Bid Notice-Intelligent Transportation System - I-35.pdf

PDF 1 MB Posted

Attached to
Intelligent Transportation System - I-35
Solicitation number
526066151
Issued by
Johnson County, Kansas

About this file

This is a Bid Notice and Proposal document from the Kansas Department of Transportation (KDOT) for an Intelligent Transportation System (ITS) installation project on Interstate 35 southbound, located 0.18 miles north of Johnson Drive in Johnson County, Kansas. The project involves the installation of dynamic message signs (DMS) and related ITS infrastructure on the BNSF Railway corridor. The project is designated as State Project Number I035-046 KA 7668-01, with Contract Number 526066151. The letting date is June 17, 2026, with an earliest start date of July 13, 2026, and a latest start date of October 12, 2026. The contract includes 55 restricted days to open the project to unrestricted traffic and 75 total contract working days for project completion. Prequalified contractors must submit electronic proposals through the Bid Express website (http://ui.bidx.com) no later than 1:00 p.m. local time on the letting date. KDOT will open and read proposals at 3:00 p.m. on the letting date at the Eisenhower State Office Building in Topeka. The contractor must execute the contract within ten business days of award notification.

The project scope includes multiple line items covering common items (construction staking, removal of existing structures, mobilization, and flagging), road items (clearing and grubbing, guardrail removal and reconstruction), concrete surfacing items (concrete safety barriers), ITS items, and traffic control items (temporary concrete barriers, impact attenuators, work zone signs, barricades, channelizers, warning lights, arrow displays, and portable changeable message signs). The project is funded entirely with state funds. Contractors must provide a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award and comply with numerous special provisions including noncollusion certification, financial prequalification compliance, EEO requirements, and ITS unit cost submissions. The project includes significant railroad coordination requirements with BNSF Railway Company, including execution of a separate agreement, procurement of Railroad Protective Liability Insurance with minimum coverage of $2,000,000 per occurrence and $6,000,000 aggregate, payment of flagger services estimated between $1,200 to $2,000 for an eight-hour day, and compliance with extensive safety and operational protocols detailed in the BNSF Railway contractor agreement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745

Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org

Bureau of Construction and Materials

STATE PROJECT NUMBER: I035-046 KA 7668-01

CALL ORDER NUMBER: 615

PROPOSAL NUMBER: 526066151

LETTING DATE 06/17/2026

COUNTY: JOHNSON

FUND TYPE: STATE

OLATHEKDOT CONSTRUCTION OFFICE:

PROJECT DESCRIPTION

INTELLIGENT TRANSPORTATION SYSTEM. I-35: SB I-35 LOC 0.18 MI N

OF JO DR IN JO CO.

RESTRICTED DAYS

(55)

TOTAL CONTRACT DAYS

(75)

JULY 13, 2026

OCTOBER 12, 2026

Earliest Start Date:

Latest Start Date:

9:53:55AM5/18/2026 @

Letting 06/17/2026 Kansas Department of Transportation Project No. I035-046 KA 7668-01

Contract No. 526066151

I035-046 KA 7668-01 I035-046 KA 7668-01

CONTRACT PROPOSAL

DOT Form No. 202 Rev. 02/19

Contract ID: 526066151

1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:

I035-046 KA 7668-01 / I035-046 KA 7668-01

The general scope, location and net length are:

INTELLIGENT TRANSPORTATION SYSTEM. I-35: SB I-35 LOC 0.18

MI N OF JO DR IN JO CO.

2. This is the Proposal of

[Contractor] to complete the Project for the amount set out in the accompanying Unit

Prices List.

3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:

4. Contractors and other interested entities may examine the Bidding Proposal Form/

Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract

Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.

Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".

5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project

EBSX file are available on Bid Express' website at http://ui.bidx.com.

Contractor: Page 1 Check: 1D955C54F6

6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.

7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW

Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.

8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.

9. The contractor shall complete work to open the project to unrestricted traffic within

_55_ Restricted Days and shall complete the work within the total Contract Working Days of _75_.

10. The Contractor shall complete the Project according to the plans, Standard

Specifications, provisions identified in the Special Provision List and all other

Contract Documents identified in Standard Specifications subsection 101.3

11. The undersigned declares that the Contractor has carefully examined the Bidding

Proposal Form for the Project. The Contractor understands the following:

A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).

B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.

C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form

202, and submits the completed EBSX file documents and bid bond to KDOT using Bid

Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the

Contractor's Proposal.

D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.

12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.

Contractor: Page 2 Check: 1D955C54F6

13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions

(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the

Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, or III in the EBSX file, and may reject proposals that fail to contain completed Provisions IV, V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.

I. 08-10-66 Certification-Noncollusion & History of Debarment

II. 04-30-82 Certification-Financial Prequalification Amount

III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying

IV. 04-06-26 Certification of Company Not Currently Engaged in the Procurement or Use of Prohibited Foreign Unmanned Aeriel Systems

V. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm

VI. 10-10-00 Price Adjustment for Fuel

VII. 08-08-01 Furnishing and Planting Plant Materials

VIII. 06-01-06 Price Adjustment for Asphalt Material

IX. 05-18-07 Repair (Structures)

X. 08-31-09 Price Adjustment for Emulsified Asphalt

XI. 11-15-17 Electric Lighting System Unit Cost

XII. 04-06-09 ITS Unit Cost

XIII. 08-17-16 Water System Unit Cost

XIV. 06-19-19 Sanitary Sewer System Unit Cost

XV. 01-01-18 Smart Work Zone System Unit Cost

XVI. 08-12-24 Continuously Operating Reference Station Unit Cost

XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate

14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.

15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - V) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.

I. 11-03-80 Affirmative Action For EEO

II. 11-15-96 Affirmative Action & EEO Policies

III. 09-06-94 U.S. DOT Fraud Hotline

IV. FHWA-1273 Federal-Aid Required Contract Provisions

16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.

Contractor: Page 3 Check: 1D955C54F6

17. SIGNATURE SECTION:

A. Electronic Internet Proposal

The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.

B. Certification

I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING

THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT

LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH

13) IS TRUE AND CORRECT.

EXECUTED ON

C. Signature

Number of company or joint venture:

Name of company or joint venture:

Name of person signing:

Title of the person signing:

Signature: Electronic Internet Proposal

RELEASED FOR CONSTRUCTION:

Date:____________________________________

Chief of Construction and Materials

Contractor: Page 4 Check: 1D955C54F6

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

05/15/26

STATE PROJECT NO: I035-046 KA 7668-01 STATE CONTRACT NO: 526066151

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: JOHNSON1

INTELLIGENT TRANSPORTATION SYSTEM. I-35: SB I-35 LOC 0.18 MI N OF JO DR IN

JO CO.

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05

REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07

REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03

REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06

REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1

MINIMUM WAGE RATE (JOHNSON COUNTY)KS20260140

REQUIRED CONTRACT PROVISION-AREA PRACTICE DG-JO-LV-MI-SN-WY02-01-95-R02

REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01

REQUIRED CONTRACT PROVISION-ITS UNIT COST04-06-09-R02

POLICY AGAINST SEXUAL HARASSMENT03-01-18

ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23

REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003

ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06

PROSECUTION AND PROGRESS15-01016-R04

CONTROL OF WORK15-01019-R02

BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03

SCOPE OF WORK15-01022-R04

BIDDING REQUIREMENTS AND CONDITIONS15-01023

AWARD AND EXECUTION OF CONTRACT15-01024

REMOVAL OF EXISTING STRUCTURES15-02001

STRUCTURAL CONCRETE15-04002-R01

GENERAL CONCRETE15-04005-R04

STRUCTURAL METALS FABRICATION15-07004-R02

SIGN STRUCTURES AND BRIDGE MOUNTED SIGN ATTACHMENTS15-07008-R01

CONCRETE SAFETY BARRIER15-08014

CONTRACTOR CONSTRUCTION STAKING15-08015

WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03

WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029

STORMWATER POLLUTION MANAGEMENT15-09002-R05

AGGS FOR CONCRETE NOT PLACED ON GRADE15-11003-R04

AGGREGATES FOR BACKFILL15-11009-R03

AIR-ENTRAINING ADMIXTURES FOR CONCRETE15-14001-R01

SHEET MATERIALS FOR CURING CONCRETE15-14002

LIQUID MEMBRANE FORMING COMPOUNDS15-14003

STRUCTURAL STEEL TUBING15-16001-R01

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

05/15/26

STATE PROJECT NO: I035-046 KA 7668-01 STATE CONTRACT NO: 526066151

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: JOHNSON1

INTELLIGENT TRANSPORTATION SYSTEM. I-35: SB I-35 LOC 0.18 MI N OF JO DR IN

JO CO.

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

STEEL SIGN POSTS15-16002-R03

ANCHOR BOLTS FOR STRUCTURAL USES15-16006-R01

STEEL FASTENERS15-16007-R02

STEEL PLATE GUARDRAIL AND PROPRIETARY END TERMINALS15-16008-R01

PORTABLE CHANGEABLE MESSAGE SIGNS15-17001

PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT15-20001-R02

HYDRATED LIME15-20002

FLYASH FOR USE IN CONCRETE15-20004-R01

SILICA FUME15-20005

SLAG CEMENT FOR USE IN CONCRETE AND MORTAR15-20006

IMAGE SYSTEMS15-22005-R03

RETROREFLECTIVE SHEETING15-22006-R01

ROLL-UP SIGNS15-22011

WOOD POSTS15-23001-R03

FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02

PART V15-25001-R07

MATERIALS CERTIFICATIONS15-26001-R13

RAILROAD FLAGGING REQUIREMENTS15-RF0406

END OF SPECIAL PROVISION LIST

REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)

CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT

K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322

Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this

Certificate.

NONCOLLUSION

I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.

HISTORY OF DEBARMENT

I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:

1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;

2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;

3. Do not have a proposed debarment pending;

4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.

Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.

Yes No

The exceptions, if any, are:

Contractor: Page 5 Check: 1D955C54F6

REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)

CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT

Select the appropriate response below to indicate whether this Proposal exceeds the

Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this

Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.

I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.

If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).

KDOT Approval Granted by:

KDOT Approval Date:

Contractor: Page 6 Check: 1D955C54F6

REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)

CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT

LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM

Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:

This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:

Name:

Address:

City State Zip:

Business Telephone:

Contractor: Page 7 Check: 1D955C54F6

REQUIRED CONTRACT PROVISION - 04-06-09-R02 (Rev. 03/26)

ITS UNIT COST

Prior to award, the contractor shall submit a spreadsheet for the Unit Costs. A spreadsheet template is available on KDOT’s website - https://www.ksdot.gov/doing-business/highway-contractors/contractor-resources under “Other Resources.” The completed spreadsheet shall be submitted to the Letting Engineer no later than noon on the Friday after letting day. Once approved, the spreadsheet will be placed on KDOT’s Exploratory

Site and incorporated into the contract by reference.

The Contractor shall comply with Section 859 of the Standard Specifications when providing and installing elements of the Intelligent Transportation System (ITS). Add the following at the end of Section 859.4 Measurement and Payment.

The Contractor will submit a unit cost in this Required Contract Provision for each individual ITS item the contract requires. Even though the bid item is a lump sum price, the Engineer will adjust the lump sum price by any increase or decrease in the quantities indicated in the Summary of Quantities shown in the plans. To calculate the adjustment, the Engineer will determine the overrun or underrun quantity for each ITS item listed in the contract. The Engineer will multiply any overrun or underrun quantity by the unit cost the Contractor provided below. The Engineer will increase the lump sum price by the cost of any overruns and decrease the lump sum price by the cost of any underruns. The sum of the unit costs multiplied by the items listed in the *Summary of Quantities for each site or the entire project must be less than or equal to the lump sum price, or the unit cost submittal will be rejected. Contractor will then be required to resubmit unit costs that meet this requirement for the bid to be accepted. The Engineer will only negotiate or receive new prices on ITS items if they were not identified in the original

Summary of Quantities.

The Secretary may reject this Proposal if the Contractor fails to complete this Required

Contract Provision before noon on Friday after letting day.

ID# Unit Cost ID# Unit Cost ID# Unit Cost

Contractor: Page 8 Check: 1D955C54F6

*Refer to the Summary of Quantities sheet in the Plans for the ID #

Contractor: Page 9 Check: 1D955C54F6

REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)

TAX CLEARANCE CERTIFICATE

Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.

Yes No

Insert the Tax Clearance Confirmation Number if available at the time of bidding:

Contractors shall have a current Tax Clearance Certificate from the Kansas Department of

Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's

Proposal as non-responsive if the Contractor does not have a current Tax Clearance

Certificate at the time of the contract award.

To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction

ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.

After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.

If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special

Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.

Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not

"clearance" for all types of taxes the State of Kansas may assess.

Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the

Secretary approves them for subcontract work. The Contractor shall submit to the KDOT

Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.

Contractor: Page 10 Check: 1D955C54F6

Line Number Item Number Quantity Unit Unit Price Extension Price

Section 01

COMMON ITEMS

1 020100 1.000 LS

CONTRACTOR CONSTRUCTION STAKING /

2 025200 1.000 LS

REMOVAL OF EXISTING STRUCTURES /

3 025323 1.000 LS

MOBILIZATION /

4 070580 1.000 HOUR $70.000 $70.00

FLAGGER (SET PRICE) /

Section 01 Total $70.00

Section 02

ROAD ITEMS

5 025361 1.000 LS

CLEARING AND GRUBBING /

6 023454 100.000 LNFT

GUARDRAIL, REMOVAL AND RECONSTRUCTION OF STEEL PLATE /

Section 02 Total

Section 03

CONCRETE SURFACING ITEMS

7 010092 8.000 LNFT

CONCRETE SAFETY BARRIER (TYPE III) (32") (MODIFIED) /

8 070347 26.000 LNFT

CONCRETE SAFETY BARRIER (TYPE III) (SPECIAL) /

Section 03 Total

Section 04

ITS ITEMS (DMS SB I-35 NORTH OF JOHNSON DRIVE)

9 071738 1.000 LS

INTELLIGENT TRANSPORTATION SYSTEM /

Section 04 Total

Section 05

TRAFFIC CONTROL ITEMS

10 011927 588.000 LNFT

CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) /

11 011929 263.000 LNFT

CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) /

12 011074 3.000 EACH

IMPACT ATTENUATOR (TL-3) (TEMPORARY) /

13 018158 15.000 EACH

REPLACEMENT MODULES (IMPACT ATTENUATOR) /

Contractor: Page 11 Check: 1D955C54F6

14 025331 1500.000 EADA

WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) /

15 025332 920.000 EADA

WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) /

16 025333 3220.000 EADA

WORK ZONE SIGNS (16.26 SQ.FT. & OVER) /

17 025376 9200.000 EADA

WORK ZONE BARRICADES (TYPE 3 - 4 TO 12 LIN. FT.) /

18 011492 73490.000 EADA

CHANNELIZER (PORTABLE) /

19 025343 10350.000 EADA

WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) /

20 025364 580.000 EADA

ARROW DISPLAY /

21 025365 230.000 EADA

PORTABLE CHANGEABLE MESSAGE SIGN /

22 072116 1.000 LS

TRAFFIC CONTROL (INITIAL SETUP) /

Section 05 Total

Item Total $70.00

Contractor: Page 12 Check: 1D955C54F6

���!����������'"(�")*+��,�� -.� (,��/-,&0� �1 ��2� �� ���������������������������������������*-/�3��4�������������3����������������������������������-��������������5���#���*-/0� 0-''''''''''''''''''''''''6��3'�7��������������'��4444444444444444444444444444444444444444444444444444444444444444�0��(����4������������������������������������������������-��������������5���#��/,)0-�08.(/10� �,/0-* ,-�������9� ��0;

�''6���'�=��������������'�>�����9�

���%�����'''''''''''''''6���'�=��������������'�>�����?

����''''''''''''''''''''''6���'�=��������������'�>�����/�<���@*��$���A�*##��#���A����������� ����B'''''''''''''''6���'�=��������������'�>�����- ����''''''''''''''''''''''6���'�=��������������'�>�����- �1���'''''''''''''''''''6���'�=��������������'�>4444444444444444444444444444444444444444444444444444444444444444�(-,�����4������������������������������������������������-��������������5���#��(-,�),-�0-�@-0(�5,-�(���*� ���� -.� .-*?B''''''''''''''''''''''6�3>'��������������3�'��4444444444444444444444444444444444444444444444444444444444444444�?*9,���34��=���������������������������������������������-��������������5���#��?*9,-0-�@� �������%�@"������"����)��:�9�$���BB'''''''''''''''6�3='����������������'7=4444444444444444444444444444444444444444444444444444444444444444�?*9,��>�4������������������������������������������������-��������������5���#��?*9,-0-�@*��$���A�(� ��������-�:��A��$ <����A���������A������� �������� �B'''''''''''''''''6�3='����������������'7=4444444444444444444444444444444444444444444444444444444444444444�/?*����74������������������������������������������������-��������������5���#���010� �1*�,���,��-0 0�5(�(�"0-'''6�3>'���������������7'=�4444444444444444444444444444444444444444444444444444444444444444� 0*1����4��3�����������

CDEDFGH�IJFC�KL MKLNOPQ

RSSTUJDDUVWNOPQDXVOYZ[YSY\W]̂VS]P̂D_MF̀FG̀CàD̀ CDG

���*$+,���-��. /�0�1�������������������)� )������������ ��2�""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""""��& �&)� 3"�23��!(�3()� 3��������������������������������������������������� ����*�������$4������������������������)3�3������������� �� ���*$+,���-���5665 �5��%� ���0��������)2�� ������������ ������*$+,���-���0����������������������� ��)��������������������*$+,���-���5�6��5���, 01��������������) ������������ ��!2��*$+,���-��7��5 8���"�����6� �(�5 �������������������������)3�2!������������ )�����*�4���,4&�� ���,4-���9� /6� ����,/����5�������������������������������'2������������ ���'��*�4���,4&�� ���,4-��%�5� 86� ������)��3)������������ )� !��*�4���,4&�� ���,4-��* �6� ��������� �!)������������ 2�)'��,.��$�,�-��+5:���(&� 8���&����(&� 8�*5�8������������������������������������� !�����,.��$�,�-��+�0085;�����������������)�� !������������ �'!��,.��$�,�-���5 ����7��< �����������������������������)��)'�������������������,.��$�,�-���5 ������&�=����������������2������������ !� '��,.��$�,�-�����

������������������������������������� �����,.��$�,�-��%��8��(+0�8�������������)3�''������������ )�!!��,.��$�,�-��7�����0����
�>�������<�0����������������������������� ��'!�������������������,.��$�,�-��7��<�
������������������)�)!������������ !�� ��,.��$�,�-��&���/������������������� 2�'2�������������������,.��$�,�-��&����8������������������ 2������������������!)��,.��$�,�-�������5������������������)��)��������������������,.��$�,�-��5�5�700�%�5�

86� ��7��< ����������)2�)2������������ )�)!����$������,4��,*-���&��? ������� ?�������������������������������)���������������� )��3����$�����&�%4$*�@$��,4-���

ABCBDEF�GHDA�IJ KIJLMNO

PQQRSHBBSTULMNOBVTMWXYWQWZU[\TQ[N\B]KD̂DÊA_̂B̂ DBE

����+�,*�-�����������������������������%.�'��������������'��(����������� !�"�/������������0��������&��1�����������������22222222222222222222222222222222222222222222222222222222222222223!+�!���2��$�$�4$����$�#�$ ����,5��5�,$��� ����66666666666666666666666666666666666666666666666666666666666666667��$"�!8$����4$�/��$���!/���9��1:�!

