Summary
This is a Bid Notice from the North Carolina Department of Transportation for a state-funded roadway construction project in Guilford County. The contract (DG00682, TIP No. U-5841) involves grading, paving, drainage, signals, retaining walls, and structure work on State Route 2147 (West Friendly Avenue) from East of Green Valley Road to North Lindell Road in Greensboro, covering 0.088 miles. The bid opening is scheduled for December 3, 2026, at 2:00 PM. The project requires electronic bidding through Bid Express, with questions due seven calendar days prior to bid opening directed to Jennifer Sour at jsour@ncdot.gov. Prequalification as a bidder or prime contractor is required prior to bid submission. The contract date of availability is March 15, 2027, except work in jurisdictional waters and wetlands cannot begin until a meeting between the DOT, regulatory agencies, and contractor occurs. The completion date is March 15, 2028. Multiple intermediate contract times with specific restrictions apply, including lane closure restrictions on SR 2147 and N. Lindell Road during peak hours and holidays, with a 90-day phase closure restriction that cannot occur in August during school opening weeks or in November or December. Payment and performance bonds are not required; however, a bid bond is required.
The contract includes fuel price adjustments and steel price adjustments based on market indices. The base index price for Diesel #2 Fuel is $5.1018 per gallon, with varying fuel usage factors applied to eligible pay items. Steel price adjustments are calculated using Fastmarkets data across seven categories, with bidding indices ranging from $48.63 to $91.91 per hundredweight. Contractors must submit Form SPA-1 within 14 calendar days of award notice to participate in steel price adjustments. The bid cannot exceed $5.0 million in total amount. There is no Minority Business Enterprise (MBE) or Women Business Enterprise (WBE) goal for this project. Liquidated damages are $200.00 per calendar day for the overall contract, $1,600.00 per calendar day for Intermediate Contract Time Nos. 1 and 3, $1,600.00 per hour for Intermediate Contract Time No. 2, and $500.00 per calendar day for Intermediate Contract Time No. 4. The project is subject to the 2024 Standard Specifications for Roads and Structures and includes erosion control, traffic signal installation, permanent vegetation establishment, and comprehensive traffic management requirements throughout the construction period.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DG00682 U-5841 Guilford County
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION 7
PROPOSAL
DATE AND TIME OF BID OPENING: DECEMBER 3, 2026, AT 2:00 PM
CONTRACT ID: DG00682
WBS ELEMENT NO.: 50232.3.1
FEDERAL AID NO.: STATE FUNDED
COUNTY: GUILFORD COUNTY
TIP NO.: U-5841
MILES: 0.088
ROUTE NO.: SR 2147 (W FRIENDLY AVE)
LOCATION: SR 2147 (W FRIENDLY AVE) FROM EAST OF GREEN
VALLEY ROAD TO NORTH LINDELL ROAD IN
GREENSBORO
TYPE OF WORK: GRADING, PAVING, DRAINAGE, SIGNALS, RETAINING
WALLS AND STRUCTURE
NOTICE:
ALL BIDDERS SHALL COMPLY WITH ALL APPLICABLE LAWS REGULATING THE PRACTICE
OF GENERAL CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE GENERAL STATUTES OF
NORTH CAROLINA WHICH REQUIRES THE BIDDER TO BE LICENSED BY THE N.C. LICENSING
BOARD FOR CONTRACTORS WHEN BIDDING ON ANY NON-FEDERAL AID PROJECT WHERE
THE BID IS $40,000 OR MORE, EXCEPT FOR CERTAIN SPECIALTY WORK AS DETERMINED BY
THE LICENSING BOARD. BIDDERS SHALL ALSO COMPLY WITH ALL OTHER APPLICABLE
LAWS REGULATING THE PRACTICES OF ELECTRICAL, PLUMBING, HEATING AND AIR
CONDITIONING AND REFRIGERATION CONTRACTING AS CONTAINED IN CHAPTER 87 OF THE
GENERAL STATUTES OF NORTH CAROLINA. NOTWITHSTANDING THESE LIMITATIONS ON
BIDDING, THE BIDDER WHO IS AWARDED ANY FEDERAL - AID FUNDED PROJECT SHALL
COMPLY WITH CHAPTER 87 OF THE GENERAL STATUTES OF NORTH CAROLINA FOR
LICENSING REQUIREMENTS WITHIN 60 CALENDAR DAYS OF BID OPENING.
THIS IS A ROADWAY & STRUCTURE PROJECT. BID BOND IS REQUIRED.
NAME OF BIDDER
ADDRESS OF BIDDER
PROPOSAL FOR THE CONSTRUCTION OF
CONTRACT No. DG00682 IN GUILFORD COUNTY, NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION,
RALEIGH, NORTH CAROLINA
The Bidder has carefully examined the location of the proposed work to be known as Contract
No. DG00682; has carefully examined the plans and specifications, which are acknowledged to be part of the proposal, the special provisions, the proposal, the form of contract; and thoroughly understands the stipulations, requirements and provisions. The undersigned bidder agrees to be bound upon his execution of the bid and subsequent award to him by the Department of
Transportation in accordance with this proposal. Payment and performance bonds are not required on this project. The undersigned Bidder further agrees to provide all necessary machinery, tools, labor, and other means of construction; and to do all the work and to furnish all materials, except as otherwise noted, necessary to perform and complete the said contract in accordance with the 2024 Standard Specifications for Roads and Structures by the dates(s) specified in the Project Special Provisions and in accordance with the requirements of the
Engineer, and at the unit or lump sum prices, as the case may be, for the various items given on the sheets contained herein.
The Bidder shall provide and furnish all the materials, machinery, implements, appliances and tools, and perform the work and required labor to construct and complete Contract No. DG00682 in Guilford County, for the unit or lump sum prices, as the case may be, bid by the Bidder in his bid and according to the proposal, plans, and specifications prepared by said Department, which proposal, plans, and specifications show the details covering this project, and hereby become a part of this contract.
The published volume entitled North Carolina Department of Transportation, Raleigh, Standard
Specifications for Roads and Structures, January 2024 with all amendments and supplements thereto, is by reference incorporated into and made a part of this contract; that, except as herein modified, all the construction and work included in this contract is to be done in accordance with the specifications contained in said volume, and amendments and supplements thereto, under the direction of the Engineer.
If the proposal is accepted and the award is made, the contract is valid only when signed either by the Contract Officer or such other person as may be designated by the Secretary to sign for the Department of Transportation. The conditions and provisions herein cannot be changed except over the signature of the said Contract Officer or Division Engineer.
The quantities shown in the itemized proposal for the project are considered to be approximate only and are given as the basis for comparison of bids. The Department of Transportation may increase or decrease the quantity of any item or portion of the work as may be deemed necessary or expedient.
An increase or decrease in the quantity of an item will not be regarded as sufficient ground for an increase or decrease in the unit prices, nor in the time allowed for the completion of the work, except as provided for the contract.
TABLE OF CONTENTS
COVER SHEET
PROPOSAL SHEET
PROJECT SPECIAL PROVISIONS
BIDS OVER LIMIT: ................................................................................................................ G - 1
DIVISION LET CONTRACT PREQUALIFICATION: ......................................................... G - 1
BOND REQUIREMENTS: ...................................................................................................... G - 1
HAUL ROADS: ........................................................................................................................ G - 1
CONTRACT TIME AND LIQUIDATED DAMAGES: ......................................................... G - 1
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES: ..... G - 2
INTERMEDIATE CONTRACT TIME NUMBER 2 AND LIQUIDATED DAMAGES: ..... G - 2
INTERMEDIATE CONTRACT TIME NUMBER 3 AND LIQUIDATED DAMAGES: ..... G - 4
INTERMEDIATE CONTRACT TIME NUMBER 4 AND LIQUIDATED DAMAGES: ..... G - 4
PERMANENT VEGETATION ESTABLISHMENT:............................................................. G - 4
MAJOR CONTRACT ITEMS: ................................................................................................ G - 5
SPECIALTY ITEMS: ............................................................................................................... G - 5
FUEL PRICE ADJUSTMENT: ................................................................................................ G - 5
STEEL PRICE ADJUSTMENT: .............................................................................................. G - 6
SCHEDULE OF ESTIMATED COMPLETION PROGRESS: ............................................... G-18
MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
(DIVISIONS): ........................................................................................................................... G-18
RESTRICTIONS ON ITS EQUIPMENT AND SERVICES: .................................................. G-33
USE OF UNMANNED AIRCRAFT SYSTEM (UAS): .......................................................... G-33
EQUIPMENT IDLING GUIDELINES: ................................................................................... G-34
SUBSURFACE INFORMATION: ........................................................................................... G-34
ELECTRONIC BIDDING: ....................................................................................................... G-35
OUTSOURCING OUTSIDE THE USA: ................................................................................. G-35
EROSION AND SEDIMENT CONTROL/STORMWATER CERTIFICATION: ................. G-35
PROCEDURE FOR MONITORING BORROW PIT DISCHARGE: ..................................... G-41
NOTES TO CONTRACTOR: .................................................................................................. G-42
ROADWAY ...............................................................................................................................R - 1
STANDARD SPECIAL PROVISIONS
AVAILABILITY OF FUNDS – TERMINATION OF CONTRACTS ................................SSP - 1
NCDOT GENERAL SEED SPECIFICATION FOR SEED QUALITY ..............................SSP - 1
ERRATA................................................................................................................................SSP - 4
PLANT AND PEST QUARANTINES .................................................................................SSP - 6
MINIMUM WAGES .............................................................................................................SSP - 7
TITLE VI AND NONDISCRIMINATION: .........................................................................SSP - 8
ON-THE-JOB TRAINING ....................................................................................................SSP-16
UNIT PROJECT SPECIAL PROVISIONS
GEOTECHNICAL .................................................................................................................. GT - 1
TRAFFIC CONTROL ............................................................................................................ TC - 1
UTILITY BY OTHERS ....................................................................................................... UBO - 1
EROSION CONTROL ........................................................................................................... EC - 1
TRAFFIC SIGNALS ...............................................................................................................TS - 1
STRUCTURE/CULVERTS ....................................................................................................ST - 1
PERMITS ................................................................................................................................. P - 1
SIGNATURE SHEETS AND FORMS .................................................................................. S - 1
BID/PAY ITEM SHEETS ....................................................................................................... T - 1
DOT EXECUTION SHEET .................................................................................................. U - 1
INSTRUCTIONS TO BIDDERS
PLEASE READ ALL INSTRUCTIONS CAREFULLY
BEFORE PREPARING AND SUBMITTING YOUR BID.
All bids shall be prepared and submitted in accordance with the following requirements.
Failure to comply with any requirement may cause the bid to be considered irregular and may be grounds for rejection of the bid.
For preparing and submitting the bid electronically, refer to Subarticle 102-8(B) of the Standard
Specifications.
Bidders that bid electronically on Raleigh Central-Let projects will need a separate request to bid from the approved electronic bidding website for Division Contracts.
ELECTRONIC ON-LINE BID:
1. Plans and the proposal can be found on the Connect NCDOT website.
2. In accordance with Subarticle 102-8(B)(1) of the Standard Specifications, obtain an account and valid Digital Signature to bid with Bid Express (bidx.com)
3. In accordance with Subarticle 102-8(B)(3) of the Standard Specifications, if bid bond is required and bid deposit is not chosen register bond with Surety2000 or Tinubu and submit with the online bid.
4. In accordance with Article 102-3 of the Standard Specifications, registration on the
Interested Parties List is required unless SP1 G02 Interested Parties List Not Required provision is included in the proposal.
5. Prepare and submit a bid electronically using the approved electronic bidding provider website.
6. Electronic bidding website necessary for electronic bidding can be found on the Bid Express website following the directions at: https://connect.ncdot.gov/letting/Pages/Electronic-
Bidding.aspx.
7. Questions should be emailed 7 calendar days prior to the bid opening to Jennifer Sour at jsour@ncdot.gov. Contact with any other NCDOT personnel concerning this project is strictly prohibited, unless otherwise noted, and may result in bids being considered non-responsive.
https://connect.ncdot.gov/letting/Pages/Electronic-Bidding.aspx https://connect.ncdot.gov/letting/Pages/Electronic-Bidding.aspx
DG00682 U-5841 G-1
Guilford County
PROJECT SPECIAL PROVISIONS - GENERAL
BIDS OVER LIMIT:
(08-01-16) SPD 01-400
In accordance with GS 136-28.1(b), if the total bid amount of the contract exceeds $5.0 million, the bid will not be considered for award.
DIVISION LET CONTRACT PREQUALIFICATION:
(07-01-14)(12-1-16) SPD 01-410
Any firm that wishes to bid as a prime contractor shall be prequalified as a Bidder or PO Prime
Contractor prior to submitting a bid. Information regarding prequalification can be found at:
https://connect.ncdot.gov/business/Prequal/Pages/default.aspx.
Prior to performing the work, the prime contractor and/or subcontractor(s) shall be prequalified in the work code(s) which are identified as work items in the prime contractor’s construction progress schedule that they will complete themselves. Any contractor identified as working outside their expertise may be considered in default of contract.
BOND REQUIREMENTS:
(6-1-16)(Rev.1-16-24) 102-8, 102-10 SPD 01-420A
A Bid Bond is required in accordance with Article 102-10 of the Standard Specifications for
Roads and Structures.
Contract Payment and Performance Bonds are required in accordance with Article 103-7 of the
Standard Specifications.
HAUL ROADS:
(7-16-24) 105 SP1 G04
Revise the Standard Specifications as follows:
Page 1-45, Article 105-15 RESTRICTION OF LOAD LIMITS, line 31, add the following after second sentence of the second paragraph:
At least 30 days prior to use, the Contractor shall notify the Engineer of any public road proposed for use as a haul road for the project.
CONTRACT TIME AND LIQUIDATED DAMAGES:
(8-15-00) (Rev. 5-16-23) 108 SP1 G08 A
The date of availability for this contract is March 15, 2027, except that work in jurisdictional waters and wetlands shall not begin until a meeting between the DOT, Regulatory Agencies, and the Contractor is held as stipulated in the permits contained elsewhere in this proposal. This delay in availability has been considered in determining the contract time for this project.
The completion date for this contract is March 15, 2028.
https://connect.ncdot.gov/business/Prequal/Pages/default.aspx
DG00682 U-5841 G-2
Except where otherwise provided by the contract, observation periods required by the contract will not be a part of the work to be completed by the completion date and/or intermediate contract times stated in the contract. The acceptable completion of the observation periods that extend beyond the final completion date shall be a part of the work covered by the performance and payment bonds.
The liquidated damages for this contract are Two Hundred Dollars ($ 200.00) per calendar day.
These liquidated damages will not be cumulative with any liquidated damages which may become chargeable under Intermediate Contract Time Number 1.
INTERMEDIATE CONTRACT TIME NUMBER 1 AND LIQUIDATED DAMAGES:
(7-1-95) (Rev. 2-21-12) 108 SP1 G13 A
Except for that work required under the Project Special Provisions entitled Planting, Reforestation and/or Permanent Vegetation Establishment, included elsewhere in this proposal, the Contractor will be required to complete all work included in this contract and shall place and maintain traffic on same.
The date of availability for this intermediate contract time is March 15, 2027.
The completion date for this intermediate contract time is September 15, 2027.
The liquidated damages for this intermediate contract time are One Thousand Six Hundred
Dollars ($ 1,600.00) per calendar day.
Upon apparent completion of all the work required to be completed by this intermediate date, a final inspection will be held in accordance with Article 105-17 and upon acceptance, the
Department will assume responsibility for the maintenance of all work except Planting, Reforestation and/or Permanent Vegetation Establishment. The Contractor will be responsible for and shall make corrections of all damages to the completed roadway caused by his planting operations, whether occurring prior to or after placing traffic through the project.
INTERMEDIATE CONTRACT TIME NUMBER 2 AND LIQUIDATED DAMAGES:
(2-20-07) 108 SP1 G14 A
The Contractor shall complete the required work of installing, maintaining, and removing the traffic control devices for lane closures and restoring traffic to the existing traffic pattern. The
Contractor shall not close or narrow a lane of traffic on SR 2147 (W. FRIENDLY AVE) AND
N. LINDELL RD during the following time restrictions:
DAY AND TIME RESTRICTIONS
MONDAY THRU FRIDAY
6:00 AM TO 9:00 AM
AND
4:00 PM TO 6:00 PM
SUNDAY 7:30 AM TO 12:30 PM
DG00682 U-5841 G-3
In addition, the Contractor shall not close or narrow a lane of traffic on SR 2147 (W.
FRIENDLY AVE) AND N. LINDELL RD, detain and/or alter the traffic flow on or during holidays, holiday weekends, special events, or any other time when traffic is unusually heavy, including the following schedules:
HOLIDAY AND HOLIDAY WEEKEND LANE CLOSURE RESTRICTIONS
1. For unexpected occurrence that creates unusually high traffic volumes, as directed by the Engineer.
2. For New Year's Day, between the hours of 6:00 AM December 31st and 6:00 PM
January 2nd. If New Year's Day is on a Friday, Saturday, Sunday or Monday, then until
6:00 PM the following Tuesday.
3. For Easter, between the hours of 6:00 AM Thursday and 6:00 PM Monday.
4. For Memorial Day, between the hours of 6:00 AM Friday and 6:00 PM Tuesday.
5. For Independence Day, between the hours of 6:00 AM the day before Independence
Day and 6:00 PM the day after Independence Day.
If Independence Day is on a Friday, Saturday, Sunday or Monday, then between the hours of 6:00 AM the Thursday before Independence Day and 6:00 PM the Tuesday after Independence Day.
6. For Labor Day, between the hours of 6:00 AM Friday and 6:00 PM Tuesday.
7. For Thanksgiving Day, between the hours of 6:00 AM Tuesday and 6:00 PM Monday.
8. For Christmas, between the hours of 6:00 AM the Friday before the week of Christmas
Day and 6:00 PM the following Tuesday after the week of Christmas Day.
Holidays and holiday weekends shall include New Year's, Easter, Memorial Day, Independence
Day, Labor Day, Thanksgiving, and Christmas. The Contractor shall schedule his work so that lane closures will not be required during these periods, unless otherwise directed by the
Engineer.
The time of availability for this intermediate contract work shall be the time the Contractor begins to install all traffic control devices for lane closures according to the time restrictions listed herein.
The completion time for this intermediate contract work shall be the time the Contractor is required to complete the removal of all traffic control devices for lane closures according to the time restrictions stated above and place traffic in the existing traffic pattern.
The liquidated damages are One Thousand Six Hundred Dollars ($ 1,600.00) per hour.
DG00682 U-5841 G-4
INTERMEDIATE CONTRACT TIME NUMBER 3 AND LIQUIDATED DAMAGES:
(2-20-07) (Rev. 6-18-13) 108 SP1 G14 H
The Contractor shall complete the work required of PHASE I, STEP 2 as shown on Sheet(s)
TMP-5 and shall place and maintain traffic on same.
The date of availability for this intermediate contract time is the date the Contractor elects to begin the work.
The completion date for this intermediate contract time is the date which is Ninety (90) consecutive calendar days after and including the date the Contractor begins this work. This closure shall not occur in August during the weeks of August 23rd and August 27th when
Greensboro Schools open or the months of November or December.
The liquidated damages are One Thousand Six Hundred Dollars ($ 1,600.00) per calendar day.
INTERMEDIATE CONTRACT TIME NUMBER 4 AND LIQUIDATED DAMAGES:
(5-21-13) 108 SP1 G14 I
The Contractor shall complete the work required of installing each new inductive loop after the removal of each existing loop by the milling, patching or resurfacing operations and shall place and maintain traffic on same.
The date of availability for this intermediate contract time for each inductive loop installation will be the date when the Contractor elects to disturb the existing inductive loop.
The completion date for this intermediate contract time for each inductive loop installation will be the date which is seven (7) consecutive calendar days after the date of availability.
The liquidated damages are Five Hundred Dollars ($ 500.00) per calendar day.
PERMANENT VEGETATION ESTABLISHMENT:
(2-16-12)(Rev. 1-16-24) 104 SP1 G16
Establish a permanent stand of the vegetation mixture shown in the contract. During the period between initial vegetation planting and final project acceptance, perform all work necessary to establish permanent vegetation on all erodible areas within the project limits, as well as, in borrow and waste pits. This work shall include erosion control device maintenance and installation, repair seeding and mulching, supplemental seeding and mulching, mowing, and fertilizer topdressing, as directed. All work shall be performed in accordance with the applicable section of the Standard Specifications. All work required for initial vegetation planting shall be performed as a part of the work necessary for the completion and acceptance of the Intermediate Contract Time (ICT). Between the time of ICT and Final Project acceptance, or otherwise referred to as the vegetation establishment period, the Department will be responsible for preparing the required National Pollutant Discharge Elimination System
(NPDES) inspection records.
Once the Engineer has determined that the permanent vegetation establishment requirement has been achieved at an 80% vegetation density (the amount of established vegetation per given area to stabilize the soil) and no erodible areas exist within the project limits, the Contractor will be
DG00682 U-5841 G-5
notified to remove the remaining erosion control devices that are no longer needed.
The Contractor will be responsible for, and shall correct any areas disturbed by operations performed in permanent vegetation establishment and the removal of temporary erosion control measures, whether occurring prior to or after placing traffic on the project.
Payment for Response for Erosion Control, Seeding and Mulching, Repair Seeding, Supplemental Seeding, Mowing, Fertilizer Topdressing, Silt Excavation, and Stone for Erosion
Control will be made at contract unit prices for the affected items. Work required that is not represented by contract line items will be paid in accordance with Articles 104-7 or 104-3 of the
Standard Specifications. No additional compensation will be made for maintenance and removal of temporary erosion control items.
MAJOR CONTRACT ITEMS:
(2-19-02)(Rev. 1-16-24) 104 SP1 G28
The following listed items are the major contract items for this contract (see Article 104-5 of the
Standard Specifications):
Line # Description
135 CLASS A CONCRETE (CULVERT)
SPECIALTY ITEMS:
(7-1-95)(Rev. 1-16-24) 108-6 SP1 G37
Items listed below will be the specialty items for this contract (see Article 108-6 of the
Standard Specifications).
Line # Description
33 - 37 GUARDRAIL
41 - 46, 69 SIGNING
57 - 68 LONG-LIFE PAVEMENT MARKINGS
70 - 93 EROSION CONTROL
94 - 131 SIGNALS/ITS SYSTEM
FUEL PRICE ADJUSTMENT:
(11-15-05)(Rev. 1-16-24) 109-8 SP1 G43
Page 1-82, Article 109-8, FUEL PRICE ADJUSTMENTS, add the following:
The base index price for DIESEL #2 FUEL is $ 5.1018 per gallon. Where any of the following are included as pay items in the contract, they will be eligible for fuel price adjustment.
The pay items and the fuel factor used in calculating adjustments to be made will be as follows:
Description Units Fuel Usage
Factor Diesel
Unclassified Excavation Gal/CY 0.29
Borrow Excavation Gal/CY 0.29
Class IV Subgrade Stabilization Gal/Ton 0.55
DG00682 U-5841 G-6
Description Units Fuel Usage
Factor Diesel
Aggregate Base Course Gal/Ton 0.55
Sub-Ballast Gal/Ton 0.55
Erosion Control Stone Gal/Ton 0.55
Rip Rap, Class _____ Gal/Ton 0.55
Asphalt Concrete Base Course, Type ____ Gal/Ton 0.90 or 2.90
Asphalt Concrete Intermediate Course, Type ____ Gal/Ton 0.90 or 2.90
Asphalt Concrete Surface Course, Type ____ Gal/Ton 0.90 or 2.90
Open-Graded Asphalt Friction Course Gal/Ton 0.90 or 2.90
Permeable Asphalt Drainage Course, Type ____ Gal/Ton 0.90 or 2.90
Sand Asphalt Surface Course, Type ____ Gal/Ton 0.90 or 2.90
Ultra-thin Bonded Wearing Course Gal/Ton 0.90 or 2.90
Aggregate for Cement Treated Base Course Gal/Ton 0.55
Portland Cement for Cement Treated Base Course Gal/Ton 0.55
> 11" Portland Cement Concrete Pavement Gal/SY 0.327
Concrete Shoulders Adjacent to > 11” Pavement Gal/SY 0.327
9” to 11" Portland Cement Concrete Pavement Gal/SY 0.272
Concrete Shoulders Adjacent to 9” to 11” Pavement Gal/SY 0.272
< 9” Portland Cement Concrete Pavement Gal/SY 0.245
Concrete Shoulders Adjacent to < 9” Pavement Gal/SY 0.245
For the asphalt items noted in the chart as eligible for fuel adjustments, the bidder may include the Fuel Usage Factor Adjustment Form with their bid submission if they elect to use the fuel usage factor. The Fuel Usage Factor Adjustment Form is found at the following link:
https://connect.ncdot.gov/letting/LetCentral/Fuel%20Usage%20Factor%20Adjustment%20Form
%20-%20%20Starting%20Nov%202022%20Lettings.pdf
Select either 2.90 Gal/Ton fuel factor or 0.90 Gal/Ton fuel factor for each asphalt line item on the Fuel Usage Factor Adjustment Form. The selected fuel factor for each asphalt item will remain in effect for the duration of the contract.
Failure to complete the Fuel Usage Factor Adjustment Form will result in using 2.90 gallons per ton as the Fuel Usage Factor for Diesel for the asphalt items noted above. The contractor will not be permitted to change the Fuel Usage Factor after the bids are submitted.
STEEL PRICE ADJUSTMENT:
(4-19-22)(Rev. 12-20-22) SP1 G47
Description and Purpose
Steel price adjustments will be made to the payments due the Contractor for items as defined herein that are permanently incorporated into the work, when the price of raw steel mill products utilized on the contract have fluctuated. The Department will adjust monthly progress payments up or down as appropriate for cost changes in steel according to this provision.
https://connect.ncdot.gov/letting/LetCentral/Fuel%20Usage%20Factor%20Adjustment%20Form%20-%20%20Starting%20Nov%202022%20Lettings.pdf https://connect.ncdot.gov/letting/LetCentral/Fuel%20Usage%20Factor%20Adjustment%20Form%20-%20%20Starting%20Nov%202022%20Lettings.pdf
DG00682 U-5841 G-7
Eligible Items
The list of eligible bid items for steel price adjustment can be found on the Departments website at the following address:
https://connect.ncdot.gov/letting/LetCentral/Eligible%20Bid%20Items%20for%20Steel%20Price
%20Adjustment.xlsx
Nuts, bolts, anchor bolts, rebar chairs, connecting bands and other miscellaneous hardware associated with these items shall not be included in the price adjustment.
Adjustments will only be made for fluctuations in the material cost of the steel used in the above products as specified in the Product Relationship Table below. The producing mill is defined as the source of steel product before any fabrication has occurred (e.g., coil, plate, rebar, hot rolled shapes, etc.). No adjustment will be made for changes in the cost of fabrication, coating, shipping, storage, etc.
No steel price adjustments will be made for any products manufactured from steel having an adjustment date, as defined by the Product Relationship Table below, prior to the letting date.
Bid Submittal Requirements
The successful bidder, within 14 calendar days after the notice of award is received by him, shall provide the completed Form SPA-1 to the Department (State Contract Officer or Division
Contract Engineer) along with the payment bonds, performance bonds and contract execution signature sheets in a single submittal. If Form SPA-1 is not included in the same submittal as the payment bonds, performance bonds and contract execution signature sheets, the Contractor will not be eligible for any steel price adjustment for any item in the contract for the life of the contract. Form SPA-1 can be found on the Department’s website at the following address:
https://connect.ncdot.gov/letting/LetCentral/Form%20SPA-1.xlsm
The Contractor shall provide Form SPA-1 listing the Contract Line Number, (with corresponding
Item Number, Item Description, and Category) for the steel products they wish to have an adjustment calculated. Only the contract items corresponding to the list of eligible item numbers for steel price adjustment may be entered on Form SPA-1. The Contractor may choose to have steel price adjustment applied to any, all, or none of the eligible items. However, the
Contractor’s selection of items for steel price adjustment or non-selection (non-participation) may not be changed once Form SPA-1 has been received by the Department. Items the Bidder chooses for steel price adjustment must be designated by writing the word “Yes” in the column titled “Option” by each Pay Item chosen for adjustment. Should the bidder elect an eligible steel price item, the entire quantity of the line item will be subject to the price adjustment for the duration of the Contract. The Bidder’s designations on Form SPA-1 must be written in ink or typed and signed by the Bidder (Prime Contractor) to be considered complete. Items not properly designated, designated with “No”, or left blank on the Bidder’s Form SPA-1 will automatically be removed from consideration for adjustment. No steel items will be eligible for steel price adjustment on this Project if the Bidder fails to return Form SPA-1 in accordance with this provision.
https://connect.ncdot.gov/letting/LetCentral/Eligible%20Bid%20Items%20for%20Steel%20Price%20Adjustment.xlsx https://connect.ncdot.gov/letting/LetCentral/Eligible%20Bid%20Items%20for%20Steel%20Price%20Adjustment.xlsx https://connect.ncdot.gov/letting/LetCentral/Form%20SPA-1.xlsm
DG00682 U-5841 G-8
Establishing the Base Price
The Department will use a blend of monthly average prices as reported from the Fastmarkets platform to calculate the monthly adjustment indices (BI and MI). This data is typically available on the first day of the month for the preceding month. The indices will be calculated by the Department for the different categories found on the Product Relationship Table below. For item numbers that include multiple types of steel products, the category listed for that item number will be used for adjusting each steel component.
The bidding index for Category 1 Steel items is $ 48.63 per hundredweight.
The bidding index for Category 2 Steel items is $ 76.54 per hundredweight.
The bidding index for Category 3 Steel items is $ 83.61 per hundredweight.
The bidding index for Category 4 Steel items is $ 64.56 per hundredweight.
The bidding index for Category 5 Steel items is $ 65.81 per hundredweight.
The bidding index for Category 6 Steel items is $ 91.91 per hundredweight.
The bidding index for Category 7 Steel items is $ 51.59 per hundredweight.
The bidding index represents a selling price of steel based on Fastmarkets data for the month of
October 2026.
MI = Monthly Index. – in Dollars ($) per hundredweight (CWT). Use the adjustment indices from the month the steel was shipped from the producing mill, received on the project, or member cast as defined in the
Product Relationship Table.
BI = Bidding Index. - in Dollars ($) per hundredweight (CWT). Use the adjustment indices as listed in the proposal.
Product Relationship Table
Steel Product (Title)
BI, MI* Adjustment Date for MI Category
Reinforcing Steel, Bridge
Deck, and SIP Forms
Based on one or more
Fastmarkets indices
Delivery Date from
Producing Mill
Structural Steel and
Encasement Pipe
Based on one or more
Fastmarkets indices
Delivery Date from
Producing Mill
Steel H-Piles, Soldier Pile
Walls
Based on one or more
Fastmarkets indices
Delivery Date from
Producing Mill
Guardrail Items and Pipe
Piles
Based on one or more
Fastmarkets indices
Material Received
Date**
Fence Items Based on one or more
Fastmarkets indices
Material Received
Date**
Overhead Sign Assembly, Signal Poles, High Mount
Standards
Based on one or more
Fastmarkets indices
Material Received
Date**
Prestressed Concrete
Members
Based on one or more
Fastmarkets indices
Cast Date of Member 7
* BI and MI are in converted units of Dollars per Hundredweight ($/CWT)
DG00682 U-5841 G-9
** Material Received Date is defined as the date the materials are received on the project site. If a material prepayment is made for a Category 4-6 item, the Adjustment Date to be used will be the date of the prepayment request instead of the Materials Received Date.
Submit documentation to the Engineer for all items listed in the Contract for which the
Contractor is requesting a steel price adjustment.
Submittal Requirements
The items in categories 1,2, and 3, shall be specifically stored, labeled, or tagged, recognizable by color marking, and identifiable by Project for inspection and audit verification immediately upon arrival at the fabricator.
Furnish the following documentation for all steel products to be incorporated into the work and documented on Form SPA-2, found on the Departments website at the following address:
https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-2.xlsx
Submit all documentation to the Engineer prior to incorporation of the steel into the completed work. The Department will withhold progress payments for the affected contract line item if the documentation is not provided and at the discretion of the Engineer the work is allowed to proceed. Progress payments will be made upon receipt of the delinquent documentation.
Step 1 (Form SPA -2)
Utilizing Form SPA-2, submit separate documentation packages for each line item from Form
SPA-1 for which the Contractor opted for a steel price adjustment. For line items with multiple components of steel, each component should be listed separately. Label each SPA-2 documentation package with a unique number as described below.
a. Documentation package number: (Insert the contract line-item) - (Insert sequential package number beginning with “1”).
Example: 412 - 1, 412 - 2, 424 – 1, 424 – 2, 424 – 3, etc.
b. The steel product quantity in pounds
i. The following sources should be used, in declining order of precedence, to determine the weight of steel/iron, based on the
Engineers decision:
1. Department established weights of steel/iron by contract pay item per pay unit;
2. Approved Shop Drawings;
3. Verified Shipping Documents;
4. Contract Plans;
5. Standard Drawing Sheets;
https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-2.xlsx
DG00682 U-5841 G-10
6. Industry Standards (i.e., AISC Manual of Steel Construction, AWWA Standards, etc.); and
7. Manufacture’s data.
ii. Any item requiring approved shop drawings shall have the weights of steel calculated and shown on the shop drawings or submitted and certified separately by the fabricator.
c. The date the steel product, subject to adjustment, was shipped from the producing mill (Categories 1-3), received on the project (Categories 4-6), or casting date (Category 7).
Step 2 (Monthly Calculator Spreadsheet)
For each month, upon the incorporation of the steel product into the work, provide the Engineer the following:
1) Completed NCDOT Steel Price Adjustment Calculator Spreadsheet, summarizing all the steel submittal packages (Form SPA-2) actually incorporated into the completed work in the given month.
a. Contract Number
b. Bidding Index Reference Month
c. Contract Completion Date or Revised Completion Date
d. County, Route, and Project TIP information
e. Item Number
f. Line-Item Description
g. Submittal Number from Form SPA-2
h. Adjustment date
i. Pounds of Steel
2) An affidavit signed by the Contractor stating the documentation provided in the
NCDOT Steel Price Adjustment Calculator Spreadsheet is true and accurate.
Price Adjustment Conditions
Download the Monthly Steel Adjustment Spreadsheet with the most current reference data from the Department’s website each month at the following address:
https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-
3%20NCDOT%20Steel%20Price%20Adjustment%20Calculator.xlsx
If the monthly Fastmarkets data is not available, the data for the most recent immediately preceding month will be used as the basis for adjustment.
Price Adjustment Calculations
The price adjustment will be determined by comparing the percentage of change in index value listed in the proposal (BI) to the monthly index value (MI). (See included sample examples).
Weights and date of shipment must be documented as required herein. The final price adjustment dollar value will be determined by multiplying this percentage increase or decrease in https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-3%20NCDOT%20Steel%20Price%20Adjustment%20Calculator.xlsx https://connect.ncdot.gov/projects/construction/Construction%20Forms/Form%20SPA-3%20NCDOT%20Steel%20Price%20Adjustment%20Calculator.xlsx
DG00682 U-5841 G-11
the index by the represented quantity of steel incorporated into the work, and the established bidding index (BI) subject to the limitations herein.
Price increase/decrease will be computed as follows:
SPA = ((MI/ BI) -1) * BI *(Q/100)
Where;
SPA = Steel price adjustment in dollars
MI = Monthly Shipping Index. – in Dollars ($) per hundredweight (CWT). Use the adjustment indices from the month the steel was shipped from the producing mill, received on the project, or member cast as defined in the
Product Relationship Table.
BI = Bidding Index. - in Dollars ($) per hundredweight (CWT). Use the adjustment indices as listed in the proposal.
Q = Quantity of steel, product, pounds actually incorporated into the work as documented by the Contractor, or Design Build Team and verified by the
Calculations for price adjustment shall be shown separate from the monthly progress estimate and will not be included in the total cost of work for determination of progress or for extension of Contract time in accordance with Subarticle 108-10(B)(1).
Any apparent attempt to unbalance bids in favor of items subject to price adjustment may result in rejection of the bid proposal.
Adjustments will be paid or charged to the Contractor only. Any Contractor receiving an adjustment under this provision shall distribute the proper proportional part of such adjustments to the subcontractor who performed the applicable work.
Delays to the work caused by steel shortages may be justification for a Contract time extension but will not constitute grounds for claims for standby equipment, extended office overhead, or other costs associated with such delays.
If an increase in the steel material price is anticipated to exceed 50% of the original quoted price, the contractor must notify the Department within 7 days prior to purchasing the material. Upon receipt of such notification, the Department will direct the Contractor to either (1) proceed with the work or (2) suspend the work and explore the use of alternate options.
If the decrease in the steel material exceeds 50% of the original quoted price, the contractor may submit to the Department additional market index information specific to the item in question to dispute the decrease. The Department will review this information and determine if the decrease is warranted.
When the steel product adjustment date, as defined in the Product Relationship Table, is after the approved contract completion date, the steel price adjustments will be based on the lesser value of either the MI for the month of the approved contract completion date or the MI for the actual adjustment date.
DG00682 U-5841 G-12
If the price adjustment is based on estimated material quantities for that time, and a revision to the total material quantity is made in a subsequent or final estimate, an appropriate adjustment will be made to the price adjustment previously calculated. The adjustment will be based on the same indices used to calculate the price adjustment which is being revised. If the adjustment date of the revised material quantity cannot be determined, the adjustment for the quantity in question, will be based on the indices utilized to calculate the steel price adjustment for the last initial documentation package submission, for the steel product subject to adjustment, that was incorporated into the particular item of work, for which quantities are being finalized.
Example: Structural steel for a particular bridge was provided for in three different shipments with each having a different mill shipping date. The quantity of structural steel actually used for the bridge was calculated and a steel price adjustment was made in a progress payment. At the conclusion of the work an error was found in the plans of the final quantity of structural steel used for the bridge. The quantity to be adjusted cannot be directly related to any one of the three mill shipping dates. The steel price adjustment for the quantity in question would be calculated using the indices that were utilized to calculate the steel price adjustment for the quantity of structural steel represented by the last initial structural steel documentation package submission.
The package used will be the one with the greatest sequential number.
Extra Work/Force Account:
When steel products, as specified herein, are added to the contract as extra work, in accordance with the provisions of Article 104-7 or 104-3, the Engineer will determine and specify in the supplemental agreement, the need for application of steel price adjustments on a case-by-case basis. No steel price adjustments will be made for any products manufactured from steel having an adjustment date prior to the supplemental agreement execution date. Price adjustments will be made as provided herein, except the Bidding Index will be based on the month in which the supplemental agreement pricing was executed.
For work performed on force account basis, reimbursement of actual material costs, along with the specified overhead and profit markup, will be considered to include full compensation for the current cost of steel and no steel price adjustments will be made.
DG00682 U-5841 G-13
Examples Form SPA-2
Steel Price Adjustment Submission Form
Contract Number __C203394_______________ Bid Reference Month __January 2019__
Submittal Date ___8/31/2019____________
Contract Line Item ______237_______________
Line Item Description __APPROX….LBS Structural Steel______________________
Sequential Submittal
Number _________2______________
Supplier Description of material Location information Quantity in lbs.
Adjustment
Date
XYZ mill Structural Steel Structure 3, Spans A-C 1,200,000 May 4, 2020
ABC
distributing
Various channel & angle shapes
Structure 3 Spans A-C 35,000 July 14, 2020
Total Pounds of Steel 1,235,000
Note: Attach the following supporting documentation to this form.
• Bill of Lading to support the shipping dates
• Supporting information for weight documentation (e.g., Pay item reference, Shop drawings, shipping documents, Standards Sheets, industry standards, or manufacturer's data)
By providing this data under my signature, I attest to the accuracy of and validity of the data on this form and certify that no deliberate misrepresentation in any manner has occurred.
Printed Name Signature
DG00682 U-5841 G-14
Examples Form SPA-2
Steel Price Adjustment Submission Form
Contract Number C203394 Bid Reference Month __January 2019__
Submittal Date August 31, 2019
Contract Line Item 237
Line Item Description SUPPORT, OVRHD SIGN STR -DFEB – STA 36+00
Sequential Submittal
Number _________2______________
Supplier Description of material Location information
Quantity in lbs.
Adjustment Date
XYZ mill Tubular Steel (Vertical legs)
-DFEB – STA 36+00 12000 December 11, 2021
PDQ Mill 4” Tubular steel (Horizontal legs)
-DFEB – STA 36+00 5900 December 11, 2021
ABC
distributing
Various channel & angle shapes (see quote)
-DFEB – STA 36+00 1300 December 11, 2021
Catwalk assembly -DFEB – STA 36+00 2000 December 11, 2021
Nucor Flat plate -DFEB – STA 36+00 650 December 11, 2021
Total Pounds of Steel 21,850
Note: Attach the following supporting documentation to this form.
• Bill of Lading to support the shipping dates
• Supporting information for weight documentation (e.g., Pay item reference, Shop drawings, shipping documents, Standards Sheets, industry standards, or manufacturer's data)
By providing this data under my signature, I attest to the accuracy of and validity of the data on this form and certify that no deliberate misrepresentation in any manner has occurred.
Printed Name Signature
DG00682 U-5841 G-15
Price Adjustment Sample Calculation (increase)
Project bid on September 17, 2019
Line Item 635 “Structural Steel” has a plan quantity of 2,717,000 lbs.
Bidding Index for Structural Steel (Category 2) in the proposal was $36.12/CWT = BI
450,000 lbs. of Structural Steel for Structure 2 at Station 44+08.60 were shipped to fabricator from the producing mill in same month, May 2021.
Monthly Index for Structural Steel (Category 2) for May 2021 was $64.89/CWT = MI
The Steel Price Adjustment formula is as follows:
Where; SPA = Steel price adjustment in dollars
BI = Bidding Index – in dollars ($) per hundredweight (CWT). Use the adjustment indices as listed in the proposal.
MI = Mill Shipping Index – in dollars ($) per hundredweight (CWT). Use the adjustment indices from the month the steel was shipped from the producing mill, received on the project, or member cast as defined in the Product
Relationship Table.
Q = Quantity of steel product, in pounds (lbs.) actually incorporated into the work as
BI = $36.12/ CWT
MI = $64.89 / CWT
% change = ((MI/ BI)-1) = ($64.89 / $36.12 – 1) = (1.79651 – 1) = 0.79651162791
Q = 450,000 lbs.
SPA = 0.79651162791x $36.12 x (450,000/100)
SPA = 0.79651162791* $36.12 *4,500
SPA = $129,465 pay adjustment to Contractor for Structural Steel (Structure 2 at Station 44+08.60)
DG00682 U-5841 G-16
Price Adjustment Sample Calculation (decrease)
Project bid on December 18, 2018
Line Item 635 Structural Steel has a plan quantity of 2,717,000 lbs.
Bidding Index for Structural Steel (Category 2) in the proposal was $46.72/CWT = BI
600,000 lbs. of Structural Steel for Structure 1 at Station 22+57.68 were shipped to fabricator from the producing mill in same month, August 2020.
Monthly Index for Structural Steel (Category 2) for August 2020 was $27.03/CWT = MI
BI = $46.72/ CWT
MI = $27.03 / CWT
% change = ((MI/ BI)-1) = ($27.03/ $46.72–1) = (0.57855–1) = -0.421446917808
Q = 600,000 lbs.
SPA = -0.421446917808 * $46.72 * (600,000/100)
SPA = -0.421446917808 * $46.72 *6,000
SPA = $ 118,140.00 Credit to the Department for Structural Steel (Structure 1 at Station 22+57.68)
DG00682 U-5841 G-17
Price Adjustment Sample Calculation (increase)
Project bid on July 16, 2020
Line Item 614 Reinforced Concrete Deck Slab has a plan quantity of 241974 lbs.
Bidding Index Reference Month was May 2020. Bidding Index for Reinforced Concrete Deck Slab
(Category 1) in the proposal was $29.21/CWT = BI
51,621 lbs. of reinforcing steel and 52,311 lbs. of epoxy coated reinforcing steel for Structure 2 at Station
107+45.55 -L- was shipped to fabricator from the producing mill in same month, May 2021.
Monthly Index for Reinforced Concrete Deck Slab (Category 1) for May 2021 was $43.13/CWT = MI
BI = $29.21/ CWT
MI = $43.13 / CWT
% change = ((MI/ BI)-1) = ($43.13 / $29.21 – 1) = (1.47655 – 1) = 0.47654912701
Q = 103932 lbs.
SPA = 0. 47654912701 * $29.21 * (103,932/100)
SPA = 0. 47654912701 * $29.21 *1,039.32
SPA = $14,467.33 Pay Adjustment to Contractor for Reinforced Concrete Deck Slab (Category 1) at
Station 107+45.55 -L-
DG00682 U-5841 G-18
SCHEDULE OF ESTIMATED COMPLETION PROGRESS:
(7-15-08)(Rev. 6-16-26) 108-2 SP1 G58
The Contractor's attention is directed to the Standard Special Provision entitled Availability of
Funds Termination of Contracts included elsewhere in this proposal. The Department of
Transportation's schedule of estimated completion progress for this project as required by that
Standard Special Provision is as follows:
The Contractor shall also furnish his own progress schedule in accordance with Article 108-2 of the Standard Specifications. Any acceleration of the progress as shown by the Contractor's progress schedule over the progress as shown above shall be subject to the approval of the
MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
(DIVISIONS):
(10-16-07)(Rev. 10-21-25) 102-15(J) SP1 G67
Description
The purpose of this Special Provision is to carry out the North Carolina Department of
Transportation’s policy of ensuring nondiscrimination in the award and administration of contracts financed in whole or in part with State funds.
Definitions
Additional MBE/WBE Subcontractors - Any MBE/WBE submitted at the time of bid that will not be used to meet the Combined MBE/WBE goal. No submittal of a Letter of Intent is required.
Combined MBE/WBE Goal: A portion of the total contract, expressed as a percentage that is to be performed by committed MBE/WBE subcontractors.
Committed MBE/WBE Subcontractor - Any MBE/WBE submitted at the time of bid that is being used to meet the Combined MBE / WBE goal by submission of a Letter of Intent. Or any MBE or WBE used as a replacement for a previously committed MBE or WBE firm.
Contract Goal Requirement - The approved participation at time of award, but not greater than the advertised Combined MBE/WBE contract goal.
Goal Confirmation Letter - Written documentation from the Department to the bidder confirming the Contractor's approved, committed participation along with a listing of the committed MBE and WBE firms.
Manufacturer - A firm that owns (or leases) and operates or maintains a factory or establishment that produces on the premises, the materials or supplies obtained by the Contractor. A firm that
Fiscal Year Progress (% of Dollar Value)
2027 (7/01/26 - 6/30/27) 58% of Total Amount Bid
2028 (7/01/27 - 6/30/28) 42% of Total Amount Bid
DG00682 U-5841 G-19
makes minor modifications to the materials, supplies, articles, or equipment is not a manufacturer.
MBE Participation (Anticipated) - A portion of the total contract, expressed as a percentage that is anticipated to be performed by committed MBE subcontractor(s).
Minority Business Enterprise (MBE) - A firm certified as a Disadvantaged Minority-Owned
Business Enterprise through the North Carolina Unified Certification Program.
Regular Dealer - A firm that owns (or leases), and operates a store, warehouse, or other establishment in which the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .