Bid Notice-Milling _ HMA Overlay. US-183 - Rush County.pdf
PDF 5 MB Posted
- Attached to
- Milling & HMA Overlay. US-183 - Rush County
- Solicitation number
- 526116525
- Issued by
- Rooks County, Kansas
About this file
This is a Bid Notice issued by the Kansas Department of Transportation for a milling and Hot Mix Asphalt (HMA) overlay project on US-183 in Rush County. The project extends from the Rush County line at Rush Center to the Rush County line at LaCrosse, covering a total length of 4.52 miles. The scope of work includes milling and HMA overlay activities on this designated highway segment. The latest anticipated start date for the project is September 13, 2027. The bid notice solicits proposals from qualified contractors interested in undertaking this road construction work, with specific details regarding submission requirements, bidding procedures, and project specifications contained within the notice documentation.
The bid notice establishes the framework for contractor selection and contract award for this highway improvement project. Interested bidders are required to review all bid documents and project specifications prior to submitting their proposals. Payment and contract terms are to be determined through the competitive bidding process, with pricing to be submitted by qualified contractors. The project is funded through Kansas transportation funds allocated for highway maintenance and improvement initiatives. No set-asides are specified in the notice. Contractors should verify all project requirements, site conditions, and technical specifications outlined in the complete bid package before preparing and submitting their bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745
Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org
Bureau of Construction and Materials
STATE PROJECT NUMBER: U183-083 KA 8023-01
CALL ORDER NUMBER: 652
PROPOSAL NUMBER: 526116525
LETTING DATE 11/18/2026
COUNTY: RUSH
FUND TYPE: STATE
GREAT BENDKDOT CONSTRUCTION OFFICE:
PROJECT DESCRIPTION
MILLING AND HMA OVERLAY. US-183; FR SCL RUSH CENTER TO SCL
LACROSSE IN RH CO. LGTH 4.52 MI.
RESTRICTED DAYS
(20)
TOTAL CONTRACT DAYS
(30)
SEPTEMBER 13, 2027
Earliest Start Date:
Latest Start Date:
4:34:30PM10/20/2026 @
Letting 11/18/2026 Kansas Department of Transportation Project No. U183-083 KA 8023-01 Contract No. 526116525
U183-083 KA 8023-01 U183-083 KA 8023-01
CONTRACT PROPOSAL
DOT Form No. 202 Rev. 02/19
Contract ID: 526116525
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:
U183-083 KA 8023-01 / U183-083 KA 8023-01
The general scope, location and net length are:
MILLING AND HMA OVERLAY. US-183; FR SCL RUSH CENTER TO SCL
LACROSSE IN RH CO. LGTH 4.52 MI.
2. This is the Proposal of [Contractor] to complete the Project for the amount set out in the accompanying Unit Prices
List.
3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:
4. Contractors and other interested entities may examine the Bidding Proposal Form/Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of
Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting
Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above. Contractors shall furnish this notice no later than 5:00
P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard
Specifications] by using KDOT's website of http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".
5.Contractors shall use the Bidx.com website to complete and submit the bid form. Project bid forms are available on Bid
Express' website at http://www.bidx.com.
6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website.
7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid
Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State
Office Building, 700 SW Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.
8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.
9. The contractor shall complete work to open the project to unrestricted traffic within _20_ Restricted Days and shall complete the work within the total Contract Working Days of _30_.
10. The Contractor shall complete the Project according to the plans, Standard Specifications, provisions identified in the Special Provision List and all other Contract Documents identified in Standard Specifications subsection 101.3
Contractor: Check: Page 1
11. The undersigned declares that the Contractor has carefully examined the Bidding Proposal Form for the Project. The
Contractor understands the following:
A. The Bidding Proposal Form consists of the following documents: the Bidx bid form on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).
B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.
C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the Bidx bid form, electronically signs the Proposal where required on DOT Form 202, and submits the completed Bidx bid form documents and bid bond to KDOT using Bid Express. The special provision list, project special provisions, special provisions, Standard
Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the Contractor's Proposal.
D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.
12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.
13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions (I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Bidx bid form. Some or all of these apply to the Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the Bidx bid form file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed
Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the Bidx bid form.
I. 08-10-66 Certification-Noncollusion & History of Debarment
II. 04-30-82 Certification-Financial Prequalification Amount
III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying
IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm
V. 10-10-00 Price Adjustment for Fuel
VI. 06-01-06 Price Adjustment for Asphalt
VII. 08-31-09 Price Adjustment for Emulsified Asphalt
VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost
IX. 05-18-07 Repair (Structures) Unit Cost
X. 11-15-17 Electric Lighting System Unit Cost
XI. 04-06-09 ITS Unit Cost
XII. 08-17-16 Water System Unit Cost
XIII. 06-19-19 Sanitary Sewer System Unit Cost
XIV. 01-01-18 Smart Work Zone System Unit Cost
XV. 08-12-24 CORS Unit Cost
XVI. 04-06-26 Federal Restrictions on Foreign Drones
XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate
14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.
Contractor: Check: Page 2
15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the
Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.
I. 11-03-80 Affirmative Action For EEO
II. 11-15-96 Affirmative Action & EEO Policies
III. 09-06-94 U.S. DOT Fraud Hotline
IV. FHWA-1273 Federal-Aid Required Contract Provisions
16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.
17. SIGNATURE SECTION:
A. Electronic Internet Proposal
The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.
B. Certification
I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING THIS PROPOSAL. I CERTIFY UNDER
PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL
PROVISIONS REFERENCED IN PARAGRAPH 13) IS TRUE AND CORRECT.
