About this file

This is a Bid Notice for a construction project issued by the Kansas Department of Transportation (KDOT) for milling and hot mix asphalt (HMA) overlay work on U.S. Route 40 in Logan County. The project extends 14.71 miles from Road 140 NE to Road 270 and includes milling of existing pavement, HMA overlay application, rumble strip installation, and pavement marking. The letting date is July 22, 2026, with electronic proposals due by 1:00 p.m. Local Time on that date through the Bid Express website. The earliest project start date is March 15, 2027, with a latest start date of June 21, 2027. The project has 80 restricted working days and a total contract duration of 100 calendar days. Selected line items include 51,683 tons of HMA overlay (SR-12.5A, PG 64-28), 29,254 tons of milling, 18,380 tons of HMA commercial grade material, and various pavement marking and rumble strip installations totaling approximately 153,622 linear feet of white pavement markings and 37,442 linear feet of yellow markings.

The contract is funded through federal and state sources under Federal Project Number PRTCT-A766(201) and State Project Number U040-055 KA 7662-01, with a contract number of 526072313. Contractors must be prequalified with KDOT and possess a current Tax Clearance Certificate from the Kansas Department of Revenue at time of award. The project includes multiple special provisions addressing price adjustments for fuel, asphalt material, and emulsified asphalt; environmental compliance including stormwater pollution management and migratory bird protection; federal restrictions on foreign unmanned aerial systems; prevailing wage requirements; and affirmative action and equal employment opportunity certifications. Contractors must complete required certifications regarding noncollusion, debarment history, financial prequalification, and federal fund lobbying limitations. The contract will be executed within ten business days following award notification.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745

Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org

Bureau of Construction and Materials

FEDERAL PROJECT NUMBER: PRTCT-A766(201)

STATE PROJECT NUMBER: U040-055 KA 7662-01

CALL ORDER NUMBER: 231

PROPOSAL NUMBER: 526072313

LETTING DATE 07/22/2026

COUNTY: LOGAN

FUND TYPE: FEDERAL

OAKLEYKDOT CONSTRUCTION OFFICE:

PROJECT DESCRIPTION

MILLING AND HMA OVERLAY. U-40. FR RD 140 NE TO RD 270 IN LG

CO. LGTH 14.71 MI.

RESTRICTED DAYS

(80)

TOTAL CONTRACT DAYS

(100)

MARCH 15, 2027

JUNE 21, 2027

Earliest Start Date:

Latest Start Date:

9:46:59AM6/16/2026 @

Letting 07/22/2026 Kansas Department of Transportation Project No. U040-055 KA 7662-01

Contract No. 526072313

U040-055 KA 7662-01 PRTCT-A766(201)

CONTRACT PROPOSAL

DOT Form No. 202 Rev. 02/19

Contract ID: 526072313

1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:

U040-055 KA 7662-01 / PRTCT-A766(201)

The general scope, location and net length are:

MILLING AND HMA OVERLAY. U-40. FR RD 140 NE TO RD 270 IN

LG CO. LGTH 14.71 MI.

2. This is the Proposal of

[Contractor] to complete the Project for the amount set out in the accompanying Unit

Prices List.

3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:

4. Contractors and other interested entities may examine the Bidding Proposal Form/

Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract

Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.

Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".

5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project

EBSX file are available on Bid Express' website at http://ui.bidx.com.

Contractor: Page 1 Check: DAFF727A28

6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.

7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW

Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.

8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.

9. The contractor shall complete work to open the project to unrestricted traffic within

_80_ Restricted Days and shall complete the work within the total Contract Working Days of _100_.

10. The Contractor shall complete the Project according to the plans, Standard

Specifications, provisions identified in the Special Provision List and all other

Contract Documents identified in Standard Specifications subsection 101.3

11. The undersigned declares that the Contractor has carefully examined the Bidding

Proposal Form for the Project. The Contractor understands the following:

A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).

B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.

C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form

202, and submits the completed EBSX file documents and bid bond to KDOT using Bid

Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the

Contractor's Proposal.

D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.

12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.

Contractor: Page 2 Check: DAFF727A28

13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions

(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the

Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.

I. 08-10-66 Certification-Noncollusion & History of Debarment

II. 04-30-82 Certification-Financial Prequalification Amount

III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying

IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm

V. 10-10-00 Price Adjustment for Fuel

VI. 06-01-06 Price Adjustment for Asphalt

VII. 08-31-09 Price Adjustment for Emulsified Asphalt

VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost

IX. 05-18-07 Repair (Structures) Unit Cost

X. 11-15-17 Electric Lighting System Unit Cost

XI. 04-06-09 ITS Unit Cost

XII. 08-17-16 Water System Unit Cost

XIII. 06-19-19 Sanitary Sewer System Unit Cost

XIV. 01-01-18 Smart Work Zone System Unit Cost

XV. 08-12-24 CORS Unit Cost

XVI. 04-06-26 Federal Restrictions on Foreign Drones

XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate

14. The funding source for this Project is FEDERAL/STATE. On Projects involving City or

County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.

15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.

I. 11-03-80 Affirmative Action For EEO

II. 11-15-96 Affirmative Action & EEO Policies

III. 09-06-94 U.S. DOT Fraud Hotline

IV. FHWA-1273 Federal-Aid Required Contract Provisions

16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.

Contractor: Page 3 Check: DAFF727A28

17. SIGNATURE SECTION:

A. Electronic Internet Proposal

The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.

B. Certification

I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING

THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT

LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH

13) IS TRUE AND CORRECT.

