This is a bid notice issued by the Kansas Department of Transportation (KDOT) for grading, bridge, and surfacing work on K-61 in McPherson County. The project encompasses repair and reconstruction of Bridge 100 (located 0.19 miles east of the K-153 Spur) and Bridge 102 (US-81 ALT, located at the junction of US-81 ALT/K-61), with a total project length of 0.147 miles. The scope includes common items such as contractor construction staking, field office and laboratory setup, and mobilization; road items including excavation, compaction, pipe installation, guardrail installation, and railroad coordination; temporary erosion control and stormwater pollution management; structural concrete, reinforcing steel, and bridge painting for both bridges; concrete surfacing with granular base and bridge approach slabs; asphalt surfacing with milling and pavement edge wedge; signing and pavement marking; and work zone traffic control. The contract specifies 140 restricted working days to open the project to unrestricted traffic and 170 total contract working days for completion. The earliest start date is March 1, 2027. Electronic proposals must be submitted via the Bid Express website by 1:00 P.M. Local Time on the letting date of August 19, 2026, with bids to be opened at 3:00 P.M. the same day. Contractors must notify KDOT of their intent to bid by 5:00 P.M. on the Monday preceding the letting date and must execute a contract within ten business days of award notification.

Pricing for this project is unit-price based, with contractors required to provide pricing for all line items across eight sections (common items, road items, temporary erosion and pollution control, bridge repairs, concrete surfacing, asphalt surfacing, signing, pavement marking, and traffic control). Several items have set prices, including foundation stabilization at $40 per cubic yard, reinforcing steel at $3.00–$4.00 per pound, water for various purposes at $40 per thousand gallons, sediment removal at $50 per cubic yard, and temporary berms at $2.00 per linear foot. The project is funded through federal and state sources (Federal Project Number ACNHP-A675(501), State Project Number K061-059 KA 6755-01). Prequalified contractors only are eligible to bid. Contractors must provide a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award and must comply with multiple required contract provisions including noncollusion certification, financial prequalification confirmation, federal lobbying restrictions, fuel and asphalt price adjustment provisions, and federal drone prohibition requirements. Subcontractors also require current Tax Clearance Certificates before approval.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745

Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org

Bureau of Construction and Materials

FEDERAL PROJECT NUMBER: ACNHP-A675(501)

STATE PROJECT NUMBER: K061-059 KA 6755-01

CALL ORDER NUMBER: 224

PROPOSAL NUMBER: 526082242

LETTING DATE 08/19/2026

COUNTY: MCPHERSON

FUND TYPE: FEDERAL

MARIONKDOT CONSTRUCTION OFFICE:

PROJECT DESCRIPTION

GRADING, BRIDGE AND SURFACING. K-61: BR 100 LOC 0.19 MI E OF

THE K-153 SPUR. BR 102 (US-81ALT) LOC AT THE JCT OF

US-81ALT/K-61 IN MP CO. LGTH IS 0.147 MI.

RESTRICTED DAYS

(140)

TOTAL CONTRACT DAYS

(170)

MARCH 01, 2027

Earliest Start Date:

Latest Start Date:

4:46:42PM7/22/2026 @

Letting 08/19/2026 Kansas Department of Transportation Project No. K061-059 KA 6755-01

Contract No. 526082242

K061-059 KA 6755-01 ACNHP-A675(501)

CONTRACT PROPOSAL

DOT Form No. 202 Rev. 02/19

Contract ID: 526082242

1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:

K061-059 KA 6755-01 / ACNHP-A675(501)

The general scope, location and net length are:

GRADING, BRIDGE AND SURFACING. K-61: BR 100 LOC 0.19 MI E

OF THE K-153 SPUR. BR 102 (US-81ALT) LOC AT THE JCT OF

US-81ALT/K-61 IN MP CO. LGTH IS 0.147 MI.

2. This is the Proposal of

[Contractor] to complete the Project for the amount set out in the accompanying Unit

Prices List.

3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:

4. Contractors and other interested entities may examine the Bidding Proposal Form/

Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract

Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.

Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".

5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project

EBSX file are available on Bid Express' website at http://ui.bidx.com.

Contractor: Page 1 Check: 26643D8FC9

6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.

7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW

Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.

8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.

9. The contractor shall complete work to open the project to unrestricted traffic within

_140_ Restricted Days and shall complete the work within the total Contract Working Days of _170_.

10. The Contractor shall complete the Project according to the plans, Standard

Specifications, provisions identified in the Special Provision List and all other

Contract Documents identified in Standard Specifications subsection 101.3

11. The undersigned declares that the Contractor has carefully examined the Bidding

Proposal Form for the Project. The Contractor understands the following:

A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).

B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.

C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form

202, and submits the completed EBSX file documents and bid bond to KDOT using Bid

Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the

Contractor's Proposal.

D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.

12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.

Contractor: Page 2 Check: 26643D8FC9

13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions

(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the

Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.

I. 08-10-66 Certification-Noncollusion & History of Debarment

II. 04-30-82 Certification-Financial Prequalification Amount

III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying

IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm

V. 10-10-00 Price Adjustment for Fuel

VI. 06-01-06 Price Adjustment for Asphalt

VII. 08-31-09 Price Adjustment for Emulsified Asphalt

VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost

IX. 05-18-07 Repair (Structures) Unit Cost

X. 11-15-17 Electric Lighting System Unit Cost

XI. 04-06-09 ITS Unit Cost

XII. 08-17-16 Water System Unit Cost

XIII. 06-19-19 Sanitary Sewer System Unit Cost

XIV. 01-01-18 Smart Work Zone System Unit Cost

XV. 08-12-24 CORS Unit Cost

XVI. 04-06-26 Federal Restrictions on Foreign Drones

XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate

14. The funding source for this Project is FEDERAL/STATE. On Projects involving City or

County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.

15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.

I. 11-03-80 Affirmative Action For EEO

II. 11-15-96 Affirmative Action & EEO Policies

III. 09-06-94 U.S. DOT Fraud Hotline

IV. FHWA-1273 Federal-Aid Required Contract Provisions

16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.

Contractor: Page 3 Check: 26643D8FC9

17. SIGNATURE SECTION:

A. Electronic Internet Proposal

The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.

B. Certification

I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING

THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT

LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH

13) IS TRUE AND CORRECT.

EXECUTED ON

C. Signature

Number of company or joint venture:

Name of company or joint venture:

Name of person signing:

Title of the person signing:

Signature: Electronic Internet Proposal

RELEASED FOR CONSTRUCTION:

Date:____________________________________

Chief of Construction and Materials

Contractor: Page 4 Check: 26643D8FC9

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

07/15/26

STATE PROJECT NO: K061-059 KA 6755-01 STATE CONTRACT NO: 526082242

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: MCPHERSON2

GRADING, BRIDGE AND SURFACING. K-61: BR 100 LOC 0.19 MI E OF THE K-153

SPUR. BR 102 (US-81ALT) LOC AT THE JCT OF US-81ALT/K-61 IN MP CO. LGTH IS

0.147 MI.

ACNHP-A675(501)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05

REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07

REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03

REQUIRED CONTRACT PROVISION-LIMITS OF FED FUNDS FOR LOBBYING04-26-90-R05

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR FUEL10-10-00-R09

REQUIRED CONTRACT PROVISION-FEDERAL RESTRICTIONS ON FOREIGN DRONES04-06-26

REQUIRED CONTRACT PROVISION-NOTICE FOR AFFIRMATIVE ACTION11-03-80-R09

REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06

REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1

REQUIRED CONTRACT PROVISION-NDAA 889 TELECOMM PROHIBITION12-17-20

MINIMUM WAGE RATE (MCPHERSON COUNTY)KS20260101

REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01

NOTICE TO CONTRACTORS (USDOT HOTLINE)09-06-94-R01

REQUIRED CONTRACT PROVISION-FEDERAL-AID CONSTRUCTION CONTRACTSFHWA-1273

POLICY AGAINST SEXUAL HARASSMENT03-01-18

ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23

INFORMATION TO CONTRACTORS (STATUS OF UTILITIES)15-01002

FUEL ADJUSTMENT15-01008-R02

ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06

PROSECUTION AND PROGRESS15-01016-R04

CONTROL OF MATERIALS15-01018-R01

CONTROL OF WORK15-01019-R02

BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03

SCOPE OF WORK15-01022-R04

BIDDING REQUIREMENTS AND CONDITIONS15-01023

AWARD AND EXECUTION OF CONTRACT15-01024

ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501

REMOVAL OF EXISTING STRUCTURES15-02001

STRUCTURAL CONCRETE15-04002-R01

ON GRADE CONCRETE15-04003

GENERAL CONCRETE15-04005-R04

PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA)15-05002-R01

HOT MIX ASPHALT (HMA)-COMMERCIAL GRADE15-06010-R02

STRUCTURAL STEEL FABRICATION15-07003-R04

PAGE:

DATE:

07/15/26

STATE PROJECT NO: K061-059 KA 6755-01 STATE CONTRACT NO: 526082242

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: MCPHERSON2

GRADING, BRIDGE AND SURFACING. K-61: BR 100 LOC 0.19 MI E OF THE K-153

SPUR. BR 102 (US-81ALT) LOC AT THE JCT OF US-81ALT/K-61 IN MP CO. LGTH IS

0.147 MI.

ACNHP-A675(501)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

STRUCTURAL METALS FABRICATION15-07004-R02

QUALIFICATION OF FIELD WELDERS15-07005-R02

CONCRETE STRUCTURE CONSTRUCTION15-07011-R01

STRUCTURAL STEEL CONSTRUCTION15-07016-R01

FALSEWORK AND FORM CONSTRUCTION15-07018

ABUTMENT DRAINAGE SYSTEMS15-07026

PERMANENT SIGNING15-08010-R02

PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE15-08011-R02

CONTRACTOR CONSTRUCTION STAKING15-08015

WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03

DURABLE PAVEMENT MARKING15-08020-R02

PIPE AND END SECTIONS15-08022-R01

FIELD OFFICE AND LABORATORY15-08023-R01

WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029

STORMWATER POLLUTION MANAGEMENT15-09002-R05

TEMPORARY EROSION AND SEDIMENT CONTROL/SEEDING15-09004-R03

AGGREGATE FOR HMA15-11002-R01

AGGS FOR CONCRETE NOT PLACED ON GRADE15-11003-R04

AGGREGATE FOR ON GRADE15-11004-R03

AGGREGATES FOR BACKFILL15-11009-R03

GENERAL REQUIREMENT DIVISION 120015-12001-R01

PERFORMANCE GRADED ASPHALT BINDER15-12002-R01

AIR-ENTRAINING ADMIXTURES FOR CONCRETE15-14001-R01

SHEET MATERIALS FOR CURING CONCRETE15-14002

LIQUID MEMBRANE FORMING COMPOUNDS15-14003

HOT JOINT SEALING COMPOUND15-15001-R01

COLD APPLIED CHEMICALLY CURED JOINT SEALANT15-15004

MEMBRANE SEALANT15-15007

STRUCTURAL STEEL TUBING15-16001-R01

STEEL SIGN POSTS15-16002-R03

STEEL WIRE & WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT15-16003-R01

MATERIALS FOR FENCING15-16004

STRUCTURAL STEEL15-16005-R01

ANCHOR BOLTS FOR STRUCTURAL USES15-16006-R01

PAGE:

DATE:

07/15/26

STATE PROJECT NO: K061-059 KA 6755-01 STATE CONTRACT NO: 526082242

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: MCPHERSON2

GRADING, BRIDGE AND SURFACING. K-61: BR 100 LOC 0.19 MI E OF THE K-153

SPUR. BR 102 (US-81ALT) LOC AT THE JCT OF US-81ALT/K-61 IN MP CO. LGTH IS

0.147 MI.

ACNHP-A675(501)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

STEEL FASTENERS15-16007-R02

STEEL PLATE GUARDRAIL AND PROPRIETARY END TERMINALS15-16008-R01

HELICAL REINFORCEMENT15-16009

PORTABLE CHANGEABLE MESSAGE SIGNS15-17001-R01

RELEASE COMPOUND FOR ASPHALT MIXES15-17004-R05

GEOSYNTHETICS15-17007-R04

MOISTURE CURE URETHANE15-18001-R01

CALCIUM SULFONATE ALKYD SYSTEM15-18002-R02

PLASTIC PIPE FOR UNDERDRAINS, OUTLETS AND DRAIN TILE15-19002-R01

USES OF PIPE15-19005-R04

PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT15-20001-R02

HYDRATED LIME15-20002

FLYASH FOR USE IN CONCRETE15-20004-R01

SILICA FUME15-20005

SLAG CEMENT FOR USE IN CONCRETE AND MORTAR15-20006

SEEDS15-21001

MULTI - COMPONENT LIQUID PAVEMENT MARKING MATERIAL15-22003-R02

PAVEMENT MARKING PAINT15-22004-R02

IMAGE SYSTEMS15-22005-R03

RETROREFLECTIVE SHEETING15-22006-R01

ROLL-UP SIGNS15-22011

TEMPORARY PAVEMENT MARKING TAPE15-22016

WOOD POSTS15-23001-R03

FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02

PART V15-25001-R07

MATERIALS CERTIFICATIONS15-26001-R13

TIED CONCRETE BLOCK MAT15-PS0116-R1

HOT MIX ASPHALT(HMA)COMMERCIAL GRADE15-PS0255

RAILROAD COORDINATION15-PS0285

RAILROAD FLAGGING REQUIREMENTS15-RF0376

END OF SPECIAL PROVISION LIST

REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)

CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT

K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322

Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this

Certificate.

NONCOLLUSION

I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.

HISTORY OF DEBARMENT

I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:

1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;

2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;

3. Do not have a proposed debarment pending;

4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.

Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.

Yes No

The exceptions, if any, are:

Contractor: Page 5 Check: 26643D8FC9

REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)

CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT

Select the appropriate response below to indicate whether this Proposal exceeds the

Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this

Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.

I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.

If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).

KDOT Approval Granted by:

KDOT Approval Date:

Contractor: Page 6 Check: 26643D8FC9

REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)

CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT

LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM

Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:

This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:

Name:

Address:

City State Zip:

Business Telephone:

Contractor: Page 7 Check: 26643D8FC9

REQUIRED CONTRACT PROVISION- 04-26-90-R05 (Rev. 07/13)

DECLARATION

LIMITATIONS ON USE OF FEDERAL FUNDS FOR LOBBYING

PURSUANT TO 31 U.S.C. 1352

The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

DEFINITIONS:

1. Designated Entity: an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress.

2. Federal Grant: an award of financial assistance by the Federal government. (Federal

Aid Highway Program is considered a grant program.)

3. Influencing (or attempt): making, with the intent to influence, any communication to or appearance before any designated entity in connection with the making of a Federal contract or Federal grant.

4. Person: an individual, corporation, company, association, authority, firm, partnership, society, State or local government.

5. Recipient: all contractors, subcontractors, subgrantees, at any tier, and other persons receiving funds in connection with a Federal grant.

EXPLANATION:

As of December 23, 1989, 31 U.S.C. section 1352 limits the use of appropriated Federal funds to influence Federal contracting. Under this law, recipients of Federal grants shall not use appropriated funds to pay any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant or the extension, continuation, renewal, amendment or modification of a Federal grant. These restrictions apply to contracts and grants exceeding $100,000.00. Federal law requires submission of this declaration. If a recipient fails to file the declaration or amend a declaration, the recipient shall be subject to a civil penalty of not less than

$10,000.00 and not more than $100,000.00 for each failure. If the recipient uses appropriated Federal funds to influence or to attempt to influence a designated entity contrary to this provision, the recipient shall be subject to a civil penalty of not less than $10,000.00 and not more than $100,000.00 for each such payment.

CERTIFICATIONS:

I certify that the Contractor recipient (including its owners, partners, directors, officers, or principals) has not paid and will not pay federally appropriated funds to any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant, or the extension, continuation, renewal, amendment or modification of a Federal grant.

Contractor: Page 8 Check: 26643D8FC9

Answer 'Yes' if a person registered under the Lobbying Disclosure Act of 1995

(Registrant) has made lobbying contacts on the Contractor recipient's behalf with respect to this contract. Answer 'No' if no Registrant has lobbied on the Contractor recipient's behalf with respect to this contract.

Yes No

The Registrants, if any, are:

I certify that the Contractor recipient will report payments made to a person for influencing or attempting to influence a designated entity, that come from funds other than appropriated Federal funds. The Contractor recipient shall report such payments on

Form LLL "DISCLOSURE FORM TO REPORT LOBBYING" according to the instructions and may obtain Form LLL from the KDOT Bureau of Construction and Materials.

I certify that, if information contained in this DECLARATION changes, the Contractor recipient will amend the DECLARATION within 30 days of the change(s).

I certify that the Contractor recipient will provide to and require subcontractors to sign a like DECLARATION, if the subcontract work exceeds $100,000.00.

The Contractor recipient understands that this declaration is a material representation of fact and the Secretary will have relied upon this declaration in entering into a contract with the Contractor recipient.

NOTE: This Reporting requirement does not apply to payments made to the recipient's regular employees and contracts, subcontracts, and grants less than $100,000.00.

Contractor: Page 9 Check: 26643D8FC9

REQUIRED CONTRACT PROVISION - 10-10-00-R09 (Rev. 01/20)

PRICE ADJUSTMENT FOR FUEL

The Contractor may accept or reject the application of Special Provision 15-01008 (latest revision) "Price Adjustment for Fuel". Any items listed on Special Provision 15-01008

(latest revision) that are included in this project are eligible for the fuel price adjustment unless otherwise stated in the contract documents.

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

If the Contractor accepts 15-01008 (latest revision), the Contractor shall mark the checkboxes below for the eligible items/sections listed in Special Provision 15-01008

(latest revision). Then they should indicate their desire for the specific fuel price adjustment by selecting the 'Yes' or 'No' option.

Road Items (Earthwork)

Concrete Surfacing Items

Asphalt Surfacing Items

Contractor: Page 10 Check: 26643D8FC9

REQUIRED CONTRACT PROVISION - 04-06-26

CERTIFICATION OF COMPANY NOT CURRENTLY ENGAGED IN THE PROCUREMENT OR

USE OF PROHIBITED FOREIGN UNMANNED AERIAL SYSTEMS

Effective December 22, 2025, the American Security Drone Act of 2023 (ASDA) and OMB

Memorandum M-26-02 strictly prohibits the use of federal funds for unmanned aerial systems (UAS) manufactured by covered foreign entities including any aircraft, flight controller, camera, or ground control station supplied by a manufacturer that is based in, or subject to the control of, a foreign adversary country, specifically the People’s

Republic of China. This prohibition restricts the use of drones from these countries on any federal-aid project even if the drone related costs are billed separately or not at all. Any use of these covered drones including operation, maintenance or data processing on federal aid projects is prohibited.

The Contractor agrees that the procurement and/or use of any drone (UAS) to complete any primary or supporting tasks within the scope of this Contract, as well as any subcontracts, will comply with the following directives:

• National Defense Authorization Act (NDAA) – American Security Drone Act of 2023

(ASDA, Pub. L. No. 118-31).

• Office of Management and Budget Memorandum M-26-02 – Restrictions on using federal funds to purchase or operate prohibited foreign UAS.

• Federal Acquisition Regulation Clause 52.240-1 – Prohibition on Unmanned Aircraft

Systems Manufactured or Assembled by American Security Drone Act-Covered

Foreign Entities.

If Contractor has violated, misrepresented, or otherwise fails to comply with this certification document as determined by KDOT, KDOT may terminate this Contract according to Section 108.11 of the State Specifications for State Road and Bridge Construction

(2015 Edition).

By signing the below, Contractor acknowledges and agrees to comply with the provisions of this policy.

CONTRACTOR

Signature, Title

Date

*4/6/26 C&M (JVN)

April-2026 Letting

Contractor: Page 11 Check: 26643D8FC9

REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)

TAX CLEARANCE CERTIFICATE

Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.

Yes No

Insert the Tax Clearance Confirmation Number if available at the time of bidding:

Contractors shall have a current Tax Clearance Certificate from the Kansas Department of

Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's

Proposal as non-responsive if the Contractor does not have a current Tax Clearance

Certificate at the time of the contract award.

To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction

ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.

After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.

If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special

Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.

Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not

"clearance" for all types of taxes the State of Kansas may assess.

Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the

Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT

Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.

Contractor: Page 12 Check: 26643D8FC9

Line Number Item Number Quantity Unit Unit Price Extension Price

Section 01

COMMON ITEMS

1 020100 1.000 LS

CONTRACTOR CONSTRUCTION STAKING /

2 025600 1.000 EACH

FIELD OFFICE AND LABORATORY (TYPE A) /

3 025323 1.000 LS

MOBILIZATION /

4 025200 1.000 LS

REMOVAL OF EXISTING STRUCTURES /

5 040707 1.000 LS

CURING ENVIRONMENT /

6 012340 1.000 CUYD $40.000 $40.00

FOUNDATION STABILIZATION (SET PRICE) /

7 025099 1.000 LBS. $4.000 $4.00

REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE) /

8 025105 1.000 LBS. $3.000 $3.00

REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) /

9 070580 1.000 HOUR $30.000 $30.00

FLAGGER (SET PRICE) /

Section 01 Total $77.00

Section 02

ROAD ITEMS

10 060359 1.000 LS

CLEANING EXISTING STRUCTURE /

11 025361 1.000 LS

CLEARING AND GRUBBING /

12 012410 598.000 CUYD

COMMON EXCAVATION (RURAL SMALL) /

13 012415 923.000 CUYD

COMMON EXCAVATION (CONTRACTOR FURNISHED) /

14 012420 315.000 CUYD

ROCK EXCAVATION /

15 012317 1069.000 CUYD

COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) /

16 012319 233.000 CUYD

COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) /

17 010114 1.000 MGAL $40.000 $40.00

WATER (GRADING) (SET PRICE) /

18 030189 2080.000 SQYD

SALVAGED TOPSOIL /

19 050401 70.000 LNFT

CROSS ROAD PIPE ( 15") (RCP) /

20 023456 915.520 LNFT

GUARDRAIL, STEEL PLATE (MGS) /

21 030567 2.000 EACH

GUARDRAIL END TERMINAL (MGS-FLEAT) /

Contractor: Page 13 Check: 26643D8FC9

22 012849 1.000 EACH

INLET (TYPE I DITCH) /

23 012272 63.000 LNFT

SLOPE DRAIN (CONCRETE) /

24 012711 4.000 EACH

FLUME INLET (CONCRETE) /

25 030700 0.300 PMPS

MOWING /

26 013314 1.000 LS

RAILROAD FLAGGING /

27 013313 1.000 LS

RAILROAD COORDINATION /

Section 02 Total $40.00

Section 03

TEMP PRJ WTR POL CTL-SOIL EROSION

28 072223 165.000 LBS.

TEMPORARY FERTILIZER (16-20- 0) /

29 030537 122.200 LBS.

SOIL EROSION MIX /

30 072285 5501.000 SQYD

EROSION CONTROL (CLASS 1) (TYPE C) /

31 071291 1.000 CUYD $50.000 $50.00

SEDIMENT REMOVAL (SET PRICE) /

32 072400 1.000 LNFT $2.000 $2.00

TEMPORARY BERM (SET PRICE) /

33 071320 1.000 EACH

TEMPORARY INLET SEDIMENT BARRIER /

34 072411 500.000 SQYD

GEOTEXTILE (EROSION CONTROL) /

35 000098 1.000 LS

SWPPP DESIGN /

36 000097 34.000 EACH

SWPPP INSPECTION /

37 000103 34.000 EACH

WATER POLLUTION CONTROL MANAGER /

38 010123 1.000 MGAL $40.000 $40.00

WATER (EROSION CONTROL) (SET PRICE) /

Section 03 Total $92.00

Section 04

BR. NO. 61-59-79.84 (100) REPAIR

39 012402 25.000 CUYD

CLASS III EXCAVATION /

40 032813 183.300 CUYD

CONCRETE (GRADE 4.0) (AE) (SA) /

41 025103 42050.000 LBS.

Contractor: Page 14 Check: 26643D8FC9

REINFORCING STEEL (GRADE 60) (EPOXY COATED) /

42 011374 30.000 SQFT

CONCRETE SURFACE REPAIR /

43 025110 2628.000 EACH

WELDED STUD SHEAR CONNECTORS /

44 014411 1.000 LS

BRIDGE PAINTING (CALCIUM SULFONATE / ALKYD SYSTEM) /

45 071014 1.000 LS

POWER WASH /

46 014402 1.000 LS

ENVIRONMENTAL PROTECTION /

47 014184 18.000 SQYD

ABUTMENT STRIP DRAIN /

48 071021 22.000 SQYD

BRIDGE BACKWALL PROTECTION SYSTEM /

49 025479 53.000 EACH

DRILLING AND GROUTING /

50 023475 9240.000 SQFT

TIED CONCRETE BLOCK MAT (FILTER FABRIC) /

51 013333 557.000 SQYD

BRIDGE DECK GROOVING /

52 071797 158.000 LNFT

FENCE (CHAIN LINK) ( 6'-6") (SPECIAL) /

53 010300 1.000 LS

FALSEWORK INSPECTION /

Section 04 Total

Section 05

BR. NO. 61-59-79.84 (102) REPAIR

54 012402 25.000 CUYD

CLASS III EXCAVATION /

55 032813 225.900 CUYD

CONCRETE (GRADE 4.0) (AE) (SA) /

56 025103 58400.000 LBS.

REINFORCING STEEL (GRADE 60) (EPOXY COATED) /

57 011374 30.000 SQFT

CONCRETE SURFACE REPAIR /

58 025110 3078.000 EACH

WELDED STUD SHEAR CONNECTORS /

59 014411 1.000 LS

BRIDGE PAINTING (CALCIUM SULFONATE / ALKYD SYSTEM) /

60 014184 23.000 SQYD

ABUTMENT STRIP DRAIN /

61 071021 23.000 SQYD

BRIDGE BACKWALL PROTECTION SYSTEM /

62 025479 43.000 EACH

DRILLING AND GROUTING /

63 013333 608.000 SQYD

Contractor: Page 15 Check: 26643D8FC9

BRIDGE DECK GROOVING /

64 010300 1.000 LS

FALSEWORK INSPECTION /

Section 05 Total

Section 06

CONCRETE SURFACING ITEMS

65 013605 776.000 SQYD

CONCRETE PAVEMENT (12" UNIFORM) (AE) (BR APP) /

66 025509 50.600 CUYD

BRIDGE APPROACH SLAB FOOTING /

67 010355 1.000 MGAL $40.000 $40.00

WATER (GRANULAR BASE) (SET PRICE) /

68 025155 776.000 SQYD

GRANULAR BASE ( 6") /

Section 06 Total $40.00

Section 07

ASPHALT SURFACING ITEMS

69 041003 226.000 TON

HMA-COMMERCIAL GRADE (CLASS A) /

70 011763 3.300 STA.

MILLING /

71 081050 212.000 TON

PAVEMENT EDGE WEDGE (ROCK) /

72 011478 1.000 MGAL $40.000 $40.00

WATER (EARTHWORK COMPACTION) (SET PRICE) /

Section 07 Total $40.00

Section 08

SIGNING ITEMS

73 025501 223.000 SQFT

SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) /

74 026381 79.000 LNFT

SIGN POST (W10X12 STEEL BEAM) /

75 026398 4.000 EACH

SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X12) /

76 023208 4.000 EACH

SIGN POST BREAKAWAY BASE PLATE (W10X12) /

77 026048 32.000 LNFT

SIGN POST FOOTING (24" STEEL BEAM POST CONCRETE) /

78 014176 4.000 EACH

SIGNING OBJECT MARKER (TYPE 2) /

79 025990 2.000 EACH

SIGNING DELINEATOR (TYPE B) (WHITE RIGID "U" POST) /

80 026052 1.000 EACH

Contractor: Page 16 Check: 26643D8FC9

SIGNING DELINEATOR (TYPE A) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) /

81 026058 4.000 EACH

SIGNING DELINEATOR (TYPE B) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) /

Section 08 Total

Section 09

PAVEMENT MARKING ITEMS

82 023140 7929.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") /

83 023141 1010.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") /

84 023428 225.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") /

85 023192 6177.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") /

86 013019 6003.000 LNFT

PAVEMENT MARKING REMOVAL /

Section 09 Total

Section 10

TRAFFIC CONTROL ITEMS

87 025331 21840.000 EADA

WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) /

88 025332 5460.000 EADA

WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) /

89 025333 1260.000 EADA

WORK ZONE SIGNS (16.26 SQ.FT. & OVER) /

90 025376 6090.000 EADA

WORK ZONE BARRICADES (TYPE 3 - 4 TO 12 LIN. FT.) /

91 011492 19530.000 EADA

CHANNELIZER (PORTABLE) /

92 025343 13230.000 EADA

WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) /

93 025364 210.000 EADA

ARROW DISPLAY /

94 025365 210.000 EADA

PORTABLE CHANGEABLE MESSAGE SIGN /

95 070916 33.100 STAL

PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) /

96 013019 7538.000 LNFT

PAVEMENT MARKING REMOVAL /

97 082002 3.000 EACH

WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) /

98 072116 1.000 LS

TRAFFIC CONTROL (INITIAL SETUP) /

Section 10 Total

Contractor: Page 17 Check: 26643D8FC9

Item Total $289.00

Contractor: Page 18 Check: 26643D8FC9

�� ������������������������������������������������������������������������������)*)���+�,��-����-�����������������������������������������������������������.����������������������/���"��)*)��.0�01�222222222222222222222222222222222222222223�4�2�4��������������������2�5,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,�)��0����,�������������������������������������������������������������������.����������������������/���"��'67).�)890'&)���6').1�6.�� .0**�.0���10��6��222222223�-�2�-��������������������2��,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,�0.6�����,��+��4�������������������������������������������������������������.����������������������/���"��0.6�76.�).:���.9��9.1*2222222222222222222222222222223�-52��������������������-42��,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,��9�����5,�4������5����5�����������������������������������������������������.����������������������/���"���.9��� .0;).��6//�.61 ��.9��2222222222222222222222223���2-��������������������2���.9��� .0;).��/*1�<) �1� �*67<6=222222222222222222223��52���������������������2���.9��� .0;).�� 9&'�1� ��1� )&222222222222222222222223��+25��������������������2���.9��� .0;).���71�).��.9��222222222222222222222222223��+2�+�������������������2���.9��� .0;).���'0��9'��.9��22222222222222222222222223���2�5�������������������2���.1//0���6��.6*�����).;0�)� .0;).22222222222222222223��42���������������������2���).;0�)&1���)890'&)��22222222222222222222222222222223���2--�������������������2+46').1�6.����.0'0���&1�!0�)222222222222222222222222223��525-������������������42456').1�6.��.6�6�&0**��.69� &1�222222222222222222222223���2-��������������������2��6').1�6.��.6�6�&0**2222222222222222222222222222222223��+2�-�������������������2��6').1�6.����.1��6.22222222222222222222222222222222223���2���������������������2��6').1�6.�����.)) 222222222222222222222222222222222223���2���������������������2��6').1�6.�����.1').22222222222222222222222222222222223��+2+��������������������2��6').1�6.���.6**).222222222222222222222222222222222223��+2�4�������������������2��6').1�6.���'1;).��>1�'!1*�:�1��.)�1�):�1� ��6��.)�)?22222222222222222222222222222222222222222223��52���������������������2��6').1�6.���&)�!1�0�2222222222222222222222222222222223��-2���������������������2��6').1�6.���&1�).01*��.1��/).�;)!0�*)22222222222222223��-25��������������������2��6').1�6.���*61 ).222222222222222222222222222222222223���2+��������������������2��6').1�6.����.1 ).�<*1 )222222222222222222222222222223���2-+�������������������25�6').1�6.��� 0��.0<9�6.2222222222222222222222222222223���2�5�������������������2��6').1�6.����.1�)2222222222222222222222222222222222223���2��������������������+2��6').1�6.����6��.)�)��17222222222222222222222222222223���2+��������������������2��6').1�6.����6��.)�)�/0�0�!0���&1�!0�)2222222222222223���2���������������������2��

@ABAC@D�EFGG�HI JHIKLMN

OPPQRFAARSTKLMNAUSLVWXVPVYTZ[SPZM[A\JC]C@]̂]̂Â Â_

�������������������������������������$�������������������������#������'����#%����#&����������������������������������������������������������%���������������������������������������������������������$��������������������������#������#���#������%�#���������������������������������$���������������������������#���������������������������������������������������"�����������������������((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((��������(��)*)+,)�-./)�0-)1*-+2)3�45-�*-.4/�0)-45-6+7850)-./+57�/5�9:+*:�9);3+78�+1�+7*+3)7/.;�<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<#5/)���=)*>/+,)��-3)-�?��@������'��1/.2;+1:+78��.+3��+*A��).,)45-�%)3)-.;��57/-.*/5-1�.00;+)1�/5�.;;�*57/-.*/1�1>2B)*/�/5�/:)�.,+1( .*57��*/�45-�9:+*:�/:)�*57/-.*/�+1�.9.-3)3�?.73�.7C15;+*+/./+57�9.1�+11>)3@�57�5-�.4/)-�D.7>.-C��'���������4�/:+1*57/-.*/�+1�*5,)-)3�2C�/:)���'�/:)�*57/-.*/5-�6>1/�0-5,+3))60;5C))1�9+/:���:5>-�54�0.+3�1+*A�;).,)�45-�),)-C����:5>-1/:)C�95-A'�>0�/5����:5>-1�54�0.+3�1+*A�;).,)�).*:�C).-��60;5C))1�6>1/�2)�0)-6+//)3�/5�>1)�0.+3�1+*A�;).,)�45-�/:)+-597�+;;7)11'�+7B>-C�5-�5/:)-�:).;/:(-);./)3�7))31'�+7*;>3+780-),)7/+,)�*.-)E�/5�.11+1/�.�4.6+;C�6)62)-�?5-�0)-157�9:5�+1;+A)�4.6+;C�/5�/:)�)60;5C))@�9:5�+1�+;;'�+7B>-)3'�5-�:.1�5/:)-:).;/:(-);./)3�7))31'�+7*;>3+78�0-),)7/+,)�*.-)E�5-�45-�-).1571-)1>;/+78�4-56'�5-�/5�.11+1/�.�4.6+;C�6)62)-�?5-�0)-157�9:5�+1;+A)�4.6+;C�/5�/:)�)60;5C))@�9:5�+1�.�,+*/+6�54'�356)1/+*,+5;)7*)'�1)=>.;�.11.>;/'�5-�1/.;A+78����33+/+57.;�+745-6./+5757�*57/-.*/5-�-)F>+-)6)7/1�.73�95-A)-�0-5/)*/+571�>73)-�/:)���+1�.,.+;.2;)�./://01���999�35;�85,�.8)7*+)1�9:3�85,)-76)7/(*57/-.*/1�#5/)���=)*>/+,)��-3)-�����$�8)7)-.;;C�.00;+)1�/5�*57/-.*/1�1>2B)*/�/5�/:)��.,+1( .*57��*/�/:./�9)-)�.9.-3)3�57�5-�2)/9))7�D.7>.-C��'������.73�D.7>.-C��"'�����'�.73�/:./�:.,)�75/�2))7�-)7)9)3�5-�)=/)73)3�57�5-�.4/)-�D.7>.-C���'��������=)*>/+,)��-3)-�����$�35)1�75/�.00;C�/5�*57/-.*/1�1>2B)*/�57;C�/5�/:)��.,+1( .*57��);./)3��*/1�-)8.-3;)11�54�9:)7�/:)C�9)-)�.9.-3)3���4�.�*57/-.*/�+1�1>2B)*/�/5��=)*>/+,)��-3)-�����$'�/:)�*57/-.*/5-�6>1/�0.C�.;;�*5,)-)3�95-A)-1�./�;).1/��������0)-�:5>-�?5-�/:)�.00;+*.2;)�9.8)�-./)�;+1/)3�57�/:+1�9.8)�3)/)-6+7./+57'�+4�+/�+1�:+8:)-@�45-�.;;�:5>-1�10)7/�0)-45-6+78�57�/:)�*57/-.*/�4-56��.C���'�����'�/:-5>8:��)*)62)-���'���������:)�.00;+*.2;)��=)*>/+,)��-3)-�6+7+6>6�9.8)�-./)�9+;;�2)�.3B>1/)3�.77>.;;C��33+/+57.;�+745-6./+57�57�*57/-.*/5-�-)F>+-)6)7/1�.73�95-A)-�0-5/)*/+571�>73)-��=)*>/+,)��-3)-�����$�+1�.,.+;.2;)�./�999�35;�85,�9:3�85,*57/-.*/1� 7;+1/)3�*;.11+4+*./+571�7))3)3�45-�95-A�75/�+7*;>3)3�9+/:+7/:)�1*50)�54�/:)�*;.11+4+*./+571�;+1/)3�6.C�2)�.33)3�.4/)-.9.-3�57;C�.1�0-5,+3)3�+7�/:)�;.25-�1/.73.-31�*57/-.*/�*;.>1)1?�"�%������?.@�?�@�?+++@@�(((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((�:)�253C�54�).*:�9.8)�3)/)-6+7./+57�;+1/1�/:)�*;.11+4+*./+571.73�9.8)�-./)1�/:./�:.,)�2))7�45>73�/5�2)�0-),.+;+78�45-�/:)/C0)?1@�54�*571/->*/+57�.73�8)58-.0:+*�.-).�*5,)-)3�2C�/:)�9.8)3)/)-6+7./+57���:)�*;.11+4+*./+571�.-)�;+1/)3�+7�.;0:.2)/+*.;5-3)-�>73)-�-./)�+3)7/+4+)-1�+73+*./+78�9:)/:)-�/:)�0.-/+*>;.--./)�+1�.�>7+57�-./)�?*>--)7/�>7+57�7)85/+./)3�-./)@'�.�1>-,)C-./)'�.�9)+8:/)3�>7+57�.,)-.8)�-./)'�.�1/./)�.350/)3�-./)'�5-�.

GHIHJGK�LMNN�OP QOPRSTU

VWWXYMHHYZ[RSTUH\ZS]̂_]W]̀[abZWaTbHcQJdJGdedeHe JHf

�����������
�����
������
���������
���
���
�����!�����
���
�����
������

)./)*/0)01�

�������
���
���!����
�����
�������

2��

�
�������
���
�������������

2�� )./)*/0)01

������������������
���!�����
���
����
��
������
��
�������!��
���
��
��������
��������

6 7�8

��������
������������
�!����
���

����2��

��������
���
���
���!����
�����
��������

*))9

�����
�������

#:�(&'#%�����;4�))*) )*/)*/0)01�

��������
���
!����
����

;4 ;����2��

�
�������
���
�������������

2�� )*/)*/0)01��

�$�����
��������
���
������������
��������
!����
�����
"���
�����"
��������
���������
��������!�"
���

����2��

��������
���
������������
���!����
6�

0+ *�08

���������
������
���
��
!����
���
����
���
�����
�������
��������!����
���
��
����
�����
#$����%

��='0)00�)).>/0./0)01�

������������!�����
���
��������
�������

0)00

�����
�������
��
����
�������

2��

�
�������������
���
�������������

2�� � ���>/0./0)01

�$�����
��������
�����
�������
��
����
���
����
�"�����"
�����

4���!���

3��
��

4��� 5�!����� 63458 0+ *�>6�86*8��� �� ����2��

��������
���
�����
�������
�����!�����
���
����

6�� ��� �8 0+ *�?6�8�6�8�

��(#0)0?�)).

@ABAC@D

EFGG

HI JHIKLMN

OPPQRFAARSTKLMNAUSLVWXVPVYTZ[SPZM[A\JC]C@]̂]̂Â GA_

00� 1 �0,/2� �3�4���������!�������������������������������������5�"�������!�6������������3������ ���������������������������������������������!3�����#���������!�������������������������������������3������������)4+���������������� �������������������������������������������������������������������������3��������������� ��������7����������������� �������������������������������3��������������/����� ������������������$����������������$�������������8����� ���� ���$��������!������������������)4+�9������ �)���� �� �����,�8����������!����!������� ������������� ��!������ �:������ ����!���������6������������9������� �)���� �� ���������������)��������4����+� �����������������;� ��+����������� �1�!������������������2������������ ����$�.�)�������������)���������$�+2������,������������������������������������������������������� �����������������$���8������ ����������������������������!�����������������)4+�9������� �2������������)����+��������������,�8����������!����!������� ������������92)+(/

���:������ ���!���������6������������9������� �2������������)����+�������������������������)��������4����+� �����������������;� ��+����������� �1�!������������������2������������ ����$�.�)�������������)���������$�+2�������3�- �������������������������!����������$��������������������������7�������

������!������������3���������������������������������������8������� ������������������������ ��������)�������4���� �������������7 ����<�2=,�0������>������<�2=,�0����%3�,�8������ ����� ����������������������������!����!������� ������������!�����������������:������ ����!���������6������������)��������4���� �1�!������������������2������������ ����$�.�)�������������)���������$�+2������"�����8������������!��������������!���� ���������7����������������$����@���������������$�����������������������$�����3�����������8��������������������� ������������������3�- ����������� �,� ����9�����7 �������9����3���)�������6������������ ����������� ��,� ����9����������������;� ��+����������� �1�!������������������2������������ ����$�.�)�������������)���������$�+2�������AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA�����������.+�/=�*�.�, 1�+�2- -/.B��������

CDEDFCG�HIJJ�KL MKLNOPQ

RSSTUIDDUVWNOPQDXVOYZ[YSY\W]̂VS]P̂D_MF̀FC̀àaDa bDb

12-17-20 Sheet 1 of 2

REQUIRED CONTRACT PROVISION

FEDERAL-AID CONTRACTS

PROHIBITION ON COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES

PURSUANT TO SECTION 889 OF THE NATIONAL DEFENSE AUTHORIZATION ACT (2019)

As of August 13, 2020, recipients and subrecipients of federal aid funds are prohibited from obligating or expending loan or grant funds to procure or obtain; extend or renew a contract to procure or obtain; or enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that use Covered Telecommunications Equipment or Services as a substantial or essential component of any system, or as critical technology as part of any system. See Section 889 of Public Law 115-232 (National Defense Authorization Act 2019)(NDAA). In addition to preventing direct purchases of such Covered Telecommunications Equipment or Services, federal law prevents KDOT, LPA’s, and their Contractors from using federal aid funds to pay for Covered Telecommunications Equipment or Services that the Contractor may use on a Project. Costs for such Covered Telecommunications Equipment or Services are unallowable under 2 CFR 200.216 and 2 CFR 200.471.

The term ‘‘Covered Telecommunications Equipment or Services’’ means any of the following:

Telecommunications equipment produced by and/or telecommunications services provided by Huawei Technologies Company, ZTE Corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).

Video surveillance equipment produced by and/or video surveillance services provided by Huawei Technologies Company, ZTE Corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).

Telecommunications and/or video surveillance services provided by third parties that are using equipment produced by Huawei Technologies Company, ZTE Corporation, Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities) in performing such services.

Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country [defined under 889(f)(2) as “the People’s Republic of China”].

As a Contractor on a federal-aid construction contract with the Secretary of Transportation, as the principal contracting party for the State of Kansas or as the agent for a disclosed Local Public Authority (LPA), the Contractor shall not be required to provide to KDOT or the LPA Covered Telecommunications Equipment or Services in the performance of any contract, subcontract, supply contract, or other contractual instrument resulting from or associated with this Project.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .