Bid_Form_Cost_Sheet.docx
DOCX document 22 KB Posted
- Attached to
- Infill two Garage Doors Ellsworth
- Solicitation number
- EVT0009879
- Issued by
- Ellis County, Kansas
About this file
The document appears to be a Bid Form and Cost Sheet for a construction project to infill garage bay doors at the Ellsworth Subarea Building of the Kansas Department of Transportation (KDOT). The project requires the contractor to provide and install metal door frames, windows, concrete blocks, reinforcement rebar, and bond beams to fill two garage bays. Site visits are mandatory, and bidders must contact KDOT's Howard Reece by 9/3/2024 to schedule a visit. The contractor is responsible for all parts, labor, and installation, with KDOT providing the metal door frames. Pricing must be FOB (Freight on Board) Destination, Prepaid and Allowed, with the total lump sum bid amount to be filled in on the form.
The document does not mention any set-asides, incumbents, funding sources, or other salient pricing or contract details. The project appears to be a straight-forward construction project to infill two garage bays at the KDOT Ellsworth Subarea Building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AdditionalRequiredDocuments.pdf | ||
| Infill_two_Garage_Doors_Ellsworth.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVT0009857
Ellsworth Subarea Infill Garage Doors Kansas Department of Transportation
| Ellsworth Subarea Building Block Infill Specs | 08-07-24 | |
| 202 W. 15th | BD 2-4022 |
Ellsworth, KS 67439
Infill 2 garage bay doors:
. Set metal door frame and window (provided by KDOT).
. Door will need to be placed on the side closest to the drinking fountain with the window on the other side. KDOT will like to have between 12-15ft between the door and window.
. Floors do not need to be done as this will occur after, . Drill and epoxy in #4 rebar every 4’ for vertical reinforcement.
. Lay 12”x8”x16” concrete block to fill garage bays.
. Install bond beam course every 4’ vertically with (2) #4 rebar placed horizontally inside of the bond beam with wall grout.
. Install bond beam with 8” over hanging each side of the door opening and window opening with (2) #4 rebar placed horizontally inside of the bod beam with wall grout.
. Pour wall grout every 4’ with (1) #r4 rebar for vertical reinforcement
Site visits are required. If you have not visited the site, please contact Howard Reece by 9/3/2024.
Contact: Howard Reece (785) 515-6803 Office, (785) 826-6836 Cell
General Summary
The Contractor shall provide and deliver: Parts, Labor and Installation with the exception of the Metal door frame that is provided by KDOT.
SHIPPING:
Prices shall be FOB DESTINATION, PREPAID AND ALLOWED (Included in the bid price), which means delivered to a state agency’s receiving dock or other designated point as specified in this contract or subsequent purchase orders without additional charge.
Bid Schedule Total Lump Sum: $______
File details come from the government source that posted it. Updated .