EXECUTED ON
C. Signature
Number of company or joint venture:
Name of company or joint venture:
Name of person signing:
Title of the person signing:
Signature: Electronic Internet Proposal
RELEASED FOR CONSTRUCTION:
Date:____________________________________
Chief of Construction and Materials
Contractor: Check: Page 3
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
10/17/26
STATE PROJECT NO: U183-083 KA 8023-01 STATE CONTRACT NO: 526116525
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: RUSH5
MILLING AND HMA OVERLAY. US-183; FR SCL RUSH CENTER TO SCL LACROSSE
IN RH CO. LGTH 4.52 MI.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05
REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07
REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03
REQUIRED CONTRACT PROVISION-EMULSIFIED ASPHALT ADJUSTMENT08-31-09-R01
REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR ASPHALT06-01-06-R01
REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06
REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1
MINIMUM WAGE RATE (CN,CM,ED,EK,GO,GL,ME,MT,NS,PL,RA,RH,SM,ST & WH
COUNTIES)
KS20260130
REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01
POLICY AGAINST SEXUAL HARASSMENT03-01-18
ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23
REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003
ASPHALT PRICE ADJUSTMENT15-01009-R01
EMULSIFIED ASPHALT ADJUSTMENT15-01010
ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06
SEASONAL LIMITATIONS15-01012-R01
PROSECUTION AND PROGRESS15-01016-R04
CONTROL OF WORK15-01019-R02
BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03
SCOPE OF WORK15-01022-R04
BIDDING REQUIREMENTS AND CONDITIONS15-01023
AWARD AND EXECUTION OF CONTRACT15-01024
ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501
ASPHALT PAVEMENT SMOOTHNESS15-06006-R01
HOT MIX ASPHALT CONSTRUCTION QC/QA15-06007-R03
CHIP SEALS15-06011
WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04
MAINTENANCE AND RESTORATION OF HAUL ROADS15-08018
WORK ZONE TRAFFIC CONTROL & SAFETY15-08019-R04
DURABLE PAVEMENT MARKING15-08020-R02
FIELD OFFICE AND LABORATORY15-08023-R01
RUMBLE STRIPS (MILLED)15-08025
WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029-R01
STORMWATER POLLUTION MANAGEMENT15-09002-R05
SPECIAL PROVISION LIST
PAGE:
DATE:
10/17/26
STATE PROJECT NO: U183-083 KA 8023-01 STATE CONTRACT NO: 526116525
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: RUSH5
MILLING AND HMA OVERLAY. US-183; FR SCL RUSH CENTER TO SCL LACROSSE
IN RH CO. LGTH 4.52 MI.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
AGGREGATE FOR HMA15-11002-R01
GENERAL REQUIREMENT DIVISION 120015-12001-R01
PERFORMANCE GRADED ASPHALT BINDER15-12002-R01
STEEL SIGN POSTS15-16002-R03
RELEASE COMPOUND FOR ASPHALT MIXES15-17004-R05
THERMOPLASTIC15-22001-R01
MULTI - COMPONENT LIQUID PAVEMENT MARKING MATERIAL15-22003-R02
PAVEMENT MARKING PAINT15-22004-R02
IMAGE SYSTEMS15-22005-R03
RETROREFLECTIVE SHEETING15-22006-R01
PREFORMED THERMOPLASTIC PAVEMENT MARKING MATERIAL15-22008-R01
ROLL-UP SIGNS15-22011
HIGH DURABILITY PAVEMENT MARKING MATERIAL15-22014
TEMPORARY PAVEMENT MARKING TAPE15-22016
WOOD POSTS15-23001-R03
FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02
PART V15-25001-R07
MATERIALS CERTIFICATIONS15-26001-R13
MODIFIED REQUIREMENTS – ASPHALT MIXTURES15-MR1019
COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS15-PS0018
E-TICKETING SYSTEM(ETS) FOR HOT MIX ASPHALT(HMA)15-PS0020-R2
RAILROAD FLAGGING REQUIREMENTS15-RF0426
END OF SPECIAL PROVISION LIST
REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)
CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT
K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322
Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal
(DOT Form 202) supplies the necessary signature for this Certificate.
NONCOLLUSION
I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.
HISTORY OF DEBARMENT
I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:
1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;
2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;
3. Do not have a proposed debarment pending;
4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, antitrust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.
Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.
◯ Yes ◯ No
The exceptions, if any, are:
Contractor: Check: Page 4
REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)
CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT
Select the appropriate response below to indicate whether this Proposal exceeds the Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.
I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states ◯ exceeds ◯ does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.
If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).
KDOT Approval Granted by:
KDOT Approval Date:
Contractor: Check: Page 5
REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)
CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT
LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM
Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:
This Contract ◯ is ◯ is not with a legislator or a firm in which a legislator is a member. That Legislator is:
Name:
Address:
City State Zip:
Business Telephone:
Contractor: Check: Page 6
REQUIRED CONTRACT PROVISION - 06-01-06-R01 (Rev. 03/15)
PRICE ADJUSTMENT FOR ASPHALT MATERIAL
The Contractor may accept or reject the application of Special Provision 15-01009 (latest revision) "Price Adjustment for Asphalt Material."
Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.
◯ Accept ◯ Reject
Contractor: Check: Page 7
REQUIRED CONTRACT PROVISION - 08-31-09-R01 (Rev. 03/15)
PRICE ADJUSTMENT FOR EMULSIFIED ASPHALT
The Contractor may accept or reject the application of Special Provision 15-01010 (latest revision) "Emulsified Asphalt
Price Adjustment."
Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.
◯ Accept ◯ Reject
Contractor: Check: Page 8
REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)
TAX CLEARANCE CERTIFICATE
Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.
◯ Yes ◯ No
Insert the Tax Clearance Confirmation Number if available at the time of bidding:
Contractors shall have a current Tax Clearance Certificate from the Kansas Department of Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's
Proposal as non-responsive if the Contractor does not have a current Tax Clearance Certificate at the time of the contract award.
To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http://www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a
Transaction ID number. The Contractor shall use the Transaction ID number to retrieve the Tax Clearance Certificate.
Decisions on on-line applications are generally available the following business day.
After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract
Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax
Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation
Number inserted on this Required Contract Provision or contained on the Certificate submitted.
If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for
Tax Clearance, the Contractor shall call KDOR's Special Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.
Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance
Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not
"clearance" for all types of taxes the State of Kansas may assess.
Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.
Contractor: Check: Page 9
Line Number Item Number Quantity Unit Unit Price Extension Price
Section 01
COMMON ITEMS
1 025323 1.000 LS
MOBILIZATION /
2 025324 1.000 LS
TRAFFIC CONTROL /
3 070580 1.000 HOUR $30.000 $30.00
FLAGGER (SET PRICE) /
4 025600 1.000 EACH
FIELD OFFICE AND LABORATORY (TYPE A) /
5 020001 1.000 LS $4,000.000 $4,000.00
MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) /
Section 01 Total 4,030.00
Section 02
ASPHALT SURFACING ITEMS
6 060241 8074.000 TON
HMA OVERLAY (SR-12.5A) (PG 70-28) /
7 081699 8074.000 TON
QUALITY CONTROL TESTING (HMA) /
8 010256 18.000 TON
EMULSIFIED ASPHALT (SS-1HP) /
9 081773 6059.000 TON
MILLING /
10 000063 1.000 EACH $1.000 $1.00
ASPHALT AIR VOID PAY ADJUSTMENT /
11 000062 1.000 EACH $1.000 $1.00
ASPHALT DENSITY PAY ADJUSTMENT /
12 080465 1.000 TON $250.000 $250.00
MATERIAL FOR HMA PATCHING (SET PRICE) /
13 011750 1.000 EACH $50.000 $50.00
ASPHALT CORE (SET PRICE) /
14 012809 208.000 STA.
MANIPULATION (CHIP SEAL) /
15 080672 51.000 TON
EMULSIFIED ASPHALT (CRS-1HP) (SEAL) /
16 010814 291.000 CUYD
COVER MATERIAL (CM-L-1) /
17 010112 1.000 MGAL $40.000 $40.00
WATER (FLEXIBLE PAVEMENT) (SET PRICE) /
18 070912 239.000 STAL
PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I) /
Section 02 Total 342.00
Section 03
RUMBLE STRIPS
19 032406 197.000 STA.
RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) /
Section 03 Total
Contractor: Check: Page 10
Section 04
PAVEMENT MARKING ITEMS
20 023143 18131.000 LNFT
PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") /
21 023140 42207.000 LNFT
PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") /
22 013813 2.000 EACH
PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE)(RAILROAD XING) /
23 013812 24.000 LNFT
PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") /
Section 04 Total
Item Total $4,372.00
Contractor: Check: Page 11
�� ������������������������������������������������������������������������������(��0����1�������������������������������������������������������������������.����������������������2���#��-3/(.�(450-,(���3-(.6�3.�� .077�.0���60��3��888888889���8����������������������8��1111111111111111111111111111111111111111111111111111111111111111�0.3�����1��:��;�������������������������������������������������������������.����������������������2���#��0.3�/3.�(.'���.5��5.678888888888888888888888888888889��<8���������������������;8��1111111111111111111111111111111111111111111111111111111111111111��5�����<1��<�����<����<�����������������������������������������������������.����������������������2���#���.5��� .0=(.��322�.36 ��.5��8888888888888888888888889���8���������������������8���.5��� .0=(.��276�>( �6� �73/>3?888888888888888888889��<8���������������������8���.5��� .0=(.�� 5,-�6� ��6� (,888888888888888888888889���8:<�������������������8���.5��� .0=(.���/6�(.��.5��888888888888888888888888889��:8�:�������������������8���.5��� .0=(.���-0��5-��.5��88888888888888888888888889���8�<�������������������8���.6220���3��.37�����(.=0�(� .0=(.88888888888888888889��;8���������������������8���(.