EXECUTED ON

C. Signature

Number of company or joint venture:

Name of company or joint venture:

Name of person signing:

Title of the person signing:

Signature: Electronic Internet Proposal

RELEASED FOR CONSTRUCTION:

Date:____________________________________

Chief of Construction and Materials

Contractor: Page 4 Check: DAFF727A28

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

06/12/26

STATE PROJECT NO: U040-055 KA 7662-01 STATE CONTRACT NO: 526072313

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: LOGAN3

MILLING AND HMA OVERLAY. U-40. FR RD 140 NE TO RD 270 IN LG CO. LGTH

14.71 MI.

PRTCT-A766(201)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05

REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07

REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03

REQUIRED CONTRACT PROVISION-LIMITS OF FED FUNDS FOR LOBBYING04-26-90-R05

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR FUEL10-10-00-R09

REQUIRED CONTRACT PROVISION-EMULSIFIED ASPHALT ADJUSTMENT08-31-09-R01

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR ASPHALT06-01-06-R01

REQUIRED CONTRACT PROVISION-FEDERAL RESTRICTIONS ON FOREIGN DRONES04-06-26

REQUIRED CONTRACT PROVISION-NOTICE FOR AFFIRMATIVE ACTION11-03-80-R09

REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06

REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1

REQUIRED CONTRACT PROVISION-NDAA 889 TELECOMM PROHIBITION12-17-20

MINIMUM WAGE RATE (LOGAN COUNTY)KS20260097

REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01

NOTICE TO CONTRACTORS (USDOT HOTLINE)09-06-94-R01

REQUIRED CONTRACT PROVISION-FEDERAL-AID CONSTRUCTION CONTRACTSFHWA-1273

ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23

POLICY AGAINST SEXUAL HARASSMENT03-01-18

INFORMATION TO CONTRACTORS (STATUS OF UTILITIES)15-01002

FUEL ADJUSTMENT15-01008-R02

ASPHALT PRICE ADJUSTMENT15-01009-R01

EMULSIFIED ASPHALT ADJUSTMENT15-01010

ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06

SEASONAL LIMITATIONS15-01012-R01

PROSECUTION AND PROGRESS15-01016-R04

CONTROL OF MATERIALS15-01018-R01

CONTROL OF WORK15-01019-R02

BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03

SCOPE OF WORK15-01022-R04

BIDDING REQUIREMENTS AND CONDITIONS15-01023

AWARD AND EXECUTION OF CONTRACT15-01024

ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501

ASPHALT PAVEMENT SMOOTHNESS15-06006-R01

HOT MIX ASPHALT CONSTRUCTION QC/QA15-06007-R03

HOT MIX ASPHALT (HMA)-COMMERCIAL GRADE15-06010-R02

SPECIAL PROVISION LIST

PAGE:

DATE:

06/12/26

STATE PROJECT NO: U040-055 KA 7662-01 STATE CONTRACT NO: 526072313

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: LOGAN3

MILLING AND HMA OVERLAY. U-40. FR RD 140 NE TO RD 270 IN LG CO. LGTH

14.71 MI.

PRTCT-A766(201)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04

PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE15-08011-R02

CONTRACTOR CONSTRUCTION STAKING15-08015

MAINTENANCE AND RESTORATION OF HAUL ROADS15-08018

WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03

DURABLE PAVEMENT MARKING15-08020-R02

FIELD OFFICE AND LABORATORY15-08023-R01

RUMBLE STRIPS (MILLED)15-08025

WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029

STORMWATER POLLUTION MANAGEMENT15-09002-R05

AGGREGATE FOR HMA15-11002-R01

GENERAL REQUIREMENT DIVISION 120015-12001-R01

PERFORMANCE GRADED ASPHALT BINDER15-12002-R01

STEEL SIGN POSTS15-16002-R03

RELEASE COMPOUND FOR ASPHALT MIXES15-17004-R05

THERMOPLASTIC15-22001-R01

MULTI - COMPONENT LIQUID PAVEMENT MARKING MATERIAL15-22003-R02

PAVEMENT MARKING PAINT15-22004-R02

IMAGE SYSTEMS15-22005-R03

RETROREFLECTIVE SHEETING15-22006-R01

PREFORMED THERMOPLASTIC PAVEMENT MARKING MATERIAL15-22008-R01

ROLL-UP SIGNS15-22011

HIGH DURABILITY PAVEMENT MARKING MATERIAL15-22014

TEMPORARY PAVEMENT MARKING TAPE15-22016

WOOD POSTS15-23001-R03

FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02

PART V15-25001-R07

MATERIALS CERTIFICATIONS15-26001-R13

MODIFIED REQUIREMENTS – ASPHALT MIXTURES15-MR0960

COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS15-PS0018

E-TICKETING SYSTEM(ETS) FOR HOT MIX ASPHALT(HMA)15-PS0020-R2

END OF SPECIAL PROVISION LIST

REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)

CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT

K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322

Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this

Certificate.

NONCOLLUSION

I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.

HISTORY OF DEBARMENT

I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:

1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;

2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;

3. Do not have a proposed debarment pending;

4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.

Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.

Yes No

The exceptions, if any, are:

Contractor: Page 5 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)

CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT

Select the appropriate response below to indicate whether this Proposal exceeds the

Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this

Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.

I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.

If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).

