Bid Notice.pdf
PDF 664 KB Posted
- Solicitation number
- 26-055
- Issued by
- Pueblo County, Colorado
About this file
This Bid Notice document is issued by the Colorado Department of Transportation (CDOT) for roadway and signalization improvements at the intersection of State Highway 45A (Pueblo Boulevard) and Mirror Avenue in Pueblo County, Colorado. The project scope includes installation of new traffic signal poles at all four corners of the intersection, construction of raised medians on Pueblo Boulevard extending approximately 1,200 feet east and 2,000 feet west of Mirror Avenue, and resurfacing of the eastbound to northbound left turn lane. The raised medians require 6-inch over-excavation of native fill below existing asphalt with replacement Class 6 ABC material, while the turn lane will receive a 2-inch mill and overlay with new striping and signage. Proposals are due October 14, 2026, and all work must be completed in accordance with the project plans, specifications, and any addenda issued prior to bid submission.
The project is funded through Colorado state transportation resources allocated for highway safety and infrastructure improvements. Specific details regarding pricing terms, performance timelines, bonding requirements, insurance specifications, and award criteria are contained within the referenced bidding document. Contractors are required to review all plans, specifications, and addenda prior to submission to ensure compliance with project requirements and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| biddoc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUBLIC IMPROVEMENT INVITATION FOR BID
26-055
ROADWAY AND SIGNALIZATION IMPROVEMENTS - STATE
HIGHWAY 45A (PUEBLO BOULEVARD)
City of Pueblo
230 S. Mechanic St.
Pueblo, CO 81003
RELEASE DATE: September 22, 2026
DEADLINE FOR QUESTIONS: October 6, 2026, 4:00 pm
RESPONSE DEADLINE: October 14, 2026, 10:00 am
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/pueblo
City of Pueblo
PUBLIC IMPROVEMENT INVITATION FOR BID
Roadway and Signalization Improvements - State Highway 45A (Pueblo
Boulevard)
I. ADVERTISEMENT FOR BIDS
II. INTRODUCTION
III. SPECIAL PROVISIONS
IV. LABOR PROVISIONS
V. GENERAL PROVISIONS
VI. VENDOR SUBMISSIONS
VII. PRICING TABLE
Attachments:
A - Sample Contract Documents
B - Licensing and Sales Tax Information
C - Bid Plans - C0 45 & Acero
D - Bid Plans - CO 45 & Mirror
E - CDOT R2 CO 45 & Mirror - Access Permit #224098 - PSE Spec Package
Public Improvement Invitation for Bid #26-055 Title: Roadway and Signalization Improvements - State Highway 45A (Pueblo Boulevard)
1. ADVERTISEMENT FOR BIDS
(AS PUBLISHED)
The City of Pueblo is soliciting bids for the following project.
Project No.: 26-055
Project Name: Roadway and Signalization Improvements - State Highway 45A (Pueblo Boulevard)
In general, this project will consist of the installation of new traffic signal poles in all four corners of the intersection of CO45A (Pueblo Boulevard) and Mirror Avenue, as detailed in the plans and specifications.
This project also includes the installation of raised medians on Pueblo Boulevard approximately 1200 feet to the east and 2000 feet to the west of Mirror Avenue. The raised medians will include a 6-inch over-excavation of native fill below existing asphalt and replacement with Class 6 ABC. The east bound to north bound left turn lane will receive a 2-inch mill and overlay with new striping and signage and other incidental items.
Complete solicitation information can be obtained on the City of Pueblo Purchasing Department website at www.pueblo.us/purchasing or the OpenGov portal at https://procurement.opengov.com/portal/pueblo.
Published: Tuesday, September 22, 2026, in The Pueblo Chieftain Newspaper
2. INTRODUCTION
2.1. Summary
In general, this project will consist of the installation of new traffic signal poles in all four corners of the intersection of CO45A (Pueblo Boulevard) and Mirror Avenue, as detailed in the plans and specifications.
This project also includes the installation of raised medians on Pueblo Boulevard approximately 1200 feet to the east and 2000 feet to the west of Mirror Avenue. The raised medians will include a 6-inch over-excavation of native fill below existing asphalt and replacement with Class 6 ABC. The east bound to north bound left turn lane will receive a 2-inch mill and overlay with new striping and signage and other incidental items.
2.2. Contact Information
Debby Rivera
Purchasing Contract Administrator
Email: purchasing@pueblo.us
Phone: (719) 553-2350
Department:
Public Works
2.3. Timeline
Advertisement/Release Project Date September 22, 2026
Pre-Bid Meeting (Non-Mandatory) September 29, 2026, 9:00am
In-Person:
Department of Public Works Conference Room
211 East D Street
Pueblo, Colorado 81003
Microsoft Teams:
Join:
https://teams.microsoft.com/meet/272060153963
206?p=EP8KiiyAqSmQgbx0kH
Meeting ID: 272 060 153 963 206
Passcode: va727yH2
Dial in by phone
+1 719-467-7197,,331419434# United States, Pueblo
Question Submission Deadline October 6, 2026, 4:00pm
Bid Opening October 14, 2026, 10:00am
3. SPECIAL PROVISIONS
3.1. GENERAL INSTRUCTIONS
All specifications included in the Special Provisions shall have precedence over and will govern in the event of a conflict with other sections contained in this document.
Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Failure to do so will not relieve a Bidder from any obligation or responsibility to understand and comply with all requirements and conditions for this project.
Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No
Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening.
Downloaded plans/drawings must be printed as “Actual Size”; scaling is NOT correct when printed using other options. It is the Bidder’s sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidder’s failure to follow this requirement.
Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of
Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award.
The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
Bidders must follow the submittal procedures outlined in the bid documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest.
3.2. PERFORMANCE OF WORK
Contractor must be capable of, and shall be required to, self-perform at least thirty percent (30%) of the actual labor or trade work (not supervision) required to complete the project. By submitting a bid, Contractor certifies that Contractor’s own employees shall be utilized to meet the self-performance requirement. Supervision of subcontractors is not considered self-performance. Failure to meet this requirement may result in the bid being deemed non-responsive. Documented confirmation that
Contractor is meeting this requirement during the performance of the work will be required.
3.3. RESPONSIBILITY AND CAPACITY TO PERFORM CONCURRENT WORK
In determining responsibility, the City may review each Bidder’s capacity to perform multiple City projects concurrently, including staffing, equipment, bonding, financial resources, current workload, and performance history. Bidder’s failure to adequately demonstrate such capacity shall be grounds for determining bidder not responsible.
3.4. STANDARD CONSTRUCTION SPECIFICATIONS AND STANDARD DETAILS
This project shall be constructed in accordance with the Colorado Department of Transportation (CDOT)
Standard Specifications for Road and Bridge Construction (2025) (referred to as the standard specifications) and the most current versions of the CDOT Standard Plans M Standards and S Standards
(2026). These CDOT specifications and standards are not included in this bid package but are available on the CDOT website.
The 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado, adopted January 12, 2026, and as most recently amended, shall control the construction and quality of materials for this project except where specifically modified by the Special Provisions. Unless specifically modified by the Special Provisions, the 2026 Standard Construction Specifications and Standard Details shall control with respect to any inconsistencies with the Plans. The 2026 Standard Construction
Specifications and Standard Details are not included in this bid package but are available on the City of
Pueblo’s website at 2026 Standard Construction Specifications and Standard Details.
By submitting a bid, the Contractor acknowledges possession of a copy of said documents.
3.5. SPECIFICATION LANGUAGE
Specifications may be written in abbreviated style with incomplete sentences. Omission of words such as “The General Contractor shall”, “Conforming to”, “shall be”, etc., are intentional; omitted words shall be supplied by inference. Where words “approved”, “satisfactory”, “directed”, “submitted”, etc., are used it shall be assumed that the words “Project Manager” follows, such as “approved by the Project
Manager”.
3.6. DEFINITION OF ENGINEER
The term “Engineer” as used in Sections GENERAL PROVISIONS Authority of Engineer (a) and (b), of
GENERAL PROVISIONS , shall mean the City Engineer with respect to all questions relating to the conformance of the work with the technical requirements of the plans and specifications, interpretation of the technical requirements of the plans and specifications, and with respect to the rejection of work and materials which do not conform. With respect to all other uses of the term “Engineer” in Section
GENERAL PROVISIONS Authority of Engineer, the term shall mean the Director of Public Works. In
Sections TERMINATION FOR CAUSE, FINAL ACCEPTANCE OF THE WORK, COMMENCEMENT AND
COMPLETION OF WORK and UNCORRECTED WORK and TERMINATION FOR CONVENIENCE of GENERAL
PROVISIONS, all references to Engineer shall mean the Director of Public Works. All other references to
Engineer in GENERAL PROVISIONS not specifically addressed in this section shall mean the City Engineer.
3.7. APPROVED EQUAL
An approved equal, where noted, may be considered by the City. For consideration as an approved equal, a Request for Substitution must be submitted through the OpenGov portal by Tuesday, October
6, 2026 at 4:00 pm (MT). Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. If approved, an addendum will be issued that lists all approved equal products or materials. No other products or materials will be considered.
3.8. INCONSISTENCIES
Any inquiries regarding seeming inconsistencies between the Plans and Specifications for this project must be made by Tuesday, October 6, 2026 at 4:00 pm (MT).
3.9. PREPAYMENT OF CITY SALES AND USE TAX
(This section applies to public improvement construction projects $100,000 and over.)
The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded, including Base Bid plus those Alternates selected. Application and prepayment shall be made within fourteen (14) days of the date authorized to proceed with construction of the Project as set forth in the Notice to Proceed. All applications and prepayments shall be coordinated directly with City’s Division of Sales and Use Tax, Attention: Tax Audit Manager, 1 City Hall Place, Pueblo, Colorado 81003.
Finance Department policy sets the threshold at $100,000. Any contractual obligations below this amount will not generally be required to make a pre-payment of Use Tax.
3.10. PERA LIABILITY
Contractor shall reimburse the City for the full amount of any employer contribution required to be paid by the City of Pueblo to the Public Employees’ Retirement Association (“PERA”) for salary or other compensation paid to a PERA retiree performing contracted services for the City under this Agreement.
Awarded Contractor will be required to submit a completed Colorado PERA Questionnaire form. This form is available to view at Colorado PERA Questionnaire and is included by reference in this Contract.
3.11. CONTRACTOR EVALUATION
The performance of the awarded Contractor will be evaluated using the Contractor Evaluation
Form. This form is available to view at Contractor Evaluation Form and is included by reference in this
Invitation for Bid. The evaluation will be utilized to review Contractor’s performance, increase communication, and foster positive business relationships.
The completed evaluation form will serve to document Contractor’s overall performance. Material failure to perform in accordance with the terms of one or more contracts, or materially unsatisfactory performance of one or more contracts, may be justification for disqualifying future bids by Contractor pursuant to Pueblo Municipal Code, Title 1, Chapter 10, Section 1-10-4(d).
3.12. SITE INVESTIGATION
By submitting a bid, Contractor acknowledges the nature and location of the work, the general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, uncertainties of weather, physical conditions at the site, the character/quality of surface and subsurface materials to be encountered, the character of equipment and facilities needed prior to and during the work, and all other matters which can in any way affect the work or the cost thereof under this Contract. Failure by Contractor to acquaint themself with all the available information concerning these conditions will not relieve them from responsibility for estimating properly the difficulty or cost of successfully performing the work.
3.13. PRE-CONSTRUCTION CONFERENCE
The Contractor shall attend a pre-construction conference with the Project Manager, City employees, representatives of the utility companies, and/or other interested parties prior to any construction.
Preconstruction meeting will be scheduled 7-10 days after notice of award is issued.
Documents Required to be submitted at Pre-Construction Conference
• Contractor Organization with 24-hour emergency contact
• Schedule
• Traffic Control Plan
• Material Submittals
3.14. SAFETY REGULATIONS
The Contractor shall be aware of and shall comply with all State and Federal Safety regulations which are applicable to the work included under this Contract. Enforcement will be by the proper State and
Federal regulatory agencies.
If any construction activity is deemed to be unsafe for inspection, Contractor shall, upon notification, discontinue work until the deficiencies are corrected and the job can be properly inspected.
3.15. EMERGENCY REPAIR OR PROTECTIVE WORK BY THE CITY OF PUEBLO
As referenced in PROTECTION OF THE PUBLIC, WORK, AND PROPERTY and ACCIDENT PREVENTION of the GENERAL PROVISIONS , it is the Contractor’s responsibility to provide adequate barricades, protective devices and safety measures, and to employ other precautionary means for the adequate protection of the public, the work, and public/private property from injury or loss. Should the City become aware of any condition or circumstance arising from the work, or with respect to any excavation or areas disturbed by Contractor which, in the opinion of the Project Manager, creates or results in any imminent or unreasonable risk to the health/safety of the public or to public/private property, the City may undertake emergency work or repairs. Such work may include, by way of illustration, provision of barricades, traffic control devices or flagmen, deployment or warning signs, repair of lines under construction, repair of collapsed excavations or sinkholes, placement of sandbags or dams, and other emergency efforts. The determination of the necessity during the construction and warranty periods for the City to do any such emergency work or repairs shall rest entirely with the Project Manager. The cost of emergency work done by the City, including the actual cost of labor, equipment, and materials, plus
100 percent, shall be deducted from any amounts otherwise owed to Contractor, or may be invoiced to
Contractor, or the same amount shall be recovered from Contractor’s performance bond.
3.16. REPRESENTATIVE AVAILABLE FOR EMERGENCY CALLS
The Contractor shall provide the name, address and phone number of a representative who may be reached at any time during the life of the Contract regarding repairs, detours, barricading, etc. This information shall be furnished in writing to the Project Manager.
3.17. DUST PREVENTION
During construction and until final acceptance by the Project Manager, Contractor shall be responsible for controlling dust emissions in the construction area. No earthwork activities shall be performed when the wind speed exceeds thirty (30) miles per hour. All fill areas shall be compacted on a daily basis to
95% minimum compaction. Any mud or dirt carry out onto paved surfaces shall be cleaned up on a daily basis. Contractor shall promptly comply with all directives from the Project Manager relating to dust control. If Contractor fails to comply or provide adequate means to control dust, a stop-work order will be issued until the problem is corrected.
3.18. SITE RESTORATION AND CLEANUP
Contractor shall maintain and/or repair any damage done to all existing properties, public or private, adjacent to site improvements, including but not limited to, asphalt, base course, utilities, sod, irrigation systems and landscaped areas. In general, disturbed areas shall be replaced to the lines, grades, thickness, and like materials of the existing conditions unless otherwise stated on the plans. Restoration shall be consistent with that of areas adjacent to the limits of construction. Grass and other plant areas shall be restored, maintained, and irrigated until final acceptance by the Project Manager. Fabric shall be installed under all rock landscape areas. Any landscape material salvaged by Contractor for reuse will not be acceptable if contaminated by dirt or different landscape material. Slopes to match from the new improvements to existing improvements shall not exceed a 4:1 slope.
All work to relocate existing irrigation sprinklers which conflicts with the new construction shall be considered site restoration. The accuracy of information furnished regarding existing irrigation systems is not guaranteed. The locations are approximate and may not include all irrigation system components.
Contractor shall determine the exact location of all irrigation systems before commencing work and shall be fully responsible for any damage resulting from failure to locate and protect all irrigation systems.
Site restoration and cleanup will not be measured or paid separately but shall be included in the unit prices for each bid item. Partial payments will not be made on any bid item until the restoration and cleanup associated with that item is satisfactorily complete and acceptable to the Project Manager.
3.19. UTILITY LOCATIONS
The accuracy of information furnished in regard to underground utilities is not guaranteed. The utility locations are approximate and may not include all utilities. Contractor shall determine the exact location of all utilities before commencing work. Contractor shall be fully responsible for any damage which might occur due to Contractor’s failure to locate and protect all utilities. Contractor shall repair or have repaired, at no cost to the City, any damage to utilities.
Existing utilities include gas, water, service lines, meters, meter cans, buried telephone cables, buried power lines, pedestals, utility poles, sanitary sewer, manholes and services, and any other existing utility.
3.20. ABANDONED UTILITIES
If during construction an abandoned utility is encountered Contractor shall contact and coordinate with the Project Manager to arrange for the removal of the utility. If Contractor elects to remove the utility without contacting the Project Manager, Contractor shall do so at no cost to the City.
3.21. OVERHEAD AND/OR UNDERGROUND HIGH VOLTAGE POWER LINES
Unless danger against contact with high voltage overhead and/or underground lines has been effectively guarded against, Contractor shall not perform any function/activity upon any land, building, highway, or other premises if at any time during the performance of any function/activity it could move or be placed within ten (10) feet of any high voltage overhead and/or underground line. If work is to be performed within ten (10) feet of high voltage overhead and/or underground lines, the public utility must first be notified to arrange for safety provisions. Contractor may perform the work only after arrangements, including coordination and payment of fees, if applicable, have been made with the utility company.
3.22. CONCRETE PERMITS
The “no fee” permit shall be obtained from the City Engineering Division at 211 E. “D” Street. Any concrete work placed without benefit of both permit and inspection by the Public Works Department will not be paid for.
3.23. COORDINATION OF CONSTRUCTION ACTIVITIES
Contractor and subcontractors shall coordinate work with all other construction activities and contractors; and cooperate with them to facilitate general progress of the work. Each trade shall afford other trades every reasonable opportunity for installation and storage of materials.
3.24. WORK BY OTHERS
Contractor shall coordinate work on the project with all work shown on the plans which is to be done by
“others”. It is the Contractor’s responsibility to coordinate work with each entity and incorporate it into the project schedule.
Pueblo Board of Water Works shall complete the work to relocate fire hydrants as shown on the plans.
Black Hills Energy shall complete the work to relocate light poles as shown on the plans.
3.25. COMPLETE WORK ON TIME
Failure to complete the work by the allotted 180 calendar days shall result in the assessing of liquidated damages according to GENERAL PROVISIONS.
3.26. LAYING OUT WORK
Contractor shall locate all general reference points and take such action as necessary to prevent their destruction. Contractor shall lay out their own work and be responsible for all lines, elevations, and measurements of the building, grading, utilities, and other work executed under this Contract.
Contractor shall exercise proper precaution to verify figures shown on the drawing before laying out work and will be responsible for any error resulting from failure to exercise such precautions.
3.27. CONSTRUCTION STAKING
Contractor will be required to perform all construction staking and surveying.
3.28. HOURS OF WORK
The Project Manager and the Inspection Division are available from 7:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m., Monday through Friday, excluding holidays. Any work done outside of these hours must be approved by the Project Manager.
3.29. MOBILIZATION
This item shall consist of mobilizing of personnel, equipment, and supplies to the project site in preparation for work on the project. Item shall include all costs incurred which must be performed prior to beginning the other items.
Partial payments for mobilization will be made each month as the work progresses. These payments will be made as follows:
A. When ten percent (10%) of the project bid amount is earned, fifty percent (50%) of the amount bid for mobilization will be paid.
B. When fifty percent (50%) of the project bid amount is earned, one hundred percent (100%) of the amount bid for mobilization will be paid.
C. The sum of all payments shall not exceed the original amount bid for the item, regardless of the fact that Contractor may have, for any reason, shut down the work on the project or moved equipment away and then back again.
Note: Payments for materials on hand will be included as a percent of original project bid amount earned until said materials have been incorporated into the work and accepted and paid for by the City.
3.30. CONSTRUCTION TRAFFIC CONTROL
Contractor shall submit a traffic control plan prepared by a Certified Traffic Control Supervisor at the preconstruction conference for approval by the City’s Traffic Engineer.
Where possible, crosspans may be constructed full width with proper street closures; however, the time of closure must be kept to a minimum. To expedite the curing, the minimum 28-day compressive strength shall be increased to 4500 psi (increased to seven (7) sacks per cubic yard). The additional cost for the added cement shall be paid by the Contractor.
All traffic control procedures, signing, lighting and barricades shall conform to the latest edition of the
Manual on Uniform Traffic Control Devices, and shall be set up and maintained by a Certified Traffic
Control Supervisor.
Construction traffic control shall be paid as “Traffic Control.” Periodic payments for this item shall be based upon the percentage of work completed compared to the original bid amount.
3.31. TRAFFIC CONTROL SUPERVISOR
The Traffic Control Supervisor shall be certified as a Worksite Traffic Supervisor by the American Traffic
Safety Services Association (ATSSA) or Colorado Contractors Association (CCA). A copy of the Traffic
Control Supervisor's Certification shall be provided to the Project Manager at the project pre construction conference
3.32. TRAFFIC CONTROL DEVICES – SIGNS
Contractor shall be responsible for all permanent traffic control devices (signs) within the construction area. If permanent devices conflict with construction activities, Contractor shall be responsible for placement of temporary traffic control devices and the removal/reinstallation of permanent devices.
All work shall be in accordance with the Manual of Uniform Traffic Control Devices. All regulatory signs
(Stop, Yield, One Way, Do Not Enter, etc.) shall be maintained in either a temporary or permanent manner. Temporary devices shall be in place prior to the removal of permanent devices. Contractor shall be held fully responsible for any claims resulting from negligence in failing to act or maintain any traffic control device.
Contractor shall be responsible for maintaining the condition of any sign that is temporarily removed.
Should there be any damage to devices (signs, poles, bases, and hardware) Contractor shall be financially responsible to the City for replacement of said devices.
Contractor shall contact Traffic Maintenance at (719) 553-2300 for approval of the specific location in which the devices are to be reinstalled. Contractor shall obtain underground utility locates prior to reinstalling devices.
The Traffic Engineer or designee will evaluate existing signage for replacement with new materials. If required, the City will provide all replacement materials to the Contractor prior to reinstallation. Where new devices are required per the construction drawings all signs, posts, bases, and hardware shall be supplied by the City. Contractor shall contact the Traffic Engineer at (719) 553-2722 to order signs providing the City at least two-week notification to obtain the necessary material.
3.33. PROTECTION OF CONCRETE FROM TRAFFIC AND VANDALISM
All concrete shall be protected from traffic for a period of fourteen (14) days, or as directed by the
Project Manager. The Contractor shall provide necessary supervision and/or barriers to protect all concrete from traffic or vandalism. Any concrete damaged by traffic and/or vandalism will be rejected.
Replacement of damaged concrete shall be paid for entirely by the Contractor.
3.34. ASPHALT AND CONCRETE REMOVAL
Asphalt and concrete shall be removed to the lines and grades established by the Project Manager. Any removal outside those lines and grades not approved by the Project Manager, will not be paid for by the
City. Contractor shall properly dispose of all removed items from the construction site.
Saw cutting to remove asphalt and concrete to a neat line shall not be paid for separately but shall be included in the cost of the asphalt and concrete removal bid item.
3.35. CURB AND GUTTER CONSTRUCTION AND PAYMENT
Contractor shall schedule their work to minimize the inconvenience to the public. Property owners shall be notified well in advance of any work that interferes with access to private driveways. Access to driveways shall be restored no later than fifteen (15) days after the concrete is placed.
Sections of curb and gutter shall not be considered for partial payment until backfill and restoration (if applicable) are completed.
Under the bid item labeled “Const. Curb and Gutter”, the Contractor shall construct curb and gutter to match existing type (6” Std. 9”x30” pan, Roll top, etc.). Payment for all types of curb and gutter will be the unit price in the Bid Schedule.
3.36. TACTILE BAND FOR CURB RAMPS
The base of the curb ramp area only shall include a Tactile Band. The Tactile Band shall be cast iron castings containing truncated domes. Castings shall meet the requirements of Americans with
Disabilities Act Accessibility Guidelines (ADAAG) for Accessible Public Rights-of-Way. Castings shall be cast-in-place truncated dome tactile system, Neenah R-4984, East Jordan Iron Works 7005, or approved equal at the sizes shown on the plans. Radial castings shall be East Jordan Iron Works 7006-20 (20’ radius), 7006-25 (25’ radius), 7006-30 (30’ radius) or approved equal, placed as shown on the plans. All work associated with this item shall be paid for under the “Install Tactile Band” bid item.
3.37. EROSION AND SEDIMENT CONTROL
Contractor shall submit and comply with, an Erosion and Sediment Control Plan. This plan is considered incidental to the construction and shall not be paid for separately. Contractor shall take this into consideration in preparing their bid.
To comply with current state and federal permit regulations the City must meet minimum requirements for all construction sites less than one (1) acre to provide necessary Best Management Practices (BMPs) and prevent illicit discharges from the site. The minimum requirements which the Contractor must provide and comply with are as follows:
A. Provide an Erosion and Sediment Control Plan that shall include the minimum following items:
1. Stockpile BMPs protection.
2. Concrete washout BMPs.
3. Vehicle tracking control BMPs.
4. Site sediment containment BMPs.
5. Downstream secondary defense BMPs, if applicable.
6. Any additional BMPs required due to site specific conditions.
B. Prior to any construction, including site grading and excavation, an approved Erosion and
Sediment Control Plan shall be posted on site and all required BMPs installed.
C. Contractor shall maintain and update the Erosion and Sediment Control Plan as construction dictates. The current and correct plan shall remain on-site and be readily accessible to the City
Stormwater Inspector at all times.
D. Contractor or the Contractor’s representative shall, at a minimum, inspect the site every two (2) weeks and within twenty-four (24) hours of any precipitation or snowmelt event that causes surface erosion. (i.e., that results in stormwater running across the ground).
E. Contractor shall be responsible for maintaining all required BMPs to prevent erosion and sediment from leaving the construction site.
F. Failure to comply with the requirements to prevent illicit discharges from the construction site is unlawful and a municipal offense which may result in the issuance of a summons and complaint to the Pueblo Municipal Court. Persons who are convicted of violating any provision of the
Pueblo Municipal Code are subject to fines of up to one thousand dollars ($1,000) and/or one
(1) year imprisonment for each day the violation continues.
G. Information regarding acceptable BMPs and proper installation can be found in the Urban
Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual Volume 3, CDOT Erosion Control & Stormwater Quality Guide, and City of Pueblo approved details.
3.38. PERMITS AND FEES
It shall be the Contractor’s responsibility to investigate and assess the requirements for all necessary environmental, drainage, and construction permits. The total cost of all permits or fees which may be required shall be included in the bid proposal. No additional payment shall be allowed for any permits or fees required to complete the project. Contractor shall comply with all conditions of the permits. City and/or other agency fines are the sole responsibility of the Contractor.
Following is a list of potential permits required for the project. Contractor shall be responsible for verifying this list and adding/obtaining any additional permits needed for the project.
• Air Quality Permit o Permitting Agency: Pueblo County/Colorado Department of Public Health and Environment o Responsibility to Obtain: Contractor
• CDPHE Stormwater Construction Permit o Permitting Agency: Colorado Department of Public Health and Environment
• Excavation Permit o Permitting Agency: City of Pueblo o Responsibility to Obtain: Contractor
• Concrete Permit o Permitting Agency: City of Pueblo o Responsibility to Obtain: Contractor
• Traffic Control Permit o Permitting Agency: City of Pueblo o Responsibility to Obtain: Contractor
• Fugitive Particulate Emissions Control Plan o Permitting Agency: Colorado Department of Public Health and Environment
3.39. SUBMITTALS
The Submittal Register included as Attachment F lists the major items the awarded Contractor will be required to submit for this project. Contractor shall use the provided Submittal Register for every submittal. All submittals shall be made electronically and sent directly to the Project Manager for review. All MSDS sheets must be submitted prior to bringing materials on site.
Contractor shall also submit any other material items not listed but which will be used in the construction of this project.
4. LABOR PROVISIONS
4.1. CONTRACTOR BONDS
Payment and performance bonds are required to be filed prior to issuance of Notice to Proceed. The specific requirements for such bonds are set forth in Section CONTRACT SECURITY of the GENERAL
PROVISIONS.
4.2. NONDISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY
REQUIREMENTS
In accordance with §1.8 of the Pueblo Municipal Code (entire Code included by reference), all contractors shall meet and comply with the following provisions which shall be contained in all municipal contracts:
A. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, ancestry, disability, age, or national origin. The
Contractor will take affirmative action in all areas of employment to ensure that applicants for employment are employed, and that employees are treated during employment, without regard to race, color, religion, sex, sexual orientation, ancestry, disability, age, or national origin. Areas of employment shall mean and include, but shall not be limited to, the following: initial employment, upgrading, demotion, transfer, recruitment, recruitment advertising, layoffs, terminations, rates of pay, terms of compensation and selection for training, including apprenticeship. The Contractor will post in conspicuous places, available to employees and applicants for employment, notices to be provided by the City setting forth the provisions of this nondiscrimination and equal employment opportunity paragraph. Failure to subscribe to and accept the nondiscrimination and equal employment requirements of this Chapter shall render a bidder ineligible for a municipal contract award and ineligible to participate in the work for which a municipal contract award is made. (§§1.8.3 and 1.8.4 of the PMC; Ord. No. 4479, 5-22-
78)
B. It is the policy of the City to provide equal opportunity in employment without regard to race, color, religion, sex, sexual orientation, ancestry, disability, age, or national origin. It is hereby deemed and declared to be for the public welfare and in the best interests of the City to require bidders and contractors furnishing and providing work, services, supplies and materials to the
City under municipal contracts not to discriminate in the hiring and promoting of employees in order to further equal employment opportunities for members of minority groups and women.
The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, ancestry, disability, age, or national origin. (§1.8.3 of the PMC; Ord. No. 4479, 5-22- 78; Ord. No. 8453 §2, 2-27-12)
C. Contractor will meet or comply with the letter and spirit of Chapter 8, Title 1 of the Pueblo
Municipal Code (as amended) and applicable State statutes. If the municipal contract involves construction work or the providing of supplies or materials in excess of ten thousand dollars
($10,000.00) in the building and construction trades industry, Contractor shall have adopted and file with the City a copy of the Contractor’s complying Affirmative Action Program. A complying
Affirmative Action Program shall be a written affirmative action program meeting all the requirements of Chapter 60 of Title 41, Code of Federal Regulations (41 CFR, Chapter 60), including all parts and subparts thereof. This requirement applies regardless of whether Federal financial assistance has been provided for this project.
D. In the event of Contractor’s non-compliance with the requirements of Chapter 8, Title 1 of the
Pueblo Municipal Code (as amended), the Contract may be cancelled, terminated, or suspended, in whole or in part, and Contractor may be declared ineligible for further contracts with the City of Pueblo.
E. Contractor will include the provisions of the above listed paragraphs (a) through (d) in every sub-contract entered in to by Contractor to provide and furnish work, services, supplies, or materials under a City project.
4.3. COMPLIANCE REVIEW
A. The City of Pueblo shall have the power to review, upon not less than five (5) days notice, and during normal business hours, the employment practices of Contractor during the performance of every such City project, and of subcontractors during the performance of every sub-contract awarded thereunder, to obtain information relating to compliance or non-compliance with non-discrimination and equal employment requirements.
B. When a written complaint is filed and an investigation by the City indicates that there has been a violation of this provision, or when a compliance review by the City indicates that a contractor or subcontractor has violated this provision, the City shall issue and cause to be served on said
Contractor or subcontractor a Notice of Violation. Such notice shall specify the violations and shall direct the Contractor or subcontractor to respond in writing within ten (10) days to show cause why the sanctions of the provision should not be imposed. The City shall forward a copy of the Notice of Violation and the response of the Contractor or subcontractor to the City Mayor within thirty (30) days from the date of such notice.
C. The City Mayor or authorized City representative shall review the Notice of Violation and response and shall determine whether any violations have occurred. If the City representative has determined that a violation has occurred, they may impose such sanctions as deemed appropriate, including, but not limited to, suspending or terminating the Contract involved or any portion or portions thereof, or causing to be removed from the list of eligible pre-qualified contractors the names of contractors or subcontractors found to be in noncompliance with the non-discrimination and equal employment opportunity requirements of the provision and the provision of any such contract or subcontract awarded thereunder until such time as the City is satisfied that such contractors or subcontractors are in compliance with said requirements.
4.4. FEDERAL REQUIREMENTS GOVERN
Federal requirements govern. Whenever the provisions and requirements of this Chapter, or of the bidding specifications, conflict in any way or to any degree with the nondiscrimination and equal employment opportunity requirements of the United States and any such contract under consideration is funded in whole or in part by the United States or is otherwise subject to requirements having the force of law of the United States, such requirements of the United States shall govern and control. (Ord.
No. 4479, 5-22-78)
4.5. COMPLIANCE
By submitting a bid Contractor agrees to abide by the provisions herein set forth and will require any and all subcontractors to comply with said provisions.
5. GENERAL PROVISIONS
The provisions of this Section are of a general nature and are intended to apply to contract work of all types. Whenever any of these provisions do not apply to a specific contract, the exceptions are noted in
SPECIAL PROVISIONS.
5.1. BIDDING AND CONTRACT EXECUTION: DEFINITIONS
The following terms, as used in these Contract Documents, are respectively defined as follows:
A. City: City of Pueblo, Colorado
B. Closing Time: The scheduled closing time for the receipt of bids and the opening thereof.
C. Contractor: The person, persons, firm, or corporation to whom the within Contract is awarded by the City and who is subject to the terms of said Contract. Also, the agents, employees, workers, or assignees of said Contractor.
D. Engineer: Unless otherwise stated in the Special Provisions, Engineer shall mean the Director of
Public Works of Pueblo, Colorado, or their authorized agents.
E. Work: All work contemplated by the Contract Documents and Specifications including materials, labor, supervision, and use of tools necessary to complete the project in full compliance with the terms of the Contract.
F. Notice: Where in any section of the Contract Document there is any provision in respect to the giving of any notice, such notice shall be deemed to have been given (as to the City) when written notice shall be delivered to the Engineer or shall have been placed in the United States
Mail addressed to the Purchasing Department at the place where the bids, or proposals for the
Contract were opened; (as to the Contractor) when a written notice shall be delivered to the chief representative of the Contractor at the site of the project to be constructed under the
Contract or when such written notice shall have been placed in the United States mail addressed to the Contractor at the place stated in the papers prepared by them to accompany their proposal as the address of their permanent place of business; (as to the Surety) on the performance and payment bonds when a written notice is placed in the United States mails addressed to the Surety at either the home office of such Surety or when such notice is placed in the United States mails addressed to the Commissioner of Insurance of the State of Colorado.
G. Project: The entire improvement proposed by the City to be constructed in whole or in part pursuant to the Contract Documents.
H. Subcontractor: A person, firm, or corporation, other than the Contractor, supplying labor and materials, or labor only, on work at the site of the project, having a direct contract with the
Contractor and including one who furnishes material worked to a special design according to the plans and specifications of this work, but not including one who merely furnishes material not so worked.
I. Surety: The person, firm, or corporation that has executed, as surety, the Contractor’s
Performance and Payment Bonds.
5.2. BIDDING AND CONTRACT EXECUTION: SITE EXAMINATION
A. Bidders shall inform themselves of the conditions under which the work is to be performed, concerning the site of the work, the structure of the ground, obstacles which may be encountered, availability of labor and all other relevant matters concerning the work to be performed. Where soil reports or test boring logs indicating underground conditions are provided or shown on the plans, such information shall be considered only as indicative of conditions as observed at the time and place indicated, and the City in no way warrants the accuracy or reliability of said reports or boring logs and is not responsible for any deduction, interpretation or conclusion drawn therefrom by the Contractor. Contractor acknowledges that the City shall not be held responsible for any variance in conditions or unforeseen conditions encountered at the time of actual construction. It shall be the responsibility of the Contractor to satisfy themself by such methods as they deem necessary prior to the letting as to underground conditions, structures, and obstacles to be encountered.
B. The Contractor to whom a contract is awarded will not be allowed any extra compensation by reason of any matter or thing concerning which they might fully have informed themself, prior to the bidding. Misunderstanding as to the amount of work, availability of materials or labor shall be no cause for failure to enter into the Contract or to perform the same.
C. The successful Contractor will be required to employ, so far as possible, such methods and means in the carrying out of their work as will not cause any interruption or interference with any other Contractor.
5.3. BIDDING AND CONTRACT EXECUTION: SPECIFICATION REQUIREMENTS
A. The bidder is expected to base their bid on materials and equipment complying fully with the plans and specifications, and in the event they name in their bid, materials or equipment which do not conform, they will be responsible for furnishing materials and equipment which fully conform at no change in their bid price.
B. Before submitting a bid, each Contractor should read the complete specifications and plans, including all related documents contained herein, all of which contain provisions applicable not only to the successful bidder, but also to their subcontractors.
5.4. BIDDING AND CONTRACT EXECUTION: SUSPENSION AND DEBARMENT
A. Bidder acknowledges that as of the solicitation submittal date, neither the Contractor, nor its subcontractor(s), is (a) debarred, suspended, or subject to any proceeding for debarment or suspension with a final determination still pending; declared ineligible or voluntarily excluded
(as such terms are defined in any of the Debarment Regulations) from participating in procurement or non-procurement transactions with any Federal, State, or City government department or agency pursuant to any of the Debarment Regulations, or (b) indicted, convicted or had a Judgment rendered against the Contractor, or its subcontractor(s) for any of the offenses listed in any of the Federal, State, or City’s Debarment Regulations and no event has occurred and no condition exists that is likely to result in the debarment or suspension of the
Contractor, or its subcontractor(s), from contracting with the City of Pueblo, Federal or State government, or any agency or instrumentality thereof.
5.5. BIDDING AND CONTRACT EXECUTION: STATEMENT OF BIDDER’S PLANT
AND FINANCIAL CONDITION
A. Each bidder shall be prepared to submit the following data within seven (7) days upon demand of the Purchasing Agent.
1. A statement that the bidder maintains a permanent place of business and address thereof;
2. A statement of the equipment which the bidder proposes to use on the project, together with a statement identifying that equipment previously mentioned which the bidder owns and that which bidder does not own, but is certain they will be able to rent or otherwise procure for use on the project;
3. A financial statement, duly sworn to and in form approved by the City, listing assets and liabilities;
4. Statement listing projects of similar nature which the bidder has constructed or in the construction of which the bidder was actively engaged in a responsible capacity;
5. A statement that the bidder: (i) is not presently debarred or suspended by the Colorado
State purchasing director or the head of any Colorado purchasing agency, (ii) is not listed on any federal government list of debarments, suspensions or voluntary exclusions, including but not limited to, the List of Parties Excluded From Federal Procurement or
Nonprocurement Programs maintained by the General Services Administration, and (iii) neither bidder nor any person or firm who has an interest in bidder's firm is a person or firm ineligible to be awarded a federal government contract by virtue of any provision of federal law. In the event bidder cannot truthfully make the required statement, bidder shall furnish a detailed statement indicating the reasons therefore.
B. By submitting a bid, bidder authorizes the City to obtain information concerning bidder's performance on other projects it has performed during the prior five (5) years, including those listed by bidder and those not listed which City may become aware of. The bidder also waives and releases all claims against owners, architects, and engineers, and their agents and representatives, relating to or arising from the furnishing of such information to the City concerning bidder's performance on prior projects. In order to effectuate the intent of this clause, bidder may be required by City to execute information release authorization forms.
C. Any bidder may be required by the City to submit additional data to satisfy the City that such bidder is prepared to fulfill the Contract if it is awarded to them.
D. The failure of bidder to furnish any information which is or may be required to be furnished under this section shall be grounds for determining bidder not responsible.
5.6. BIDDING AND CONTRACT EXECUTION: CONDITIONS IN A BIDDER'S
PROPOSAL
A bidder shall not stipulate in their proposal any conditions not contained in the Contract Documents.
5.7. BIDDING AND CONTRACT EXECUTION: QUANTITIES
Bidders must satisfy themselves by personal examination of the locations of the proposed work and by such other means as they may prefer as to the correctness of any quantities listed in the proposal and shall not after submission of their proposal, dispute or complain of such estimate, nor assert that there was any misunderstanding in regard to the nature or amount of work to be done.
5.8. BIDS: DATA SHEETS
Where data sheets concerning equipment to be furnished are included in the Specification Documents as a part of the proposal, the bidder shall furnish the required…
This is the start of the file's text. The full file is on GovTribe.