=0�(,6���(450-,(��88888888888888888888888888888889���8���������������������8:;3-(.6�3.����.0-0���,6�"0�(888888888888888888888888889��<8<�������������������;8;<3-(.6�3.��.3�3�,077��.35� ,6�888888888888888888888889���8���������������������8��3-(.6�3.��.3�3�,0778888888888888888888888888888888889��:8���������������������8��3-(.6�3.����.6��3.88888888888888888888888888888888889���8�;�������������������8��3-(.6�3.�����.(( 888888888888888888888888888888888889���8���������������������8��3-(.6�3.�����.6-(.88888888888888888888888888888888889���8���������������������8��3-(.6�3.���.377(.888888888888888888888888888888888889��;8�:�������������������8��3-(.6�3.���-6=(.��@6�-"67�'�6��.(�6�('�6� ��3��.(�(A88888888888888888888888888888888888888888889���8���������������������8��3-(.6�3.���,(�"6�0�8888888888888888888888888888888889���8���������������������8��3-(.6�3.���,6�(.067��.6��2(.�=("0�7(88888888888888889���8<��������������������8��3-(.6�3.���736 (.888888888888888888888888888888888889���8:��������������������8��3-(.6�3.����.6 (.�>76 (888888888888888888888888888889��:8�<�������������������8�:3-(.6�3.��� 0��.0>5�3.8888888888888888888888888888889���8�<�������������������8��3-(.6�3.����.6�(8888888888888888888888888888888888889���8��������������������:8��3-(.6�3.����3��.(�(��6/888888888888888888888888888889���8:��������������������8��3-(.6�3.����3��.(�(�20�0�"0���,6�"0�(8888888888888889���8���������������������8��3-(.6�3.���>577 3B(.888888888888888888888888888888889��:8�:�������������������8�:3-(.6�3.���>.33,��/((-(.88888888888888888888888888889���8�;�������������������8��
CDEDFCG�EHIJ�KL MKLNOPQ
RSSTUHDDUVWNOPQDXVOYZ[YSY\W]̂VS]P̂D_MFIFCIJ̀IDJ JDa
| ���������������������������������������������������������������������������������������������������������������������������������� | ���������� �������������������������������������������������������������������� | ������� |
| �!!������ �������������������������������������������������������������� | ��������������"��� |
��������������������������������������������������������������������������������''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''%�������'��()(*+(�,-.(�/,(0),*1(2�34,�),-3.�/(,34,5*674/(,-.*46�.4�89*)9�8(:2*67�*0�*6)*2(6.-:�;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;�4.(���<()=.*+(��,2(,�>��?��$���"��0.-1:*09*67��-*2��*)@��(-+(34,��(2(,-:� 46.,-).4,0�-//:*(0�.4�-::�)46.,-).0�0=1A().�.4�.9(�-+*0' -)46��).�34,�89*)9�.9(�)46.,-).�*0�-8-,2(2�>-62�-6B04:*)*.-.*46�8-0�*00=(2?�46�4,�-3.(,�C-6=-,B��"���������3�.9*0)46.,-).�*0�)4+(,(2�1B�.9(���"�.9(�)46.,-).4,�5=0.�/,4+*2((5/:4B((0�8*.9���94=,�43�/-*2�0*)@�:(-+(�34,�(+(,B�$��94=,0.9(B�84,@"�=/�.4�&��94=,0�43�/-*2�0*)@�:(-+(�(-)9�B(-,��5/:4B((0�5=0.�1(�/(,5*..(2�.4�=0(�/-*2�0*)@�:(-+(�34,�.9(*,486�*::6(00"�*6A=,B�4,�4.9(,�9(-:.9',(:-.(2�6((20"�*6):=2*67/,(+(6.*+(�)-,(D�.4�-00*0.�-�3-5*:B�5(51(,�>4,�/(,046�894�*0:*@(�3-5*:B�.4�.9(�(5/:4B((?�894�*0�*::"�*6A=,(2"�4,�9-0�4.9(,9(-:.9',(:-.(2�6((20"�*6):=2*67�/,(+(6.*+(�)-,(D�4,�34,�,(-0460,(0=:.*67�3,45"�4,�.4�-00*0.�-�3-5*:B�5(51(,�>4,�/(,046�894�*0:*@(�3-5*:B�.4�.9(�(5/:4B((?�894�*0�-�+*).*5�43"�245(0.*)+*4:(6)("�0(<=-:�-00-=:."�4,�0.-:@*67����22*.*46-:�*634,5-.*4646�)46.,-).4,�,(E=*,(5(6.0�-62�84,@(,�/,4.().*460�=62(,�.9(���*0�-+-*:-1:(�-.9../0���888�24:�74+�-7(6)*(0�892�74+(,65(6.')46.,-).0��4.(���<()=.*+(��,2(,��$�&��7(6(,-::B�-//:*(0�.4�)46.,-).0�0=1A().�.4�.9(��-+*0' -)46��).�.9-.�8(,(�-8-,2(2�46�4,�1(.8((6�C-6=-,B��"����&�-62�C-6=-,B���"�����"�-62�.9-.�9-+(�64.�1((6�,(6(8(2�4,�(<.(62(2�46�4,�-3.(,�C-6=-,B�$�"��������<()=.*+(��,2(,��$�&��24(0�64.�-//:B�.4�)46.,-).0�0=1A().�46:B�.4�.9(��-+*0' -)46��(:-.(2��).0�,(7-,2:(00�43�89(6�.9(B�8(,(�-8-,2(2���3�-�)46.,-).�*0�0=1A().�.4��<()=.*+(��,2(,��$�&�"�.9(�)46.,-).4,�5=0.�/-B�-::�)4+(,(2�84,@(,0�-.�:(-0.���$��&�/(,�94=,�>4,�.9(�-//:*)-1:(�8-7(�,-.(�:*0.(2�46�.9*0�8-7(�2(.(,5*6-.*46"�*3�*.�*0�9*79(,?�34,�-::�94=,0�0/(6.�/(,34,5*67�46�.9(�)46.,-).�3,45�!-B���"�����"�.9,4=79��()(51(,�$�"���������9(�-//:*)-1:(��<()=.*+(��,2(,�5*6*5=5�8-7(�,-.(�8*::�1(�-2A=0.(2�-66=-::B��22*.*46-:�*634,5-.*46�46�)46.,-).4,�,(E=*,(5(6.0�-62�84,@(,�/,4.().*460�=62(,��<()=.*+(��,2(,��$�&��*0�-+-*:-1:(�-.�888�24:�74+�892�74+)46.,-).0�#6:*0.(2�):-00*3*)-.*460�6((2(2�34,�84,@�64.�*6):=2(2�8*.9*6.9(�0)4/(�43�.9(�):-00*3*)-.*460�:*0.(2�5-B�1(�-22(2�-3.(,-8-,2�46:B�-0�/,4+*2(2�*6�.9(�:-14,�0.-62-,20�)46.,-).�):-=0(0>�� ���&�&�>-?�>�?�>***??�'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''�9(�142B�43�(-)9�8-7(�2(.(,5*6-.*46�:*0.0�.9(�):-00*3*)-.*460-62�8-7(�,-.(0�.9-.�9-+(�1((6�34=62�.4�1(�/,(+-*:*67�34,�.9(.B/(>0?�43�)460.,=).*46�-62�7(47,-/9*)�-,(-�)4+(,(2�1B�.9(�8-7(2(.(,5*6-.*46���9(�):-00*3*)-.*460�-,(�:*0.(2�*6�-:/9-1(.*)-:4,2(,�=62(,�,-.(�*2(6.*3*(,0�*62*)-.*67�89(.9(,�.9(�/-,.*)=:-,,-.(�*0�-�=6*46�,-.(�>)=,,(6.�=6*46�6(74.*-.(2�,-.(?"�-�0=,+(B,-.("�-�8(*79.(2�=6*46�-+(,-7(�,-.("�-�0.-.(�-24/.(2�,-.("�4,�-0=//:(5(6.-:�):-00*3*)-.*46�,-.(�
FGHGIFJ�HKLM�NO PNOQRST
UVVWXKGGXYZQRSTG[YR\]̂\V\_Z̀aYV̀SaGbPILIFLMcLGM IGd
| ��������� | � |
| � | ����� |
| �� | �� |
| ��� | ����� |
| �� | ���������������� |
| ������� | ��� | ��������������� | ||
| �� | ����� | |||
| ���������� | ||||
| �������������������������� | ��� | |||
| � | !�"#�$�� | %&'�()*+,�))-�)./)*/0)01!�&'�(��������� | ����� | |
| ������ | ���������� | ����� | ���� | � ��� |
| ���� | �� | |||
| �� | �� | |||
| ���� | ������� | ��� | ||
| � | ��� | |||
| ����������������������������������� | #�$�� | �������� | �&��$� | |
| �!)*+,�������� | ���� | ���������������$� |
| ���������� | ���! | !��&��$� | |
| ��'�����)*+,!�2� | �� | #���$� | |
| ��))-������ | � | #�$�� | ����������� |
| ��� | ����� | ||||||||||
| �� | �������� | ���� | �� | � | |||||||
| $�������!�2� | ���� | ��)./)*/0)01������ | #�$�� | ������� | � | �� | ���� | ���� | ������ | �$������ |
| ���� | ������ | � | ||
| �� | !������� | |||
| ����������� | � | |||
| �� | ��� | |||
| ������ | ����� | |||
| �� | ������������ | ��� | ||
| ���$ | ������� | |||
| � | ||||
| �� | ||||
| � | �����345������ | � | ||
| �� | ������ | ����� | ���� | ��� |
| $ | ���6�7�8���� | |||||
| ������� | ��������������!�������� | |||||
| �� | ���� | � | ||||
| � | ����� | |||||
| �2� | �������� | ����� | ||||
| �������� | ��������������� | � | ||||
| �� | �� | |||||
| ���� | ���� | |||||
| ���� | ���������������������������*))9������ | ������ | ||||
| �� | ||||||
| � | ���� | |||||
| �� | ����������������� | |||||
| �� | �� | �������� | ||||
| �� | �!�":�(&'"%�����;4�))*)�)*/)*/0)01!������������� | ��������� | � | |||
| �� | ������ | ���� | ���������� | |||
| �� | � | |||||
| �� | !�;4�������� | ���� | ����� | ����;���!2� | �� | #����$� |
| ��))*)������ | � | #�$�� | ����������� |
| �� | ������ | ||||||||||
| ���������� | ���� | �� | � | ||||||||
| $�������!�2� | ���� | ��)*/)*/0)01����� | � | #�$�� | ��������� | ���� | ���� | ��� | ���� | �� | � |
| $���������������� | ����� | ||||||||||
| �� | ����� | �$������ |
| ����������� | |||||
| �� | � | ||||
| �� | !������� | ||||
| �� | ������� | ������ | ����� | ��� | � |
| �� | ������ | ���� | ���� | |
| �� | ������ | ��� |
| ��� | ||||
| �� | ������� | ���� | ���� | ��� |
| $ | ��������������� | � | ||
| �� | ������� | �!�� | ||
| � | ���� | � | ||
| � | ����� | |||
| �2� | �������� | ����� | ||
| �������� | ������� | ��� | ||
| �������� | ���������� | |||
| �� | �� | |||
| ���� | ��6���� | ��� | �����0+��=��*!08��� | |
| ������������������������� | ��� | |||
| � | �� | |||
| �������� | � | |||
| �� | ������ | |||
| �� | ��� ��$���������� | ���� | ���� | |
| �� | � | |||
| �� | ���� | ����������� | � | |
| �� | � | |||
| �� | ||||
| � | ������� | ��� | ||
| � | ��� | |||
| ��������������������!������� | ���� | ��� | ||
| �� | � | |||
| �� | ������� | ������ | ||
| �� | �� | |||
| �� | ||||
| � | ������� | ��� | ||
| � | �����$� ������ | �������������������������� | ||
| �� | �!�"#�$�� | %���='0)00�)).>/0./0)01!����������� | ���� | � |
| �� | ����������� | ����������� | ||
| �������� | ||||
| �� | �� | |||
| ���� | ���� | ���� | ||
| �� | ������ | |||
| � | �������� | |||
| �������������������!�='�������� | ���� | ����� | ����=�� | |
| ���!�0)00������ | � | |||
| ������ | ��� | |||
| � | ������������ | � | ��������������������� | |
| �� | ��� | |||
| ��� | �!�2� | �� | #����$� | |
| ��)).������ | � | #�$�� | ����������� |
| ��� | ������ | ||||||
| ���������� | ���� | �� | � | ||||
| $�������!�2� | ���� | �>/0./0)01������ | � | #�$�� | ��������� | ���� | ��� |
| � | ���$�� | �������� | �� | ||||
| ��� | ��������������������� | ||||||
| �� | ����� | ||||||
| �������� | ����� | ||||||
| !�������� | � | ||||||
| �� | ��� ������ � | ||||||
| $������� | �� | ������������ | ���� | ||||
| � | ���������� | �!�4�� | � | ||||
| ���� | �3�� | �����4�� | |||||
| �5��������63458������� | ���� | ||||||
| ������������� | ������ | ||||||
| �� | ����� | ||||||
| �0+��=��*!>6�86*8!���� | ������ | ����� | � | ||||
| � | ����� | ||||||
| �2� | �������� | ����� | |||||
| �������� | ��������� | ��������������������� | |||||
| ����������� | � | ||||||
| �� | ��� | ��� ������� | �6� |
������8����
| �$ | ���� | ||
| ����� | ����� | ||
| �0+��!=!��*!?6�8�6�8!��"#�$�� | %���("0)0?�)).)*/)?/0)01!���� | ||
| �� | ����������� | � | |
| �� | ��� | ||
| ����� | ������ | �!�(" |
@ABAC@D�BEFG�HI JHIKLMN
OPPQREAARSTKLMNAUSLVWXVPVYTZ[SPZM[A\JCFC@FG]FAG ]Â
�������'''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''(%)*�+*�*,�-.%�-/.�%00*%1 �0,/2* !3�4
����5�������
��6����������� 3� ������������3�
������������3�
��(4+������������� ����������������3�
���7
��3�������� ����8������������� �������������������������������������������(4+�9�
��� ��������,�8�������
�����6������������9�
��4����+������ �����1 �������������������2� ��+2����!�,��
�����8����������� ���������������������������(4+�9�
������2� ��,�8�������
������92(+'/�����:�������������� �����6������������9�
������2�
��4����+������ �����1 �������������������2� ��+2����!��3�-��
����7������ 3���
���8������������
��4����%��� ����7 ����<�2=,�0
���<�2=,�0 ��� 3�,�8�����������������
�����6������������(
��4����%��� �����1 �������������������2� ��+2����!�������8���������������
�7� �������3��� �������8���������
����������������3�-�������������
����,������9� ���7�������������( ���9� ��3���(�������6������������%��� �����,������9� �����1 �������������������2� ��+2����!��AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA����������*.+�/=�)*.*,%1�+*2- -/.B��������
CDEDFCG�EHIJ�KL MKLNOPQ
RSSTUHDDUVWNOPQDXVOYZ[YSY\W]̂VS]P̂D_MFIFCIJ̀IDJ aDa
15-MR1019
Sheet 1 of 1
SPECIAL PROVISION TO THE
STANDARD SPECIFICATIONS, EDITION 2015
SECTION 602
MODIFIED REQUIREMENTS – ASPHALT MIXTURES
Project Number: 183-83 KA-8023-01
The asphalt mix listed in TABLE 1 has the following project mix requirements. [Reference TABLE
602-1, COMBINED AGGREGATE REQUIREMENTS].
TABLE 1: PROJECT MIX REQUIREMENTS
MIX CRITERIA SR-12.5A (PG70-28)(1)
AGGREGATE:
Coarse Angularity (min. %) 80
Uncompacted Voids-Fine (min. %) 43 Sand Equivalent (min. %) 40 Reclaimed Asphalt Pavement (RAP) (max. %) 30 RAP Bulk Specific Gravity 2.578
COMPACTION REVOLUTIONS:
Nini (level of compaction) 7 (<91.5) Ndes 75 Nmax 115
MIX:
VFA 65 - 82
(1) Between 0 and 30% RAP may be used. Use the material milled from the project as the RAP source. A RAP sample for the project will be available for at least 120 days after letting. The required binder and name shown below are based on the percent RAP used in the contract. The mix will be paid for at the bid price of
SR-12.5A (PG70-28).
Mix properties are for a 20 year design lane traffic range of 3.0 to less than 6.0 million ESALs.
10/8/26 C&M (BTH)
Percent RAP Name
0 SM-12.5A (PG70-28)
1 - 15 SR-12.5A (PG70-28)
16 - 30 SR-12.5A (PG64-34)
15-PS0018
STANDARD SPECIFICATIONS, EDITION 2015
COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS
SECTION 102
BIDDING REQUIREMENTS AND CONDITIONS
Page 100-13, subsection 102.5. Delete subsection 102.5a.(2)(f) and replace with the following:
(f) Kansas-funded state projects “tied to” Federal-Aid funded state projects and Kansas-funded state projects “tied with” Federal-Aid funded state projects.
10-10-17 C&M Oct-17 Letting
15-PS0020-R2
KANSAS DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS, 2015 EDITION
SECTION 109
MEASUREMENT AND PAYMENT
Page 100-77, add subsection 109.1e(5):
(5) Electronic Ticketing (e-Ticketing) of Hot Mix Asphalt (HMA). Immediately after each truck is loaded and weighed at the HMA plant, generate an e-Ticket and upload it to the KDOT portal (https://tickets.ksdot.gov). If necessary, create an application programming interface (API) to integrate the e-Tickets with the KDOT portal. Update the API as needed to support the integration. Before beginning production of HMA on a project, connect to the project in the KDOT portal and verify that the required informational fields will be populated on the e-Tickets.
Fully integrate the e-Ticketing hardware and software with electronic scale and load read-out weighing system at the HMA plant. Design the e-Ticketing platform so that weight data cannot be altered. Provide a reliable and stable broadband internet connection and offline capabilities to prevent data loss if power or connectivity is lost.
If a stable internet connection cannot be sustained during material production, suspend plant production and paving or revert to the use of paper tickets if approved by the Engineer.
As a minimum, include the following information on each e-Ticket uploaded to the KDOT portal:
• Contractor;
• Plant ID;
• KDOT Project Number;
• KDOT Contract Number;
• HMA Mix Designation;
• Scale Operator Name;
• Date;
• Hauler;
• Truck Number;
• Daily Load Count;
• Gross Weight;
• Tare Weight;
• Net Weight;
• Legal Max Gross Vehicle Weight (GVW);
• Time at load out;
• Daily Total Tons of the HMA Mix Designation produced for the project.
Request the nomenclature requirements for the e-Ticket information from KDOT.
Display the identifying Truck Number on the driver side and passenger side of each haul truck. Ensure the
Truck Number can be safely read by the Road Inspector from the work area.
The Road Inspector will review each e-Ticket in the KDOT portal after the corresponding truckload is delivered to the project. The status will be changed from “pending” to “delivered” or “rejected,” any road waste quantity will be recorded, and notes may be added. A time stamp will be generated whenever the status is changed.
The Road Inspector or Engineer may update the status, quantity of road waste or notes after the initial review.
Reissue any e-Ticket that does not include the correct or required information. Do not reissue any e-Ticket that has been marked “delivered” or “rejected” without approval of the Engineer.
Complete, sign and retain KDOT Form No 251A or a Contractor-furnished materials receipt for each truckload in accordance with subsection 109.1e(3). If an e-Ticket has been uploaded to the KDOT portal by the time the corresponding truckload is delivered to the project, provide the original form or receipt to the designated Inspector by the end of the day. Otherwise, the truck driver shall provide the original form or receipt to the designated Inspector at the time of delivery to the project. If a stable internet connection cannot be sustained by the Inspector, the Engineer may require truck drivers to provide original forms or receipts to the designated inspector at the time of delivery to the project.
04-19-23 C&M (BTH)
PROJECT: 183-83 KA-8023-01
COUNTY: RUSH
PROJECT SCOPE: MILLING AND HMA OVERLAY
KANSAS & OKLAHOMA RAILROAD COMPANY
FLAGGING REQUIREMENTS
FOR THE BENEFIT OF PROSPECTIVE BIDDERS, the Kansas Department of Transportation has obtained the requirements of the Kansas & Oklahoma (K&O) Railroad Company in relation to the protection of its traffic, the conditions under which such protection will be required, the rates of pay, working hours and other information relating to services required to protect railroad traffic during the construction operations.
The “flagging rate agreement” below includes the flagging requirements and the contact person.
For flagging services contact the Roadmaster with at least 10 days advance notice. The flagging rate is $150.00 per hour.
NOTICE TO CONTRACTORS
For the benefit of the Contractor and the Insurance Companies in the determination of a premium for the insurance coverage as specified in the Contract to be carried for and on behalf of the Railroad Company, the approximate ratio of the estimated contract cost of construction to be performed on, over or under the insured railroad's property or within fifty (50) feet of the insured railroad's tracks on which railroad trains run, to the total contract cost is 1% of Contract.
NUMBER OF TRAINS: 1 PER DAY MAXIMUM SPEED: 10 MPH
NOTICE TO CONTRACTORS AND INSURANCE COMPANIES
On behalf of the K&O Railroad Company, the Contractor shall submit a Railroad Protective Liability (RPL) Insurance that meets the requirements of Section 107.11 (LIABILITY FOR RAILROAD CLAIMS; RAILROAD INSURANCE REQUIREMENTS) of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction (2015 Ed.). The RPL Insurance shall be provided to the Railroad Company at following address. For tracking purposes, the Contractor shall notify the KDOT's Field Engineer by an email of the date the RPL Insurance is submitted to the railroad.
KANSAS AND OKLAHOMA RAILROAD COMPANY
315 W. 3rd Street Pittsburg, KS 66762 Office: 620-231-2230 Fax: 620-231-0812
Contractor must also provide Commercial General Liability Insurance (CGL) that meets the requirements of Section
107.10 (LIABILITY FOR BODILY INJURY AND PROPERTY DAMAGE CLAIMS; INSURANCE
REQUIREMENTS) of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction 2015 Ed.). In addition, the GCL policy shall contain an endorsement that amends the definition of insured contract to remove any exclusion or other limitation for any work being done within 50 feet of railroad property. The CGL policy shall be provided to K.D.O.T. Bureau of Construction & Materials, Plans and Proposal Section, 700 S.W. Harrison, 7th Floor, Topeka, Kansas 66603.
9-23-26 C&M (SH)
15-RF0426
183-83 KA-8023-01
Application for Flagging – August 2026.1
Application for Flagging Agreement Email: FlaggingApplication@watco.com
I. CURRENT LICENSEE INFORMATION
Licensee’s complete legal name:
DBA if applicable:
Licensee contact name:
Licensee legal physical address:
City: State: Zip+4
Entry type:
☐ Corporation ☐ Limited Liability Company ☐ Limited Partnership
☐ Individual ☐ Municipality ☐ General Partnership
☐ Other (Specify)
State of incorporation/formation:
Licensee email address: Phone:
II. FLAGGING BILL TO INFORMATION
Bill to Company:
Bill to Accounts Payable contact name (Required):
Bill to Accounts Payable email address:
Phone:
Bill to physical address:
City: State: Zip+4
Bill to Purchase & Procurement contact name (Required):
Purchasing
Email Address:
Purchase Order Number (Required) ☐ Yes ☐ No Purchase Order Number
(If applicable)
III. ENTRY LOCATION AND DETAILS
Name of Railroad:
Agreement Number:
Address or station physical address: County:
City: State: Milepost:
Nearest US DOT/AARR crossing number:
Latitude/Longitude
Scope of work:
Number of working day(s):
Number of weekend or holiday day(s):
Date(s) day access requested: Start Date: Completion Date:
Date(s) night access requested: Start Date: Completion Date:
If night protection is needed, what are the preferred work hours:
Start Time: End Time:
Provide a copy of the preliminary work schedule mailto:FlaggingApplication@watco.com
IV. THIRD-PARTY CONTRACTOR INFORMATION
Contractor company name:
Contractor name: Phone:
Contractor address:
City: State: Zip+4
Contractor email address:
Scope of work:
V. DEPARTMENT OF TRANSPORTATION PROJECT INFORMATION (If applicable)
DOT agency:
DOT project number: DOT contract number:
Project engineer name: Phone:
Project engineer email:
Provide a copy of the executed DOT Agreement
VI. FLAGGING FEE SCHEDULE
The contractor(s) on site will be invoiced for flagging protection.
Expedited fee will automatically be applied if flagging is requested with less than 14 days’ notice.
☐ $5,000
Day Flagging Rates Standard Rate Priority Rate
Weekday day (standard 8-hour day): ☐ $1,300 ☐ $1,950
Weekday day overtime (per hour after 8 hours): ☐ $220 ☐ $330
Weekend/holiday day (standard 8-hour day): ☐ $1,825 ☐ $2,740
Weekend/holidays day overtime (per hour after 8 hours): ☐ $250 ☐ $375
Night Flagging Rates
Weekday night (standard 8 hours): ☐ $2,350 ☐ $3,525
Weekday night overtime (per hour after 8 hours): ☐ $300 ☐ $450
Weekend/holiday night (standard 8 hours): ☐ $2,975 ☐ $4,465
Weekend/holiday night overtime (per hour after 8 hours): ☐ $335 ☐ $505
All fees are non-refundable and subject to change without notice.
VII. FLAGGING TIMESHEET DETAILS
This section will be completed in its entirety as the work is being performed.
Date: Time Day/Night: Start Time: End Time: Total Billable Hours: Contractor’s Initials
Railroad’s Initials
Total Billable Timesheet Hours Approval
Licensee/Contractor: Date (MM/DD/YY):
By signing, I verify that the total hours are true and accurate to be invoiced for flagging protection provided by the Railroad.
15-RF0426
If, in the sole opinion of the Railroad, a sufficient hazard exists, the Railroad shall, upon proper advance notice, provide a flagman. In addition, if any work or activity requires the removal, replacement, modification, relocation, or protection of track, bridges, signals, railroad wires or pipelines, roadways, or necessitates the provision of railroad engineering, supervision, or other services, the Licensee agrees that all associated costs shall be borne solely by the Licensee. Federal regulations require railroad protection when a contractor and/or equipment may be working within twenty-five (25) feet of Railroad tracks. The Contractor shall contact the Railroad a minimum of fourteen (14) days prior to the proposed work schedule and obtain approval before protection is provided
Prior to confirmation of flagging services, the Licensee and/or Contractor shall execute and return the Flagging Agreement and submit all required electronic documentation in accordance with the terms of the Agreement. The Railroad will not execute the Flagging Agreement until all required documentation has been received and approved. Failure to provide the fully executed agreement, complete and accurate billing information in Section II, and all required documentation within ten (10) days of the initial request may result in cancellation of the application at the Railroad’s discretion.
Section II of this Flagging Agreement must be completed with accurate and complete billing information.
Errors or omissions shall obligate the Licensee and/or Contractor to assume full responsibility for all flagging invoices.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
Section II of the Flagging Agreement, the Contractor acknowledges that the date(s) requested for track access are accurate and represent the date(s) on which the Contractor is available and prepared to perform the work. Failure of the Contractor to utilize the requested access dates as submitted, including any Contractor "no-show," may result in the assessment of a flagging penalty charge equal to one (1) day's flagging cost for each scheduled day not utilized.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
Flagging request submitted with less than seven (7) days’ notice may be accommodated at the Railroad’s discretion. If accommodated, Priority Flagging Rates, as outlined in Section VI, Flagging Fee Schedule, will automatically apply and be assessed accordingly.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
A minimum of two (2) business days’ written notice is required for cancellation of flagging services.
Failure to comply with this requirement will result in the Licensee and/or Contractor being assessed a one
(1) day flagging penalty charge. Non-payment of the penalty charge may result in the denial of future flagging requests and/or require pre-payment for all future services.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
All flagging agreement charges are due upon receipt and payable within Net ten (10) days. Ongoing work will be billed on a continuous basis. If payment is not received within the required timeframe, the Railroad reserves the right to deny future flagging requests and/or require pre-payment for any future services.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
Following approval of the requested flagging dates, any modification to the approved request shall require resubmission of all required documentation in a single email for review. Such modifications will be processed as a new flagging request and will be subject to current scheduling, availability, and review requirements. Requests submitted with less than fourteen (14) days' advance notice may result in a $5,000 expedite fee in accordance with the railroad scheduling requirements.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
Railroad Requirement: All Railroad Team Members, contractors, and jobsite personnel are required to attend the mandatory morning job safety briefing. This requirement ensures compliance with Railroad safety standards, provides direct oversight of all work occurring within the track and right-of-way, and allows for real-time coordination to identify hazards, enforce operating protocols, and protect personnel, equipment, and rail operations. Failure to meet these requirements will cause a work stoppage if any jobsite personnel arrive after the morning safety briefing set at the time the request was approved by the railroad.
☐ Please acknowledge your acceptance of the above terms and conditions by checking the box and initialing your acceptance.
☐ Initial Here
Terms and Conditions are subject to change without notice.
Rates are…