KDOT Approval Granted by:

KDOT Approval Date:

Contractor: Page 6 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)

CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT

LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM

Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:

This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:

Name:

Address:

City State Zip:

Business Telephone:

Contractor: Page 7 Check: DAFF727A28

REQUIRED CONTRACT PROVISION- 04-26-90-R05 (Rev. 07/13)

DECLARATION

LIMITATIONS ON USE OF FEDERAL FUNDS FOR LOBBYING

PURSUANT TO 31 U.S.C. 1352

The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

DEFINITIONS:

1. Designated Entity: an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress.

2. Federal Grant: an award of financial assistance by the Federal government. (Federal

Aid Highway Program is considered a grant program.)

3. Influencing (or attempt): making, with the intent to influence, any communication to or appearance before any designated entity in connection with the making of a Federal contract or Federal grant.

4. Person: an individual, corporation, company, association, authority, firm, partnership, society, State or local government.

5. Recipient: all contractors, subcontractors, subgrantees, at any tier, and other persons receiving funds in connection with a Federal grant.

EXPLANATION:

As of December 23, 1989, 31 U.S.C. section 1352 limits the use of appropriated Federal funds to influence Federal contracting. Under this law, recipients of Federal grants shall not use appropriated funds to pay any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant or the extension, continuation, renewal, amendment or modification of a Federal grant. These restrictions apply to contracts and grants exceeding $100,000.00. Federal law requires submission of this declaration. If a recipient fails to file the declaration or amend a declaration, the recipient shall be subject to a civil penalty of not less than

$10,000.00 and not more than $100,000.00 for each failure. If the recipient uses appropriated Federal funds to influence or to attempt to influence a designated entity contrary to this provision, the recipient shall be subject to a civil penalty of not less than $10,000.00 and not more than $100,000.00 for each such payment.

CERTIFICATIONS:

I certify that the Contractor recipient (including its owners, partners, directors, officers, or principals) has not paid and will not pay federally appropriated funds to any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant, or the extension, continuation, renewal, amendment or modification of a Federal grant.

Contractor: Page 8 Check: DAFF727A28

Answer 'Yes' if a person registered under the Lobbying Disclosure Act of 1995

(Registrant) has made lobbying contacts on the Contractor recipient's behalf with respect to this contract. Answer 'No' if no Registrant has lobbied on the Contractor recipient's behalf with respect to this contract.

Yes No

The Registrants, if any, are:

I certify that the Contractor recipient will report payments made to a person for influencing or attempting to influence a designated entity, that come from funds other than appropriated Federal funds. The Contractor recipient shall report such payments on

Form LLL "DISCLOSURE FORM TO REPORT LOBBYING" according to the instructions and may obtain Form LLL from the KDOT Bureau of Construction and Materials.

I certify that, if information contained in this DECLARATION changes, the Contractor recipient will amend the DECLARATION within 30 days of the change(s).

I certify that the Contractor recipient will provide to and require subcontractors to sign a like DECLARATION, if the subcontract work exceeds $100,000.00.

The Contractor recipient understands that this declaration is a material representation of fact and the Secretary will have relied upon this declaration in entering into a contract with the Contractor recipient.

NOTE: This Reporting requirement does not apply to payments made to the recipient's regular employees and contracts, subcontracts, and grants less than $100,000.00.

Contractor: Page 9 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 10-10-00-R09 (Rev. 01/20)

PRICE ADJUSTMENT FOR FUEL

The Contractor may accept or reject the application of Special Provision 15-01008 (latest revision) "Price Adjustment for Fuel". Any items listed on Special Provision 15-01008

(latest revision) that are included in this project are eligible for the fuel price adjustment unless otherwise stated in the contract documents.

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

If the Contractor accepts 15-01008 (latest revision), the Contractor shall mark the checkboxes below for the eligible items/sections listed in Special Provision 15-01008

(latest revision). Then they should indicate their desire for the specific fuel price adjustment by selecting the 'Yes' or 'No' option.

Road Items (Earthwork)

Concrete Surfacing Items

Asphalt Surfacing Items

Contractor: Page 10 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 06-01-06-R01 (Rev. 03/15)

PRICE ADJUSTMENT FOR ASPHALT MATERIAL

The Contractor may accept or reject the application of Special Provision 15-01009 (latest revision) "Price Adjustment for Asphalt Material."

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

Contractor: Page 11 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 08-31-09-R01 (Rev. 03/15)

PRICE ADJUSTMENT FOR EMULSIFIED ASPHALT

The Contractor may accept or reject the application of Special Provision 15-01010 (latest revision) "Emulsified Asphalt Price Adjustment."

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

Contractor: Page 12 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 04-06-26

CERTIFICATION OF COMPANY NOT CURRENTLY ENGAGED IN THE PROCUREMENT OR

USE OF PROHIBITED FOREIGN UNMANNED AERIAL SYSTEMS

Effective December 22, 2025, the American Security Drone Act of 2023 (ASDA) and OMB

Memorandum M-26-02 strictly prohibits the use of federal funds for unmanned aerial systems (UAS) manufactured by covered foreign entities including any aircraft, flight controller, camera, or ground control station supplied by a manufacturer that is based in, or subject to the control of, a foreign adversary country, specifically the People’s

Republic of China. This prohibition restricts the use of drones from these countries on any federal-aid project even if the drone related costs are billed separately or not at all. Any use of these covered drones including operation, maintenance or data processing on federal aid projects is prohibited.

The Contractor agrees that the procurement and/or use of any drone (UAS) to complete any primary or supporting tasks within the scope of this Contract, as well as any subcontracts, will comply with the following directives:

• National Defense Authorization Act (NDAA) – American Security Drone Act of 2023

(ASDA, Pub. L. No. 118-31).

• Office of Management and Budget Memorandum M-26-02 – Restrictions on using federal funds to purchase or operate prohibited foreign UAS.

• Federal Acquisition Regulation Clause 52.240-1 – Prohibition on Unmanned Aircraft

Systems Manufactured or Assembled by American Security Drone Act-Covered

Foreign Entities.

If Contractor has violated, misrepresented, or otherwise fails to comply with this certification document as determined by KDOT, KDOT may terminate this Contract according to Section 108.11 of the State Specifications for State Road and Bridge Construction

(2015 Edition).

By signing the below, Contractor acknowledges and agrees to comply with the provisions of this policy.

CONTRACTOR

Signature, Title

Date

*4/6/26 C&M (JVN)

April-2026 Letting

Contractor: Page 13 Check: DAFF727A28

REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)

TAX CLEARANCE CERTIFICATE

Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.

Yes No

Insert the Tax Clearance Confirmation Number if available at the time of bidding:

Contractors shall have a current Tax Clearance Certificate from the Kansas Department of

Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's

Proposal as non-responsive if the Contractor does not have a current Tax Clearance

Certificate at the time of the contract award.

To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction

ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.

After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.

If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special

Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.

Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not

"clearance" for all types of taxes the State of Kansas may assess.

Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the

Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT

Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.

Contractor: Page 14 Check: DAFF727A28

Line Number Item Number Quantity Unit Unit Price Extension Price

Section 01

COMMON ITEMS

1 025323 1.000 LS

MOBILIZATION /

2 020100 1.000 LS

CONTRACTOR CONSTRUCTION STAKING /

3 025324 1.000 LS

TRAFFIC CONTROL /

4 070580 1.000 HOUR $30.000 $30.00

FLAGGER (SET PRICE) /

5 025600 1.000 EACH

FIELD OFFICE AND LABORATORY (TYPE A) /

6 020001 1.000 LS $16,000.000 $16,000.00

MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON-PART

Section 01 Total $16,030.00

Section 02

ROAD ITEMS

7 012410 608.000 CUYD

COMMON EXCAVATION (RURAL SMALL) /

8 012415 187.000 CUYD

COMMON EXCAVATION (CONTRACTOR FURNISHED) /

9 012332 695.000 CUYD

COMPACTION OF EARTHWORK (TYPE B) (MR-90) /

Section 02 Total

Section 03

ASPHALT SURFACING ITEMS

10 060242 51683.000 TON

HMA OVERLAY (SR-12.5A) (PG 64-28) /

11 081699 51683.000 TON

QUALITY CONTROL TESTING (HMA) /

12 083447 100.000 TON

EMULSIFIED ASPHALT (SS-1H OR CSS-1H) /

13 041004 18380.000 TON

HMA-COMMERCIAL GRADE (CLASS B) /

14 081773 29254.000 TON

MILLING /

15 080465 1.000 TON $250.000 $250.00

MATERIAL FOR HMA PATCHING (SET PRICE) /

16 011750 1.000 EACH $50.000 $50.00

ASPHALT CORE (SET PRICE) /

17 000063 1.000 EACH $1.000 $1.00

ASPHALT AIR VOID PAY ADJUSTMENT /

18 000062 1.000 EACH $1.000 $1.00

ASPHALT DENSITY PAY ADJUSTMENT /

Contractor: Page 15 Check: DAFF727A28

19 070918 776.700 STAL

PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I) /

20 070919 1553.400 STAL

PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE II) /

21 081050 7270.000 TON

PAVEMENT EDGE WEDGE (ROCK) /

22 011478 1.000 MGAL $40.000 $40.00

WATER (EARTHWORK COMPACTION) (SET PRICE) /

Section 03 Total $342.00

Section 04

RUMBLE STRIPS

23 032406 774.400 STA.

RUMBLE STRIPS (MILLED) (ASPHALT) (CENTERLINE) /

24 072252 1531.000 STA.

RUMBLE STRIPS (MILLED) (ASPHALT) /

Section 04 Total

Section 05

PAVEMENT MARKING ITEMS

25 023140 153622.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") /

26 023143 37442.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") /

27 023144 116.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") /

28 013349 4.000 EACH

PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) /

29 013348 4.000 EACH

PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) /

Section 05 Total

Item Total $16,372.00

Contractor: Page 16 Check: DAFF727A28

�� ������������������������������������������������������������������������������,��-����.�������������������������������������������������������������������/����������������������0���$��+12,/�,34-+),� �1+,/5 1/�� /-((�/-���5-��1��666666667�8�6�8��������������������6��................................................................�-/1�����.�����9�������������������������������������������������������������/����������������������0���$��-/1�21/�,/:�� /4� 4/5(6666666666666666666666666666667�8�6��������������������896��................................................................��4������.�8�����������������������������������������������������������������/����������������������0���$�� /4��� /-;,/��100�/15 � /4��6666666666666666666666667���68��������������������6�� /4��� /-;,/��0(5 <, �5� �(12<1=666666666666666666667���6���������������������6�� /4��� /-;,/�� 4)+�5� � 5� ,)666666666666666666666667���69��������������������6�� /4��� /-;,/���25 ,/� /4��666666666666666666666666667���6���������������������6�� /4��� /-;,/���+-��4+� /4��66666666666666666666666667���6���������������������6�� /500-���1� /1(�����,/;-�,� /-;,/66666666666666666667��96���������������������6���,/;-�,)5���,34-+),� 66666666666666666666666666666667���688�������������������6�91+,/5 1/��� /-+-���)5�#-�,666666666666666666666666667���6�8������������������969�1+,/5 1/��/1 1�)-((��/14� )5�666666666666666666666667���68��������������������6��1+,/5 1/��/1 1�)-((6666666666666666666666666666666667���6���������������������6��1+,/5 1/��� /5� 1/66666666666666666666666666666666667���6�9�������������������6��1+,/5 1/�����/,, 666666666666666666666666666666666667���6���������������������6��1+,/5 1/�����/5+,/66666666666666666666666666666666667���6���������������������6��1+,/5 1/���/1((,/666666666666666666666666666666666667��96���������������������6��1+,/5 1/���+5;,/��>5�+#5( :�5��/,�5 ,:�5� ��1��/, ,?66666666666666666666666666666666666666666667���6�8�������������������6��1+,/5 1/���),�#5�-�6666666666666666666666666666666667���6���������������������6��1+,/5 1/���)5 ,/-5(� /5��0,/�;,#-�(,66666666666666667��86���������������������6��1+,/5 1/���(15 ,/666666666666666666666666666666666667���6���������������������6��1+,/5 1/����/5 ,/�<(5 ,666666666666666666666666666667���6���������������������6��1+,/5 1/��� -� /-<4 1/6666666666666666666666666666667���6���������������������6��1+,/5 1/����/5�,6666666666666666666666666666666666667���6���������������������6��1+,/5 1/����1��/, ,��52666666666666666666666666666667���6���������������������6��1+,/5 1/����1��/, ,�0-�-�#-���)5�#-�,6666666666666667���6���������������������6��1+,/5 1/���<4(( 1@,/666666666666666666666666666666667���6���������������������68�1+,/5 1/���</11)��2,,+,/66666666666666666666666666667��86�9�������������������6��1+,/5 1/���<1<�5 ���- �� ,,/���- �(15 ,/6666666666667���6���������������������6��1+,/5 1/���<5��#1,�,A�5;5 1/� /5��#1,6666666666666667���6���������������������6��1+,/5 1/���5�+#5( �+(5� 66666666666666666666666666667��96���������������������6��

BCDCEBF�DGHB�IJ KIJLMNO

PQQRSGCCSTULMNOCVTMWXYWQWZU[\TQ[N\C]KÊEB̂ _̂̀Ca aCb

��"�����������������������&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&!�������&��'(')*'�+,-'�.+'/(+)0'1�23+�(+,2-�.'+23+4)563.'+,-)35�-3�78)(8�7'91)56�)/�)5()1'5-,9�::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::�3-'���;'(<-)*'��+1'+�=��>� $�#���/-,09)/8)56��,)1��)(?��',*'23+� '1'+,9��35-+,(-3+/�,..9)'/�-3�,99�(35-+,(-/�/<0@'(-�-3�-8'�,*)/&�,(35��(-�23+�78)(8�-8'�(35-+,(-�)/�,7,+1'1�=,51�,5A/39)()-,-)35�7,/�)//<'1>�35�3+�,2-'+�B,5<,+A� $����2�-8)/(35-+,(-�)/�(3*'+'1�0A�-8'�����-8'�(35-+,(-3+�4</-�.+3*)1''4.93A''/�7)-8� �83<+�32�.,)1�/)(?�9',*'�23+�'*'+A� ��83<+/-8'A�73+?��<.�-3��#�83<+/�32�.,)1�/)(?�9',*'�',(8�A',+��4.93A''/�4</-�0'�.'+4)--'1�-3�</'�.,)1�/)(?�9',*'�23+�-8')+375�)995'//��)5@<+A�3+�3-8'+�8',9-8&+'9,-'1�5''1/��)5(9<1)56.+'*'5-)*'�(,+'C�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�)99��)5@<+'1��3+�8,/�3-8'+8',9-8&+'9,-'1�5''1/��)5(9<1)56�.+'*'5-)*'�(,+'C�3+�23+�+',/35/+'/<9-)56�2+34��3+�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�,�*)(-)4�32��134'/-)(*)39'5('��/';<,9�,//,<9-��3+�/-,9?)56����11)-)35,9�)523+4,-)3535�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+�-8'���)/�,*,)9,09'�,-8--./�%%777�139�63*%,6'5()'/%781%63*'+54'5-&(35-+,(-/��3-'���;'(<-)*'��+1'+� #���6'5'+,99A�,..9)'/�-3�(35-+,(-/�/<0@'(-�-3�-8'��,*)/&�,(35��(-�-8,-�7'+'�,7,+1'1�35�3+�0'-7''5�B,5<,+A� ��,51�B,5<,+A��"��������,51�-8,-�8,*'�53-�0''5�+'5'7'1�3+�';-'51'1�35�3+�,2-'+�B,5<,+A� ����������;'(<-)*'��+1'+� #���13'/�53-�,..9A�-3�(35-+,(-/�/<0@'(-�359A�-3�-8'��,*)/&�,(35��'9,-'1��(-/�+'6,+19'//�32�78'5�-8'A�7'+'�,7,+1'1���2�,�(35-+,(-�)/�/<0@'(-�-3��;'(<-)*'��+1'+� #����-8'�(35-+,(-3+�4</-�.,A�,99�(3*'+'1�73+?'+/�,-�9',/-�� �#��.'+�83<+�=3+�-8'�,..9)(,09'�7,6'�+,-'�9)/-'1�35�-8)/�7,6'�1'-'+4)5,-)35��)2�)-�)/�8)68'+>�23+�,99�83<+/�/.'5-�.'+23+4)56�35�-8'�(35-+,(-�2+34��,A�

�����#��-8+3<68��'('40'+� �����#����8'�,..9)(,09'��;'(<-)*'��+1'+�4)5)4<4�7,6'�+,-'�7)99�0'�,1@</-'1�,55<,99A��11)-)35,9�)523+4,-)35�35�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+��;'(<-)*'��+1'+� #���)/�,*,)9,09'�,-�777�139�63*%781%63*(35-+,(-/��59)/-'1�(9,//)2)(,-)35/�5''1'1�23+�73+?�53-�)5(9<1'1�7)-8)5-8'�/(3.'�32�-8'�(9,//)2)(,-)35/�9)/-'1�4,A�0'�,11'1�,2-'+,7,+1�359A�,/�.+3*)1'1�)5�-8'�9,03+�/-,51,+1/�(35-+,(-�(9,</'/=�"� ������=,>�= >�=)))>>�&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&�8'�031A�32�',(8�7,6'�1'-'+4)5,-)35�9)/-/�-8'�(9,//)2)(,-)35/,51�7,6'�+,-'/�-8,-�8,*'�0''5�23<51�-3�0'�.+'*,)9)56�23+�-8'-A.'=/>�32�(35/-+<(-)35�,51�6'36+,.8)(�,+',�(3*'+'1�0A�-8'�7,6'1'-'+4)5,-)35���8'�(9,//)2)(,-)35/�,+'�9)/-'1�)5�,9.8,0'-)(,93+1'+�<51'+�+,-'�)1'5-)2)'+/�)51)(,-)56�78'-8'+�-8'�.,+-)(<9,++,-'�)/�,�<5)35�+,-'�=(<++'5-�<5)35�5'63-),-'1�+,-'>��,�/<+*'A+,-'��,�7')68-'1�<5)35�,*'+,6'�+,-'��,�/-,-'�,13.-'1�+,-'��3+�,/<..9'4'5-,9�(9,//)2)(,-)35�+,-'��5)35��,-'��1'5-)2)'+/

EFGFHEI�GJKE�LM NLMOPQR

STTUVJFFVWXOPQRFYWPZ[\ZTZ]X̂_WT̂Q_F̀NHaHEaabcFd HFe

����
��������
����
���
��������
���
����������
�����������
����
����������
��
���������
�"�����������������������$��"����%�����'()*��0��
!
�"��������
�������
�������
�"�
��0����
��',-'(-.'./��
�!�"�������
�����
�����
����
��"��
���
��
��������
��������
���������
��
������
������
�"�
��������
��

��123��

����
��
�������
���������
�����"
�4�5�6�����
�������7�
�8�
�����0���������
������
�����
������������
��������������

�(''9����

����
������
�����
������������
������
���

��� :�&$% #�����;2�''('�'(-'(-.'./��������

����
���������
���
���������
��;2��
��
���
����;����0��
!
�������
�"�
��0����
��'(-'(-.'./�
��
����
�
�������
�"�
��
������
���������
����������
������������
���
������������������
�����
�������
�����������
������
������
���������
����
���������������7�
�8�
�����0���������
������
��
�������
���
���������4������
���

�.)��=7�(�.6�����

����
���������������"��
��������
����������
�������
����
�����
���
�����������
���������
��
������������
������
���
��
����
��������
���
����������
�������������������
��
���
����=��������.'..����
��������
���������
����������0��
!
�������
�"�
��0����
�>-.,-.'./��
��
����������"��
����
������������
���
���
����������������
��
����������"��
���2������
��1����

��2����3������ �41236�����

��������
���
���.)��=7�(�>4�64(6��
�����
��7�
�8�
�����0���������
������
��������
��������
���

�4��������6���� �

�������
���
���.)���=�7�(�?4�6�4�6��� !�"��#���& .'.?�'','(-'?-.'./���������
����
������
�����
���& �����
����&��
��.'.?����
����������
���"��
��
���������
�����
������������
�����������0��
!

@ABAC@D�BEF@�GH IGHJKLM

NOOPQEAAQRSJKLMATRKUVWUOUXSYZROYLZA[IC\C@\\]̂A_ FÀ

�#####################################################################################################$!%&�'&�&()*+!�*,+�!--&!. �-(,/& �0�1������������������������� �����2�����������3������������0���� �4�5� � ���5����������� �������������������0�������������� ������ �������������������0������������$1'���������������������������������������������������������� 0������������������ �����6�

�����0� �������,��� �4�5������� ������7 ���������

���������� �4�5������ � ��������$1'�8��������$���� �4�5���(�7 ������������� � �4���� �4�����������9 �����4�����5�

������3������������8���������$�����4�5�������������$������
�1���'�4�����������������:� ��'�����
�������.��������������������/�����������!4�����+�$�������������$�����������'/������(����

������5������������

������������7�����������������
�������������
��������$1'�8���������/�����������$����'����
���������(�7��������������

�4���� �������8/$'#,�����9 �����4����5� ������3������������8���������/����� ������$����'����

�1���'�4�����������������:� ��'�����
�������.��������������������/�����������!4�����+�$�������������$�����������'/�������0�*�������������
���������������������

���������5���������� ����5�6������������� ��5�����������0������ ��������������7 ������4������ �1� ��!

�����������6 ����;�/<(�-������=��� ��;�/<(�-����>0�(�7 �����������4������ �4��� �������9 �����4�����5� ������3������������$������ �1� ��!

�������.��������������������/������ �����!4�� ���+�$�������������$�����������'/������������7 ������� � ��5���� �������� �����5?������������� ���5������ ������6�������5

�������������0�����������7�����������
��������4�����������������0�*������

��������������������4������������������� �����5� �5�������� ������5��������!

���������4�(�4����8��� �6��� ���5�����$����!�������8��� 0���$�������3������������!

���������4��(�4����8��� �������.��������������������/������ �����!4�� ���+�$�������������$�����������'/�������AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA����������&+'�,<�%&+&(!.�'&/* *,+B��������

CDEDFCG�EHIC�JK LJKMNOP

QRRSTHDDTUVMNOPDWUNXYZXRX[V\]UR\O]D̂LF_FC__̀aDb cDc

Company Notified to move Work started Percent

Complete Completion Date (est.)

Permit or Agreement #

The information provided in this document does not constitute a guarantee that utility facilities will be clear of construction. The information is gathered from both KDOT field personnel and utility company personnel. Estimated completion dates are dependent upon many variables (weather, material or product availability, r/w acquisition, etc.). The estimated completion date is an estimate.

LOGAN40-55 KA 7662-01

15-01002 Misc.

Status of Utilities Report

June 12, 2026

SCOPE OF PROJECT IS MILLING AND HMA OVERLAY

THERE SHOULD BE NO UTILITIES IN CONFLICT WITH PROPOSED CONSTRUCTION.

**NO KNOWN RELOCATIONS**

15-MR0960

Sheet 1 of 1

SPECIAL PROVISION TO THE

STANDARD SPECIFICATIONS, EDITION 2015

SECTION 602

MODIFIED REQUIREMENTS – ASPHALT MIXTURES

Project Number: 40-55 KA-7662-01

The asphalt mix listed in TABLE 1 has the following project mix requirements. [Reference TABLE

602-1, COMBINED AGGREGATE REQUIREMENTS].

TABLE 1: PROJECT MIX REQUIREMENTS

MIX CRITERIA SR-12.5A (PG64-28)(1)

AGGREGATE:

Coarse Angularity (min. %) 75

Uncompacted Voids-Fine (min. %) 42 Sand Equivalent (min. %) 40 Reclaimed Asphalt Pavement (RAP) (max. %) 25 RAP Bulk Specific Gravity 2.592

COMPACTION REVOLUTIONS:

Nini (level of compaction) 7 (<91.5) Ndes 75 Nmax 115

MIX:

VFA 65 - 82

(1) Between 0 and 25% RAP may be used. Use the material milled from the project as the RAP source. The required binder and name shown below are based on the percent RAP used in the contract. The mix will be paid for at the bid price of SR-12.5A (PG64-28).

Mix properties are for a 20 year design lane traffic range of 0.3 to less than 3.0 million ESALs.

6/1/26 C&M (BTH)

Percent RAP Name

0 SM-12.5A (PG64-28)

1 - 15 SR-12.5A (PG64-28)

16 - 25 SR-12.5A (PG58-34)

15-PS0018

STANDARD SPECIFICATIONS, EDITION 2015

COMBINATION, TIED BIDS ON 1R PROJECTS WITH FEDERAL-AID FUNDS

SECTION 102

BIDDING REQUIREMENTS AND CONDITIONS

Page 100-13, subsection 102.5. Delete subsection 102.5a.(2)(f) and replace with the following:

(f) Kansas-funded state projects “tied to” Federal-Aid funded state projects and Kansas-funded state projects “tied with” Federal-Aid funded state projects.

10-10-17 C&M Oct-17 Letting

15-PS0020-R2

KANSAS DEPARTMENT OF TRANSPORTATION

STANDARD SPECIFICATIONS, 2015 EDITION

SECTION 109

MEASUREMENT AND PAYMENT

Page 100-77, add subsection 109.1e(5):

(5) Electronic Ticketing (e-Ticketing) of Hot Mix Asphalt (HMA). Immediately after each truck is loaded and weighed at the HMA plant, generate an e-Ticket and upload it to the KDOT portal (https://tickets.ksdot.gov). If necessary, create an application programming interface (API) to integrate the e-Tickets with the KDOT portal. Update the API as needed to support the integration. Before beginning production of HMA on a project, connect to the project in the KDOT portal and verify that the required informational fields will be populated on the e-Tickets.

Fully integrate the e-Ticketing hardware and software with electronic scale and load read-out weighing system at the HMA plant. Design the e-Ticketing platform so that weight data cannot be altered. Provide a reliable and stable broadband internet connection and offline capabilities to prevent data loss if power or connectivity is lost.

If a stable internet connection cannot be sustained during material production, suspend plant production and paving or revert to the use of paper tickets if approved by the Engineer.

As a minimum, include the following information on each e-Ticket uploaded to the KDOT portal:

• Contractor;

• Plant ID;

• KDOT Project Number;

• KDOT Contract Number;

• HMA Mix Designation;

• Scale Operator Name;

• Date;

• Hauler;

• Truck Number;

• Daily Load Count;

• Gross Weight;

• Tare Weight;

• Net Weight;

• Legal Max Gross Vehicle Weight (GVW);

• Time at load out;

• Daily Total Tons of the HMA Mix Designation produced for the project.

Request the nomenclature requirements for the e-Ticket information from KDOT.

Display the identifying Truck Number on the driver side and passenger side of each haul truck. Ensure the

Truck Number can be safely read by the Road Inspector from the work area.

The Road Inspector will review each e-Ticket in the KDOT portal after the corresponding truckload is delivered to the project. The status will be changed from “pending” to “delivered” or “rejected,” any road waste quantity will be recorded, and notes may be added. A time stamp will be generated whenever the status is changed.

The Road Inspector or Engineer may update the status, quantity of road waste or notes after the initial review.

Reissue any e-Ticket that does not include the correct or required information. Do not reissue any e-Ticket that has been marked “delivered” or “rejected” without approval of the Engineer.

Complete, sign and retain KDOT Form No 251A or a Contractor-furnished materials receipt for each truckload in accordance with subsection 109.1e(3). If an e-Ticket has been uploaded to the KDOT portal by the time the corresponding truckload is delivered to the project, provide the original form or receipt to the designated Inspector by the end of the day. Otherwise, the truck driver shall provide the original form or receipt to the designated Inspector at the time of delivery to the project. If a stable internet connection cannot be sustained by the Inspector, the Engineer may require truck drivers to provide original forms or receipts to the designated inspector at the time of delivery to the project.

04-19-23 C&M (BTH)

COUNTY ROAD 320

COUNTY ROAD 220

JA

YH

AW

K

COUNTY ROAD 100

VIS

TA

COUNTY ROAD 300

COUNTY ROAD 380

COUNTY ROAD 340

DA

KO

TA

COUNTY ROAD 190

ROAD 32

YU

MA

BR

OK

EN

BO

W

COUNTY ROAD 310

COUNTY ROAD 350

DA

Y D

RE

AM

SE

NE

CA

CE

DA

R

CR

ES

T

COUNTY ROAD 280

COUNTY ROAD 320

COUNTY ROAD 240

COUNTY ROAD 450

COUNTY ROAD 150

PL

AI

NS

AP

AC

HE

AC

RE

AP

AC

HE

AC

RE

COUNTY ROAD 290

COUNTY ROAD 200

CO

YO

TE

ZE

ST

COUNTY ROAD 370

COUNTY ROAD 310

COUNTY ROAD 410

COUNTY ROAD 230

FO

RT

FO

X

WA

GO

N

COUNTY ROAD 340

COUNTY ROAD 240

COUNTY ROAD 170

QU

AI

L

WA

GO

N

COUNTY ROAD 220

COUNTY ROAD 400

COUNTY RD 370

TO

PE

KA

252413121

30191876

282194

272215103

262314112

252413121

30191876

292017

3130191876

3229201785

211694

34272215103

5322920178

4332821169

33427221510

2352623

241312

9433282116

1033427221510

235262314

3625241312

631301918

3526231411235

13625241312136

6313019187631

5322920178532

21169433282116

221510334272215

23141123526

1213625

292017853229

282116

151033427

1411235

2524131213625

30191863130

292017

53229

282116943328

272215103

1123526

24131213625

3019187631

2920178532

2821169433

27221510334

26231411235

25241312136

3019187631

2920178532

2821169433

27221510334

26231411235

25241312136

301918763130

20178

16943328

322920178532

332821169433

3427221510334

26231411235

25241312

24131213625

25241312136

3019187631

2920178532

2821169433

221510334

26231411235

25241312136

19187631

292017853229

282116943328

29201785

3328211694

34272215103

3526231411235

3625241312136

313019187631

2920178532

2821169433

27221510334

262314

28211694

27221510334

26231411235

25241312136

3019187631

30191876

292017

3019187631

2920178532

2821169433

27221510334

26231411235

25241312136

3019187

Th ird

S tan da rd

Pa ral lel S ou th

Th ird

S tan da rd

Pa ral lel S ou th

Fourth Guide Meridian West

Lo ga n C ou nty Sta te La ke

Sm ok y H ill

Riv er

He llC ree k

Si xm il e C reek

No rth

Bra nc hH ac kb err y C ree k

Pl um

Cr eek

So ut hBra nch

Ha ck be rry Cre ek

EastSpringCreek

Turk ey Creek

Sand Creek

Mi dd le Bra nc hHa ckb err yC ree k

North Fork Smoky Hil l Riv e r

West Spring Creek

UP

UP

UP

Mc All as ter

Elk ad er

Wi no na

Pa ge

Cit y

Mo nu me nt

Oa kle y

Lo ga n Wi ldl ife

Ar ea

Lit tle

Je rus ale m

Sta te

Pa rk

RS 1512

RS

RS

RS 1898

RS 272

RS 1417

RS

RS

RS

RS 246

RS 1594

RS

RS

RS

RS 1511

RS 1894

RS

GoveCounty

Co un ty Sh erm an

Co un ty Sc ott Co un ty

Wi ch ita

Wallace County

Co un ty Th om as

-100°50'

°00

-101°20'

-101°10'

-101°00'

°50

-101°20'

-100°50'

°00

°50

-101°00'

-101°10'

R33W

R35W

R36W

R37W

R31W

R34W

R35W

R36W

T1 4S

R37W

R34W

R32W

T1 3S

T1 2S

R32W

T1 1S

T1 1S

T1 2S

T1 6S

R33W

T1

6ST1

5S

T1 4S

T1 5S

T1 3S

R3 1W R32W

R34W

R36W

R37W

R38W

R32W

R35W

R36W

R37W

T1 3S R38W

R35W

R33W

T1 2S

T1 1S

R33W

T1 0S

T1 0S T1

1S

T1 5S

R34W

T1

5ST1

4S

T1 3S

T1 4S

T1 2S

Mi les

JU

NE

19s

KD

OT

m ak es no w arr an tie s, gu ara nte es , o r…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .