BID DRAWING SET-rev 11-05-25.pdf
PDF 13 MB Posted
- Solicitation number
- BI-CTC-688
- Issued by
- Hartford County, Connecticut
About this file
This is a Bid Drawing Set for a state construction project administered by the Connecticut Department of Administrative Services (DAS) for Naugatuck Valley Community College's Core Building located at 750 Chase Parkway, Waterbury, Connecticut. The project involves removal and replacement of existing roofing systems across four roof areas (Roofs 1-4), installation of new membrane and insulation roof systems with standing seam metal roofing in select locations, replacement of roof drains and scupper drains, and repair of water-damaged ceiling in the Fine Arts Center Auditorium Room A300 (approximately 200 square feet of non-contiguous repairs). The scope includes reconnection of existing roof-mounted mechanical equipment, ventilators, and exhaust fans to new roof curbs, extension of existing plumbing vents and storm piping to new roof elevations, disconnection and safe disposal of existing electrical wiring for mechanical equipment, and testing and balancing of all affected mechanical systems. The bid opening is scheduled for December 4, 2025, at 3:00 PM EST at 61 Woodland Street, Hartford, Connecticut. The project encompasses comprehensive architectural, mechanical, plumbing, and electrical coordination with detailed specifications requiring compliance with current editions of the International Building Code, International Plumbing Code, International Mechanical Code, NFPA standards, and Connecticut state codes.
The drawings and specifications establish that all contractors must obtain required permits and certificates of inspection before final payment, conduct site visits to verify existing conditions, submit shop drawings for review with a minimum ten-day review period, maintain existing utilities serving occupied areas without interruption, provide firestopping and fire-rating compliance at all penetrations, and guarantee all work for one year from final acceptance. The project involves work in an occupied building requiring coordination with the owner, architect, construction manager, and all affected trades to minimize disruption to building occupants. All contractors must provide operation and maintenance manuals, conduct testing and balancing through certified agencies (NEBB or AABC certified), and submit as-built drawings in electronic format. The contract documents indicate this is an alteration and renovation project with detailed demolition requirements, material specifications for roofing systems, insulation requirements (minimum R-6 for indoor ducts and R-12 for outdoor ducts), and specific requirements for hangers, supports, and identification of all electrical and mechanical systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum ONE 11-25-25.pdf | ||
| A201-2017 -GenCond_BI-CTC-688_NVCC.pdf | ||
| Addendum ONE 11-25-25.pdf.crdownload | CRDOWNLOAD file | |
| CTC-688 PROJECT MANUAL_9-12-25.pdf | ||
| BI-CTC-688_Bid Tally_12-04-2025.pdf | ||
| BI-CTC-688_Jan_27_26_solicitation_doc.pdf | ||
| A201-2017 -GenCond_BI-CTC-688_NVCC.pdf.crdownload | CRDOWNLOAD file | |
| CTC-688 Invitation to Bid_11-6-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Terrence Cheng, President
PROJECT NO. BI-CTC-XXX
FACILITIES DEPARTMENT
61 WOODLAND STREET
HARTFORD, CT 06105
LIST OF DRAWINGS
COVER
C1.01 ABBREVIATIONS, LEGENDS & GENERAL NOTES
C1.02 SITE LOCATION/AREA OF WORK
C1.03 AUDITORIUM PLAN & STAGE ELEVATION
C1.04 SUMP PIT/SUMP PUMP DETAILS
C1.05 DETAIL SECTIONS
C.06 DETAIL SECTIONS 2
170 ELM STREET, ENFIELD, CT 06082
Bid Documents
Architect / Engineer
Seal
ARCHITECT - ENGINEER
NAME XXXXXXXXX
ADDRESS XXXXXXXXX
TOWN ZIP XXXXXXXXX
Number or Website XXXXX X
SMALL ROOFS REPLACEMENTS
NAUGATUCK VALLEY
750 CHASE PARKWAY, WATERBURY, CT 06708
Architect:
edmSTUDIO
45 SOUTH MAIN STREET
UNIONVILLE, CT 06085
www.edmstudiocreates.com
09.12.2025
TITLE SHEET
A1.00 PROJECT KEY PLAN
AD1.01 ROOF 1 DEMO PLAN
AD1.02 ROOF 2 DEMO PLAN
AD1.03 ROOF 3 DEMO PLAN
AD1.04 ROOF 4 DEMO PLAN
A1.01 ROOF 1 PLAN
A1.02 ROOF 2 PLAN
A1.03 ROOF 3 PLAN
A1.04 ROOF 4 PLAN
A2,01 DETAILS
A3.01 PHOTOGRAPHS
A3.02 PHOTOGRAPHS
RN1.01 ROOF NAV ROOF 1
RN1.02 ROOF NAV ROOF 2
RN1.03 ROOF NAV ROOF 3
RN1.04 ROOF NAV ROOF 4
MEP0.00 GENERAL NOTED
MEPD1.01 ROOF 1 DEMO PLAN
MEPD1.02 ROOF 2 DEMO PLAN
MEPD1.03 ROOF 3 DEMO PLAN
MEPD1.04 ROOF 4 DEMO PLAN
MEP1.01 ROOF 1 PLAN
MEP1.02 ROOF 2 PLAN
MEP1.03 ROOF 3 PLAN
MEP1.04 ROOF 4 PLAN
MEP7.00 PLUMBING SPECIFICATIONS
MEP7.01 MECHANICAL SPECIFICATIONS
MEP7.02 ELECTRICAL SPECIFICATIONS
LIST OF DRAWINGS
O. John Maduko, M.D., Interim Chancellor
KEY PLAN
additional scope of work:
IN ADDITION TO THE ROOFING WORK PROVIDED FOR IN THESE
DRAWINGS THE CONTRACTOR IS PATCH AND REPAIR THE EXISTING
WATER DAMAGED CEILING IN THE FINE ARTS CENTER AUDITORIUM
ROOM A300.
THE WORK SHALL INCLUDE PATCHING OR REMOVAL AND
REPLACEMENT OF DAMAGED CEILING AS REQUIRED TO PROVIDE A
FINSHED CEILING TO MATCH EXISTING ADJACENT CEILING AREAS.
FOR BIDDING THE CONTRACTOR SHALL CONSIDER APPROXIMATELY
200 SQUARE FEET OF NON-CONTIGUOUS REPAIRS. REPAINTING SHALL
CONSIST OF PRIMING AND REPAINTING THE ENTIRE CEILING TO
PROVIDE SEAMLESS APPEARANCE BEWTEEN EXISTING AND REPAIRED
CEILING AREAS.
SEE ADJACENT PHOTOS FOR GENERAL REPAIR AREA.
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
CORE BUILDING SMALL ROOF REPAIRS
BI-CTC-688
professional seal
1/64" = 1'- 0"
A1.00xxxxxxxxxx.dwg
PROJECT KEY PLAN
PROJECT KEY PLAN
1/64"=1'-0"
BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 4
ROOF 1A ROOF 1B
ROOF 1C
ROOF 1D
DEMOLITION LEGEND
1 EXISTING ROOFING SYSTEM TO BE REMOVCED IN
ITS ENTIRETY TO TOP OF EXISTING STRUCTURAL
DECK
2 EXISTING METAL COPING TO REMAIN. REMOVE
AND REINSTALL AS REQUIRED FOR THE
INSTALLATION OF THE NEW ROOFING
3 EXISTING METAL WALL FLASHING TO REMAIN.
4 EXISTING METAL ROOFING SYSTEM TO BE
REMOVCED IN ITS ENTIRETY TO TOP OF EXISTING
STRUCTURAL DECK
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
1/8" = 1'- 0"
AD1.01
ROOF 1 PLANS
ROOF 1 PLAN
1/32"=1'-0"2
ROOF 1A PLAN
1/8"=1'-0"
ROOF 1B PLAN
1/8"=1'-0" 3
ROOF 1C & 1D PLAN
1/8"=1'-0"
3 3
CORE BUILDING SMALL ROOF REPAIRS
ROOF 2A
ROOF 2B
DEMOLITION LEGEND
1 EXISTING ROOFING SYSTEM TO BE REMOVCED IN
ITS ENTIRETY TO TOP OF EXISTING STRUCTURAL
DECK
2 EXISTING METAL COPING TO REMAIN. REMOVE
AND REINSTALL AS REQUIRED FOR THE
INSTALLATION OF THE NEW ROOFING
3 EXISTING METAL WALL FLASHING TO REMAIN.
4 EXISTING METAL ROOFING SYSTEM TO BE
REMOVCED IN ITS ENTIRETY TO TOP OF EXISTING
STRUCTURAL DECK
ROOF 2 PLAN
1/32"=1'-0"
CAD no.
10.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
1/8" = 1'- 0"
AD1.02xxxxxxxxxx.dwg
ROOF 2 PLANS
ROOF 2B PLAN
1/8"=1'-0"2
ROOF 2A PLAN
1/8"=1'-0"
1 1
ROOF 3B
ROOF 3A
DEMOLITION LEGEND
1 EXISTING ROOFING SYSTEM TO BE REMOVCED IN
ITS ENTIRETY TO TOP OF EXISTING STRUCTURAL
DECK
2 EXISTING METAL COPING TO REMAIN. REMOVE
AND REINSTALL AS REQUIRED FOR THE
INSTALLATION OF THE NEW ROOFING
3 EXISTING METAL WALL FLASHING TO REMAIN.
4 EXISTING METAL ROOFING SYSTEM TO BE
REMOVCED IN ITS ENTIRETY TO TOP OF EXISTING
STRUCTURAL DECK
ROOF 3 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
1/8" = 1'- 0"
AD1.03
ROOF 3 PLANS
ROOF 3B PLAN
1/8"=1'-0"
ROOF 3A PLAN
1/8"=1'-0"
ROOF 4A
ROOF 4B
DEMOLITION LEGEND
1 EXISTING ROOFING SYSTEM TO BE REMOVCED IN
ITS ENTIRETY TO TOP OF EXISTING STRUCTURAL
DECK
2 EXISTING METAL COPING TO REMAIN. REMOVE
AND REINSTALL AS REQUIRED FOR THE
INSTALLATION OF THE NEW ROOFING
3 EXISTING METAL WALL FLASHING TO REMAIN.
4 EXISTING METAL ROOFING SYSTEM TO BE
REMOVCED IN ITS ENTIRETY TO TOP OF EXISTING
STRUCTURAL DECK
ROOF 4 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
1/8" = 1'-0"
AD1.04
ROOF 4 PLANS
ROOF 4A PLAN
1/8"=1'-0"
ROOF 4B PLAN
1/8"=1'-0"
ROOF 1D
SYMBOL LEGEND
R NEW MEMBRANE AND INSULATION ROOF SYSTEM
RD ROOF DRAIN - SEE DETAIL 4 SHEET A2.01
AND MECHANICAL DRAWINGS
M CURB MOUNTED MECHANICAL UNIT - SEE DETAIL
5 SHEET A2.01 AND MECHANICAL DRAWINGS
V ROOF VENT - SEE DETAIL 6 SHEET A2.01
SS NEW STANDING SEAM METAL ROOF SYSTEM
TP 72" X 72" TRAFFIC PAD - PROVIDE CONSTRASTING
COLOR TO ROOF MEMBRANE
SC THRU WALL SCUPPER - SEE DETAIL 8 SHEET A2.01
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
CORE BUILDING SMALL ROOF REPAIRS
BI-CTC-688
professional seal
1/8"=1'- 0"
A1.01
ROOF 1 PLANS
ROOF 1 PLAN
1/32"=1'-0"
ROOF 1A PLAN
1/8"=1'-0"
ROOF 1B PLAN
1/8"=1'-0"
ROOF 1C & 1D PLAN
1/8"=1'-0"
R
RD
RD
M
R
R
RD
RD
RD RD
R
R
V
RD
RD
RD
RD
M
M
TP
TP
TP TP
SCSC
SYMBOL LEGEND
R NEW MEMBRANE AND INSULATION ROOF SYSTEM
RD ROOF DRAIN - SEE DETAIL 4 SHEET A2.01
AND MECHANICAL DRAWINGS
M CURB MOUNTED MECHANICAL UNIT - SEE DETAIL
5 SHEET A2.01 AND MECHANICAL DRAWINGS
V ROOF VENT - SEE DETAIL 6 SHEET A2.01
SS NEW STANDING SEAM METAL ROOF SYSTEM
TP 72" X 72" TRAFFIC PAD - PROVIDE CONSTRASTING
COLOR TO ROOF MEMBRANE
SC THRU WALL SCUPPER - SEE DETAIL 8 SHEET A2.01
ROOF 2 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
DAS-CTC-688
professional seal
1/8" = 1'- 0"
A1.02
ROOF 2 PLANS
ROOF 2B PLAN
1/8"=1'-0"1
ROOF 2A PLAN
1/8"=1'-0"
R
R RD
RD
TP
RD
TP
CORE BUILDING SMALL ROOF REPAIRS
SC
SCSC
SYMBOL LEGEND
R NEW MEMBRANE AND INSULATION ROOF SYSTEM
RD ROOF DRAIN - SEE DETAIL 4 SHEET A2.01
AND MECHANICAL DRAWINGS
M CURB MOUNTED MECHANICAL UNIT - SEE DETAIL
5 SHEET A2.01 AND MECHANICAL DRAWINGS
V ROOF VENT - SEE DETAIL 6 SHEET A2.01
SS NEW STANDING SEAM METAL ROOF SYSTEM
TP 72" X 72" TRAFFIC PAD - PROVIDE CONSTRASTING
COLOR TO ROOF MEMBRANE
SC THRU WALL SCUPPER - SEE DETAIL 8 SHEET A2.01
ROOF 3 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
1/8" = 1'- 0"
A1.03
ROOF 3 PLANS
ROOF 3B PLAN
1/8"=1'-0"
ROOF 3A PLAN
1/8"=1'-0"
R
R
SS
RD
SS
RD
SYMBOL LEGEND
R NEW MEMBRANE AND INSULATION ROOF SYSTEM
RD ROOF DRAIN - SEE DETAIL 4 SHEET A2.01
AND MECHANICAL DRAWINGS
M CURB MOUNTED MECHANICAL UNIT - SEE DETAIL
5 SHEET A2.01 AND MECHANICAL DRAWINGS
V ROOF VENT - SEE DETAIL 6 SHEET A2.01
SS NEW STANDING SEAM METAL ROOF SYSTEM
TP 72" X 72" TRAFFIC PAD - PROVIDE CONSTRASTING
COLOR TO ROOF MEMBRANE
SC THRU WALL SCUPPER - SEE DETAIL 8 SHEET A2.01
ROOF 4 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
DAS-CTC-688
professional seal
1/8" = 1'-0"
A1.04
ROOF 4 PLANS
ROOF 4A PLAN
1/8"=1'-0"
RD
R
RD
RD
M
ROOF 4B PLAN
1/8"=1'-0"
RD
R
COVER BOARD
RIGID INSULATION
ROOF MEMBRANE MEMBRANE FLASHING
EXISTING FLASHING
EXISTING ROOF DECK
COVER BOARD
EXISTING VENT OR PIPING
S.S. CLAMPING RING
SEALANT
ROOF MEMBRANE
RIGID INSULATION
EXISTING ROOF DECK
MEMBRANE FLASHING
VAPOR RETARDER
INSTALL VENT PIPE EXTENSION IF
REQUIRED TO PROVIDE 18" CLEARANCE
FROM TOP OF ROOF TO TOP OF VENT PIPE
EXISTING ROOF DECK
RIGID INSULATION
COVER BOARD
ROOF MEMBRANE
MEMBRANE FLASHING
REMOVE AND REPLACE
EXISTING ROOF DRAIN - SEE
PLUMBING
CONTINUOUS WATER
CUT-OFF MASTIC
COVER BOARD
RIGID INSULATION
EXISTING ROOF DECK
ROOF MEMBRANE
EXISTING CURB MOUNTED
MECHANICAL EQUIPMENT
CURB FLASHING
MEMBRANE FLASHING
VAPOR RETARDER
COVER BOARD
RIGID INSULATION
ROOF MEMBRANE
MEMBRANE FLASHING
STANDING SEAM
METAL PANEL
VAPOR RETARDER
ICE AND WATER
BARRIER
ROOF MEMBRANE
RIGID INSULATION
COVER BOARD
FACE OF EXISTING
BUILDING EXISTING ROOF DECK
EXISTING METAL COPING -
REMOVE AND REINSTALL AS
REQUIRED FOR MEMBRANE
INSTALLATION
MEMBRANE FLASHING
ROOF MEMBRANE
RIGID INSULATION
COVER BOARD
EXISTING ROOF DECK
CONT. WOOD BLOCKING - PREP AS
REQUIRED FOR MEMBRANE INSTALLATION
EXISTING METAL COPING -
REMOVE AND REINSTALL AS
REQUIRED FOR MEMBRANE
INSTALLATION
MEMBRANE
FLASHING
EXISTING RAISED CURB
FACE OF EXISTING
BUILDING
VAPOR RETARDER
VAPOR RETARDER
VAPOR RETARDER
VAPOR RETARDER
8" M
IN
EXISTING ROOF DECK
CONT. WOOD BLOCKING - PREP AS
REQUIRED FOR MEMBRANE INSTALLATION
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
1 1/2" = 1'- 0"
A2.01
ROOF DETAILS
PROJECT KEY PLAN
1/64"=1'-0"
COPING DETAIL
1 1/2"=1'-0"2
COPING DETAIL
1 1/2"=1'-0"3
THRU WALL FLASHING
1 1/2"=1'-0"
ROOF DRIAN
1 1/2"=1'-0"1
CURB DETAIL
1 1/2"=1'-0"6
VENT DETAIL
1 1/2"=1'-0"
STANDING SEAM ROOF
1 1/2"=1'-0"
PHOTOGRAPHS ARE FOR GENERAL INFORMATION ONLY AND MAY NOT
REPRESENT ALL CONDITIONS TO BE ENCOUNTERED IN THE PROJECT
note:
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
NTS
A3.01xxxxxxxxxx.dwg
ROOF 1 & 2 PHOTOS
ROOF 1A
ROOF 1A
ROOF 1B
ROOF 1B
ROOF 1C
ROOF 1D
ROOF 2A
ROOF 2A
ROOF 2B
PHOTOGRAPHS ARE FOR GENERAL INFORMATION ONLY AND MAY NOT
REPRESENT ALL CONDITIONS TO BE ENCOUNTERED IN THE PROJECT
note:
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
BI-CTC-688
professional seal
NTS
A3.02
ROOF 3 & 4 PHOTOS
ROOF 3A
ROOF 3B
ROOF 4A
ROOF 1D
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
DAS-CTC-688
professional seal
1/8" = 1'-0"
RN1.01
ROOF 1 ROOF NAV PLANS
ROOF 1 PLAN
1/32"=1'-0"2
ROOF 1A PLAN
1/8"=1'-0"
ROOF 1B PLAN
1/8"=1'-0" 3
ROOF 1C & 1D PLAN
ROOF 2 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
DAS-CTC-688
professional seal
1/8" =1'-0"
RN1.02
ROOF 2 ROOF NAV PLANS
ROOF 2B PLAN
1/8"=1'-0"
ROOF 2A PLAN
ROOF 3 PLAN
1/32"=1'-0"
CAD no.
11.06.25 project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
DAS-CTC-688
professional seal
1/8" =1'-0"
RN1.03
ROOF 3 ROOF NAV PLANS
ROOF 3B PLAN
1/8"=1'-0"
ROOF 3A PLAN
drawing prepared by
ROOF 4 PLAN
1/32"=1'-0"
CAD no.
11.06.25 drawing prepared by project no.
project drawing no.
approved by drawn by scale date drawing title descriptiondatemark
R E V I S I O N S
DAS-CTC-688
professional seal
1/8"= 1'-0"
RN1.04
ROOF 4 ROOF NAV PLANS
ROOF 4A PLAN
1/8"=1'-0"
ROOF 4B PLAN
GENERAL NOTES - PLUMBING
PIPING SYSTEM SPECIFIC NOTES:
1. SUPPORT PIPING FROM STRUCTURE. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS,
ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON PIPING.
2. PROVIDE ACCESSIBLE CLEANOUTS.
3. PLUMBING PIPING AND DRAINS SHALL BE PROTECTED FROM DEBRIS AND KEPT CLEAR OF
BLOCKAGE DURING CONSTRUCTION.
4. PROVIDE OFFSETS IN PIPING AROUND OBSTRUCTIONS.
GENERAL
1. GENERAL NOTES, SYMBOLS AND DETAILS ARE APPLICABLE TO DRAWINGS WITHIN DIVISION
22.
2. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE,
APPROXIMATE LOCATION AND GENERAL ARRANGEMENT. DETERMINE LOCATIONS OF
SYSTEMS AND COMPONENTS IN FIELD.
3. COORDINATE CONCRETE PADS AND STEEL PLATFORMS REQUIRED FOR PLUMBING WORK.
4. COORDINATE ROOF AND WALL PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH
FLASHING REQUIREMENTS. COORDINATE SLAB PENETRATIONS WITH WORK OF OTHER
SECTIONS.
5. RUN PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS.
6. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS AND WITH ALL
TRADES INVOLVED.
7. PLUMBING WORK SHALL BE DONE IN ACCORDANCE WITH THE STATE PLUMBING CODE.
COORDINATE WITH THE INSPECTOR FOR ALL PLUMBING INSPECTIONS.
8. IN THE EVENT THAT THERE ARE DISCREPANCIES BETWEEN PIPE SIZES SHOWN ON THE
PLANS, DETAILS AND DIAGRAMS, THE LARGER PIPE SIZE SHALL BE PROVIDED.
GAS NOTES:
1. OBTAIN APPLICABLE PERMITS FOR THE WORK.
FIRESTOPPING NOTES:
1. PROVIDE FIRE STOPPING AND SMOKE BARRIER SEALING OF PENETRATIONS THROUGH FIRE
WALLS OR SMOKE BARRIERS INCLUDING BOTH EMPTY OPENINGS AND OPENINGS
CONTAINING CABLES, PIPES, DUCTS, CONDUITS AND OTHER PENETRATING ITEMS. REFER TO
ARCHITECTURAL FLOOR PLANS AND CODE SHEETS FOR WALL RATINGS. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VALVE AND SYMBOL LEGEND
SYMBOL DESCRIPTION
THREE WAY AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
THREE WAY AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
AUTOMATIC CONTROL VALVE, TWO POSITION ACTUATOR
BALL VALVE WITH HOSE BIBB, CAP & CHAIN (DRAIN VALVES)
COMBINATION SHUT OFF/BALANCING VALVE (CIRCUIT SETTER)
THERMOMETER
PRESSURE GAUGE
SAFETY RELIEF VALVE
SOLENOID VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
GLOBE VALVE
BUTTERFLY VALVE
PLUG VALVE
GATE VALVE
BALL VALVE
S
OS&Y VALVE
DOUBLE CHECK VALVE ASSEMBLY
REDUCED PRESSURE BACKFLOW
PREVENTER ASSEMBLY AND DRAIN
GATE VALVE IN ROAD CURB BOX
BACKWATER VALVE
PUMP
WATER METER
FLOOR DRAIN / FLOOR SINK / AREA
DRAIN WITH PIPE TRAP
ROOF / OVERFLOW DRAIN
TRAP PRIMER
GAS METER
WATER HAMMER ARRESTOR
VENT THRU ROOF
GM
TP
M
ADA ACCESSIBLE FIXTURE
Y-PATTERN STRAINER
PIPING LEGEND
SYMBOL DESCRIPTION
PIPE RISE
PIPE DROP
PIPE TEE TOWARDS (UP IN PLAN)
PIPE TEE AWAY (DOWN IN PLAN)
PIPE DROP AND RUN
DIRECTION OF FLOW
CO
DIRT LEG
CLEANOUT
UNION OR FLANGE
BLIND FLANGE
END CAP
REDUCER (ECCENTRIC)
REDUCER (CONCENTRIC)
COLD WATER
HOT WATER (110°F)
HOT WATER RECIRCULATION (110°F)
HOT WATER (120°F)
SANITARY DRAIN/WASTE ABOVE FLOOR
SANITARY DRAIN/WASTE BELOW FLOOR
VENT
STORM ABOVE FLOOR (PRIMARY)
STORM BURIED (PRIMARY)
STORM ABOVE FLOOR (SECONDARY)
NATURAL GAS
120°F HW
HOT WATER RECIRCULATION (120°F)
SAN
SAN
GREASE WASTE
GREASE WASTE BELOW FLOOR
TEPID WATER (85°F)
FORCE MAIN ABOVE FLOOR
FORCE MAIN BELOW FLOOR
V
ST
ST
SST
G
GW
GW
T
FM
FM
PIPE TRAP
HOT WATER (140°F)
HOT WATER RECIRCULATION (140°F)
120°F HWR
140°F HW
140°F HWR
110°F HW
110°F HWR
CW
NATURAL GASNG
GREASE VENTGV
PROPANEP
OIL WASTEOW
DEMOLITION NOTES - PLUMBING
1. THE PLUMBING CONTRACTOR SHALL REMOVE ALL ROOF DRAINS AND OVERFLOW DRAINS
PIPING AS SHOWN OR INDICATED ON THE DRAWINGS.
2. NO EQUIPMENT OR DEVICES THAT HAVE BEEN DISCONNECTED AND OR ABANDONED SHALL
REMAIN.
3. ALL EXISTING PIPING AND EQUIPMENT SHOWN HAS BEEN TAKEN FROM THE BEST
AVAILABLE EXISTING INFORMATION. THE DRAWINGS ARE DIAGRAMMATIC AND ALL
FIXTURES, PIPING, AND DEVICES MAY NOT BE SHOWN. THE INTENT OF THESE DRAWINGS IS
THAT IN ALL AREAS OF RENOVATION THAT THEY ARE REMOVED, WHETHER OR NOT
SHOWN (UNLESS INDICATED TO REMAIN).
4. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE
EXISTING SYSTEMS AND CONDITIONS IN AREAS OF RENOVATION.
5. THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE OWNER, CM, AND OR
GENERAL CONTRACTOR ANY AND ALL PHASING OF THE PLUMBING DEMOLITION WORK IN
ORDER TO SATISFY THE CONSTRUCTION SCHEDULE AND OWNERS OCCUPANCY
REQUIREMENTS.
6. THE PLUMBING CONTRACTOR SHALL ALSO REVIEW THE ARCHITECTURAL DEMOLITON
DRAWINGS AS PART OF THIS CONTRACT FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
7. ALL SERVICE INTERUPTIONS SHALL BE COORDINATED AND APPROVED WITH THE OWNER A
MINIMUM OF 5 DAYS IN ADVANCE PRIOR TO COMMENCEMENT OF ANY WORK.
8. THE PLUMBING CONTRACTOR SHALL COORDINATE THEIR DEMOLITION WORK WITH THAT
OF OTHER TRADES IN ORDER TO AVOID CONFLICTS.
EQUIPMENT ABBREVIATIONS
BOTTLE FILLER
BACKFLOW PREVENTER
CLEANOUT TEE
EMERGENCY SHOWER
EXPANSION TANK
FLOOR CLEANOUT
GREASE INTERCEPTOR
HAND SINK
WALL HYDRANT
LAVATORY
LAUNDRY TUB
MOP BASIN
PUMP
SINK
SEWAGE EJECTOR PUMP
SHOWER VALVE
SUMP PUMP
TRENCH DRAIN
TRAP PRIMER
TEMPERING VALVE
URINAL
VENT CAP
WATER CLOSET
WALL CLEANOUT
WATER HEATER
WATER HAMMER ARRESTOR
WALL HYDRANT
YARD HYDRANT
BF
BFP
COT
ES
ET
FCO
GI
HS
HY
L
LT
MB
P S
SEP
SH
SP
TD
TP
TV
U
VC
WC
WCO
WH
WHA
WHYD
YH
GENERAL ABBREVIATIONS
ACCESS DOOR
ADJUSTABLE
ABOVE FINISHED FLOOR
ALTERNATE
AUTHORITY HAVING JURISDICTION
ACCESS PANEL
ACID VENT
ACID VENT THRU ROOF
ACID WASTE
BUILDING AUTOMATION SYSTEM
BRITISH THERMAL UNIT
BTU / HOUR
BOTTOM OF PIPE
CONDENSATE DRAIN
CUBIC FEET PER HOUR
CAST IRON
CLEANOUT
COLD WATER
DIAMETER
DOWN
DOWN SPOUT NOZZLE
DIRECT WASTE
ELECTRICAL
EXPANSION TANK
EMERGENCY EYEWASH/SHOWER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FINISHED GRADE CLEANOUT
FULL LOAD AMPS
FLOOR DRAIN
FLOOR SINK
FEET
FEET HEAD
GAS
GALLONS
GALLONS PER HOUR
GALLONS PER MINUTE
GAS SOLENOID VALVE
GREASE WASTE
GAS VENT
HOSE BIB
HOT WATER
HEAD
HORSEPOWER
HERTZ
HOT WATER RECIRCULATION
INTERCEPTOR
INVERT ELEVATION
INDIRECT WASTE
KILOWATT
LAVATORY
MAXIMUM
MECHANICAL
THOUSAND BTU PER HOUR
MINIMUM CIRCUIT AMPACITY
MINIMUM
NOT IN CONTRACT
NATURAL GAS
NOT TO SCALE
OVERFLOW DRAIN
OIL WASTE
PUMPED CONDENSATE DRAIN
PLUMBING
POUNDS PER SQUARE INCH GAUGE
QUANTITY
ROOF DRAIN
REDUCED PRESSURE BACKFLOW PREVENTER
ROOFTOP UNIT
SANITARY
SQUARE FEET
SOIL STACK
STORM
SECONDARY STORM
TEMPERATURE
TEMPERED WATER
TYPICAL
VENT
VENT STACK
VENT THRU ROOF
WASTE
WASTE STACK
WASTE AND VENT
AD
ADJ
AFF
ALT
