Bid Form 00405 - Oct 2025.xls

XLS spreadsheet 26 KB Posted

Attached to
Landfill Gas Blower Skid
Solicitation number
025-26-09
Issued by
South Carolina

About this file

The document is a Bid Form for a Landfill Gas Blower System Upgrade project issued by the Horry County Solid Waste Authority (HCSWA) in Conway, South Carolina, scheduled for October 2025. The bid opportunity requires electronic submission through BID NET by November 26, 2025, at 4:00 P.M. EDT, with no alternative submission methods accepted. The project involves a comprehensive blower system upgrade, including a base bid for a complete blower system package, freight, taxes, start-up and training services (5 days onsite), and spare parts. Optional bid items include lowering outlet gas temperature to 100 degrees Fahrenheit and increasing outlet gas pressure to 2.5 PSIG.

The bid form presents a unit price schedule with lump sum (LS) line items, though specific pricing has not been filled in on this document. The Horry County Solid Waste Authority reserves the right to accept or reject any proposal or individual proposal items. The project appears to be focused on upgrading landfill gas handling infrastructure, with potential performance modifications available through optional bid items. The electronic bidding process through BID NET suggests a structured, transparent procurement approach typical of municipal and county-level infrastructure projects.

View the file

Other files

File Type Posted
HCSWA.ProjectManual.BlowerSkid.Oct2025.pdf PDF
00020invit.Oct2025.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLOWER SKID

Section 00405
Schedule of Unit Price Work
Landfill Gas Blower System Upgrade
Horry County SWA Landfill - Conway, SC
October 2025
No.ItemEstimated QuantityUnitsUnit PriceItem Subtotal
1Landfill Gas Blower System Package - Base Bid1LS$ - 0$ - 0
2Freight to Conway, SC1LS$ - 0$ - 0
3Taxes1LS$ - 0$ - 0
4Start-up and Training Services - 5 days onsite1LS$ - 0$ - 0
5Spare Parts1LS$ - 0$ - 0
TOTAL CONSTRUCTION ESTIMATE (NUMBERS)$ - 0
TOTAL CONSTRUCTION ESTIMATE (WORDS)$ - 0
OPTIONAL BID ITEMS
6Lower Outlet Gas Temperature to 100 Deg F Maximum (additional cost)1LS$ - 0$ - 0
7Higher Outlet Gas Pressure to 2.5 PSIG (additional cost)1LS$ - 0$ - 0
NOTES:
LS=lump sum