This is a Bid Notice for an Invitation for Bid (IFB) issued by Carson City, Nevada for the Carson City Centennial Park Drainage Project. The project encompasses all labor, materials, tools, and equipment necessary to construct multiple drainage basins with earthen berms, drainage channels and swales, stormwater piping, concrete access paths and roads, rip rap slope protection, slope revegetation, four-wire fencing, signage, standpipes, stormwater outfalls, and gabion baskets. The contractor is also responsible for obtaining required permits, maintaining site safety, and protecting the public from construction hazards. Existing infrastructure including signage, asphalt, concrete striping, driveways, parking lots, staging areas, curb and gutter, sidewalks, and utilities must be returned to current or better condition upon completion. The bid was issued on September 30, 2026, with a bid submission deadline of October 21, 2026 at 2:00 PM (PT), and questions must be submitted by October 15, 2026. The bid opening will occur online via Webex at 2:30 PM on October 21, 2026. A final addendum will be issued by October 19, 2026, which is a minimum of two business days before the bid close date.
The project is classified as a horizontal construction project with an engineer's estimate of $356,991 and is locally funded by Carson City. This project is not subject to Buy America, Buy American Act (BABAA) requirements, and Disadvantaged Business Enterprise (DBE) goals and On-the-Job Training (OJT) goals do not apply. Required bid documents include Vendor Information, Conflict of Interest Disclosures, Certified Payroll Certification, Subcontractor Information (for both 5% and 1% participation levels), Bid Bond, and Bidding Preference Affidavits. Bidding preference affidavits and 1% Subcontractor Information must be submitted within two hours of bid opening via email to receive preference consideration. Bid attachments include the Instructions to Bidders, General Conditions, Construction Independent Contractor Agreement, Contract Award Information, Required Postings and Notices, and Senate Bill 82 Regulations, along with the bid plans and submittal documents. Questions regarding the bid should be directed to Carol Akers, Purchasing & Contracts Administrator, at cakers@carsoncity.gov or (775) 283-7362.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Login
1 2 16 items in 2 pages
Bid Opportunity Detail
Return to Listing Supplier Registration
Bid Information Type Invitation for Bid
Status Issued
Number 27300219 (Carson City Centennial Park Drainage Project)
Issue Date & Time 9/30/2026 08:00:00 AM (PT)
Close Date & Time 10/21/2026 02:00:00 PM (PT)
Question Cut Off Date 10/15/2026 02:00:00 PM (PT)
Time Left 21 days 2 hours 57 minutes 41 seconds
Notes SUMMARY:
Carson City is accepting sealed bids for all labor, materials, tools and equipment necessary for the Carson City Centennial Park Drainage Project. The project consists of multiple drainage basins with earthen berms, drainage channels/swales, stormwater pipe, concrete access paths/roads, rip rap slope protection, slope revegetation, 4-wire fencing, signage, stand pipe, stormwater outfall, gabion baskets, and all common phases customarily associated with this type of project. The Contractor will be responsible for any required permits, site safety and protection of public from hazards during construction. Existing infrastructure (signage, asphalt and concrete striping, driveways, parking lots, staging areas, curb and gutter, sidewalk, utilities) will be returned to current or better condition.
PROJECT TITLE
Carson City Centennial Park Drainage Project
CCPW PROJECT NO.
P504626001
PWP No.
CC-2027-041
ENGINEER'S ESTIMATE
$ 356,991
PROJECT TYPE
This project is deemed a horizontal construction project.
FUNDING
This project is locally funded.
BUILD AMERICA, BUY AMERICA ACT
This project is not subject to BABAA requirements.
DISADVANTAGED BUSINESS ENTERPRISE GOAL
DBE does not apply to this project.
ON-THE-JOB TRAINING GOAL
This project has no OJT goal.
QUESTIONS
Questions may only be submitted via NGEM.
Questions are to be submitted and will be responded to via Addendum.
Contact Information Name Carol Akers, Purchasing & Contracts Administrator
Address City Hall - Executive Office 201 N. Carson St., Suite 2 Carson City, NV 89701 USA
Phone 1 (775) 283-7362
Fax
Email cakers@carsoncity.gov
Bid Attachments File Name Description File Size
CC-BID-01 Vendor Information.pdf Bidder/Prime Contractor | Due at bid.
Subcontractor | Due upon contract award.
1.30 MB
CC-BID-03 Conflict of Interest Disclosures.pdf Bidder/Prime Contractor | Due at bid.
Subcontractor | Due upon contract award.
859 KB
9/30/26, 2:02 PM Nevada Gov eMarketplace https://nevada.ionwave.net/PublicDetail.aspx?bidID=20630&SourceType=1&pg=2 1/3 https://nevada.ionwave.net/Login.aspx javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl03$ctl01$ctl05','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl03$ctl01$ctl07','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl01','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl01','') https://nevada.ionwave.net/extract.aspx?e=Sm~JTxqvEL~8cEC4u3ytvvs-4Q4ZeSA7Y9oPY4rBAT0QLuZAeLEYCbjv6UUiZ-Pf https://nevada.ionwave.net/extract.aspx?e=oSUf0I3QCf5bwyMLg2BdeL9KApUi3rjSqNMilXs38PqMWOJiINXOKblvzvtei~sx
1 2 16 items in 2 pages
1 2 3 4 5 6 7 8 9 10 ... 3260 items in 218 pages
File Name Description File Size
CC-BID-05 Certified Payroll Certification of Authorization & Understanding.pdf Bidder/Prime Contractor | Due at bid.
Subcontractor | Due upon contract award.
848 KB
CC-BID-06 Subcontractors, Suppliers, & Subconsultants Bidding (non-DBE).pdf Bidder/Prime Contractor | Due at bid.
Subcontractor | Due upon contract award.
1.94 MB
CC-BID-07 5% Subcontractor Information.pdf Bidder/Prime Contractor | Due at bid.
Subcontractor | N/A
823 KB
CC-BID-08 Bid Bond.pdf Bidder/Prime Contractor | Due at bid.
Subcontractor | N/A
826 KB
CC-BID-09 Bidding Preference Affidavit.pdf Bidder/Prime Contractor | Due within two hours of bid opening to receive a preference in bidding; Email to cakers@carsoncity.gov (This document may be submitted with the bid when accompanied by the Bidding Preference Certificate of Eligibility.)
Subcontractor | N/A
1.08 MB
CC-BID-10 1% Subcontractor Information.pdf Bidder/Prime Contractor | Due within two hours of bid opening to receive a preference in bidding; Email to cakers@carsoncity.gov (This document may be submitted with the bid.)
Subcontractor | N/A
853 KB
CC-REF-01 Instructions to Bidders LOCAL.pdf Reference Document 225 KB
CC-REF-02 General Conditions.pdf Reference Document 924 KB
CC-REF-03 Construction Independent Contractor Agreement.pdf Reference Document 476 KB
CC-REF-04 Contract Award Information.pdf Reference Document 150 KB
CC-REF-05 Required Postings & Notices.pdf Reference Document 212 KB
CC-REF-06 Senate Bill 82 Regulations.pdf Reference Document 232 KB
Centennial Park Drainage IFB Submittal PWP CC-2027-041.pdf Bid Plans 8.42 MB
Bid Event Participation Activity Activity Date Activity Name Description
10/15/2026 02:00:00 PM
(PT)
Questions QUESTIONS regarding this bid must be submitted via NGEM under the "QUESTIONS TAB" and can be submitted any time up to October 15, 2026.
10/19/2026 02:00:00 PM
(PT)
Last Addendum The last addendum shall be issued by the date indicated in this advertisement, a minimum of two (2) business days before the advertised bid close date.
10/21/2026 02:00:00 PM
(PT)
Bids Due Bids must be submit via NGEM not later than 2:00 PM on the date indicated in this advertisement.
10/21/2026 02:30:00 PM
(PT)
Bid Opening The online Webex Bid Opening will begin at 2:30 PM on the date indicated in this advertisement.
Registration Link:
https://carsoncitynevada.webex.com/weblink/register/r81209e93a7f7037812a8122da3b5d8ec
Event Invitations Supplier Name City State Contact
¡Gilpin Transitport London Mr Zack Gilpin
1 Sun Solar Electric, LLC Las Vegas NV
1st Electric and Automation. Winnemucca NV Bailey
1-Vision Houston TX
2 Queens LLC LAS VEGAS NV Anthony Holly
2 Stacks LLC Pahrump NV Ryan Stackhouse
295 Cabling Sparks NV Kenny Wheeler
2H Construction Inc Las Vegas NV
2ND RODEO CONSTRUCTION LAS VEGAS NV ERICK TYLER
3B Resources Inc. Rocklin CA William butcher
3D Fitness Soldier LLC Las Vegas NV Mary Hubbard
9/30/26, 2:02 PM Nevada Gov eMarketplace https://nevada.ionwave.net/PublicDetail.aspx?bidID=20630&SourceType=1&pg=2 2/3 javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl03$ctl01$ctl05','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl03$ctl01$ctl07','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl05','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl07','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl09','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl11','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl13','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl15','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl17','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl19','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl21','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl23','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl25','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl01','') javascript:__doPostBack('ctl00$mainContent$rgBidAttachments$ctl00$ctl02$ctl01$ctl01','') https://nevada.ionwave.net/extract.aspx?e=uqJHvUw9QJLaOX8Vuf9iiBJZdlMfGS9h1ZuS8gWsEoqgL9rTgW6SSnFbxymNeEqs https://nevada.ionwave.net/extract.aspx?e=aKEhIfm~wKTWPVFpyE~60JLaQ5U~zKOMYgI9SvvvoKD0D7fHIKEY-VQaY7MOTZ9-https://nevada.ionwave.net/extract.aspx?e=KfUkDTXwtgwgExrQFWduxccKEEIcDK8iOgPYOqezv--encEm0nqk1brR9uDKbmqF https://nevada.ionwave.net/extract.aspx?e=0GWAvOzomWbSb~Mqlgptjc2CiELonSZS1UcuRd6jJrm3L13jhM9bUhtF25GlRVBy https://nevada.ionwave.net/extract.aspx?e=jSodvkCxbNhF6T1-hrY07nLCS1rzzrFKL-iT8jikaQKnUYl0d8QLJNHKZzGmGmWh https://nevada.ionwave.net/extract.aspx?e=G8QFcGNC9S2CnMEFf3VmW6MBO3HKDqbBmCswf-u1alTfQFolygx-GyS4EkuNcOIl https://nevada.ionwave.net/extract.aspx?e=nAuFT0Yn9809OE4G0tmK2t-paH94cXZ8yf5kkN4icPzJfh6xHYJfXYK0B2YQt9LR https://nevada.ionwave.net/extract.aspx?e=6F9kifxTHfS05dGQuDDmwAosw98yc7IZPly-5XOjLX0YHpsunWJEuYodeQdLXwBA https://nevada.ionwave.net/extract.aspx?e=dEN6Cfw03T--VGOpERbdOoTIClM97q6MLGkgmzlh-gpt4tAQVIbzu2lHkF11tyDr https://nevada.ionwave.net/extract.aspx?e=efp05YxewfUHVHYON4Yp73-z-qmfCqmDBVq8Rp9EMLv4-IRX1PVttymIjDmSSJxj https://nevada.ionwave.net/extract.aspx?e=W2ewQymxjCnm3dniBlQbE~KzarRZj0wYPi4fyHQ0p2qbQg1VcWkCd-suKFaTnhl6 https://nevada.ionwave.net/extract.aspx?e=cpzR-rIX9-lv~6~D9hN3RqiRW2xtXDileG1F4qPua9cniEonfNCkuNtlLRIxE51H https://nevada.ionwave.net/extract.aspx?e=7aDo-gO7N1ls2KJ1~A29nKJsVvvMOjO2d9R4SUgZrBWH5-KMh~ZbSiLzD9tpdwpW https://carsoncitynevada.webex.com/weblink/register/r81209e93a7f7037812a8122da3b5d8ec javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl01','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl01','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl02','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl02','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl03','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl03','')
1 2 3 4 5 6 7 8 9 10 ... 3260 items in 218 pages
1 13 items in 1 pages
Supplier Name City State Contact
3G Productions Las Vegas NV David Myers
3M Company St. Paul MN
4 Elements Distribution Group NEWPORT BEACH CA Bridgette
4 K Construction inc. Las Vegas NV Hector Quiles
Plan Holders Supplier Name City State Contact Name Email Phone
America United Construction, Inc. Henderson NV Nic Beechum NicB@AUCNV.com (702) 547-1182
AMERICAN HIGHWAY FERNLEY NV Benita Blanchard Benita.blanchard@americanhighway.com (775) 391-3330
Amrize Southwest Inc. Las Vegas NV Richard Cross estimatingsw@amrize.com (702) 649-6250
CG&B Enterprises Inc. Henderson NV Michelle Hall m.hall@cgandbinc.com (702) 565-6564
Convergence Group Limited 89141 NV Leonardo Todaro leonardo@convergencenv.com (702) 763-5426
Gerhardt and Berry Construction Sparks NV Tim Trudell tim@gerhardtandberry.com (775) 359-8817
MAUI ONE EXCAVATING, INC Las Vegas NV (702) 658-1556
Measure, LLC Logan UT (435) 512-2942
Nevada Barricade & Sign Co, Inc. Reno NV Joshua Dethmers Joshua.Dethmers@nbsco.com (775) 331-5100
PWXPress Jacksonville FL Mary Miller bids@pwxpress.com (408) 676-8941
SIERRA CONTRACTORS SOURCE RENO NV Jana Higgins SIERRASOURCE@SCSPLANROOM.COM (775) 329-7222
Soil-Tech Las Vegas NV Brent Neel (702) 873-2023
Spanish Springs Construction, Inc. Reno NV Leslie Skinner leslie@ssc.email (775) 425-4000
9/30/26, 2:02 PM Nevada Gov eMarketplace https://nevada.ionwave.net/PublicDetail.aspx?bidID=20630&SourceType=1&pg=2 3/3 javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl05','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl07','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl09','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl11','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl13','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl15','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl17','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl19','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl21','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl23','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl03$ctl01$ctl25','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl03$ctl01$ctl05','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl01','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl01','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl02','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl02','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl03','') javascript:__doPostBack('ctl00$mainContent$rgInvited$ctl00$ctl02$ctl01$ctl03','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl02$ctl01$ctl00','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl02$ctl01$ctl02','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl02$ctl01$ctl03','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl02$ctl01$ctl04','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl02$ctl01$ctl05','') javascript:__doPostBack('ctl00$mainContent$rgPlanHolderMemberList$ctl00$ctl02$ctl01$ctl06','')