5� �;�������0�+$�4$����)$�$������ �*<$�������5$��4� 2=��� �>�������,5��5��5$���

���-��:�%����������5� ���4$�$��*-��5$�!/:��5$��� ��#��4��$$�#��-$$ �,��5���5�������#���� ��0��$�4$�����$4$�-�9��5��� �5$-�,��0:��#����(1�5��� ��0��$�4$�$��5�-$���!�#��-$$ ��0��$�4$������5$���, <��-������5$��5$���52�$���$�� #�$4$ ��4$����$@�����

�,5��� ��0$������-�����5$�$�#��-$$��,5��� <��$�:����5� ���5$�5$���52�$���$�� �#�$4$ ��4$����$@���������$�

�,5��� ��0$������-�����5$�$�#��-$$��,5��� ���4��������:����$ ���4���$ $8�����

���0� ���������$A���$�$ ��,��0$��#���$����

�$���5$�!/� ��4����*�$���5��#

"BB,,,����� �4B� $

B,5�B �4$� �2�� �7��$"�!8$����4$�/��$���91(.� $

�*<$�������5$���4� 2=��� �>����5���,$�$��,���$��� ���5���5�4$� $,$�����$8�$ ���-�9�:�%�%%��!8$����4$/��$���91(.���$ �-�����5$��4� 2=���

����,5$ ��5$-�,$�$��,���$��������� �*<$������!8$����4$�/��$���91(.:��5$�� ��#�-�������4$�$��,��0$� ����9�9��#$�5���������5$��##����*�$�,� $����$��� ��5� �5� 5$�����������5��� ��5$��� �%�%(����5$��##����*�$�!8$����4$�/��$���

���������$A���$�$ ��,��0$��#���$����

�$��!8$����4$�/��$���91(.�� ��4����*�$���,,,����� �4B,5�B �4��

$$�$������,��0� ����$��,��5� �5$� ��#$�����5$����

�#��4��$��� ��5$���*��� �%&�)��(�(����������������2222222222222222222222222222222222222222222222222222222222222222�5$�*��-����$��5�,� $��$�$��� ��5$����

��5���5�4$�*$$ �����*$�#�$4���� ������5$�-#$�

�� $� ��#5�����$����4$�$��*-��5$�,� $�$�$��� ���5$����

���#5�*$��������$��� �,5$�5$���5$�#������������$�� ��4$-

CDEDFGH�IJFC�KL MKLNOPQ

RSSTUJDDUVWNOPQDXVOYZ[YSY\W]̂VS]P̂D_MF̀FG̀CàD̀ bDG

�������#��$%�����&'(�)*+,-�**.�*/0*+01*12��'(�)����� ����������������������'��������(�����*+,-��3

��
�������������

��3 ��������*/0*+01*12�� �������������������456��

�������
��7"8�9�����

�������3 ��������$;�)'($&��� �<5�**+*�*+0*+01*12����� �� ������ ��������<5�� ���3

��
�������������

��3 ��������*+0*+01*12� �������3 ���������������7������� �1,�">��+�19������

������
�����������������������

��������$%�����&���>(1*11�**/?01/01*12������

��������������
�������������������#�����������

�����������>��������1*11����� ������������������3

��
�������������

��3 �������?01/01*12�� ��������5��������� ��4� ��� ��5����6������ �74569� ����1,�">��+�?7�97+9����������������������� �������3 ��� �������������#���������7��������9� ����

@ABACDE�FGC@�HI JHIKLMN

OPPQRGAARSTKLMNAUSLVWXVPVYTZ[SPZM[A\JC]CD]@̂]A] ÂD

'��)�'%�����&�����%�������������&�
*�(���)�'%�������'&����%��&&'$'%��'�&���
��+�&����,���������+�
-� !�'������������-�'&��'��
�����+�
��&���'��
���%'������)��������
�'��'��,�������-� �" �"� �#�'������������-�
�$��%�&������������)�'%�����%��&&'$'%��'�&����
���&����
�����.��.�'���'$'�
����/�$$�%�����
�&�������)�'�����&�����$

��������������������������������������������������������������������0�1��2�,���34�,354��66��7��6�5 ������8�&����

��+�����''�'�����%'&'��'����������
.�,�'&�%�+������������������&�
*�(����
�('����)��������
�'��'������������+������'&�'����+�'&����)��������
�'��'�%����''�'���082������
�&���'��$�
�������&'�'�����)��������
�'��'�������
�����''�'���%�$�
��%������'�'����%��&&'$'%��'����

�' ��'� 5 �&� �9��&�&$� �%�����������082�:

�%��$�0������
*�(&����9��&�&�%��+��&�+�'�����*'�����'������*'&+�%�'$�;������*��
�%���$�0������
*�(&������������0�������8��
�2'*'&'�������������<����2���
������$�7�+�

� &�'���'� ��*� ��-�4�0�������������0�&�' ��� -�2

�'��'�������
�&�%���&%�$�
��%����%'&'�&-�

�9��&�&�$� �%�����������082�:

�%���$�
�&�
�%�'��0����2���
�'��'�&���9��&�&�%��+��&�+�'�����*'�����'�����:

02�5$$'%�;������*��

�%���$�
�&�
�%�'��0����2���
�'��'�&������������0�������8��
�2'*'&'�������������<����2���
������$�7�+�
�&�'���'���*���-�4�0�������������0�&�'���-�2
�� �� ���3$���''�'�����%'&'����&�+���'&&���-������(�'��
�(�����&���$$�%����+(������%�'���������'&��
��&�)'��������%'&'��%��

�9��&��

�*'�)����
�%�&'��
��'��$
�������0������8��
����''&�

���6� ���6� ��!����9��&�&�$�

�*'�)����
�%�&'��
��'��%��+��&�+�'�����*'����'������+��
�%�&'��
��'�;������*��
�+(���'�����������������0�������8��
����''&�

������������<����2��� ��� ���$�7�+� � &�'���'� ��*� ��-�4�0�������������0�&�' ��� -�2 �9��&��&������+���%%���� '���+(���$����&������ ���$����' ��

�(>&���&'�'������(�'$�
���'���)������(�������-��

�9��&��

@ABACDE�FGC@�HI JHIKLMN

OPPQRGAARSTKLMNAUSLVWXVPVYTZ[SPZM[A\JC]CD]@̂]A] BAD

��������������������������
�����
�������������
����������������������������������
��������������!�"��#����������

���#'�%&%*&�++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++����������,)#�-.�/,),��$�#,'�"�-)0�������� 1232456�7841�9: ;9:<=>?

@AABC822CDE<=>?2FD=GHIGAGJEKLDAK>L2M;4N45N1ON2N 525

BNSF RAILWAY COMPANY

CONTRACTOR AGREEMENT, INSURANCE AND FLAGGING

PROJECT: 35-46 KA-7668-01

PROJECT SCOPE: DMS STRUCTURE REPLACEMENT

DOT#663554J; FORT SCOTT SUBDIVISION; MP 007.44

JOHNSON COUNTY, KS.

I. PURPOSE OF PROJECT SPECIAL PROVISION

A. This Project Special Provision requires the Contractor to execute the attached Agreement with BNSF Railway Company before the Contractor may enter upon any Railroad right-of-way to perform work on the above Project.

B. This Project Special Provision modifies the insurance requirements of the Kansas Department of Transportation’s Standard Specifications for State Road and Bridge Construction (2015 Edition) as required by this agreement.

II. CONTRACTOR’S AGREEMENT WITH BNSF RAILWAY COMPANY

A. The Contractor’s Agreement is attached to this Project Special Provision and incorporated in the contract for the above Project.

B. The Agreement includes without limitation, contract obligations for commercial general liability insurance, railroad protective liability insurance, flagging, and safety requirements.

C. The Contractor shall not terminate this Agreement without first obtaining the Secretary’s permission to terminate this agreement.

D. BNSF Railway Company may enforce any and all rights given to them in this Agreement.

III. INSURANCE

A. The Contractor shall obtain all insurances required in this Agreement, in the Forms and with the endorsements specified, including without limitation the endorsement that amends the definition of insured contract to remove any exclusion or other limitation for any work being done within 50 feet of railroad property.

B. For the benefit of the Contractor and the Insurance Companies in the determination of a premium for the RPL to be carried for and on behalf of the BNSF Railway Company, the approximate ratio of the estimated contract cost of construction to be performed on, over or under the insured railroad's property or within fifty (50) feet of the insured railroad's tracks on which railroad trains run, to the total contract cost is 17.5%.

15-RF0409

35-46 KA-7668-01

C. The Contractor shall directly furnish an acceptable certificate of insurance from an authorized representative evidencing the required coverage, endorsements, and amendments. All certificate of insurance and not just Railroad Protective Liability Insurance shall be submitted to BNSF Railway Company’s authorized representative indicated under the “INSURANCE” section of this Agreement.

D. For tracking purposes, the Contractor shall notify the KDOT's Field Engineer by an email of the date the Agreement and the Railroad Protective Liability Policy are submitted to BNSF Railway Company.

E. The Contractor shall also provide a copy of the Railroad Protective Liability Policy to K.D.O.T.

Bureau of Construction & Materials, Plans and Proposal Section, 700 S.W. Harrison, 7th Floor, Topeka, Kansas 66603.

5-12-26 C&M (SH)

PROJECT: KA-7668-01

COUNTY: Johnson

TYPE: DMS Structure Replacement

FLAGGING REQUIREMENTS

FOR THE BENEFIT OF PROSPECTIVE BIDDERS, the Kansas Department of Transportation has obtained the requirements of the Burlington Northern and Santa Fe Railway Co. in relation to the protection of its traffic, the conditions under which such protection will be required, the rates of pay, working hours, and other information relating to services necessary to protect railroad traffic during the construction operations.

1.01 General:

• 1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY, hereinafter referred to as

"Railway" where work is over or under on or adjacent to Railway property and/or right-of-way, hereafter referred to as "Railway Property", during Project No. KA-7668-01, I-35 DMS on BNSF Railway near the City of Merriam in Johnson County, KS.

• 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies of the Exhibit “C-1” Agreement, in the form attached hereto, obligating the Contractor to provide and maintain in full force and effect the insurance called for under Section 3 of said Exhibit “C-1”. Questions regarding procurement of the Railroad Protective Liability Insurance should be directed to Rosa Martinez at Marsh, USA, 214-303-8519, Rosa.M.Martinez@marsh.com.

• 1.01.03 The Contractor must plan, schedule, and conduct all work activities so as not to interfere with the movement of any trains on Railway Property.

• 1.01.04 The Contractor's right to enter Railway's Property is subject to the absolute right of Railway to cause the Contractor's work on Railway's Property to cease if, in the opinion of Railway, Contractor's activities create a hazard to Railway's Property, employees, and/or operations. Railway will have the right to stop construction work on the Project immediately and without prior notice if any of the following events take place:

(i) Contractor (or any of its subcontractors) performs the Project work in a manner contrary to the plans and specifications approved by Railway; (ii) Contractor (or any of its subcontractors), in Railway’s opinion, prosecutes the Project work in a manner which is hazardous to Railway property, facilities or the safe and expeditious movement of railroad traffic; or (iii) the insurance described in the attached Exhibit C-1 is canceled during the course of the Project. Railway will have the right to stop construction work on the Project after written notice to both KDOT and Contractor in the event of a material breach of this agreement or terms of the easement agreement. The work stoppage will continue until all necessary actions are taken by Contractor or its subcontractor to rectify the situation to the satisfaction of Railway’s Division Engineer or until additional insurance has been delivered to and accepted by Railway. Any such work stoppage under this provision will not give rise to any liability on the part of Railway. Railway’s right to stop the work is in addition to any other rights Railway may have including, but not limited to, actions or suits for damages or lost profits. In the event that Railway desires to stop construction work on the Project, Railway agrees to immediately notify the following individual in writing:

Kansas Department of Transportation Coordinating Section 700 SW Harrison Street Topeka, KS 66603 785.296.3531

• 1.01.05 The Contractor is responsible for determining and complying with all Federal, State and Local Governmental laws and regulations, including, but not limited to environmental laws and regulations (including but not limited to the Resource Conservation and Recovery Act, as amended; the Clean Water Act, the Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health and safety laws and regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for, from and against all fines or penalties imposed or assessed by Federal, State and Local Governmental Agencies against the Railway which arise out of Contractor's work under this Agreement.

• 1.01.06 The Contractor must notify KDOT at 785-296-3529 and Railway's Manager Public Projects, email kara.brockamp@bnsf.com, at least thirty (30) calendar days before commencing any work on Railway Property. Contractor’s notification to Railway must refer to Railway's file BF-20609989.

• 1.01.07 For any bridge demolition and/or falsework above any tracks or any excavations located with any part of the excavations located within, whichever is greater, twenty-five (25) feet of the nearest track or intersecting a slope from the plane of the top of rail on a 2 horizontal to 1 vertical slope beginning at eleven (11) feet from centerline of the nearest track, both measured perpendicular to center line of track, the Contractor must furnish the Railway five sets of working drawings showing details of construction affecting Railway Property and tracks. The working drawing must include the proposed method of installation and removal of falsework, shoring or cribbing, not included in the contract plans and two sets of structural calculations of any falsework, shoring or cribbing. For all excavation and shoring submittal plans, the current “BNSF-UPRR Guidelines for Temporary Shoring” must be used for determining the design loading conditions to be used in shoring design, and all calculations and submittals must be in accordance with the current “BNSF-UPRR Guidelines for Temporary Shoring”. All submittal drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. All calculations must take into consideration railway surcharge loading and must be designed to meet American Railway Engineering and Maintenance-of-Way Association (previously known as American Railway Engineering Association) Coopers E-80 live loading standard. All drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. The Contractor must not begin work until notified by the Railway that plans have been approved. The Contractor will be required to use lifting devices such as, cranes and/or winches to place or to remove any falsework over Railway's tracks. In no case will the Contractor be relieved of responsibility for results obtained by the implementation of said approved plans.

• 1.01.08 Subject to the movement of Railway's trains, Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient manner. The Contractor will have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by the Railway.

1.02 Contractor Safety Orientation

• 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees may enter Railway Property without first having completed Railway’s Engineering Contractor Safety Orientation, found on the web site www.bnsfcontractor.com. The Contractor must ensure that each of its employees, subcontractors, agents or invitees completes Railway’s Engineering Contractor Safety Orientation through internet sessions before any work is performed on the Project on Railroad right of way. Additionally, the Contractor must ensure that each and every one of its employees, subcontractors, agents or invitees possesses a card certifying completion of the Railway Contractor Safety Orientation before entering Railway Property. The Contractor is responsible for the cost of the Railway Contractor Safety Orientation. The Contractor must renew the Railway Contractor Safety Orientation annually. Further clarification can be found on the web site or from the Railway’s Representative.

1.03 Railway Requirements

• 1.03.01 The Contractor must take protective measures as are necessary to keep railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting from his operations. Any damage to railway facilities resulting from Contractor's operations will be repaired or replaced by Railway and the cost of such repairs or replacement must be paid for by the Agency.

• 1.03.02 The Contractor must notify the Railway's Division Engineer Dustin Karraker

(dustin.karraker@bnsf.com) and provide blasting plans to the Railway for review seven (7) calendar days prior to conducting any blasting operations adjacent to or on Railway's Property.

• 1.03.03 The Contractor must abide by the following temporary clearances during construction:

15’-0” Horizontally from centerline of nearest track 21’-6” Vertically above top of rail 27'-0" Vertically above top of rail for electric wires carrying less than 750 volts 28'-0" Vertically above top of rail for electric wires carrying 750 volts to 15,000 volts 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts 34'-0" Vertically above top of rail for electric wires carrying more than 20,000 volts

• 1.03.04 Upon completion of construction, the following clearances shall be maintained:

27’ Horizontally from centerline of nearest track 23’ 6” Vertically above top of rail

• 1.03.05 Any infringement within State statutory clearances due to the Contractor's operations must be submitted to the Railway and to the KDOT Office and must not be undertaken until approved in writing by the Railway, and until the KDOT Office has obtained any necessary authorization from the State Regulatory Authority for the infringement. No extra compensation will be allowed in the event the Contractor's work is delayed pending Railway approval, and/or the State Regulatory Authority's approval.

• 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will have the option of installing tell-tales or other protective devices Railway deems necessary for protection of Railway operations.

The cost of tell-tales or protective devices will be borne by the Agency.

• 1.03.07 The details of construction affecting the Railway's Property and tracks not included in the contract plans must be submitted to the Railway by KDOT for approval before work is undertaken and this work must not be undertaken until approved by the Railway.

• 1.03.08 At other than public road crossings, the Contractor must not move any equipment or materials across Railway's tracks until permission has been obtained from the Railway. The Contractor must obtain a "Temporary Construction Crossing Agreement" from the Railway prior to moving his equipment or materials across the Railways tracks. The temporary crossing must be gated and locked at all times when not required for use by the Contractor. The temporary crossing for use of the Contractor will be constructed and, at the completion of the project, removed at the expense of the Contractor.

• 1.03.09 Discharge, release or spill on the Railway Property of any hazardous substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous waste is prohibited and Contractor must immediately notify the Railway's Resource Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess of a reportable quantity. Contractor must not allow Railway Property to become a treatment, storage or transfer facility as those terms are defined in the Resource Conservation and Recovery Act or any state analogue.

• 1.03.10 The Contractor upon completion of the work covered by this contract, must promptly remove from the Railway's Property all of Contractor's tools, equipment, implements and other materials, whether brought upon said property by said Contractor or any Subcontractor, employee or agent of Contractor or of any Subcontractor, and must cause Railway's Property to be left in a condition acceptable to the Railway's representative.

15-RF0409

1.04 Contractor Roadway Worker on Track Safety Program and Safety Action Plan:

• 1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a track must develop and implement a Roadway Worker Protection/On Track Safety Program and work with Railway Project Representative to develop an on track safety strategy as described in the guidelines listed in the on track safety portion of the Safety Orientation. This Program must provide Roadway Worker protection/on track training for all employees of the Contractor, its subcontractors, agents or invitees. This training is reinforced at the job site through job safety briefings. Additionally, each Contractor must develop and implement the Safety Action Plan, as provided for on the web site www.bnsfcontractor.com, which will be made available to Railway prior to commencement of any work on Railway Property. During the performance of work, the Contractor must audit its work activities. The Contractor must designate an on-site Project Supervisor who will serve as the contact person for the Railway and who will maintain a copy of the Safety Action Plan, safety audits, and Material Safety Datasheets (MSDS), at the job site.

1.05 Railway Flagger Services:

• 1.05.01 The Contractor must give Railway’s Roadmaster Austin Harvey (Austin.Harvey2@bnsf.com) and third party flagging scheduling service Wilson & Company (bnsfscheduling@wilsonco.com) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (i.e., bulletin the flagger’s position).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .