Bid Notice-Install_ Remove _ Repair Fence As Needed - Guilford County (West).pdf

PDF 2 MB Posted

Attached to
Install, Remove & Repair Fence As Needed - Guilford County (West)
Solicitation number
MG00538
Issued by
Guilford County, North Carolina

About this file

Contract Summary

This is a Bid Notice for a Small Business Enterprise (SBE) ID/IQ maintenance contract issued by the North Carolina Department of Transportation, Division 7, for Guilford County (West). The contract involves the installation, removal, and repair of fence as needed on interstate, primary, and secondary roads at various locations throughout the county. The bidder must provide all materials, machinery, tools, labor, and equipment necessary to complete the work in accordance with the 2024 Standard Specifications for Roads and Structures. The proposal opening date and time is November 19, 2026, at 2:00 PM at the NCDOT Division Office in Greensboro, North Carolina. The contract is effective December 16, 2026, with a completion date of December 15, 2027. This is a multi-year contract with potential extensions for two additional one-year periods, with a maximum annual limit of $1,000,000 per year. Work orders will be assigned by the Engineer, and contractors must respond within three working days with an anticipated start date. Work must be performed continuously once begun, with liquidated damages assessed based on work order value, ranging from $100 per day for work orders under $100,000 to $850 per day for work orders between $1,000,000 and $2,000,000.

This contract is designated as a Small Business Enterprise set-aside under North Carolina General Statute 136-28.10. No minimum quantity of services is guaranteed, and no direct payment is required for mobilization or erosion control, as these are considered incidental to other bid items. The contract includes steel price adjustments for eligible fence items based on Fastmarkets indices, with material receipt dates used as adjustment dates. Bidders must submit Form SPA-1 within 14 calendar days of notice of award to participate in steel price adjustments. The contract is state-funded with no federal aid, and payment and performance bonds are not required under the Small Business Enterprise program provisions. Contractors must comply with all applicable North Carolina laws, including those regulating electrical, plumbing, heating, and air conditioning work. A North Carolina General Contractor's License is not required. Fuel price adjustments are available for eligible items using a base diesel index of $5.0299 per gallon. Lane closure restrictions apply to both intermediate contract times, with liquidated damages of $500 per hour for interstate and US roads and $250 per hour for secondary roads.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MG00538 N/A Guilford County

STATE OF NORTH CAROLINA

DEPARTMENT OF TRANSPORTATION

HIGHWAY DIVISION 7

SMALL BUSINESS ENTERPRISE ID/IQ PROPOSAL

DATE AND TIME OF BID OPENING: NOVEMBER 19, 2026, AT 2:00 PM

CONTRACT ID: MG00538

WBS ELEMENT NO.: GMR07.GLB1N, GMR07.GLB.1P, GMR07.GLB.2P &

GMR07.GLB.07.2U

FEDERAL AID NO.: STATE FUNDED

COUNTY: GUILFORD COUNTY (WEST)

TIP NO.: N/A

MILES: 0

ROUTE NO.: N/A

LOCATION: INTERSTATE, PRIMARY, AND SECONDARY ROADS

TYPE OF WORK: INSTALL, REMOVE & REPAIR FENCE AS NEEDED AT

VARIOUS LOCATIONS

NOTICE:

UNDER THE PROVISIONS OF THIS PROGRAM, A N.C. GENERAL CONTRACTOR’S LICENSE IS

NOT REQUIRED AND CONTRACT PAYMENT AND CONTRACT PERFORMANCE BONDS IS NOT

REQUIRED. BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE LAWS,

INCLUDING BUT NOT LIMITED TO, THOSE REGULATING THE PRACTICES OF ELECTRICAL,

PLUMBING, HEATING AND AIR CONDITIONING AND REFRIGERATION CONTRACTING AS

CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA.

THIS IS A ROADWAY PROJECT. BID BOND IS NOT REQUIRED.

NAME OF BIDDER

ADDRESS OF BIDDER

PROPOSAL FOR THE CONSTRUCTION OF

CONTRACT No. MG00538 IN GUILFORD COUNTY, NORTH CAROLINA

DEPARTMENT OF TRANSPORTATION,

RALEIGH, NORTH CAROLINA

The Bidder has carefully examined the location of the proposed work to be known as Contract

No. MG00538; has carefully examined the plans and specifications, which are acknowledged to be part of the proposal, the special provisions, the proposal, the form of contract; and thoroughly understands the stipulations, requirements and provisions. The undersigned bidder agrees to be bound upon his execution of the bid and subsequent award to him by the Department of

Transportation in accordance with this proposal. Payment and performance bonds are not required on this project. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and other means of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said contract in accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s) specified in the Project Special Provisions and in accordance with the requirements of the

Engineer, and at the unit or lump sum prices, as the case may be, for the various items given on the sheets contained herein.

The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the work and required labor to construct and complete Contract No.

MG00538 in Guilford County (West), for the unit or lump sum prices, as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications prepared by said

Department, which proposal, plans, and specifications show the details covering this project, and hereby become a part of this contract.

The published volume entitled North Carolina Department of Transportation, Raleigh, Standard

Specifications for Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into and made a part of this contract; that, except as herein modified, all the construction and work included in this contract is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the direction of the Engineer.

If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer or such other person as may be designated by the Secretary to sign for the Department of Transportation. The conditions and provisions herein cannot be changed except over the signature of the said Contract Officer or Division Engineer.

The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item or portion of the work as may be deemed necessary or expedient.

An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease in the unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.

TABLE OF CONTENTS

COVER SHEET

PROPOSAL SHEET

PROJECT SPECIAL PROVISIONS

INTERESTED PARTIES LIST NOT REQUIRED: ................................................................ G - 1

CONTRACT TIME FOR ID/IQ: .............................................................................................. G - 1

WORK ORDER ASSIGNMENT (SINGLE AWARDS) FOR ID/IQ: .................................... G - 1

BONDING REQUIREMENTS FOR ID/IQ: ............................................................................ G - 2

MOBILIZATION AND LIQUIDATED DAMAGES FOR ID/IQ: ......................................... G - 2

RENEWAL OF CONTRACT (CPI PRICE ADJUSTMENT) FOR ID/IQ: ............................ G - 3

DISPUTE RESOLUTION PROCESS FOR ID/IQ: ................................................................. G - 4

INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES: ..... G - 4

INTERMEDIATE CONTRACT TIME NUMBER 2 AND LIQUIDATED DAMAGES: ..... G - 5

NO MAJOR CONTRACT ITEMS:.......................................................................................... G - 7

NO SPECIALTY ITEMS: ........................................................................................................ G - 7

FUEL PRICE ADJUSTMENT PAPER BID: .......................................................................... G - 7

STEEL PRICE ADJUSTMENT: .............................................................................................. G - 8

SCHEDULE OF ESTIMATED COMPLETION PROGRESS: ............................................... G-19

SMALL BUSINESS ENTERPRISE (MULTI-YEAR MAINTENANCE CONTRACTS): ... G-19

RESTRICTIONS ON ITS EQUIPMENT AND SERVICES: .................................................. G-19

USE OF UNMANNED AIRCRAFT SYSTEM (UAS): .......................................................... G-19

EQUIPMENT IDLING GUIDELINES: ................................................................................... G-20

OUTSOURCING OUTSIDE THE USA: ................................................................................. G-20

ROADWAY ...............................................................................................................................R - 1

STANDARD SPECIAL PROVISIONS

AVAILABILITY OF FUNDS – TERMINATION OF CONTRACTS ................................SSP - 1

ERRATA................................................................................................................................SSP - 1

PLANT AND PEST QUARANTINES .................................................................................SSP - 4

MINIMUM WAGES .............................................................................................................SSP - 5

TITLE VI AND NONDISCRIMINATION: .........................................................................SSP - 5

ON-THE-JOB TRAINING ....................................................................................................SSP-13

UNIT PROJECT SPECIAL PROVISIONS

TRAFFIC CONTROL ........................................................................................................... TC – 1

SIGNATURE SHEETS AND FORMS .................................................................................. S - 1

BID/PAY ITEM SHEETS ....................................................................................................... T - 1

DOT EXECUTION SHEET .................................................................................................. U - 1

INSTRUCTIONS TO BIDDERS

PLEASE READ ALL INSTRUCTIONS CAREFULLY

BEFORE PREPARING AND SUBMITTING YOUR BID.

All bids shall be prepared and submitted in accordance with the following requirements. Failure to comply with any requirement may cause the bid to be considered irregular and may be grounds for rejection of the bid.

TRADITIONAL PAPER BIDS:

1. Small Business Enterprise bidders shall submit a SBE Application for Certification Form within the NC

Online Certification System on the Department’s website and have been approved by the Office of

Economic Opportunity & Compliance prior to bidding. The SBE shall submit this form for approval at a minimum of one week prior to bidding.

2. Download the entire proposal from the Connect NCDOT website and return the entire proposal with your bid.

3. Enter required information on the cover page. The “Name of Bidder” and the “Address of Bidder” should be as it appears in the Directory of Firms found on the Department’s website.

4. In accordance with Article 102-3 of the Standard Specifications, registration on the Interested Parties List is required unless SP1 G02 Interested Parties List Not Required provision is included in the proposal.

5. All entries on the itemized proposal sheet (bid form) shall be written in ink or typed.

6. The Bidder shall submit a unit price for every item on the itemized proposal sheet. The unit prices for the various contract items shall be written in figures. Unit prices shall be rounded off by the Bidder to contain no more than TWO decimal places.

7. An amount bid shall be entered on the itemized proposal sheet for every item. The amount bid for each item shall be determined by multiplying each unit cost bid by the quantity for that item, and shall be written in figures in the "Amount" column of the form.

8. The total amount bid shall be written in figures in the proper place on the bid form. The total amount bid shall be determined by adding the amounts bid for each item.

9. Changes to any entry shall be made by marking through the entry in ink and making the correct entry adjacent thereto in ink. A representative of the Bidder shall initial the change in ink. Do not use correction fluid, correction tape or similar products to make corrections.

10. The bid shall be properly executed on the included Execution of Bid – Non-collusion, Debarment and

Gift Ban Certification form. All bids shall provide the following information:

a. Complete one of the following forms: Corporation, Partnership, Limited Liability Company, Joint

Venture, Individual Doing Business in His Own Name or Individual Doing Business Under a Firm

Name, based on the business entity submitting the bid.

b. Corporations that have a corporate seal shall include it on the bid, otherwise write your corporations name in the seal location.

c. Provide the name of individual or representative submitting bid along with their position or title held on behalf of the bidder.

d. Name, signature, and position or title of witness.

11. The bid shall not contain any unauthorized additions, deletions, or conditional bids.

12. The Bidder shall not add any provision reserving the right to accept or reject an award, nor enter into a contract pursuant to an award.

13. THE ENTIRE PROPOSAL WITH THE ITEMIZED PROPOSAL SHEET AND ALL OTHER

APPLICABLE FORMS SHALL BE COMPLETED AND PLACED IN A SEALED ENVELOPE

AND SHALL BE DELIVERED TO AND RECEIVED IN THE NCDOT DIVISION OFFICE,

LOCATED AT 1584 YANCEYVILLE ST. GREENSBORO, NC 27405-6932, BY 2:00 PM ON,

NOVEMBER 19, 2026.

14. The sealed bid must display the following statement on the front of the sealed envelope:

https://www.ebs.nc.gov/VendorDirectory/search.html?s=fn&a=new

QUOTATION FOR – CONTRACT ID MG00538 – INSTALL, REMOVE & REPAIR FENCE AS

NEEDED ON INTERSTATE, PRIMARY, AND SECONDARY ROADS AT VARIOUS

LOCATIONS IN GUILFORD COUNTY (WEST) TO BE OPENED AT 2:00 PM ON,

NOVEMBER 19, 2026.

As well as the following information:

a. Name of the Corporation, Partnership, Limited Liability Company, Joint Venture, Individual Doing

Business in His Own Name or Individual Doing Business Under a Firm Name, submitting bid.

b. Name of the individual or representative submitting bid along with their position or title held on behalf of the bidder.

c. Address of the Corporation, Partnership, Limited Liability Company, Joint Venture, Individual Doing

Business in His Own Name or Individual Doing Business Under a Firm Name, submitting bid.

d. SAP Vendor Number of the Corporation, Partnership, Limited Liability Company, Joint Venture, Individual Doing Business in His Own Name or Individual Doing Business Under a Firm Name, submitting bid. This information can be found on the Directory of Firms found on the Department’s website.

e. Contractor License Number, if available, of the Corporation, Partnership, Limited Liability Company, Joint Venture, Individual Doing Business in His Own Name or Individual Doing Business Under a

Firm Name, submitting bid.

15. If delivered by mail, the sealed envelope shall be placed in another sealed envelope and the outer envelope shall be addressed as follows:

N. C. DEPARTMENT OF TRANSPORTATION

DIVISION OF HIGHWAYS, DIVISION 7

ATTN: Jennifer Sour

1584 Yanceyville St.

Greensboro, NC 27405-6932

16. Questions should be emailed 7 calendar days prior to the bid opening to Jennifer Sour at jsour@ncdot.gov. Contact with any other NCDOT personnel concerning this project is strictly prohibited, unless otherwise noted, and may result in bids being considered non-responsive.

https://www.ebs.nc.gov/VendorDirectory/search.html?s=fn&a=new

MG00538 N/A G-1

Guilford County

PROJECT SPECIAL PROVISIONS - GENERAL

INTERESTED PARTIES LIST NOT REQUIRED:

(6-21-22)(Rev. 2-20-24) 102 SP1 G02

Revise the Standard Specifications as follows:

The Interested Parties List sign up process is not applicable to this contract.

Page 1-13, Article 102-3 PROPOSALS AND INTERESTED PARTIES LIST, lines 12-15, delete the first paragraph.

Page 1-14, Article 102-8 PREPARATION AND SUBMISSION OF BIDS, lines 43-44, delete the first sentence of the first paragraph.

CONTRACT TIME FOR ID/IQ:

(2-15-22)(Rev. 4-15-25) 108 SP1 G11

The date of availability for this contract is December 16, 2026.

The completion date for this contract is December 15, 2027.

Except where otherwise provided by the contract, observation periods required by the contract will not be a part of the work to be completed by the completion date and/or intermediate contract times stated in the contract. The acceptable completion of the observation periods that extend beyond the final completion date shall be a part of the work covered by the performance and payment bonds.

Work shall be accomplished in a continuous manner once the contractor begins.

The liquidated damages for this contract will be assessed per the Mobilization and Liquidated

Damages for ID/IQ provision located elsewhere in this contract.

WORK ORDER ASSIGNMENT (SINGLE AWARDS) FOR ID/IQ:

(2-15-22)(Rev. 4-19-22) SPD 01-800A

Work orders will be assigned by the Engineer. The Contractor shall respond to the work order assignments with the anticipated start date, within three working days of notification unless noted otherwise. Failure to complete work in accordance with contract provisions and completion date may result in liquidated damages.

For federal ID/IQ contracts, all work orders will be assigned via the Work Order Assignment

Form (Form IDIQ-1SA), and the Contractor is required to formally respond in writing for federal work orders within three working days, unless noted otherwise. The Work Order Assignment

Form will also be used for any state ID/IQ contract in which the estimated work order cost meets the threshold for Performance and Payment Bonds in accordance with the Bonding Requirements for ID/IQ provision found elsewhere in this contract. For state ID/IQ contracts in which the work order assignment doesn’t meet the threshold for bonds, the Department has the option to

MG00538 N/A G-2

use the Work Order Assignment Form or other methods for work order assignments as agreed upon by the Engineer and Contractor.

The Contractor shall be required to prosecute the work in a continuous and uninterrupted manner from the time they begin the work until completion and final acceptance of the work order.

Multiple failures of the Contractor to mobilize and begin work on the work order within the agreed upon time frame or failure to complete the work within the given time frame may result in the Contractor being excluded from future work on this contract in accordance with the

Standard Specifications.

BONDING REQUIREMENTS FOR ID/IQ:

(2-15-22) SPD 01-810

For purposes of this ID/IQ contract, the following definitions apply:

Project Agreement: A transportation improvement with a defined scope of work; a written agreement between NCDOT and the Federal Government defining the extent of construction work to be undertaken in accordance with the submitted plans, specifications and estimates.

Execution of the agreement prompts the authorization to proceed (construction funding).

Project: An undertaking issued to a contractor through a Work Order Assignment. The construction under a Project Agreement may be accomplished by one or more work order assignments, from one or more ID/IQ contracts. Note that for ID/IQ contracts this definition supersedes the definition in the Standard Specifications.

Award: The issuance of a signed Work Order Assignment by NCDOT shall constitute the notice of award of a project.

In accordance with North Carolina General Statute 44A-26, bonds are required on contracts awarded for any one project that exceeds $500,000. Beyond statutory requirements, NCDOT policy requires payment and performance bonds on all projects where the engineer’s estimate is

$450,000 or greater, all Asphalt Surface Treatment projects, and projects containing the 12-month guarantee provision. The limit for waiving bonds for all bridge replacement and major bridge rehabilitation projects (latex overlays, etc.) is $300,000 based on the engineer’s estimate.

The decision of bonding of a work order assignment below the dollar amounts listed shall be at the discretion of the Division’s evaluation of the risks associated with the project.

The need for contract payment and performance bonds will be determined at the Work Order

Assignment level. The Work Order Assignment will notify the Contractor of an award of a project and if required, to provide contract payment and performance bonds per Article 103-7 of the Standard Specifications. The Work Order Assignment replaces the Notification of Award

Letter mentioned in Article 103-4(A) of the Standard Specifications.

MOBILIZATION AND LIQUIDATED DAMAGES FOR ID/IQ:

(2-15-22) SPD 01-820

The Contractor shall mobilize to each location he is required to perform work. There will be no direct pay for Mobilization as it will be incidental to the other bid items. The only exception is if there is an Emergency Mobilization provision within the contract.

MG00538 N/A G-3

The Contractor will be provided a Work Order Assignment for each project with location(s), estimated quantities, and liquidated damages unless waived by the Engineer. Notification will be verbal followed by a faxed or emailed signed Work Order Assignment. There will be no minimum quantities for any line item associated with a particular mobilization. The Contractor shall complete the work identified on each Work Order Assignment.

The Contractor shall mobilize and complete the work within the time specified on the Work

Order Assignment. Failure to complete the work by the completion date may result in the application of liquidated damages. Liquidated damage amounts will be based on the work order estimate and the liquidated damage table below.

Work Order Value Liquidated Damages (per calendar day)

$0 - $100K $100.00

$100K - $200K $250.00

$200K - $300K $500.00

$300K - $500K $600.00

$500K - $1M $700.00

$1M - $2M $850.00

RENEWAL OF CONTRACT (CPI PRICE ADJUSTMENT) FOR ID/IQ:

(2-15-22)(Rev. 9-19-23) SPD 01-840

The Contractor shall submit a bid for one year. At the option of the Department, this contract may be extended for Two (2) additional periods of one year each (maximum (3) three years total). Each year shall have a limit of One Million Dollars ($1,000,000.00).

The compensation payable to the contractor shall be fixed for the first twelve months of this contract. However, upon an application of renewal of the contract, or thirty days prior to the end of each contract period, the renewal contract may be adjusted to reflect the adjustment in the

Consumer Price Index over the latest twelve-month period as published by the US Bureau of

Labor and Statistics at http://www.bls.gov/cpi to be applied to new work order assignments. The

Consumer Price Index for All Urban Consumers (CPI-U), US City Average, All Items, 1982-

84=100, not seasonally adjusted will be used. If the amount of the requested adjustment is more than ten percent, the Department of Transportation reserves the right to cancel this contract.

CPI adjustment values can be determined using the calculator on the NCDOT Construction website.

This price escalation method will not be applied to items of work that are separately covered under commodity price escalation clauses. No other changes in the terms, conditions, etc. of this contract will be made when an extension to the contract is implemented. The Engineer will notify the Contractor in writing 90 DAYS BEFORE THE END OF THE CONTRACT

PERIOD if the contract may be extended. The Contractor must notify the Engineer in writing

WITHIN 60 CALENDER DAYS of his acceptance or rejection of this offer. Failure on the part of the Contractor to reply will be received as a rejection of contract extension.

http://www.bls.gov/cpi

MG00538 N/A G-4

DISPUTE RESOLUTION PROCESS FOR ID/IQ:

(2-15-22)(Rev. 1-16-24) SPD 01-850

If a question should arise on the contract or assignment of a work order, the contractor should notify the Engineer noted on the assignment documentation or the Division Engineer within 48 hours after the scheduled time of bid opening or work order assignment. The following should be included in the notification if applicable:

(A) the contract for which bids were solicited;

(B) the particular law, regulation, or contract specification violated;

(C) a detailed description of the alleged violation; and

(D) any other information deemed to be relevant.

Once the initial evaluation has been completed, the contractor may be asked to attend a meeting for further discussion and clarification.

Once a determination has been made, the contractor will be notified of the decision by the

Division Engineer. If the decision does not meet the satisfaction of the contractor, they have 24 hours from the Division Engineer’s notification to elevate the dispute to the Chief Engineer. The

Chief Engineer will make the final decision and will not be subject to further review by NCDOT.

INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:

(2-20-07) 108 SP1 G14 A

The Contractor shall complete the required work of installing, maintaining, and removing the traffic control devices for lane closures and restoring traffic to the existing traffic pattern. The

Contractor shall not close or narrow a lane of traffic on INTERSTATE, US & NC during the following time restrictions:

DAY AND TIME RESTRICTIONS

MONDAY THRU FRIDAY

SUNRISE TO SUNSET

FRIDAY SUNSET UNTIL MONDAY SUNRISE

In addition, the Contractor shall not close or narrow a lane of traffic on INTERSTATE, US &

NC, detain and/or alter the traffic flow on or during holidays, holiday weekends, special events, or any other time when traffic is unusually heavy, including the following schedules:

HOLIDAY AND HOLIDAY WEEKEND LANE CLOSURE RESTRICTIONS

1. For unexpected occurrence that creates unusually high traffic volumes, as directed by the Engineer.

2. For New Year's Day, between the hours of SUNRISE December 31st and SUNSET

January 2nd. If New Year's Day is on a Friday, Saturday, Sunday or Monday, then until

SUNSET the following Tuesday.

MG00538 N/A G-5

3. For Easter, between the hours of SUNRISE Thursday and SUNSET Monday.

4. For Memorial Day, between the hours of SUNRISE Friday and SUNSET Tuesday.

5. For Independence Day, between the hours of SUNRISE the day before Independence

Day and SUNSET the day after Independence Day.

If Independence Day is on a Friday, Saturday, Sunday or Monday, then between the hours of SUNRISE the Thursday before Independence Day and SUNSET the Tuesday after Independence Day.

6. For Labor Day, between the hours of SUNRISE Friday and SUNSET Tuesday.

7. For Thanksgiving Day, between the hours of SUNRISE Tuesday and SUNSET

Monday.

8. For Christmas, between the hours of SUNRISE the Friday before the week of Christmas

Day and SUNSET the following Tuesday after the week of Christmas Day.

Holidays and holiday weekends shall include New Year's, Easter, Memorial Day, Independence

Day, Labor Day, Thanksgiving, and Christmas. The Contractor shall schedule his work so that lane closures will not be required during these periods, unless otherwise directed by the

Engineer.

The time of availability for this intermediate contract work shall be the time the Contractor begins to install all traffic control devices for lane closures according to the time restrictions listed herein.

The completion time for this intermediate contract work shall be the time the Contractor is required to complete the removal of all traffic control devices for lane closures according to the time restrictions stated above and place traffic in the existing traffic pattern.

The liquidated damages are Five Hundred Dollars ($ 500.00) per hour.

INTERMEDIATE CONTRACT TIME NUMBER 2 AND LIQUIDATED DAMAGES:

(2-20-07) 108 SP1 G14 A

The Contractor shall complete the required work of installing, maintaining, and removing the traffic control devices for lane closures and restoring traffic to the existing traffic pattern. The

Contractor shall not close or narrow a lane of traffic on SECONDARY ROAD during the following time restrictions:

DAY AND TIME RESTRICTIONS

MONDAY THRU FRIDAY

SUNRISE TO SUNSET

FRIDAY SUNSET UNTIL MONDAY SUNRISE

MG00538 N/A G-6

In addition, the Contractor shall not close or narrow a lane of traffic on SECONDARY ROAD, detain and/or alter the traffic flow on or during holidays, holiday weekends, special events, or any other time when traffic is unusually heavy, including the following schedules:

HOLIDAY AND HOLIDAY WEEKEND LANE CLOSURE RESTRICTIONS

1. For unexpected occurrence that creates unusually high traffic volumes, as directed by the Engineer.

2. For New Year's Day, between the hours of SUNRISE December 31st and SUNSET

January 2nd. If New Year's Day is on a Friday, Saturday, Sunday or Monday, then until

SUNSET the following Tuesday.

3. For Easter, between the hours of SUNRISE Thursday and SUNSET Monday.

4. For Memorial Day, between the hours of SUNRISE Friday and SUNSET Tuesday.

5. For Independence Day, between the hours of SUNRISE the day before Independence

Day and SUNSET the day after Independence Day.

If Independence Day is on a Friday, Saturday, Sunday or Monday, then between the hours of SUNRISE the Thursday before Independence Day and SUNSET the Tuesday after Independence Day.

6. For Labor Day, between the hours of SUNRISE Friday and SUNSET Tuesday.

7. For Thanksgiving Day, between the hours of SUNRISE Tuesday and SUNSET

Monday.

8. For Christmas, between the hours of SUNRISE the Friday before the week of Christmas

Day and SUNSET the following Tuesday after the week of Christmas Day.

Holidays and holiday weekends shall include New Year's, Easter, Memorial Day, Independence

Day, Labor Day, Thanksgiving, and Christmas. The Contractor shall schedule his work so that lane closures will not be required during these periods, unless otherwise directed by the

The time of availability for this intermediate contract work shall be the time the Contractor begins to install all traffic control devices for lane closures according to the time restrictions listed herein.

The completion time for this intermediate contract work shall be the time the Contractor is required to complete the removal of all traffic control devices for lane closures according to the time restrictions stated above and place traffic in the existing traffic pattern.

The liquidated damages are Two Hundred Fifty Dollars ($ 250.00) per hour.

MG00538 N/A G-7

NO MAJOR CONTRACT ITEMS:

(2-19-02) (Rev. 8-21-07) 104 SP1 G31

None of the items included in this contract will be major items.

NO SPECIALTY ITEMS:

(7-1-95)(Rev. 1-16-24) 108-6 SP1 G34

None of the items included in this contract will be specialty items (see Article 108-6 of the

Standard Specifications).

FUEL PRICE ADJUSTMENT PAPER BID:

(11-15-05)(Rev. 1-16-24) 109-8 SP1 G44

Page 1-82, Article 109-8, FUEL PRICE ADJUSTMENTS, add the following:

The base index price for DIESEL #2 FUEL is $ 5.0299 per gallon. Where any of the following are included as pay items in the contract, they will be eligible for fuel price adjustment.

The pay items and the fuel factor used in calculating adjustments to be made will be as follows:

Description Units Fuel Usage

Factor Diesel

Unclassified Excavation Gal/CY 0.29

Borrow Excavation Gal/CY 0.29

Class IV Subgrade Stabilization Gal/Ton 0.55

Aggregate Base Course Gal/Ton 0.55

Sub-Ballast Gal/Ton 0.55

Erosion Control Stone Gal/Ton 0.55

Rip Rap, Class _____ Gal/Ton 0.55

Asphalt Concrete Base Course, Type ____ Gal/Ton 0.90 or 2.90

Asphalt Concrete Intermediate Course, Type ____ Gal/Ton 0.90 or 2.90

Asphalt Concrete Surface Course, Type ____ Gal/Ton 0.90 or 2.90

Open-Graded Asphalt Friction Course Gal/Ton 0.90 or 2.90

Permeable Asphalt Drainage Course, Type ____ Gal/Ton 0.90 or 2.90

Sand Asphalt Surface Course, Type ____ Gal/Ton 0.90 or 2.90

Ultra-thin Bonded Wearing Course Gal/Ton 0.90 or 2.90

Aggregate for Cement Treated Base Course Gal/Ton 0.55

Portland Cement for Cement Treated Base Course Gal/Ton 0.55

> 11" Portland Cement Concrete Pavement Gal/SY 0.327

Concrete Shoulders Adjacent to > 11” Pavement Gal/SY 0.327

9” to 11" Portland Cement Concrete Pavement Gal/SY 0.272

Concrete Shoulders Adjacent to 9” to 11” Pavement Gal/SY 0.272

< 9” Portland Cement Concrete Pavement Gal/SY 0.245

Concrete Shoulders Adjacent to < 9” Pavement Gal/SY 0.245

For the asphalt items noted in the chart as eligible for fuel adjustments, the bidder may include the Fuel Usage Factor Adjustment Form for Paper Bid with their bid submission if they elect to

MG00538 N/A G-8

use the fuel usage factor. The Fuel Usage Factor Adjustment Form for Paper Bid is included toward the end of this paper bid document when asphalt items noted in the chart as eligible for fuel adjustments are part of the project.

Select either 2.90 Gal/Ton fuel factor or 0.90 Gal/Ton fuel factor for each asphalt line item on the Fuel Usage Factor Adjustment Form for Paper Bid. The selected fuel factor for each asphalt item will remain in effect for the duration of the contract.

Failure to complete the Fuel Usage Factor Adjustment Form for Paper Bid will result in using

2.90 gallons per ton as the Fuel Usage Factor for Diesel for the asphalt items noted above. The contractor will not be permitted to change the Fuel Usage Factor after the bids are submitted.

STEEL PRICE ADJUSTMENT:

(4-19-22)(Rev. 12-20-22) SP1 G47

Description and Purpose

Steel price adjustments will be made to the payments due the Contractor for items as defined herein that are permanently incorporated into the work, when the price of raw steel mill products utilized on the contract have fluctuated. The Department will adjust monthly progress payments up or down as appropriate for cost changes in steel according to this provision.

Eligible Items

The list of eligible bid items for steel price adjustment can be found on the Departments website at the following address:

https://connect.ncdot.gov/letting/LetCentral/Eligible%20Bid%20Items%20for%20Steel%20Price

%20Adjustment.xlsx

Nuts, bolts, anchor bolts, rebar chairs, connecting bands and other miscellaneous hardware associated with these items shall not be included in the price adjustment.

Adjustments will only be made for fluctuations in the material cost of the steel used in the above products as specified in the Product Relationship Table below. The producing mill is defined as the source of steel product before any fabrication has occurred (e.g., coil, plate, rebar, hot rolled shapes, etc.). No adjustment will be made for changes in the cost of fabrication, coating, shipping, storage, etc.

No steel price adjustments will be made for any products manufactured from steel having an adjustment date, as defined by the Product Relationship Table below, prior to the letting date.

Bid Submittal Requirements

The successful bidder, within 14 calendar days after the notice of award is received by him, shall provide the completed Form SPA-1 to the Department (State Contract Officer or Division

Contract Engineer) along with the payment bonds, performance bonds and contract execution signature sheets in a single submittal. If Form SPA-1 is not included in the same submittal as the payment bonds, performance bonds and contract execution signature sheets, the Contractor will https://connect.ncdot.gov/letting/LetCentral/Eligible%20Bid%20Items%20for%20Steel%20Price%20Adjustment.xlsx https://connect.ncdot.gov/letting/LetCentral/Eligible%20Bid%20Items%20for%20Steel%20Price%20Adjustment.xlsx

MG00538 N/A G-9

not be eligible for any steel price adjustment for any item in the contract for the life of the contract. Form SPA-1 can be found on the Department’s website at the following address:

https://connect.ncdot.gov/letting/LetCentral/Form%20SPA-1.xlsm

The Contractor shall provide Form SPA-1 listing the Contract Line Number, (with corresponding

Item Number, Item Description, and Category) for the steel products they wish to have an adjustment calculated. Only the contract items corresponding to the list of eligible item numbers for steel price adjustment may be entered on Form SPA-1. The Contractor may choose to have steel price adjustment applied to any, all, or none of the eligible items. However, the

Contractor’s selection of items for steel price adjustment or non-selection (non-participation) may not be changed once Form SPA-1 has been received by the Department. Items the Bidder chooses for steel price adjustment must be designated by writing the word “Yes” in the column titled “Option” by each Pay Item chosen for adjustment. Should the bidder elect an eligible steel price item, the entire quantity of the line item will be subject to the price adjustment for the duration of the Contract. The Bidder’s designations on Form SPA-1 must be written in ink or typed and signed by the Bidder (Prime Contractor) to be considered complete. Items not properly designated, designated with “No”, or left blank on the Bidder’s Form SPA-1 will automatically be removed from consideration for adjustment. No steel items will be eligible for steel price adjustment on this Project if the Bidder fails to return Form SPA-1 in accordance with this provision.

Establishing the Base Price

The Department will use a blend of monthly average prices as reported from the Fastmarkets platform to calculate the monthly adjustment indices (BI and MI). This data is typically available on the first day of the month for the preceding month. The indices will be calculated by the Department for the different categories found on the Product Relationship Table below. For item numbers that include multiple types of steel products, the category listed for that item number will be used for adjusting each steel component.

The bidding index for Category 1 Steel items is $ 47.50 per hundredweight.

The bidding index for Category 2 Steel items is $ 73.00 per hundredweight.

The bidding index for Category 3 Steel items is $ 81.25 per hundredweight.

The bidding index for Category 4 Steel items is $ 62.39 per hundredweight.

The bidding index for Category 5 Steel items is $ 64.31 per hundredweight.

The bidding index for Category 6 Steel items is $ 86.32 per hundredweight.

The bidding index for Category 7 Steel items is $ 50.35 per hundredweight.

The bidding index represents a selling price of steel based on Fastmarkets data for the month of

September 2026.

MI = Monthly Index. – in Dollars ($) per hundredweight (CWT). Use the adjustment indices from the month the steel was shipped from the producing mill, received on the project, or member cast as defined in the

Product Relationship Table.

BI = Bidding Index. - in Dollars ($) per hundredweight (CWT). Use the adjustment indices as listed in the proposal.

https://connect.ncdot.gov/letting/LetCentral/Form%20SPA-1.xlsm

MG00538 N/A G-10

Product Relationship Table

Steel Product (Title)

BI, MI* Adjustment Date for MI Category

Reinforcing Steel, Bridge

Deck, and SIP Forms

Based on one or more

Fastmarkets indices

Delivery Date from

Producing Mill

Structural Steel and

Encasement Pipe

Based on one or more

Fastmarkets indices

Delivery Date from

Producing Mill

Steel H-Piles, Soldier Pile

Walls

Based on one or more

Fastmarkets indices

Delivery Date from

Producing Mill

Guardrail Items and Pipe

Piles

Based on one or more

Fastmarkets indices

Material Received

Date**

Fence Items Based on one or more

Fastmarkets indices

Material Received

Date**

Overhead Sign Assembly, Signal Poles, High Mount

Standards

Based on one or more

Fastmarkets indices

Material Received

Date**

Prestressed Concrete

Members

Based on one or more

Fastmarkets indices

Cast Date of Member 7

* BI and MI are in converted units of Dollars per Hundredweight ($/CWT)

** Material Received Date is defined as the date the materials are received on the project site. If a material prepayment is made for a Category 4-6 item, the Adjustment Date to be used will be the date of the prepayment request instead of the Materials Received Date.

Submit documentation to the Engineer for all items listed in the Contract for which the

Contractor is requesting a steel price adjustment.

Submittal Requirements

The items in categories 1,2, and 3, shall be specifically stored, labeled, or tagged, recognizable by color marking, and identifiable by Project for inspection and audit verification immediately upon arrival at the fabricator.

Furnish the following documentation for all steel products to be incorporated into the work and documented on Form SPA-2, found on the Departments website at the following address:

https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-2.xlsx

Submit all documentation to the Engineer prior to incorporation of the steel into the completed work. The Department will withhold progress payments for the affected contract line item if the documentation is not provided and at the discretion of the Engineer the work is allowed to proceed. Progress payments will be made upon receipt of the delinquent documentation.

Step 1 (Form SPA -2)

Utilizing Form SPA-2, submit separate documentation packages for each line item from Form

SPA-1 for which the Contractor opted for a steel price adjustment. For line items with multiple components of steel, each component should be listed separately. Label each SPA-2 documentation package with a unique number as described below.

https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-2.xlsx

MG00538 N/A G-11

a. Documentation package number: (Insert the contract line-item) - (Insert sequential package number beginning with “1”).

Example: 412 - 1, 412 - 2, 424 – 1, 424 – 2, 424 – 3, etc.

b. The steel product quantity in pounds

i. The following sources should be used, in declining order of precedence, to determine the weight of steel/iron, based on the

Engineers decision:

1. Department established weights of steel/iron by contract pay item per pay unit;

2. Approved Shop Drawings;

3. Verified Shipping Documents;

4. Contract Plans;

5. Standard Drawing Sheets;

6. Industry Standards (i.e., AISC Manual of Steel Construction, AWWA Standards, etc.); and

7. Manufacture’s data.

ii. Any item requiring approved shop drawings shall have the weights of steel calculated and shown on the shop drawings or submitted and certified separately by the fabricator.

c. The date the steel product, subject to adjustment, was shipped from the producing mill (Categories 1-3), received on the project (Categories 4-6), or casting date (Category 7).

Step 2 (Monthly Calculator Spreadsheet)

For each month, upon the incorporation of the steel product into the work, provide the Engineer the following:

1) Completed NCDOT Steel Price Adjustment Calculator Spreadsheet, summarizing all the steel submittal packages (Form SPA-2) actually incorporated into the completed work in the given month.

a. Contract Number

b. Bidding Index Reference Month

c. Contract Completion Date or Revised Completion Date

d. County, Route, and Project TIP information

e. Item Number

f. Line-Item Description

g. Submittal Number from Form SPA-2

h. Adjustment date

i. Pounds of Steel

MG00538 N/A G-12

2) An affidavit signed by the Contractor stating the documentation provided in the

NCDOT Steel Price Adjustment Calculator Spreadsheet is true and accurate.

Price Adjustment Conditions

Download the Monthly Steel Adjustment Spreadsheet with the most current reference data from the Department’s website each month at the following address:

https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-

3%20NCDOT%20Steel%20Price%20Adjustment%20Calculator.xlsx

If the monthly Fastmarkets data is not available, the data for the most recent immediately preceding month will be used as the basis for adjustment.

Price Adjustment Calculations

The price adjustment will be determined by comparing the percentage of change in index value listed in the proposal (BI) to the monthly index value (MI). (See included sample examples).

Weights and date of shipment must be documented as required herein. The final price adjustment dollar value will be determined by multiplying this percentage increase or decrease in the index by the represented quantity of steel incorporated into the work, and the established bidding index (BI) subject to the limitations herein.

Price increase/decrease will be computed as follows:

SPA = ((MI/ BI) -1) * BI *(Q/100)

Where;

SPA = Steel price adjustment in dollars

MI = Monthly Shipping Index. – in Dollars ($) per hundredweight (CWT). Use the adjustment indices from the month the steel was shipped from the producing mill, received on the project, or member cast as defined in the

Product Relationship Table.

BI = Bidding Index. - in Dollars ($) per hundredweight (CWT). Use the adjustment indices as listed in the proposal.

Q = Quantity of steel, product, pounds actually incorporated into the work as documented by the Contractor, or Design Build Team and verified by the

Calculations for price adjustment shall be shown separate from the monthly progress estimate and will not be included in the total cost of work for determination of progress or for extension of Contract time in accordance with Subarticle 108-10(B)(1).

Any apparent attempt to unbalance bids in favor of items subject to price adjustment may result in rejection of the bid proposal.

Adjustments will be paid or charged to the Contractor only. Any Contractor receiving an adjustment under this provision shall distribute the proper proportional part of such adjustments to the subcontractor who performed the applicable work.

https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-3%20NCDOT%20Steel%20Price%20Adjustment%20Calculator.xlsx https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-3%20NCDOT%20Steel%20Price%20Adjustment%20Calculator.xlsx

MG00538 N/A G-13

Delays to the work caused by steel shortages may be justification for a Contract time extension but will not constitute grounds for claims for standby equipment, extended office overhead, or other costs associated with such delays.

If an increase in the steel material price is anticipated to exceed 50% of the original quoted price, the contractor must notify the Department within 7 days prior to purchasing the material. Upon receipt of such notification, the Department will direct the Contractor to either (1) proceed with the work or (2) suspend the work and explore the use of alternate options.

If the decrease in the steel material exceeds 50% of the original quoted price, the contractor may submit to the Department additional market index information specific to the item in question to dispute the decrease. The Department will review this information and determine if the decrease is warranted.

When the steel product adjustment date, as defined in the Product Relationship Table, is after the approved contract completion date, the steel price adjustments will be based on the lesser value of either the MI for the month of the approved contract completion date or the MI for the actual adjustment date.

If the price adjustment is based on estimated material quantities for that time, and a revision to the total material quantity is made in a subsequent or final estimate, an appropriate adjustment will be made to the price adjustment previously calculated. The adjustment will be based on the same indices used to calculate the price adjustment which is being revised. If the adjustment date of the revised material quantity cannot be determined, the adjustment for the quantity in question, will be based on the indices utilized to calculate the steel price adjustment for the last initial documentation package submission, for the steel product subject to adjustment, that was incorporated into the particular item of work, for which quantities are being finalized.

Example: Structural steel for a particular bridge was provided for in three different shipments with each having a different mill shipping date. The quantity of structural steel actually used for the bridge was calculated and a steel price adjustment was made in a progress payment. At the conclusion of the work an error was found in the plans of the final quantity of structural steel used for the bridge. The quantity to be adjusted cannot be directly related to any one of the three mill shipping dates. The steel price adjustment for the quantity in question would be calculated using the indices that were utilized to calculate the steel price adjustment for the quantity of structural steel represented by the last initial structural steel documentation package submission.

The package used will be the one with the greatest sequential number.

Extra Work/Force Account:

When steel products, as specified herein, are added to the contract as extra work, in accordance with the provisions of Article 104-7 or 104-3, the Engineer will determine and specify in the supplemental agreement, the need for application of steel price adjustments on a case-by-case basis. No steel price adjustments will be made for any products manufactured from steel having an adjustment date prior to the supplemental agreement execution date. Price adjustments will be made as provided herein, except the Bidding Index will be based on the month in which the supplemental agreement pricing was executed.

MG00538 N/A G-14

For work performed on force account basis, reimbursement of actual material costs, along with the specified overhead and profit markup, will be considered to include full compensation for the current cost of steel and no steel price adjustments will be made.

Examples Form SPA-2 Steel Price Adjustment Submission Form

Contract Number __C203394_______________ Bid Reference Month __January 2019__

Submittal Date ___8/31/2019____________

Contract Line Item ______237_______________

Line Item Description __APPROX….LBS Structural Steel______________________

Sequential Submittal

Number _________2______________

Supplier Description of material Location information Quantity in lbs.

Adjustment

Date

XYZ mill Structural Steel Structure 3, Spans A-C 1,200,000 May 4, 2020

ABC

distributing

Various channel & angle shapes

Structure 3 Spans A-C 35,000 July 14, 2020

Total Pounds of Steel 1,235,000

Note: Attach the following supporting documentation to this form.

• Bill of Lading to support the shipping dates

• Supporting information for weight documentation (e.g., Pay item reference, Shop drawings, shipping documents, Standards Sheets, industry standards, or manufacturer's data)

By providing this data under my signature, I attest to the accuracy of and validity of the data on this form and certify that no deliberate misrepresentation in any manner has occurred.

Printed Name Signature

MG00538 N/A G-15

Examples Form SPA-2

Steel Price Adjustment Submission Form

Contract Number C203394 Bid Reference Month __January 2019__

Submittal Date August 31, 2019

Contract Line Item 237

Line Item Description SUPPORT, OVRHD SIGN STR -DFEB – STA 36+00

Sequential Submittal

Number _________2______________

Supplier Description of material Location information

Quantity in lbs.

Adjustment Date

XYZ mill Tubular Steel (Vertical legs)

-DFEB – STA 36+00 12000 December 11, 2021

PDQ Mill 4” Tubular steel (Horizontal legs)

-DFEB – STA 36+00 5900 December 11, 2021

ABC

distributing

Various channel & angle shapes (see quote)

-DFEB – STA 36+00 1300 December 11, 2021

Catwalk assembly -DFEB – STA 36+00 2000 December 11, 2021

Nucor Flat plate -DFEB – STA 36+00 650 December 11, 2021

Total Pounds of Steel 21,850

Note: Attach the following supporting documentation to this form.

• Bill of Lading to support the shipping dates

• Supporting information for weight documentation (e.g., Pay item reference, Shop drawings, shipping documents, Standards Sheets, industry standards, or manufacturer's data)

By providing this data under my signature, I attest to the accuracy of and validity of the data on this form and certify that no deliberate misrepresentation in any manner has occurred.

Printed Name Signature

MG00538 N/A G-16

Price Adjustment Sample Calculation (increase)

Project bid on September 17, 2019

Line Item 635 “Structural Steel” has a plan quantity of 2,717,000 lbs.

Bidding Index for Structural Steel (Category 2) in the proposal was $36.12/CWT = BI

450,000 lbs. of Structural Steel for Structure 2 at Station 44+08.60 were shipped to fabricator from the producing mill in same month, May 2021.

Monthly Index for Structural Steel (Category 2) for May 2021 was $64.89/CWT = MI

The Steel Price Adjustment formula is as follows:

Where; SPA = Steel price adjustment in dollars

BI = Bidding Index – in dollars ($) per hundredweight (CWT). Use the adjustment indices as listed in the proposal.

MI = Mill Shipping Index – in dollars ($) per hundredweight (CWT). Use the adjustment indices from the month the steel was shipped from the producing…

This is the start of the file's text. The full file is on GovTribe.