If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's
Application for Tax Clearance, the Contractor shall call KDOR's Special Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.
Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax
Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax
Clearance Certificate is not "clearance" for all types of taxes the State of Kansas may assess.
Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT Field Office the Subcontractor's Tax
Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.
Contractor: Check: Page 9
Line Number Item Number Quantity Unit Unit Price Extension Price
Section 01
COMMON ITEMS
1 025323 1.000 LS
MOBILIZATION /
2 025324 1.000 LS
TRAFFIC CONTROL /
3 070580 1.000 HOUR $30.000 $30.00
FLAGGER (SET PRICE) /
4 025600 1.000 EACH
FIELD OFFICE AND LABORATORY (TYPE A) /
Section 01 Total 30.00
Section 02
ASPHALT SURFACING ITEMS
5 010253 1365.500 STA.
SURFACE RECYCLING (2") /
6 083220 601.000 TON
ASPHALT REJUVENATING AGENT /
7 010813 3374.000 CUYD
COVER MATERIAL (CM-L-2) /
8 080672 653.000 TON
EMULSIFIED ASPHALT (CRS-1HP) (SEAL) /
9 012809 1365.500 STA.
MANIPULATION (CHIP SEAL) /
10 010112 1.000 MGAL $40.000 $40.00
WATER (FLEXIBLE PAVEMENT) (SET PRICE) /
11 080465 1.000 TON $350.000 $350.00
MATERIAL FOR HMA PATCHING (SET PRICE) /
12 000067 1.000 EACH $1.000 $1.00
SURFACE RECYCLING PAY ADJUSTMENT /
13 070923 2731.000 STAL
PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II) /
14 072410 8.000 EACH
PAVEMENT MARKING (TEMP) (SYMBOL) (TYPE II) /
15 071992 1365.500 STAL
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3 FT.)) /
Section 02 Total 391.00
Item Total $421.00
Contractor: Check: Page 10
�� ������������������������������������������������������������������������������*+,�����-��.����������������������������������������������������������������+����������������������/���#��*+,�0,+�1+2���+3��3+456666666666666666666666666666667�8.6��������������������8�6��----------------------------------------------------------------��3�����.-��������.����.�����������������������������������������������������+����������������������/���#���+3��� +*91+��,//�+,4 ��+3��6666666666666666666666667��.6���������������������6���+3��� +*91+��/54�:1 �4� �5,0:,;666666666666666666667��86��������������������.6�.�+3��� +*91+�� 3('�4� ��4� 1(666666666666666666666667���6�8�������������������6���+3��� +*91+���04�1+��+3��666666666666666666666666667���6����������������������6���+4//*���*��45*<4�*,����+4//*���*��45�*���4554�*,��=�+,3� (4�>666666666666666666666666666666666666666667���6���������������������6���+4//*���,��+,5�����1+9*�1� +*91+66666666666666666667���6�?�������������������6��,'1+4�,+����+*'*���(4�"*�1666666666666666666666666667��?6�?��������������������6��,'1+4�,+��+,�,�(*55��+,3� (4�666666666666666666666667���6�8�������������������6��,'1+4�,+��+,�,�(*556666666666666666666666666666666667��.6���������������������6��,'1+4�,+����+4��,+66666666666666666666666666666666667���6.��������������������6��,'1+4�,+�����+11 666666666666666666666666666666666667���6���������������������6��,'1+4�,+�����+4'1+66666666666666666666666666666666667��?6�?�������������������6��,'1+4�,+���+,551+666666666666666666666666666666666667���6�8�������������������6��,'1+4�,+���'491+��=4�'"45�2�4��+1�4�12�4� ��,��+1�1>66666666666666666666666666666666666666666667��?6�.�������������������6��,'1+4�,+���(1�"4�*�6666666666666666666666666666666667���6�.�������������������6��,'1+4�,+���(4�1+*45��+4��/1+�91"*�5166666666666666667���6���������������������6��,'1+4�,+���5,4 1+666666666666666666666666666666666667��?68��������������������6��,'1+4�,+����+4 1+�:54 1666666666666666666666666666667���6��������������������86.�,'1+4�,+��� *��+*:3�,+6666666666666666666666666666667���6�8�������������������6��,'1+4�,+����+4�16666666666666666666666666666666666667��86�.�������������������6��,'1+4�,+����,��+1�1�/*�*�"*���(4�"*�16666666666666667���6���������������������6��,'1+4�,+���:355 ,<1+666666666666666666666666666666667��.6���������������������6��,'1+4�,+���:+,,(��011'1+66666666666666666666666666667���6���������������������6��,'1+4�,+���:,:�4����* ���11+���* �5,4 1+6666666666667���6�.�������������������6��,'1+4�,+���:4��",1�1@�494�,+��+4��",16666666666666667���6?8������������������86��54:,+1+���(4�,���1� 1+�-��1(1����,��+1�16666666666667��.6?���������������������6�854:,+1+���/54��1+666666666666666666666666666666666667���6���������������������6��54:,+1+����,��+1�1��40�="4� �"15 �045��:1"*� >6666667��.6����������������������6�854:,+1+����,((,��,+��1�1+4566666666666666666666666667���6���������������������6��*+,�0,+�1+2�+1*�/,+�*��666666666666666666666666666667���6���������������������6��151��+*�*4�666666666666666666666666666666666666666667��.6.8��������������������6���1(1���(4�,���,��+1�1�/*�*�"1+66666666666666666666667���68��������������������6��
ABCBDAE�CFGG�HI JHIKLMN
OPPQRFBBRSTKLMNBUSLVWXVPVYTZ[SPZM[B\JD]DA]Ĝ_BG GB̂
| �� | ���� | ���������������������������� | ����� | �������������������������������������������������������������������� | ���������� | ��������� | |||||||||||||||||||||||||||||||||||||||||||
| ����+������������������������������������ | ����� | ���,������������������������������������������������������������������������������������������������������������������������������������������������������������������������ | |||||||||||||||||||||||||||||||||||||||||||||||
| ��� | � | �#-#&.# | %!"# | /%#$-%&0#1 | 23% | -%!2" | /#%23%4&'(3/#%!"&3' | "3 | 56&-6 | 5#71&'( | &$ | &'-&1#'"!7�8888888888888888888888888888888888888888888888888888888888888888�3"#* | �9#-:"&.# | �%1#% | ;��< | ��,��� | �$"!07&$6&'( | �!&1 | �&-= | �#!.#23% | �#1#%!7 | �3'"%!-"3%$ | !//7&#$ | "3 | !77 | -3'"%!-"$ | $:0>#-" | "3 | "6# | ||||||||||||||||||||
| !.&$�)!-3' | �-" | 23% | 56&-6 | "6# | -3'"%!-" | &$ | !5!%1#1 | ;!'1 | !'?$37&-&"!"&3' | 5!$ | &$$:#1< | 3' | 3% | !2"#% | @!':!%? | �� | ���,� | ||||||||||||||||||||||||||||||||
| 2 | "6&$-3'"%!-" | &$ | -3.#%#1 | 0? | "6# | ��� | "6# | -3'"%!-"3% | 4:$" | /%3.&1##4/73?##$ | 5&"6 | � | 63:% | 32 | /!&1 | $&-= | 7#!.# | 23% | #.#%? | �� | 63:%$"6#? | 53%=� | :/ | "3 | � | 63:%$ | 32 | /!&1 | $&-= | 7#!.# | #!-6 | ?#!%��4/73?##$ | 4:$" | 0# | /#%4&""#1 | "3 | :$# | /!&1 | $&-= | 7#!.# | 23% | "6#&%35' | &77'#$$� | &'>:%? | 3% | 3"6#% | 6#!7"6�%#7!"#1 | '##1$� | &'-7:1&'(/%#.#'"&.# |
| !.&$�)!-3' | �-" | "6!" | 5#%# | !5!%1#1 | 3' | 3% | 0#"5##' | @!':!%? | �� | ��� | !'1 | @!':!%? | �D� | ����� | !'1 | "6!" | 6!.# | '3" | 0##' | %#'#5#1 | 3% | #9"#'1#1 | 3' | 3% | !2"#% | @!':!%? | ��� | ����� | �9#-:"&.# | �%1#% | ��� C | 13#$ | '3" | !//7? | "3 | -3'"%!-"$ | $:0>#-" | 3'7? | "3 | "6# | |||||||||
| !.&$�)!-3' | �#7!"#1 | �-"$ | %#(!%17#$$ | 32 | 56#' | "6#? | 5#%# | !5!%1#1� | |||||||||||||||||||||||||||||||||||||||||
| 2 | ! | -3'"%!-" | &$ | $:0>#-" | "3 | �9#-:"&.# | �%1#% | ��� C� | "6# | -3'"%!-"3% | 4:$" | /!? | !77 | -3.#%#1 | 53%=#%$ | !" | 7#!$" | ����� | /#% | 63:% | ;3% | "6# | !//7&-!07# | 5!(# | %!"# | 7&$"#1 | 3' | "6&$ | 5!(# | 1#"#%4&'!"&3'� | &2 | &" | &$ | 6&(6#%< | 23% | !77 | 63:%$ | $/#'" | /#%23%4&'( | 3' | "6# | -3'"%!-" | 2%34 | �!? | ��� | ����� | "6%3:(6 | ||
| #-#40#% | ��� | ����� | �6# | !//7&-!07# | �9#-:"&.# | �%1#% | 4&'&4:4 | 5!(# | %!"# | 5&77 | 0# | !1>:$"#1 | !'':!77?��11&"&3'!7 | &'23%4!"&3' | 3' | -3'"%!-"3% | %#B:&%#4#'"$ | !'1 | 53%=#% | /%3"#-"&3'$ | :'1#% | �9#-:"&.# | �%1#% | ��� C | &$ | !.!&7!07# | !" | 555�137�(3.�561�(3.-3'"%!-"$��'7&$"#1 | -7!$$&2&-!"&3'$ | '##1#1 | 23% | 53%= | '3" | &'-7:1#1 | 5&"6&'"6# | $-3/# | 32 | "6# | -7!$$&2&-!"&3'$ | 7&$"#1 | 4!? | 0# | !11#1 | !2"#%!5!%1 | 3'7? | !$ | /%3.&1#1 | &' | |
| 1#'"&2&#%$� | 23:%�7#""#% | &1#'"&2&#% | 0#(&''&'( | 5&"6 | -6!%!-"#%$ | 3"6#% | "6!'E��E� | E����E� | E��E� | 3% | E��E | 1#'3"#$ | "6!" | ! | :'&3' | %!"# | 5!$/%#.!&7&'( | 23% | "6!" | -7!$$&2&-!"&3' | &' | "6# | $:%.#?� | �9!4/7#* |
FGHGIFJ HKLL MN OMNPQRS
TUUVWKGGWXYPQRSGZXQ[\][U[̂Y_̀XU_R̀GaOIbIFbLcdGL IGc
������������&�'$��%��������������� ��������������'��������������#������������������$�� �����#���#�������������$�������������������������#��� �����'�������������$���������)*+���������������������������� ��"��#�����#��#���'����,-./0�#� �����#�������������������������/ ���#��1����2����������(����/34���������������������������������#��������$�� ������������������������������%�"�����������5���������������$����������������������������������������������������67/���68�/34 9* ������� �������/34��������������������������������#������������ ���#��������9*���������������:��������9����(�����&����'"��%��������������&�'$��%������������������'"����������$�������#�������#�������'���������(�������%��� ������������&�'$��%��������������������������#�������'������������$���������������������'������������������� ���#�������/��/34�����������"���$�������������!���%�������!����;�����!%����������������#������ ���#������������������������������������� ��"��#�����#��#���'��������������������������"�����:�� �!�1����2����������(���<:�<���������������������������������������#������ ����������$�� ������,�����������������-=1����0���������������������������������� �!�������������������������� ���"!��'$����#������#������ ���#�������"�����������������������$���������������� �!��������������������������/�������#����� ���#����������������������������$���������������� �!%����'�!��������"����������������� �������������6&�'$��8�:�=����� ���> �������������&�'$��%������������������ �!���'$�������������������������������������������������������������������<:�<���#���������!$�����!���'����������������������������� �!��������������*��� ��%�����)�#������*����+� ������,)*+0�����������������������$�������������������������-=1���>,�0,�0�:�����/��$����1����2����������(���<:/<��������������������������������������������������$�� �����#���#������������"!���������,��������0�#� ���'�����������$�������������-�=�1���?,#0 ,�0���6&�'$��8�:/�6���? ����� ������:/��������������������������������������$������6��������������:������������������?��������!���������#������������������'$������������� �!��������������������������������������������������"������(�����&����'"��%�������������&�'$��%�����������������'"�����������$�������#�������#�������'��������(�������%���
ABCBDAE�CFGG�HI JHIKLMN
OPPQRFBBRSTKLMNBUSLVWXVPVYTZ[SPZM[B\JD]DA]Ĝ_BG B̀̂
| ������ | ��� |
| ��������� | ��� |
| � | ���������������������������������������������������������������������������������������������������������������������������������� ��!"� ��#�""$%�&� |
| ���� | ��'������������������� |
| ���������������� | (���� |
| � | *�+����� | �+��,��� |
| �,������ | �������������������'%�����-� |
| �,������ | ��������������������%�������������&������� | � |
| �����,��� | ������� |
| ����������������������������� | ���%����� | ����������� |
| � | *�+� | ������������ |
| /����������������/���������,� | �0�� |
| �� | � |
| ���� | �� |
������'���� ��������������&��1 ���������,��"� *�+ ����0��
| '��������2����,�*�� | �'+��������)������������1 | ����������,��"� | *�+ |
| ��������������,������&�� | ���*� | ||
| ���������������3�"������ | ���������!�'� | ������������455�#�� |
| ���,���/��#�454$5��,� | ���,���+����� | � |
| �,������ | �������������� | � |
/� �0��
| ������'��� | ��������������&��1 | ��������#�� |
| � | ���������,������ | �������� |
���0��
| �'�������*������������1#���������2����,�*�� | '+��������)������������1 | ��������#�� |
| � | ���������,������ | �������� |
| ��������������,������&�� | ���*� | |
| ���������������3�"������ | ���������!�'� | ������������455�#�� |
���,���/��#�454$54%�������������������
| ���/��������+����� | � |
| ����� | �+�.��� |
| �������� | �0�� | |||
| �� | �*�� | |||
| ����� | ���� | |||
| ��� | ������� | ���������,�����&�� | ������� | |
| � | ��� | �."���46�#7�� � | ��$�8�����46�#7�� � | ��9%���0�� |
| ��� | � | �*�� | ||
| ����� | ���� | |||
| ��� | ����������'�� | |||
| �'�������*������������'�� | ���� | |||
| ��� | �����2����,�*�� | �'+��������)��������������,������&�� | ������� | |
| � | ��� | ������������3�"������ | ���������!�'� | ������������455�#�� |
���,���/��#�454$5���� �0��
| ������������������� | � |
| ������ | �+: |
| ������������+����� | �������. | ||||
| �,����+��������/�� | �;������ | ||||
| � | ������/�� | ���� | ����������� | ���/�����%��������� | �0�� |
| �� | ���� |
| � | ��� | �� | |
| �������*� | �'��/������� | � | |
| ������ | �+���+���������� | ����+�������������� | |
| � | ���*���*�� | ||
| �1�� | ��.�� | �� | �+�������,�������� |
| �1�� | �%���� | ������)������������������ | |
| � | ���*����*�� | ||
| �1�� | �������������3�"������ | ���������!�'� | ������������455�#�� |
���,���/��#�454$5�================================================================���������������7�������!���#�"���>��������
?@A@B?C�ADEE�FG HFGIJKL
MNNOPD@@PQRIJKL@SQJTUVTNTWRXYQNXKY@ZHB[B?[E\]@E \@\
15-PS0018
Sheet 1 of 1
SPECIAL PROVISION TO THE
STANDARD SPECIFICATIONS, EDITION 2015
COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS
SECTION 102
BIDDING REQUIREMENTS AND CONDITIONS
Page 100-13, subsection 102.5. Delete subsection 102.5a.(2)(f) and replace with the following:
(f) Kansas-funded state projects “tied to” Federal-Aid funded state projects and Kansas-funded state projects “tied with” Federal-Aid funded state projects.
10-10-17 C&M Oct-17 Letting
S ta rt : K
-9 9/
U S
-2
JC
T
E nd
: P ot ta w at om ie /M ar sh al l
C ou nt y lin e
General Notes
6/17/2026
Project No. 99-75
1. This job consists of a 2” Surface Recycle and Chip Seal. Project goes from the K-99/US-
24 JCT to the Pottawatomie/Marshall County line.
2. A minimum of one lane must be maintained open to traffic at all times through the work zone. All intersections are to remain open during construction. The Contractor shall make it possible for property owners to have safe and unobstructed passage to their properties. No lane closures or detours will be allowed overnight.
3. The contractor is responsible for establishing and maintaining centerline of the traveled way for the duration of the project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items in the contract.
4. Permanent pavement marking shall be done by KDOT.
KA 8080-01
TYPICAL SECTION
C
Slope Varies Chip Seal
2 in. Surface Recycle
1:1 @ edge of Asphalt
Match Existing Surface 35.0 ft not to scale
ROADWAY WIDTHS
Approx. Approx.
Location mile Width Location mile Width
MAINLINE: 25.9 729+01 to 749+76 36.0'
0+00 (JCT US-24/K-99) 133.0' 749+76 to 760+76 26.0'
0+00 to 0+99 50.5' 760+76 to 794+20 27.0'
0+99 to 4+99 43.0' 794+20 to 1088+90 26.0'
4+99 to 10+23 32.0' 1088+90 to 1088+90 33.0'
10+23 to 20+59 38.5' 1088+90 to 1133+71 26.0'
20+59 to 130+59 27.0' 1133+71 to 1374+51 25.0'
130+59 to144+17 32.0'
144+17 to 246+32 25.0' Total: 408,715.78 SQYD
246+32 to 296+34 26.0'
296+34 to 361+23 25.0'
361+23 to 403+38 26.0' State Fishing Lake Ramp 16.0'
403+38 to 413+66 32.0'
413+66 to 424+37 41.0' Total: 844.44 SQYD
424+37 to 561+21 26.0'
561+21 to 593+20 25.0'
593+20 to 700+76 26.0' WIDENING: 7.0'
700+76 to 711+87 34.0'
711+87 to 729+01 26.0' Total: 1,913.33 SQYD
RATE OF APPLICATION
Asphalt Rejuvenating Agent @ 0.35 gal/yd2 ALT 1: Emulsified Asphalt CRS-1HP @ 0.38 gal/yd2
Cover Material CM-L-2 @ 0.0082 yd3/yd2
Date: 5/20/2026 11:38 AM
KANSAS DEPARTMENT OF
TRANSPORTATION
POTTAWATOMIE Co. PROJ. NO.99-75 TITLE: SRCHIPHIADTALT
KA 8080-01
SUMMARY OF TRAFFIC CONTROL DEVICES
(FOR INFORMATION ONLY)
All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control.
WORK ZONE SIGNS *
SIGN
NO.
SIZE – SQ. FT.
0-9.25 9.26-16.25 16.26 & OVER
R2-1
R4-1 2
W3-4 2
W3-5
W8-11
W14-3 2
W20-1 4
W20-4 2
W20-5
W20-7 2
W21-5
KG20-5 4
KR5-17 10
G20-4
W7-3A
W1-4R
KM4-20
KG20-2 2
LIGHTED DEVICES *
WORK ZONE WARNING LIGHT
(TYPE “A” LOW INTENSITY) 16
WORK ZONE WARNING LIGHT
(RED TYPE ”B” HIGH INTENSITY)
ARROW DISPLAY
PORTABLE CHANGEABLE MESSAGE SIGN
BARRICADES * CHANNELIZING DEVICES *
TYPE III (4’
TO 12’)
PEDESTRIAN FIXED PORTABLE PEDESTRIAN
8 40
SUMMARY OF TRAFFIC CONTROL DEVICES
(EACH)
RECAPITULATION OF QUANTITIES
ITEM QUANTITY UNIT
WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) EADA
WORK ZONE SIGNS (9.26 TO 16.25 SQ. FT.) EADA
WORK ZONE SIGNS (16.26 SQ. FT. & OVER) EADA
WORK ZONE BARRICADES (TYPE 3 – 4’ TO 12’) EADA
WORK ZONE BARRICADES (PEDESTRIAN) EADA
CHANNELIZER (FIXED) EADA
CHANNELIZER (PORTABLE) EADA
CHANNELIZER (PEDESTRIAN) EADA
WORK ZONE WARNING LIGHT (TYPE “A” LOW INTENSITY) EADA
WORK ZONE WARNING LIGHT (RED TYPE “B” HIGH INTENSITY) EADA
ARROW DISPLAY EADA
PORTABLE CHANGEABLE MESSAGE SIGN EADA
PAVEMENT MARKING (TEMPORARY)
4" SOLID (TYPE I) STA./LINE
4" SOLID (TYPE II) STA./LINE
4" BROKEN (8')(TYPE I) STA./LINE
4" BROKEN (8')(TYPE II) STA./LINE
4" BROKEN (3')(TYPE I) STA./LINE
4" BROKEN (3')(TYPE II) 2,731.0 STA./LINE
4" DOTTED EXTENSION (TYPE I) STA./LINE
4" DOTTED EXTENSION (TYPE II) STA./LINE
SOLID (LINE MASKING TAPE) STA./LINE
BROKEN (LINE MASKING TAPE) STA./LINE
SYMBOL (TYPE I) EACH
SYMBOL (TYPE II) 8.0 EACH
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8’)) STA./LINE
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3’)) 1,365.5 STA./LINE
PAVEMENT MARKING REMOVAL LIN. FT.
CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) LIN. FT.
CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-INSTALL ONLY) LIN. FT.
CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-RELOCATE) LIN. FT.
INERTIAL BARRIER SYSTEM EACH
REPLACEMENT MODULES (IBS) EACH
WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH
WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH
RIGID RAISED PAVEMENT MARKER (TYPE I) EACH
RIGID RAISED PAVEMENT MARKER (TYPE II) EACH
TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM
TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM
TRAFFIC CONTROL LUMPSUM LUMP SUM
FLAGGER (SET PRICE) 1 HOUR
NOTES:
1 11/10/16 Removed Replacement Modules Summary Table, Added “(IBS)” to Replacement Modules description
JGB
NO. DATE REVISIONS BY APP’D
TRAFFIC CONTROL
SUMMARY OF DEVICES
RECAPITULATION OF QUANTITIES
TE795
FHWA APPROVAL 06/01/15 APP’D Kristina Erickson
DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED
DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK.
WORK ZONE SIGN (SPECIAL)
SIGN NO. 16.25 SQ. FT. & LESS 16.26 SQ. FT. & OVER
POTTAWATOMIE Co. Proj. No. 99-75 Title: Traffic Control KA 8080-01
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .