Bid Notice-Pedestrian _ Bicycle Paths - Crawford County.pdf
PDF 1019 KB Posted
- Attached to
- Pedestrian & Bicycle Paths - Crawford County State and local contract opportunity
- Solicitation number
- 526052414
- Issued by
- Crawford County, Pomona City, Kansas
About this file
This is a Bid Notice issued by the Kansas Department of Transportation (KDOT) for a pedestrian and bicycle paths construction project in Crawford County. The project involves constructing pedestrian and bicycle paths on East 20th Street from North Rouse Street to North Home Avenue in Pittsburg, Crawford County, spanning 0.58 miles. The work includes common excavation, rock excavation, sidewalk construction, concrete pavement, curb and gutter, drainage improvements, erosion control measures, pavement marking, and sodding. Contractors must register as bid holders no later than 5:00 p.m. on the Monday preceding the letting date of May 20, 2026. Electronic proposals must be submitted through the Bid Express website (http://ui.bidx.com) using AASHTO's Project Bids software no later than 1:00 p.m. local time on the letting date, with proposals opening at 3:00 p.m. the same day. The contractor must execute the contract within ten business days of award notification. Work must be completed within 40 total contract working days, with an earliest start date of November 15, 2026.
The project is federally funded through the Federal Highway Program with city funds participation. Contractors must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of award and must comply with Davis-Bacon wage requirements, with prevailing wage rates established by the U.S. Department of Labor General Decision KS20260077 effective January 2, 2026. Required contract provisions include noncollusion certification, financial prequalification verification, equal employment opportunity and affirmative action compliance, prohibition on foreign unmanned systems, lobbying limitations on federal funds, and various other federal-aid construction contract requirements. The contract involves multiple specialized provisions related to materials, stormwater pollution management, traffic control, and environmental protection. Subcontractors must also obtain Tax Clearance Certificates before approval for subcontract work.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745
Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org
Bureau of Construction and Materials
FEDERAL PROJECT NUMBER: ACTA-T057(501)
STATE PROJECT NUMBER: 019 TE 0575-01
CALL ORDER NUMBER: 241
PROPOSAL NUMBER: 526052414
LETTING DATE 05/20/2026
COUNTY: CRAWFORD
FUND TYPE: FEDERAL
PITTSBURGKDOT CONSTRUCTION OFFICE:
PROJECT DESCRIPTION
PEDESTRIAN AND BICYCLE PATHS. E 20TH ST FR N ROUSE ST TO N
HOME AVE IN THE CITY OF PITTSBURG IN CR CO. LGTH IS 0.58 MI.
RESTRICTED DAYS
(40)
TOTAL CONTRACT DAYS
NOVEMBER 15, 2026
Earliest Start Date:
Latest Start Date:
8:29:08AM4/21/2026 @
Letting 05/20/2026 Kansas Department of Transportation Project No. 019 TE 0575-01
Contract No. 526052414
019 TE 0575-01 ACTA-T057(501)
CONTRACT PROPOSAL
DOT Form No. 202 Rev. 02/19
Contract ID: 526052414
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:
019 TE 0575-01 / ACTA-T057(501)
The general scope, location and net length are:
PEDESTRIAN AND BICYCLE PATHS. E 20TH ST FR N ROUSE ST TO N
HOME AVE IN THE CITY OF PITTSBURG IN CR CO. LGTH IS 0.58
MI.
2. This is the Proposal of
[Contractor] to complete the Project for the amount set out in the accompanying Unit
Prices List.
3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:
4. Contractors and other interested entities may examine the Bidding Proposal Form/
Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract
Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.
Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".
5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project
EBSX file are available on Bid Express' website at http://ui.bidx.com.
Contractor: Page 1 Check: 86D9DBD977
6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.
7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW
Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.
8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.
9. The contractor shall complete work to open the project to unrestricted traffic within
_50_ Restricted Days and shall complete the work within the total Contract Working Days of _40_.
10. The Contractor shall complete the Project according to the plans, Standard
Specifications, provisions identified in the Special Provision List and all other
Contract Documents identified in Standard Specifications subsection 101.3
11. The undersigned declares that the Contractor has carefully examined the Bidding
Proposal Form for the Project. The Contractor understands the following:
A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).
B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.
C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form
202, and submits the completed EBSX file documents and bid bond to KDOT using Bid
Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the
Contractor's Proposal.
D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.
12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.
Contractor: Page 2 Check: 86D9DBD977
13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions
(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the
Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, or III in the EBSX file, and may reject proposals that fail to contain completed Provisions IV, V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.
I. 08-10-66 Certification-Noncollusion & History of Debarment
II. 04-30-82 Certification-Financial Prequalification Amount
III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying
IV. 04-06-26 Certification of Company Not Currently Engaged in the Procurement or Use of Prohibited Foreign Unmanned Aeriel Systems
V. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm
VI. 10-10-00 Price Adjustment for Fuel
VII. 08-08-01 Furnishing and Planting Plant Materials
VIII. 06-01-06 Price Adjustment for Asphalt Material
IX. 05-18-07 Repair (Structures)
X. 08-31-09 Price Adjustment for Emulsified Asphalt
XI. 11-15-17 Electric Lighting System Unit Cost
XII. 04-06-09 ITS Unit Cost
XIII. 08-17-16 Water System Unit Cost
XIV. 06-19-19 Sanitary Sewer System Unit Cost
XV. 01-01-18 Smart Work Zone System Unit Cost
XVI. 08-12-24 Continuously Operating Reference Station Unit Cost
XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate
14. The funding source for this Project is FEDERAL/CITY. On Projects involving City or
County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.
15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - V) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.
I. 11-03-80 Affirmative Action For EEO
II. 11-15-96 Affirmative Action & EEO Policies
III. 09-06-94 U.S. DOT Fraud Hotline
IV. FHWA-1273 Federal-Aid Required Contract Provisions
16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.
Contractor: Page 3 Check: 86D9DBD977
17. SIGNATURE SECTION:
A. Electronic Internet Proposal
The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.
B. Certification
I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING
THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT
LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH
13) IS TRUE AND CORRECT.
EXECUTED ON
C. Signature
Number of company or joint venture:
Name of company or joint venture:
Name of person signing:
Title of the person signing:
Signature: Electronic Internet Proposal
RELEASED FOR CONSTRUCTION:
Date:____________________________________
Chief of Construction and Materials
Contractor: Page 4 Check: 86D9DBD977
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
04/16/26
STATE PROJECT NO: 019 TE 0575-01 STATE CONTRACT NO: 526052414
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: CRAWFORD4
PEDESTRIAN AND BICYCLE PATHS. E 20TH ST FR N ROUSE ST TO N HOME AVE
IN THE CITY OF PITTSBURG IN CR CO. LGTH IS 0.58 MI.
ACTA-T057(501)
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05
REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07
REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03
REQUIRED CONTRACT PROVISION-LIMITS OF FED FUNDS FOR LOBBYING04-26-90-R05
REQUIRED CONTRACT PROVISION-FEDERAL RESTRICTIONS ON FOREIGN DRONES04-06-26
REQUIRED CONTRACT PROVISION-NOTICE FOR AFFIRMATIVE ACTION11-03-80-R09
REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06
REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1
MINIMUM WAGE RATE (CRAWFORD COUNTY)KS20260077
REQUIRED CONTRACT PROVISION-NDAA 889 TELECOMM PROHIBITION12-17-20
REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01
NOTICE TO CONTRACTORS (USDOT HOTLINE)09-06-94-R01
REQUIRED CONTRACT PROVISION-FEDERAL-AID CONSTRUCTION CONTRACTSFHWA-1273
POLICY AGAINST SEXUAL HARASSMENT03-01-18
ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23
INFORMATION TO CONTRACTORS (STATUS OF UTILITIES)15-01002
SALES TAX EXEMPTION15-01004
ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06
PROSECUTION AND PROGRESS15-01016-R04
CONTROL OF MATERIALS15-01018-R01
CONTROL OF WORK15-01019-R02
BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03
SCOPE OF WORK15-01022-R04
BIDDING REQUIREMENTS AND CONDITIONS15-01023
AWARD AND EXECUTION OF CONTRACT15-01024
STRUCTURAL CONCRETE15-04002-R01
ON GRADE CONCRETE15-04003
GENERAL CONCRETE15-04005-R04
PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA)15-05002-R01
CONTRACTOR CONSTRUCTION STAKING15-08015
WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03
DURABLE PAVEMENT MARKING15-08020-R02
PIPE AND END SECTIONS15-08022-R01
WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029
STORMWATER POLLUTION MANAGEMENT15-09002-R05
PAGE:
DATE:
04/16/26
STATE PROJECT NO: 019 TE 0575-01 STATE CONTRACT NO: 526052414
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: CRAWFORD4
PEDESTRIAN AND BICYCLE PATHS. E 20TH ST FR N ROUSE ST TO N HOME AVE
IN THE CITY OF PITTSBURG IN CR CO. LGTH IS 0.58 MI.
ACTA-T057(501)
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
SODDING15-09005
AGGS FOR CONCRETE NOT PLACED ON GRADE15-11003-R04
AGGREGATE FOR ON GRADE15-11004-R03
AGGREGATES FOR SURFACING OR RESURFACING15-11006
AGGREGATES FOR BACKFILL15-11009-R03
MASONARY BRICK15-13001-R01
PAVING BRICKS for SOLID INTERLOCKING PAVING15-13002
AIR-ENTRAINING ADMIXTURES FOR CONCRETE15-14001-R01
SHEET MATERIALS FOR CURING CONCRETE15-14002
LIQUID MEMBRANE FORMING COMPOUNDS15-14003
HOT JOINT SEALING COMPOUND15-15001-R01
PREFORMED EXPANSION JOINT FILLER FOR CONCRETE15-15002
COLD APPLIED CHEMICALLY CURED JOINT SEALANT15-15004
STEEL SIGN POSTS15-16002-R03
STEEL WIRE & WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT15-16003-R01
FIBROUS REINFORCEMENT FOR CONCRETE15-17006-R02
DETECTABLE WARNING SURFACE PANEL15-17011-R01
USES OF PIPE15-19005-R04
PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT15-20001-R02
HYDRATED LIME15-20002
FLYASH FOR USE IN CONCRETE15-20004-R01
SILICA FUME15-20005
SLAG CEMENT FOR USE IN CONCRETE AND MORTAR15-20006
THERMOPLASTIC15-22001-R01
MULTI - COMPONENT LIQUID PAVEMENT MARKING MATERIAL15-22003-R02
IMAGE SYSTEMS15-22005-R03
RETROREFLECTIVE SHEETING15-22006-R01
PREFORMED THERMOPLASTIC PAVEMENT MARKING MATERIAL15-22008-R01
ROLL-UP SIGNS15-22011
HIGH DURABILITY PAVEMENT MARKING MATERIAL15-22014
WOOD POSTS15-23001-R03
FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02
PART V15-25001-R07
MATERIALS CERTIFICATIONS15-26001-R13
PAGE:
DATE:
04/16/26
END OF SPECIAL PROVISION LIST
REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)
CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT
K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322
Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this
Certificate.
NONCOLLUSION
I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.
HISTORY OF DEBARMENT
I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:
1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;
2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;
3. Do not have a proposed debarment pending;
4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.
Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.
Yes No
The exceptions, if any, are:
Contractor: Page 5 Check: 86D9DBD977
REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)
CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT
Select the appropriate response below to indicate whether this Proposal exceeds the
Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this
Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.
I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.
If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).
KDOT Approval Granted by:
KDOT Approval Date:
Contractor: Page 6 Check: 86D9DBD977
REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)
CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT
LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM
Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:
This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:
Name:
Address:
City State Zip:
Business Telephone:
Contractor: Page 7 Check: 86D9DBD977
REQUIRED CONTRACT PROVISION- 04-26-90-R05 (Rev. 07/13)
DECLARATION
LIMITATIONS ON USE OF FEDERAL FUNDS FOR LOBBYING
PURSUANT TO 31 U.S.C. 1352
The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
DEFINITIONS:
1. Designated Entity: an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress.
2. Federal Grant: an award of financial assistance by the Federal government. (Federal
Aid Highway Program is considered a grant program.)
3. Influencing (or attempt): making, with the intent to influence, any communication to or appearance before any designated entity in connection with the making of a Federal contract or Federal grant.
4. Person: an individual, corporation, company, association, authority, firm, partnership, society, State or local government.
5. Recipient: all contractors, subcontractors, subgrantees, at any tier, and other persons receiving funds in connection with a Federal grant.
EXPLANATION:
As of December 23, 1989, 31 U.S.C. section 1352 limits the use of appropriated Federal funds to influence Federal contracting. Under this law, recipients of Federal grants shall not use appropriated funds to pay any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant or the extension, continuation, renewal, amendment or modification of a Federal grant. These restrictions apply to contracts and grants exceeding $100,000.00. Federal law requires submission of this declaration. If a recipient fails to file the declaration or amend a declaration, the recipient shall be subject to a civil penalty of not less than
$10,000.00 and not more than $100,000.00 for each failure. If the recipient uses appropriated Federal funds to influence or to attempt to influence a designated entity contrary to this provision, the recipient shall be subject to a civil penalty of not less than $10,000.00 and not more than $100,000.00 for each such payment.
CERTIFICATIONS:
I certify that the Contractor recipient (including its owners, partners, directors, officers, or principals) has not paid and will not pay federally appropriated funds to any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant, or the extension, continuation, renewal, amendment or modification of a Federal grant.
Contractor: Page 8 Check: 86D9DBD977
Answer 'Yes' if a person registered under the Lobbying Disclosure Act of 1995
(Registrant) has made lobbying contacts on the Contractor recipient's behalf with respect to this contract. Answer 'No' if no Registrant has lobbied on the Contractor recipient's behalf with respect to this contract.
Yes No
The Registrants, if any, are:
I certify that the Contractor recipient will report payments made to a person for influencing or attempting to influence a designated entity, that come from funds other than appropriated Federal funds. The Contractor recipient shall report such payments on
Form LLL "DISCLOSURE FORM TO REPORT LOBBYING" according to the instructions and may obtain Form LLL from the KDOT Bureau of Construction and Materials.
I certify that, if information contained in this DECLARATION changes, the Contractor recipient will amend the DECLARATION within 30 days of the change(s).
I certify that the Contractor recipient will provide to and require subcontractors to sign a like DECLARATION, if the subcontract work exceeds $100,000.00.
The Contractor recipient understands that this declaration is a material representation of fact and the Secretary will have relied upon this declaration in entering into a contract with the Contractor recipient.
NOTE: This Reporting requirement does not apply to payments made to the recipient's regular employees and contracts, subcontracts, and grants less than $100,000.00.
Contractor: Page 9 Check: 86D9DBD977
REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)
TAX CLEARANCE CERTIFICATE
Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.
Yes No
Insert the Tax Clearance Confirmation Number if available at the time of bidding:
Contractors shall have a current Tax Clearance Certificate from the Kansas Department of
Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's
Proposal as non-responsive if the Contractor does not have a current Tax Clearance
Certificate at the time of the contract award.
To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction
ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.
After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.
If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special
Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.
Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not
"clearance" for all types of taxes the State of Kansas may assess.
Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the
Secretary approves them for subcontract work. The Contractor shall submit to the KDOT
Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.
Contractor: Page 10 Check: 86D9DBD977
Line Number Item Number Quantity Unit Unit Price Extension Price
Section 01
COMMON ITEMS
1 020100 1.000 LS
CONTRACTOR CONSTRUCTION STAKING /
2 025323 1.000 LS
MOBILIZATION /
3 025324 1.000 LS
TRAFFIC CONTROL /
4 070580 1.000 HOUR $30.000 $30.00
FLAGGER (SET PRICE) /
Section 01 Total $30.00
Section 02
ROAD ITEMS
5 012412 153.000 CUYD
COMMON EXCAVATION (URB) /
6 012420 116.000 CUYD
ROCK EXCAVATION /
7 012319 122.000 CUYD
COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) /
8 025361 1.000 LS
CLEARING AND GRUBBING /
9 056551 21.000 LNFT
STORM SEWER (24") (RCP) /
10 054601 2.000 EACH
END SECTION ( 24") (RC) /
11 025026 1862.000 SQYD
SIDEWALK CONSTRUCTION ( 4") (AE) /
12 022625 72.000 SQYD
SIDEWALK RAMP /
13 010114 1.000 MGAL $40.000 $40.00
WATER (GRADING) (SET PRICE) /
14 070644 4.000 EACH
ADJUSTMENT OF VALVE BOX (WATER) /
Section 02 Total $40.00
Section 03
TEMP PRJ WTR POL CTL-SOIL EROSION
15 071291 1.000 CUYD $50.000 $50.00
SEDIMENT REMOVAL (SET PRICE) /
16 072400 1.000 LNFT $2.000 $2.00
TEMPORARY BERM (SET PRICE) /
17 071320 9.000 EACH
TEMPORARY INLET SEDIMENT BARRIER /
18 010123 1.000 MGAL $40.000 $40.00
WATER (EROSION CONTROL) (SET PRICE) /
Contractor: Page 11 Check: 86D9DBD977
Section 03 Total $92.00
Section 04
CONCRETE SURFACING ITEMS
19 061597 245.000 LNFT
CURB AND GUTTER, COMBINED (AE) /
20 013541 97.000 SQYD
CONCRETE PAVEMENT ( 6" UNIFORM) (AE) /
21 013581 320.000 SQYD
CONCRETE PAVEMENT ( 8" UNIFORM) (AE) /
22 013581 189.000 SQYD
CONCRETE PAVEMENT ( 8" UNIFORM) (AE) / NON PART
23 010171 78.000 SQYD
AGGREGATE BASE (AB-3) ( 4") /
24 081460 3.000 TON
SURFACING MATERIAL (SA-1 OR SA-X) /
25 010107 1.000 MGAL $40.000 $40.00
WATER (AGGREGATE BASE) (SET PRICE) /
Section 04 Total $40.00
Section 05
PAVEMENT MARKING ITEMS
26 023142 115.000 LNFT
PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (24") /
Section 05 Total
Section 06
SEEDING ITEMS
27 030344 135.000 LBS.
FERTILIZER (15-30-15) /
28 030574 2296.000 SQYD
SOD (FESCUE) (STRIPS) /
Section 06 Total
Item Total $202.00
Contractor: Page 12 Check: 86D9DBD977
"General Decision Number: KS20260077 01/02/2026
Superseded General Decision Number: KS20250077
State: Kansas
Construction Type: Highway
County: Crawford County in Kansas.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/02/2026
ENGI0101-002 05/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR
(Drill Rig Caissons).............$ 38.83 20.80
IRON0010-007 04/01/2025
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 39.00 34.25
SUKS2019-016 05/09/2019
Rates Fringes
CARPENTER........................$ 14.94 0.00
CEMENT MASON/CONCRETE FINISHER...$ 22.80 0.00
ELECTRICIAN......................$ 26.72 4.22
FORM WORKER......................$ 15.33 1.20
IRONWORKER, REINFORCING..........$ 14.09 0.00
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 14.38 0.00
LABORER: Common or General......$ 16.33 0.00
LABORER: Flagger................$ 12.19 0.00
OPERATOR: Asphalt Plant.........$ 14.81 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.77 2.19
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 16.90 0.00
OPERATOR: Broom/Sweeper.........$ 14.13 0.00
OPERATOR: Bulldozer.............$ 17.17 2.37
OPERATOR: Concrete Finishing Machine..........................$ 21.11 0.00
OPERATOR: Concrete Saw..........$ 16.71 0.00
OPERATOR: Crane.................$ 20.22 7.66
OPERATOR: Distributor...........$ 15.19 0.00
OPERATOR: Grader/Blade..........$ 17.89 1.67
OPERATOR: Loader................$ 15.75 0.00
OPERATOR: Material Transfer Vehicle..........................$ 13.92 0.00
OPERATOR: Mechanic..............$ 20.51 0.00
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.30 0.00
OPERATOR: Roller................$ 13.78 0.00
OPERATOR: Scraper...............$ 15.68 0.00
OPERATOR: Screed................$ 16.19 0.00
OPERATOR: Tractor...............$ 16.24 0.00
OPERATOR: Roto Mill Groundman....$ 15.35 0.00
OPERATOR: Roto Mill..............$ 17.80 0.00
OPERATOR: Striping Machine.......$ 19.93 4.49
SERVICEMAN: EQUIPMENT............$ 16.33 1.74
TRAFFIC CONTROL: Service Driver...........................$ 14.55 0.00
TRUCK DRIVER: Pickup Truck......$ 16.19 0.00
TRUCK DRIVER: Water Truck.......$ 17.07 0.00
TRUCK DRIVER: Dump and Tandem....$ 14.88 0.00
TRUCK DRIVER: Flatbed and Lowboy...........................$ 19.20 0.00
TRUCK DRIVER: Off Road Truck.....$ 16.38 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
12-17-20 Sheet 1 of 2
REQUIRED CONTRACT PROVISION
FEDERAL-AID CONTRACTS
PROHIBITION ON COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES
PURSUANT TO SECTION 889 OF THE NATIONAL DEFENSE AUTHORIZATION ACT (2019)
As of August 13, 2020, recipients and subrecipients of federal aid funds are prohibited from obligating or expending loan or grant funds to procure or obtain; extend or renew a contract to procure or obtain; or enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that use Covered Telecommunications Equipment or Services as a substantial or essential component of any system, or as critical technology as part of any system. See Section 889 of Public Law 115-232 (National Defense Authorization Act 2019)(NDAA). In addition to preventing direct purchases of such Covered Telecommunications Equipment or Services, federal law prevents KDOT, LPA’s, and their Contractors from using federal aid funds to pay for Covered Telecommunications Equipment or Services that the Contractor may use on a Project. Costs for such Covered Telecommunications Equipment or Services are unallowable under 2 CFR 200.216 and 2 CFR 200.471.
The term ‘‘Covered Telecommunications Equipment or Services’’ means any of the following:
Telecommunications equipment produced by and/or telecommunications services provided by Huawei Technologies Company, ZTE Corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).
Video surveillance equipment produced by and/or video surveillance services provided by Huawei Technologies Company, ZTE Corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).
Telecommunications and/or video surveillance services provided by third parties that are using equipment produced by Huawei Technologies Company, ZTE Corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities) in performing such services.
Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country [defined under 889(f)(2) as “the People’s Republic of China”].
As a Contractor on a federal-aid construction contract with the Secretary of Transportation, as the principal contracting party for the State of Kansas or as the agent for a disclosed Local Public Authority (LPA), the Contractor shall not be required to provide to KDOT or the LPA Covered Telecommunications Equipment or Services in the performance of any contract, subcontract, supply contract, or other contractual instrument resulting from or associated with this Project. The Contractor will notify KDOT if the Contractor believes the Project scope requires the acquisition of any Covered Telecommunications Equipment or Services.
Current federal law does not prohibit the Contractor from using Covered Telecommunications Equipment or Services on the Project; however, the costs of Covered Telecommunications Equipment or Services are federal-aid non-participating. Thus, the Contractor shall notify KDOT or the LPA if the Contractor and/or any of its subcontractors or suppliers at any tier are using Covered Telecommunications Equipment or Services on the Project. This notice is necessary so KDOT can reimburse the Contractor with state funds, local funds, or a combination thereof rather than with federal-aid funds.
12-17-20 Sheet 2 of 2
The Contractor will ensure that this Required Contract Provision is included in all subcontracts, supply agreements, and other contractual instruments resulting from or associated with this Project, so the prohibition is made binding on all subcontractors and suppliers at any tier. For purposes of this Required Contract Provision, the term subcontractors and suppliers shall have the broadest application to include manufacturers, producers, and all other entities that have a contractual instrument resulting from or associated with this Project.
12-17-20 C&M (CDB)
Jan 2021 – Letting; retroactive on earlier Federal Aid Projects with payments
FHWA-1273 – Revised October 23, 2023
REQUIRED CONTRACT PROVISIONS
FEDERAL-AID CONSTRUCTION CONTRACTS
I. General II. Nondiscrimination III. Non-segregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act
Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water
Pollution Control Act X. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion XI. Certification Regarding Use of Contract Funds for
Lobbying XII. Use of United States-Flag Vessels:
ATTACHMENTS
A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only)
I. GENERAL
1. Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR 633.102(e).
The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e).
Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.
Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b).
2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d).
3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.
4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b).
The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.
23 U.S.C. 101(a).
II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part 230, Subpart A, Appendix A; EO 11246)
The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.
In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.
2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60- 1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.
Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C.
2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.
1. Equal Employment Opportunity: Equal Employment Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:
a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409 (g)(4) & (5).
b. The contractor will accept as its operating policy the following statement:
"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin,…