This is a Bid Notice issued by the Kansas Department of Transportation (KDOT) Bureau of Construction and Materials for a milling and hot mix asphalt (HMA) overlay construction project on US-24 in Riley County, Kansas. The project encompasses milling and HMA overlay work on US-24 from the US-24/US-77 junction to the US-24/K-13 junction, spanning 9.8 miles and tied to project KA 8058-01. The work includes asphalt surfacing, pavement marking, rumble strip installation, and associated common items such as mobilization, traffic control, and field office operations. The project has a restricted working period of 70 days to open the project to unrestricted traffic and a total contract duration of 90 calendar days. The letting date is October 21, 2026, with electronic proposals due by 1:00 PM Local Time on that date via the Bid Express website (bidx.com). Proposal opening and reading will occur at 3:00 PM Local Time on the same date at the Eisenhower State Office Building in Topeka, Kansas. The earliest start date is July 10, 2028. Contractors must be prequalified, notify KDOT of their intent to bid by 5:00 PM on the Monday preceding the letting date, and execute the contract within ten business days of award notification.

The funding source is identified as STATE. Contractors must comply with extensive special provisions and required contract provisions including noncollusion certification, financial prequalification verification, tax clearance certification from the Kansas Department of Revenue, and compliance with prevailing wage requirements for Riley County. Price adjustment provisions apply for fuel, asphalt material, and emulsified asphalt. The contract includes approximately 15,928 tons of HMA overlay, 7,960 tons of milling, 503 to 1,006 stations of rumble strips, and extensive pavement marking work measured in linear feet and station lengths. Bid items are organized into four sections: Common Items, Asphalt Surfacing Items, Rumble Strips, and Pavement Marking Items, with specific unit prices to be provided by contractors. All contractors must obtain and maintain current tax clearance certificates, and subcontractors must also provide current tax clearance certificates before approval. The Standard Specifications for State Road and Bridge Construction, 2015 Edition, govern the work, and all contract documents, special provisions, and addenda are incorporated by reference into the proposal upon electronic submission.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745

Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org

Bureau of Construction and Materials

STATE PROJECT NUMBER: U024-081 KA 8059-01

CALL ORDER NUMBER: 614

PROPOSAL NUMBER: 526106141

LETTING DATE 10/21/2026

COUNTY: RILEY

FUND TYPE: STATE

WAMEGOKDOT CONSTRUCTION OFFICE:

PROJECT DESCRIPTION

MILLING AND HMA OVERLAY. US-24; FR US-24/US-77 JCT TO

US-24/K-13 JCT IN RL CO. LGTH 9.8 MI. TIED TO KA 8058-01.

RESTRICTED DAYS

(70)

TOTAL CONTRACT DAYS

(90)

TIED TO: 526102231 KA 8058-01

JULY 10, 2028

Earliest Start Date:

Latest Start Date:

1:11:00PM9/16/2026 @

Letting 10/21/2026 Kansas Department of Transportation Project No. U024-081 KA 8059-01

Contract No. 526106141

U024-081 KA 8059-01 U024-081 KA 8059-01

CONTRACT PROPOSAL

DOT Form No. 202 Rev. 02/19

Contract ID: 526106141

1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:

U024-081 KA 8059-01 / U024-081 KA 8059-01

The general scope, location and net length are:

MILLING AND HMA OVERLAY. US-24; FR US-24/US-77 JCT TO

US-24/K-13 JCT IN RL CO. LGTH 9.8 MI. TIED TO KA 8058-01.

2. This is the Proposal of [Contractor] to complete the Project for the amount set out in the accompanying

Unit Prices List.

3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:

4. Contractors and other interested entities may examine the Bidding Proposal Form/Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the

Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office

Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal

Form/Contract Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal

Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above. Contractors shall furnish this notice no later than 5:00 P.M. on the

Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".

5.Contractors shall use the Bidx.com website to complete and submit the bid form. Project bid forms are available on Bid Express' website at http://www.bidx.com.

6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website.

7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using

Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the

Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the

Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.

8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.

9. The contractor shall complete work to open the project to unrestricted traffic within _70_ Restricted Days and shall complete the work within the total Contract Working Days of _90_.

Contractor: Check: Page 1

10. The Contractor shall complete the Project according to the plans, Standard Specifications, provisions identified in the Special Provision List and all other Contract Documents identified in Standard

Specifications subsection 101.3

11. The undersigned declares that the Contractor has carefully examined the Bidding Proposal Form for the

Project. The Contractor understands the following:

A. The Bidding Proposal Form consists of the following documents: the Bidx bid form on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid

Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).

B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.

C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the Bidx bid form, electronically signs the Proposal where required on DOT Form 202, and submits the completed Bidx bid form documents and bid bond to KDOT using Bid Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the Contractor's Proposal.

D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.

12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.

13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions (I-XVII) require the

Contractor to furnish information. The current versions of these provisions are contained in the Bidx bid form. Some or all of these apply to the Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the Bidx bid form file. When these documents are required, the

Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the Bidx bid form.

I. 08-10-66 Certification-Noncollusion & History of Debarment

II. 04-30-82 Certification-Financial Prequalification Amount

III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying

IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm

V. 10-10-00 Price Adjustment for Fuel

VI. 06-01-06 Price Adjustment for Asphalt

VII. 08-31-09 Price Adjustment for Emulsified Asphalt

VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost

IX. 05-18-07 Repair (Structures) Unit Cost

X. 11-15-17 Electric Lighting System Unit Cost

XI. 04-06-09 ITS Unit Cost

XII. 08-17-16 Water System Unit Cost

XIII. 06-19-19 Sanitary Sewer System Unit Cost

XIV. 01-01-18 Smart Work Zone System Unit Cost

XV. 08-12-24 CORS Unit Cost

XVI. 04-06-26 Federal Restrictions on Foreign Drones

XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate

Contractor: Check: Page 2

14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.

15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.

I. 11-03-80 Affirmative Action For EEO

II. 11-15-96 Affirmative Action & EEO Policies

III. 09-06-94 U.S. DOT Fraud Hotline

IV. FHWA-1273 Federal-Aid Required Contract Provisions

16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.

17. SIGNATURE SECTION:

A. Electronic Internet Proposal

The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this

Proposal and binds the named individual to the certification in paragraph B.

B. Certification

I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING THIS PROPOSAL. I

CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT LIMITED TO THE INFORMATION CONTAINED

IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH 13) IS TRUE AND CORRECT.

EXECUTED ON

C. Signature

Number of company or joint venture:

Name of company or joint venture:

Name of person signing:

Title of the person signing:

Signature: Electronic Internet Proposal

RELEASED FOR CONSTRUCTION:

Date:____________________________________

Chief of Construction and Materials

Contractor: Check: Page 3

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

09/09/26

STATE PROJECT NO: U024-081 KA 8059-01 STATE CONTRACT NO: 526106141

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: RILEY1

MILLING AND HMA OVERLAY. US-24; FR US-24/US-77 JCT TO US-24/K-13 JCT IN RL

CO. LGTH 9.8 MI. TIED TO KA 8058-01.

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05

REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07

REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR FUEL10-10-00-R09

REQUIRED CONTRACT PROVISION-EMULSIFIED ASPHALT ADJUSTMENT08-31-09-R01

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR ASPHALT06-01-06-R01

REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06

REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1

MINIMUM WAGE RATE (RILEY COUNTY)KS20260146

REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01

ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23

POLICY AGAINST SEXUAL HARASSMENT03-01-18

REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003

WORKING DAYS AND LIQUIDATED DAMAGES15-01006-R02

FUEL ADJUSTMENT15-01008-R02

ASPHALT PRICE ADJUSTMENT15-01009-R01

EMULSIFIED ASPHALT ADJUSTMENT15-01010

ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06

SEASONAL LIMITATIONS15-01012-R01

PROSECUTION AND PROGRESS15-01016-R04

CONTROL OF WORK15-01019-R02

BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03

SCOPE OF WORK15-01022-R04

BIDDING REQUIREMENTS AND CONDITIONS15-01023

AWARD AND EXECUTION OF CONTRACT15-01024

ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501

ASPHALT PAVEMENT SMOOTHNESS15-06006-R01

HOT MIX ASPHALT CONSTRUCTION QC/QA15-06007-R03

HOT MIX ASPHALT (HMA)-COMMERCIAL GRADE15-06010-R02

WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04

PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE15-08011-R02

MAINTENANCE AND RESTORATION OF HAUL ROADS15-08018

WORK ZONE TRAFFIC CONTROL & SAFETY15-08019-R04

DURABLE PAVEMENT MARKING15-08020-R02

FIELD OFFICE AND LABORATORY15-08023-R01

SPECIAL PROVISION LIST

PAGE:

DATE:

09/09/26

STATE PROJECT NO: U024-081 KA 8059-01 STATE CONTRACT NO: 526106141

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: RILEY1

MILLING AND HMA OVERLAY. US-24; FR US-24/US-77 JCT TO US-24/K-13 JCT IN RL

CO. LGTH 9.8 MI. TIED TO KA 8058-01.

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

RUMBLE STRIPS (MILLED)15-08025

WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029

STORMWATER POLLUTION MANAGEMENT15-09002-R05

AGGREGATE FOR HMA15-11002-R01

GENERAL REQUIREMENT DIVISION 120015-12001-R01

PERFORMANCE GRADED ASPHALT BINDER15-12002-R01

STEEL SIGN POSTS15-16002-R03

RELEASE COMPOUND FOR ASPHALT MIXES15-17004-R05

THERMOPLASTIC15-22001-R01

MULTI - COMPONENT LIQUID PAVEMENT MARKING MATERIAL15-22003-R02

PAVEMENT MARKING PAINT15-22004-R02

IMAGE SYSTEMS15-22005-R03

RETROREFLECTIVE SHEETING15-22006-R01

PREFORMED THERMOPLASTIC PAVEMENT MARKING MATERIAL15-22008-R01

ROLL-UP SIGNS15-22011

HIGH DURABILITY PAVEMENT MARKING MATERIAL15-22014

TEMPORARY PAVEMENT MARKING TAPE15-22016

WOOD POSTS15-23001-R03

FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02

PART V15-25001-R07

MATERIALS CERTIFICATIONS15-26001-R13

MODIFIED REQUIREMENTS – ASPHALT MIXTURES15-MR0984

COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS15-PS0018

E-TICKETING SYSTEM(ETS) FOR HOT MIX ASPHALT(HMA)15-PS0020-R2

END OF SPECIAL PROVISION LIST

REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)

CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT

K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322

Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's

Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

NONCOLLUSION

I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.

HISTORY OF DEBARMENT

I certify that, except as noted below, the Contractor submitting this bid and any person associated with this

Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:

1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;

2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;

3. Do not have a proposed debarment pending;

4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, antitrust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.

Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.

◯ Yes ◯ No

The exceptions, if any, are:

Contractor: Check: Page 4

REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)

CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT

Select the appropriate response below to indicate whether this Proposal exceeds the Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form

202) supplies the necessary signature for this Certificate.

I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.

I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas

Department of Transportation plus the unearned amount of all other contracts in this state or other states

◯ exceeds ◯ does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.

If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).

KDOT Approval Granted by:

KDOT Approval Date:

Contractor: Check: Page 5

REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)

CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT

LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM

Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT

Form 202) supplies the necessary signature for this Certificate.

Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:

This Contract ◯ is ◯ is not with a legislator or a firm in which a legislator is a member. That Legislator is:

Name:

Address:

City State Zip:

Business Telephone:

Contractor: Check: Page 6

REQUIRED CONTRACT PROVISION - 10-10-00-R09 (Rev. 01/20)

PRICE ADJUSTMENT FOR FUEL

The Contractor may accept or reject the application of Special Provision 15-01008 (latest revision) "Price

Adjustment for Fuel". Any items listed on Special Provision 15-01008 (latest revision) that are included in this project are eligible for the fuel price adjustment unless otherwise stated in the contract documents.

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

◯ Accept ◯ Reject

If the Contractor accepts 15-01008 (latest revision), the Contractor shall mark the checkboxes below for the eligible items/sections listed in Special Provision 15-01008 (latest revision). Then they should indicate their desire for the specific fuel price adjustment by selecting the 'Yes' or 'No' option.

◯ Road Items (Earthwork)

◯ Concrete Surfacing Items

◯ Asphalt Surfacing Items

Contractor: Check: Page 7

REQUIRED CONTRACT PROVISION - 06-01-06-R01 (Rev. 03/15)

PRICE ADJUSTMENT FOR ASPHALT MATERIAL

The Contractor may accept or reject the application of Special Provision 15-01009 (latest revision) "Price

Adjustment for Asphalt Material."

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

◯ Accept ◯ Reject

Contractor: Check: Page 8

REQUIRED CONTRACT PROVISION - 08-31-09-R01 (Rev. 03/15)

PRICE ADJUSTMENT FOR EMULSIFIED ASPHALT

The Contractor may accept or reject the application of Special Provision 15-01010 (latest revision)

"Emulsified Asphalt Price Adjustment."

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

◯ Accept ◯ Reject

Contractor: Check: Page 9

REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)

TAX CLEARANCE CERTIFICATE

Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.

◯ Yes ◯ No

Insert the Tax Clearance Confirmation Number if available at the time of bidding:

Contractors shall have a current Tax Clearance Certificate from the Kansas Department of Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the

Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The

Secretary will reject the Contractor's Proposal as non-responsive if the Contractor does not have a current

Tax Clearance Certificate at the time of the contract award.

To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for

Tax Clearance obtained from KDOR's website at http://www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.

After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required

Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the

Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the

Certificate submitted.

If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's

Application for Tax Clearance, the Contractor shall call KDOR's Special Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.

Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax

Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax

Clearance Certificate is not "clearance" for all types of taxes the State of Kansas may assess.

Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT Field Office the Subcontractor's Tax

Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.

Contractor: Check: Page 10

Line Number Item Number Quantity Unit Unit Price Extension Price

Section 01

COMMON ITEMS

1 025323 1.000 LS

MOBILIZATION /

2 025324 1.000 LS

TRAFFIC CONTROL /

3 070580 1.000 HOUR $30.000 $30.00

FLAGGER (SET PRICE) /

4 020001 1.000 LS $8,000.000 $8,000.00

MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) /

5 025600 1.000 EACH

FIELD OFFICE AND LABORATORY (TYPE A) /

Section 01 Total 8,030.00

Section 02

ASPHALT SURFACING ITEMS

6 060242 15928.000 TON

HMA OVERLAY (SR-12.5A) (PG 64-28) /

7 081699 15928.000 TON

QUALITY CONTROL TESTING (HMA) /

8 010256 41.000 TON

EMULSIFIED ASPHALT (SS-1HP) /

9 081773 7960.000 TON

MILLING /

10 000062 1.000 EACH $1.000 $1.00

ASPHALT DENSITY PAY ADJUSTMENT /

11 000063 1.000 EACH $1.000 $1.00

ASPHALT AIR VOID PAY ADJUSTMENT /

12 011750 1.000 EACH $50.000 $50.00

ASPHALT CORE (SET PRICE) /

13 080465 1.000 TON $250.000 $250.00

MATERIAL FOR HMA PATCHING (SET PRICE) /

14 081050 6062.000 TON

PAVEMENT EDGE WEDGE (ROCK) /

15 011478 1.000 MGAL $40.000 $40.00

WATER (EARTHWORK COMPACTION) (SET PRICE) /

16 070912 603.600 STAL

PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) /

17 072412 3.000 EACH

PAVEMENT MARKING (TEMP) (SYMBOL) (TYPE I) /

Section 02 Total 342.00

Section 03

RUMBLE STRIPS

18 032406 503.000 STA.

RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) /

19 072252 1006.000 STA.

RUMBLE STRIPS (MILLED) (ASPHALT) /

Section 03 Total

Contractor: Check: Page 11

Section 04

PAVEMENT MARKING ITEMS

20 023140 102501.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") /

21 023141 175.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") /

22 023143 35429.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") /

23 023144 437.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") /

24 013348 3.000 EACH

PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) /

Section 04 Total

Item Total $8,372.00

Contractor: Check: Page 12

�� ������������������������������������������������������������������������������+',�����-��.����������������������������������������������������������������'����������������������/���#��+',�0,'�1'2���'3��3'456666666666666666666666666666667�8.6��������������������8�6��----------------------------------------------------------------��3�����.-��������.����.�����������������������������������������������������'����������������������/���#���'3��� '+91'��,//�',4 ��'3��6666666666666666666666667��.6���������������������6���'3��� '+91'��/54�:1 �4� �5,0:,;666666666666666666667��86��������������������.6�.�'3��� '+91'�� 3(*�4� ��4� 1(666666666666666666666667���6���������������������6���'3��� '+91'���04�1'��'3��666666666666666666666666667���6����������������������6���'4//+���+��45+<4�+,����'4//+���+��45�+���4554�+,��=�',3� (4�>666666666666666666666666666666666666666667���6���������������������6���'4//+���,��',5�����1'9+�1� '+91'66666666666666666667���6���������������������6��,*1'4�,'����'+*+���(4�"+�1666666666666666666666666667��?6�?��������������������6��,*1'4�,'��',�,�(+55��',3� (4�666666666666666666666667���6�8�������������������6��,*1'4�,'��',�,�(+556666666666666666666666666666666667��.6���������������������6��,*1'4�,'����'4��,'66666666666666666666666666666666667���6.��������������������6��,*1'4�,'�����'11 666666666666666666666666666666666667���6���������������������6��,*1'4�,'�����'4*1'66666666666666666666666666666666667��?6�?�������������������6��,*1'4�,'���',551'666666666666666666666666666666666667���6�.�������������������6��,*1'4�,'���*491'��=4�*"45�2�4��'1�4�12�4� ��,��'1�1>66666666666666666666666666666666666666666667��?6�.�������������������6��,*1'4�,'���(1�"4�+�6666666666666666666666666666666667���6�.�������������������6��,*1'4�,'���(4�1'+45��'4��/1'�91"+�5166666666666666667���6���������������������6��,*1'4�,'���5,4 1'666666666666666666666666666666666667��?68��������������������6��,*1'4�,'����'4 1'�:54 1666666666666666666666666666667��?6��������������������86��,*1'4�,'��� +��'+:3�,'6666666666666666666666666666667���6�8�������������������6��,*1'4�,'����'4�16666666666666666666666666666666666667��86�.�������������������6��,*1'4�,'����,��'1�1�/+�+�"+���(4�"+�16666666666666667���6���������������������6��,*1'4�,'���:355 ,<1'666666666666666666666666666666667��.6���������������������6��,*1'4�,'���:',,(��011*1'66666666666666666666666666667���6���������������������6��,*1'4�,'���:,:�4����+ ���11'���+ �5,4 1'6666666666667��?6�?�������������������6��,*1'4�,'���:4��",1�1@�494�,'��'4��",16666666666666667���6�8������������������86�?54:,'1'���(4�,���1� 1'�-��1(1����,��'1�16666666666667��.6?���������������������6�854:,'1'���/54��1'666666666666666666666666666666666667���6�.�������������������6��54:,'1'����,��'1�1��40�="4� �"15 �045��:1"+� >6666667��.6����������������������6�854:,'1'����,((,��,'��1�1'4566666666666666666666666667���6���������������������6��+',�0,'�1'2�'1+�/,'�+��666666666666666666666666666667���6���������������������6��151��'+�+4�666666666666666666666666666666666666666667��.6.8��������������������6���1(1���(4�,���,��'1�1�/+�+�"1'66666666666666666666667���68��������������������6��

ABCBDAE�CFGD�HI JHIKLMN

OPPQRFBBRSTKLMNBUSLVWXVPVYTZ[SPZM[B\JD]DA]ĜABG GB̂

������������������������������������������������������������������������������������������������������������������������������
����+��������������������������������������������,������������������������������������������������������������������������������������������������������������������������������������������������������������������������
�����#-#&.#%!"#/%#$-%&0#123%-%!2"/#%23%4&'(3/#%!"&3'"356&-65#71&'(&$&'-&1#'"!7�8888888888888888888888888888888888888888888888888888888888888888�3"#*�9#-:"&.#�%1#%;��<��,����$"!07&$6&'(�!&1�&-=�#!.#23%�#1#%!7�3'"%!-"3%$!//7&#$"3!77-3'"%!-"$$:0>#-""3"6#
!.&$�)!-3'�-"23%56&-6"6#-3'"%!-"&$!5!%1#1;!'1!'?$37&-&"!"&3'5!$&$$:#1<3'3%!2"#%@!':!%?�����,�
2"6&$-3'"%!-"&$-3.#%#10?"6#���"6#-3'"%!-"3%4:$"/%3.&1##4/73?##$5&"6�63:%32/!&1$&-=7#!.#23%#.#%?��63:%$"6#?53%=�:/"3�63:%$32/!&1$&-=7#!.##!-6?#!%��4/73?##$4:$"0#/#%4&""#1"3:$#/!&1$&-=7#!.#23%"6#&%35'&77'#$$�&'>:%?3%3"6#%6#!7"6�%#7!"#1'##1$�&'-7:1&'(/%#.#'"&.#
!.&$�)!-3'�-""6!"5#%#!5!%1#13'3%0#"5##'@!':!%?�����!'1@!':!%?�D������!'1"6!"6!.#'3"0##'%#'#5#13%#9"#'1#13'3%!2"#%@!':!%?���������9#-:"&.#�%1#%��� C13#$'3"!//7?"3-3'"%!-"$$:0>#-"3'7?"3"6#
!.&$�)!-3'�#7!"#1�-"$%#(!%17#$$3256#'"6#?5#%#!5!%1#1�
2!-3'"%!-"&$$:0>#-""3�9#-:"&.#�%1#%��� C�"6#-3'"%!-"3%4:$"/!?!77-3.#%#153%=#%$!"7#!$"�����/#%63:%;3%"6#!//7&-!07#5!(#%!"#7&$"#13'"6&$5!(#1#"#%4&'!"&3'�&2&"&$6&(6#%<23%!7763:%$$/#'"/#%23%4&'(3'"6#-3'"%!-"2%34�!?��������"6%3:(6
#-#40#%���������6#!//7&-!07#�9#-:"&.#�%1#%4&'&4:45!(#%!"#5&770#!1>:$"#1!'':!77?��11&"&3'!7&'23%4!"&3'3'-3'"%!-"3%%#B:&%#4#'"$!'153%=#%/%3"#-"&3'$:'1#%�9#-:"&.#�%1#%��� C&$!.!&7!07#!"555�137�(3.�561�(3.-3'"%!-"$��'7&$"#1-7!$$&2&-!"&3'$'##1#123%53%='3"&'-7:1#15&"6&'"6#$-3/#32"6#-7!$$&2&-!"&3'$7&$"#14!?0#!11#1!2"#%!5!%13'7?!$/%3.&1#1&'
1#'"&2&#%$�23:%�7#""#%&1#'"&2&#%0#(&''&'(5&"6-6!%!-"#%$3"6#%"6!'E��E�E����E�E��E�3%E��E1#'3"#$"6!"!:'&3'%!"#5!$/%#.!&7&'(23%"6!"-7!$$&2&-!"&3'&'"6#$:%.#?��9!4/7#*

FGHGIFJ HKLI MN OMNPQRS

TUUVWKGGWXYPQRSGZXQ[\][U[̂Y_̀XU_R̀GaOIbIFbLcFGL IGc

������������&�'$��%��������������� ��������������'��������������#������������������$�� �����#���#�������������$�������������������������#��� �����'�������������$���������)*+���������������������������� ��"��#�����#��#���'����,-./0�#� �����#�������������������������/ ���#��1����2����������(����/34���������������������������������#��������$�� ������������������������������%�"�����������5���������������$����������������������������������������������������67/���68�/34 9* ������� �������/34��������������������������������#������������ ���#��������9*���������������:��������9����(�����&����'"��%��������������&�'$��%������������������'"����������$�������#�������#�������'���������(�������%��� ������������&�'$��%��������������������������#�������'������������$���������������������'������������������� ���#�������/��/34�����������"���$�������������!���%�������!����;�����!%����������������#������ ���#������������������������������������� ��"��#�����#��#���'��������������������������"�����:�� �!�1����2����������(���<:�<���������������������������������������#������ ����������$�� ������,�����������������-=1����0���������������������������������� �!�������������������������� ���"!��'$����#������#������ ���#�������"�����������������������$���������������� �!��������������������������/�������#����� ���#����������������������������$���������������� �!%����'�!��������"����������������� �������������6&�'$��8�:�=����� ���> �������������&�'$��%������������������ �!���'$�������������������������������������������������������������������<:�<���#���������!$�����!���'����������������������������� �!��������������*��� ��%�����)�#������*����+� ������,)*+0�����������������������$�������������������������-=1���>,�0,�0�:�����/��$����1����2����������(���<:/<��������������������������������������������������$�� �����#���#������������"!���������,��������0�#� ���'�����������$�������������-�=�1���?,#0 ,�0���6&�'$��8�:/�6���? ����� ������:/��������������������������������������$������6��������������:������������������?��������!���������#������������������'$������������� �!��������������������������������������������������"������(�����&����'"��%�������������&�'$��%�����������������'"�����������$�������#�������#�������'��������(�������%���

ABCBDAE�CFGD�HI JHIKLMN

OPPQRFBBRSTKLMNBUSLVWXVPVYTZ[SPZM[B\JD]DA]ĜABG _B̂

���������
������������
����������������������������������������������������������������������������������������������������������������������������������� ��!"� ��#�""$%�&�
������'�������������������
����������������(����
�*�+������+��,���
�,�������������������������'%�����-�
�,��������������������������%�������������&��������
�����,����������
��������������������������������%����������������
�*�+�������������
/����������������/���������,��0��
���
������

������'���� ��������������&��1 ���������,��"� *�+ ����0��

'��������2����,�*���'+��������)������������1����������,��"�*�+
��������������,������&�����*�
���������������3�"���������������!�'�������������455�#��
���,���/��#�454$5��,����,���+������
�,���������������������

/� �0��

������'�����������������&��1��������#��
����������,��������������

���0��

�'�������*������������1#���������2����,�*��'+��������)������������1��������#��
����������,��������������
��������������,������&�����*�
���������������3�"���������������!�'�������������455�#��

���,���/��#�454$54%�������������������

���/��������+������
������+�.���
���������0��
���*��
���������
�������������������,�����&���������
�����."���46�#7�� ���$�8�����46�#7�� ���9%���0��
�����*��
���������
�������������'��
�'�������*������������'������
��������2����,�*���'+��������)��������������,������&���������
����������������3�"���������������!�'�������������455�#��

���,���/��#�454$5���� �0��

��������������������
�������+:
������������+������������.
�,����+��������/���;������
�������/��������������������/�����%����������0��
������
������
�������*��'��/��������
�������+���+��������������+��������������
����*���*��
�1����.�����+�������,��������
�1���%����������)������������������
����*����*��
�1���������������3�"���������������!�'�������������455�#��

���,���/��#�454$5�================================================================���������������7�������!���#�"���>��������

?@A@B?C�ADEB�FG HFGIJKL

MNNOPD@@PQRIJKL@SQJTUVTNTWRXYQNXKY@ZHB[B?[E\?@E \@\

15-MR0984

Sheet 1 of 1

SPECIAL PROVISION TO THE

STANDARD SPECIFICATIONS, EDITION 2015

SECTION 602

MODIFIED REQUIREMENTS – ASPHALT MIXTURES

Project Number: 24-81 KA-8059-01

The asphalt mix listed in TABLE 1 has the following project mix requirements. [Reference TABLE

602-1, COMBINED AGGREGATE REQUIREMENTS].

TABLE 1: PROJECT MIX REQUIREMENTS

MIX CRITERIA SR-12.5A (PG64-28)(1)

AGGREGATE:

Coarse Angularity (min. %) 75

Uncompacted Voids-Fine (min. %) 42 Sand Equivalent (min. %) 40 Reclaimed Asphalt Pavement (RAP) (max. %) 25 RAP Bulk Specific Gravity 2.550

COMPACTION REVOLUTIONS:

Nini (level of compaction) 7 (<91.5) Ndes 75 Nmax 115

MIX:

VFA 65 - 82

(1) Between 0 and 25% RAP may be used. Use the material milled from the project or from project 77-81 KA-8058-01 as the RAP source. A RAP sample for the project will be available for at least 120 days after letting. The required binder and name shown below are based on the percent RAP used in the contract.

The mix will be paid for at the bid price of SR-12.5A (PG64-28).

Mix properties are for a 20 year design lane traffic range of 0.3 to less than 3.0 million ESALs.

9/1/26 C&M (BTH)

Percent RAP Name

0 SM-12.5A (PG64-28)

1 - 15 SR-12.5A (PG64-28)

16 - 25 SR-12.5A (PG58-34)

15-PS0018

STANDARD SPECIFICATIONS, EDITION 2015

COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS

SECTION 102

BIDDING REQUIREMENTS AND CONDITIONS

Page 100-13, subsection 102.5. Delete subsection 102.5a.(2)(f) and replace with the following:

(f) Kansas-funded state projects “tied to” Federal-Aid funded state projects and Kansas-funded state projects “tied with” Federal-Aid funded state projects.

10-10-17 C&M Oct-17 Letting

15-PS0020-R2

KANSAS DEPARTMENT OF TRANSPORTATION

STANDARD SPECIFICATIONS, 2015 EDITION

SECTION 109

MEASUREMENT AND PAYMENT

Page 100-77, add subsection 109.1e(5):

(5) Electronic Ticketing (e-Ticketing) of Hot Mix Asphalt (HMA). Immediately after each truck is loaded and weighed at the HMA plant, generate an e-Ticket and upload it to the KDOT portal (https://tickets.ksdot.gov). If necessary, create an application programming interface (API) to integrate the e-Tickets with the KDOT portal. Update the API as needed to support the integration. Before beginning production of HMA on a project, connect to the project in the KDOT portal and verify that the required informational fields will be populated on the e-Tickets.

Fully integrate the e-Ticketing hardware and software with electronic scale and load read-out weighing system at the HMA plant. Design the e-Ticketing platform so that weight data cannot be altered. Provide a reliable and stable broadband internet connection and offline capabilities to prevent data loss if power or connectivity is lost.

If a stable internet connection cannot be sustained during material production, suspend plant production and paving or revert to the use of paper tickets if approved by the Engineer.

As a minimum, include the following information on each e-Ticket uploaded to the KDOT portal:

• Contractor;

• Plant ID;

• KDOT Project Number;

• KDOT Contract Number;

• HMA Mix Designation;

• Scale Operator Name;

• Date;

• Hauler;

• Truck Number;

• Daily Load Count;

• Gross Weight;

• Tare Weight;

• Net Weight;

• Legal Max Gross Vehicle Weight (GVW);

• Time at load out;

• Daily Total Tons of the HMA Mix Designation produced for the project.

Request the nomenclature requirements for the e-Ticket information from KDOT.

Display the identifying Truck Number on the driver side and passenger side of each haul truck. Ensure the

Truck Number can be safely read by the Road Inspector from the work area.

The Road Inspector will review each e-Ticket in the KDOT portal after the corresponding truckload is delivered to the project. The status will be changed from “pending” to “delivered” or “rejected,” any road waste quantity will be recorded, and notes may be added. A time stamp will be generated whenever the status is changed.

The Road Inspector or Engineer may update the status, quantity of road waste or notes after the initial review.

Reissue any e-Ticket that does not include the correct or required information. Do not reissue any e-Ticket that has been marked “delivered” or “rejected” without approval of the Engineer.

Complete, sign and retain KDOT Form No 251A or a Contractor-furnished materials receipt for each truckload in accordance with subsection 109.1e(3). If an e-Ticket has been uploaded to the KDOT portal by the time the corresponding truckload is delivered to the project, provide the original form or receipt to the designated Inspector by the end of the day. Otherwise, the truck driver shall provide the original form or receipt to the designated Inspector at the time of delivery to the project. If a stable internet connection cannot be sustained by the Inspector, the Engineer may require truck drivers to provide original forms or receipts to the designated inspector at the time of delivery to the project.

04-19-23 C&M (BTH)

E nd

: J C

T U

S -2

4/ K

-1

S ta rt : J

C T

U S

-7 7/

U S

-2

General Notes

6/16/2026

Project No. 24-81

1. This job consists of 3/4” Cold Mill and 1.5” HMA Overlay. It includes Pavement

Marking. The job is located on US-24 from the US-24/US-77 JCT to the US-24/K-13

JCT.

2. A minimum of one lane must be maintained open to traffic at all times through the work zone. All intersections are to remain open during construction. The Contractor shall make it possible for property owners to have safe and unobstructed passage to their properties. No lane closures or detours will be allowed overnight.

3. The contractor is responsible for establishing and maintaining centerline of the traveled way for the duration of the project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items in the contract.

4. All excess milled material not used on this project shall become the property of the contractor and be removed from the project.

5. Contact the KDOT Wamego office at (785) 617-6000 for RAP sample locations.

6. When milling mainline areas, a full width mill head will be required to maintain cross slope of the existing lane being milled in one pass. A smaller mill head will be allowed on miscellaneous areas as approved by the engineer and will not be allowed to perform mainline milling.

7. Contractor must mill and inlay any section of the roadway on the same day. No traffic will be allowed on the milled surface, and the contractor must have a contingency plan in case of bad weather and/or equipment breakdown.

8. No work shall take place on Saturdays of Kansas State University home football games.

KA 8059-01

TYPICAL SECTION

C

Rock Wedge

1.50 in. Overlay

0.75 in. Mill Rock Wedge

1:1 @ edge of Asphalt Match Existing Surface

2.0 ft+

45.6 ft wedge not to scale

• Typical slope 1.56 % on tangents and on super-elevated sections to match existing super or as directed by the

Engineer.

• Existing surface may be irregular and contain edge ruts. Contractor to fill to finished slope. Material for wedges shall be furnished by the contractor and paid for as “Pavement Edge Wedge (Rock)”.

• To allow for a reasonable transition the overlay is to be tapered approximately three feet at all paved side roads and entrances (except those that are approved to be fully paved).

ROADWAY WIDTHS

Approx. Approx.

Location mile Width Location mile Width

MAINLINE: 9.8 384+67 to 387+94 50.0'

(US-24/US-77) 0+00 to 3+71 32.0' 387+94 to 401+78 39.0'

3+71 to 6+08 59.0' 401+78 to 410+70 45.0'

6+08 to 7+15 69.0' 410+70 to 422+50 42.0'

7+15 to 12+21 71.0' 422+50 to 423+27 41.0'

12+21 to 15+30 68.0' 423+27 to 427+22 40.0'

15+30 to 22+91 42.0' 427+22 to 463+26 35.0'

22+91 to 318+27 31.0' US-24/K-113 Roundabout

318+27 to 330+11 32.0' 473+98 to 513+71 33.0'

330+11 to 349+99 30.0' US-24/K-13 Roundabout

349+99 to 351+81 32.0'

351+81 to 354+05 48.0' Total: 194,834.44 sqyd

354+05 to 376+20 54.0'

376+20 to 383+95 54.0' Steven's Quarry turn lane 356.0' 9.0'

383+95 to 384+67 55.0' Total: 356.0 sqyd

RATE OF APPLICATION

Quantity based on SR- 12.5A @0.0816 Ton/yd2

PG 64 - 28

SS-1HP @ 0.05 gal/yd2

AS-1 @ 150 lb/ft3

Millings Computed @ 145 lb/ft3

Date: 6/12/2026 1:02 PM

KANSAS DEPARTMENT OF

TRANSPORTATION

RILEY Co. PROJ. NO.24-81 TITLE: MILLOLROCKW

S U

M M

A R

Y O

F P

A V

E M

E N

T M

A R

K

IN

G S

L O

C A

T

IO

N o li d

W H

IT

g e

L in e g e

L in e

B ro k en

L an e L in e e L in e

(P C

P

D tt ed x te n si n in e e D p e e L in e

IT

E

L an e

D ro p L e

G re

L in e tt ed x te n si e ia g o al e h ev e

T yp e I

C ro ss w e yp e

II

ss w e to p L in e

Y

L L

O g e

L in e

L L u b le L in e

L L e

L L e

L L g e

L in e

L L ia g o e

M A

IN

L

IN

E

W es tb o u n d ,1

.0

,9

.0

,1

.0

,0

.0

,1

.0

,0

.0

E as tb o u n d ,3

.0

,7

.0

.2

U S

-2

/U S

-7

J C

T .0

.0

.0

.0

,3

.0

.0

U S

-2

/K -1

J C

T .0

U S

-2

/K -1

J

C T

.0

.0

.0

T U

R N

L A

N E

S

B ay er S te v en

's Q u ar ry .0

T O

T A

L S

.0

.0

.3

.0

.4

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

N O

T E

A

L L

T O

T A

L S

R E

F L

E C

T A

C T

U A

L Q

U A

N T

IT

Y

O F

P A

V E

M E

N

M A

R K

IN

G

M A

T E

R

IA

L S

R E

Q U

IR

E

D P ro je ct N o

-8

K

A

9-

U

M M

A R

Y W

O R

D

S Y

M B

O L

M A

R K

IN

G

S

L O

C A

T

IO

N S

T O

P O

N L

Y X

-I N

G S

C H

O O

L

U S

-2

/U S

-7

J C

T

T O

T A

L S

P ro je ct

N o

N O

T E

A

L L

T O

T A

L S

R E

F L

E C

T A

C T

U A

L Q

U A

N T

IT

Y

O F

P A

V E

M E

N

M A

R K

IN

G

M A

T E

R

IA

L S

R E

Q U

IR

E

D

-8

K

A

9-

Project No.

RECAPITULATION OF QUANTITIES

ITEMS TOTAL UNITS

PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(4") LNFT

PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(6") 102,501 LNFT

PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(8") 175 LNFT

PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(12") LNFT

PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(4") 35,429 LNFT

PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(6") LNFT

PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(12") 437 LNFT

PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(4") LNFT

PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(6") LNFT

PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(8") LNFT

PAVEMENT MARKING (THERMOPLASTIC)(WHITE)(12") LNFT

PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(4") LNFT

PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(6") LNFT

PAVEMENT MARKING (THERMOPLASTIC)(YELLOW)(12") LNFT

PAVEMENT MARKING (EPOXY)(WHITE)(4") LNFT

PAVEMENT MARKING (EPOXY)(WHITE)(6") LNFT

PAVEMENT MARKING (EPOXY)(WHITE)(8") LNFT

PAVEMENT MARKING (EPOXY)(WHITE)(12") LNFT

PAVEMENT MARKING (EPOXY)(YELLOW)(4") LNFT

PAVEMENT MARKING (EPOXY)(YELLOW)(6") LNFT

PAVEMENT MARKING (EPOXY)(YELLOW)(12") LNFT

PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") LNFT

PAVEMENT MARKING (INTERSECTION GRADE)(WHITE)(24") LNFT

PAVEMENT MARKING (INTERSECTION GRADE)(YELLOW)(12") LNFT

PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) (WHITE) (R/R XING) EACH

PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) (WHITE) (Lt Turn Arrow) 3 EACH

PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) (WHITE) (Rt Turn Arrow) EACH

PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) (WHITE) ( ONLY ) EACH

PAVEMENT MARKING SYMBOL (INTERSECTION GRADE) (WHITE) (Rt/Thru Arrow) EACH

PAVEMENT MARKING REMOVAL LNFT

NOTE:

24-81

WORDS & SYMBOLS SHALL CONFORM TO THE LATEST EDITION

OF "STANDARD ALPHABETS FOR HIGHWAY SIGNS AND

PAVEMENT MARKINGS" PRINTED BY THE U.S. DEPARTMENT OF

TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION.

PRIOR TO COMMENCEMENT OF PAVEMENT MARKING WORK THE

ENGINEER WILL ESTABLISH THE LIMITS FOR "NO PASSING"

ZONES. THESE LIMITS SHALL BE USED FOR THE LOCATION OF "

NO PASSING" LINES AND FOR THE COMPUTATION OF ACTUAL

MARKING QUANTITIES FOR THIS LINE TYPE

Pg 1 of 2

Pg 2 of 2

SUMMARY OF TRAFFIC CONTROL DEVICES

(FOR INFORMATION ONLY)

All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control.

WORK ZONE SIGNS *

SIGN

NO.

SIZE – SQ. FT.

0-9.25 9.26-16.25 16.26 & OVER

R2-1

R4-1 2

W3-4 2

W3-5

W8-11

W14-3 2

W20-1 4

W20-4 2

W20-5

W20-7 2

W21-5

KG20-5 4

KR5-17 2

G20-4

W7-3A

W1-4R

KM4-20 4

KG20-2 2

LIGHTED DEVICES *

WORK ZONE WARNING LIGHT

(TYPE “A” LOW INTENSITY) 16

WORK ZONE WARNING LIGHT

(RED TYPE ”B” HIGH INTENSITY)

ARROW DISPLAY

PORTABLE CHANGEABLE MESSAGE SIGN

BARRICADES * CHANNELIZING DEVICES *

TYPE III (4’

TO 12’)

PEDESTRIAN FIXED PORTABLE PEDESTRIAN

8 40

SUMMARY OF TRAFFIC CONTROL DEVICES

(EACH)

RECAPITULATION OF QUANTITIES

ITEM QUANTITY UNIT

WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) EADA

WORK ZONE SIGNS (9.26 TO 16.25 SQ. FT.) EADA

WORK ZONE SIGNS (16.26 SQ. FT. & OVER) EADA

WORK ZONE BARRICADES (TYPE 3 – 4’ TO 12’) EADA

WORK ZONE BARRICADES (PEDESTRIAN) EADA

CHANNELIZER (FIXED) EADA

CHANNELIZER (PORTABLE) EADA

CHANNELIZER (PEDESTRIAN) EADA

WORK ZONE WARNING LIGHT (TYPE “A” LOW INTENSITY) EADA

WORK ZONE WARNING LIGHT (RED TYPE “B” HIGH INTENSITY) EADA

ARROW DISPLAY EADA

PORTABLE CHANGEABLE MESSAGE SIGN EADA

PAVEMENT MARKING (TEMPORARY)

4" SOLID (TYPE I) STA./LINE

4" SOLID (TYPE II) STA./LINE

4" BROKEN (8')(TYPE I) STA./LINE

4" BROKEN (8')(TYPE II) STA./LINE

4" BROKEN (3')(TYPE I) 603.6 STA./LINE

4" BROKEN (3')(TYPE II) STA./LINE

4" DOTTED EXTENSION (TYPE I) STA./LINE

4" DOTTED EXTENSION (TYPE II) STA./LINE

SOLID (LINE MASKING TAPE) STA./LINE

BROKEN (LINE MASKING TAPE) STA./LINE

SYMBOL (TYPE I) 3.0 EACH

SYMBOL (TYPE II) EACH

FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8’)) STA./LINE

FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3’)) STA./LINE

PAVEMENT MARKING REMOVAL LIN. FT.

CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) LIN. FT.

CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-INSTALL ONLY) LIN. FT.

CONCRETE SAFETY BARRIER (TYPE F3) (TEMP.-RELOCATE) LIN. FT.

INERTIAL BARRIER SYSTEM EACH

REPLACEMENT MODULES (IBS) EACH

WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH

WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH

RIGID RAISED PAVEMENT MARKER (TYPE I) EACH

RIGID RAISED PAVEMENT MARKER (TYPE II) EACH

TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM

TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM

TRAFFIC CONTROL LUMPSUM LUMP SUM

FLAGGER (SET PRICE) 1 HOUR

NOTES:

1 11/10/16 Removed Replacement Modules Summary Table, Added “(IBS)” to Replacement Modules description

JGB

NO. DATE REVISIONS BY APP’D

TRAFFIC CONTROL

SUMMARY OF DEVICES

RECAPITULATION OF QUANTITIES

TE795

FHWA APPROVAL 06/01/15 APP’D Kristina Erickson

DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED

DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK.

WORK ZONE SIGN (SPECIAL)

SIGN NO. 16.25 SQ. FT. & LESS 16.26 SQ. FT. & OVER

Riley Co. Proj. No. 24-81 Title: Traffic Control KA 8059-01