AHJ
AP
AV
AVTR
AW
BAS
BTU
BTUH
BOP
CD
CFH
CI
CO
CW
DIA
DN
DSN
DW
ELEC
ET
EWS
°F
FCO
FFE
FGCO
FLA
FLD
FS
FT
FT WG
G
GALL
GPH
GPM
GSV
GW
GV
HB
HW
HD
HP
HZ
HWR
INT
INV ELEV
IW
KW
LAV
MAX
MECH
MBH
MCA
MIN
NIC
NG
NTS
OD
OW
PCD
PLBG
PSIG
QTY
RD
RPBP
RTU
SAN
SQFT / SF
SS
ST
SST
TEMP
TW
TYP
V
VS
VTR
W
WS
W&V
REMARKS
REMARKS:
1. UNLESS OTHERWISE INDICATED, SHALL BE FULL SIZE OF PIPE SERVED. REFER TO FLOOR PLANS FOR SIZES.
DESCRIPTION
MANUFACTURER/
MODEL NUMBER
SYMBOL
COMPONENTS AND
ACCESSORIES
MOUNTING
HEIGHT
PLUMBING SPECIALTIES SCHEDULE
UNDERDECK CLAMP,
VANDAL PROOF
DOME, SUMP
RECEIVER,
EXTENSION SLEEVE
FOR ROOF
INSULATION
RD-1 JR SMITH
MODEL #
ROOF DRAIN:
CAST IRON BODY,
FLASHING CLAMP,
GRAVEL STOP, CAST
IRON DOME
#1-
VANDAL PROOF
SCREWS
SD-1 JR SMITH
MODEL #
1520T
SCUPPER DRAIN:
CAST IRON BODY,
FLASHING CLAMP,
SECURED SET GRATE
#1-
DEMOLITION NOTES - MECHANICAL
DEMOLITION NOTES
1. SITE VISIT: THIS PROJECT INVOLVES CONSTRUCTION INSIDE AN EXISTING STRUCTURE.
BEFORE SUBMITTING BID, VISIT AND CAREFULLY EXAMINE SITE TO IDENTIFY EXISTING
CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK OF THIS SECTION. NO EXTRA
PAYMENT WILL BE ALLOWED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH
SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED
OBSERVER.
2. PREPARATORY WORK: BEFORE STARTING WORK IN A PARTICULAR AREA OF THE
PROJECT, VISIT SITE AND EXAMINE CONDITIONS UNDER WHICH WORK MUST BE
PERFORMED INCLUDING PREPARATORY WORK DONE UNDER OTHER SECTIONS OR
CONTRACTS BY OWNER. REPORT CONDITIONS THAT MIGHT AFFECT WORK ADVERSELY IN
WRITING TO ARCHITECT AND OWNER. DO NOT PROCEED WITH WORK UNTIL DEFECTS
HAVE BEEN CORRECTED AND CONDITIONS ARE SATISFACTORY. COMMENCEMENT OF
WORK SHALL BE CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS AND
PREPARATORY WORK.
3. PHASING: DEMOLITION WORK SHALL COMPLY WITH THE PHASING REQUIREMENTS OF THE
PROJECT AND BE COORDINATED WITH THE OWNER, ARCHITECT, CM AND ENGINEER. NO
REMOVALS SHALL BE IMPLEMENTED WITHOUT A THOROUGH UNDERSTANDING OF THE
PHASING REQUIREMENTS.
4. ABANDONING OF DUCTWORK, PIPING OR EQUIPMENT IN PLACE WITHIN SCOPE AREA IS
PROHIBITED.
5. PROVIDE 2 WEEKS NOTICE TO OWNER FOR SHUT DOWN OF ANY SERVICES AND/OR
SYSTEMS.
6. COORDINATE EXISTING EQUIPMENT AND MATERIALS THAT SHALL REMAIN THE PROPERTY
OF THE OWNER. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE
OWNER, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
FROM SITE AND LEGALLY DISPOSED OF. STORAGE OR SALE OF ITEMS ON THE PROJECT
SITE IS PROHIBITED.
7. PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING
DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY.
PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY
REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE
EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
8. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION.
KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES
SERVING OCCUPIED AREAS WITHOUT FIRST OBTAINING PERMISSION FROM THE OWNER IN
WRITING. PROVIDE TEMPORARY SERVICES AS REQUIRED.
9. INFORMATION CONTAINED ON THESE DRAWINGS WAS OBTAINED FROM ARCHIVED
DRAWINGS AND SITE VISITS. DRAWINGS ARE DIAGRAMMATIC ONLY AND REFLECT OVERALL
SYSTEM REMOVAL. NOT EVERY ITEM OR COMPONENT OF A SYSTEM IS SHOWN. PROVIDE
COMPLETE REMOVAL OF ASSOCIATED ANCILLARY PIPES, HANGERS, VALVES AND
ACCESSORIES SERVING SYSTEM SHOWN.
10. DEMOLITION WORK SHALL COMPLY WITH OSHA, EPA AND APPLICABLE STATE AND LOCAL
CODES. COMPLY WITH HAULING AND DISPOSAL REGULATIONS.
11. REFER TO SPECIFICATIONS FOR ADDITIONAL DEMOLITION REQUIREMENTS AND
PROCEDURES.
GENERAL NOTES - MECHANICAL
1. GENERAL NOTES, SYMBOLS, AND DETAILS ARE APPLICABLE TO DRAWINGS WITHIN DIVISION 23.
2. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED, AND AS REQUIRED BY CODES.
3. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE,
APPROXIMATE LOCATION AND GENERAL ARRANGEMENT. COORDINATE LOCATIONS OF
SYSTEMS AND COMPONENTS.
4. COORDINATE ROOF AND WALL PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH
FLASHING REQUIREMENTS.
5. RUN DUCTS CONCEALED UNLESS SPECIFIED OTHERWISE NOTED.
6. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS AND WITH ALL
TRADES INVOLVED. PROVIDE OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS)
AND TRANSITIONS AROUND OBSTRUCTIONS.
7. ROOF CURB AND RAIL HEIGHTS INDICATED ARE THE DIMENSIONS BETWEEN THE ROOF
SURFACE AND THE TOPS OF THE CURBS AND RAILS. WHERE THE ROOF IS PITCHED,
CONSTRUCT CURBS AND RAILS SUCH THAT THE BOTTOM PITCHES WITH THE ROOF AND THE
TOP IS LEVEL.
8. VERIFY EQUIPMENT CONNECTIONS WITH MANUFACTURER'S DRAWINGS. VERIFY AND
PROVIDE FITTINGS TO TRANSITION TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE DIMENSIONS BEFORE FABRICATION.
9. MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND, AS SHOWN IN
THE DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT, SHALL BE FURNISHED BY THE
MECHANICAL CONTRACTOR.
ELECTRICAL GENERAL NOTES
1. DEVICES SHALL BE LABELED WITH SOURCE PANEL AND CIRCUIT NUMBER(S).
2. ELECTRICAL WORK SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE (OTHER THAN
ROOF DECK).
3. THE ELECTRICAL CONTRACTOR SHALL PERFORM CORES REQUIRED FOR ELECTRICAL WORK.
ELECTRICAL DEMOLITION NOTES
1. EXISTING ELECTRICAL DEVICES IN REGIONS OF DEMOLITION SHALL BE EXISTING TO REMAIN
UNLESS NOTED OTHERWISE. INCLUDING BUT NOT LIMITED TO PANELBOARDS, RECEPTACLES,
LIGHT FIXTURES, LIGHTING CONTROLS, TRANSFORMERS, TELECOMMUNICATION DEVICES,
FIRE ALARM DEVICES, SECURITY DEVICES, AND MECHANICAL EQUIPMENT CONNECTIONS.
2. DEMOLITION PLANS ARE DIAGRAMMATIC AND NOT INTENDED TO DEPICT THE ENTIRE SCOPE
OF ELECTRICAL DEMOLITION. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF EXISTING
DEVICES. ADDITIONAL DEMOLITION AND MODIFICATION WORK NOT SHOWN SHOULD BE
ANTICIPATED.
3. PRIOR TO SUBMITTING BID, VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES
THAT WILL AFFECT WORK TO BE PERFORMED. NO COMPENSATION WILL BE GRANTED FOR
ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR
READILY IDENTIFIED BY EXPERIENCED OBSERVERS. INCLUDE IN THE BID ALL DEMOLITION
WORK REQUIRED.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR STORAGE AND HANDLING OF EXISTING TO BE
RELOCATED EQUIPMENT AND DEVICES.
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEP0.00
MEP ABBREVIATIONS, NOTES AND
SYMBOLS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
REVISIONS
NO. DATE DESCRIPTION
11/06/2025
REFER TO
2/MEPD1.01
REFER TO
4/MEPD1.01
REFER TO
3/MEPD1.01
PD1
PD1
PD3PD3
MD2
MD2ED2
ED2
PD1
PD1
PD1
PD1
PD1
PD2 MD1
MD2
ED1
ED2
PD1
PD1
PD1
PD1PD1PD1PD1
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEPD1.01
MEP ROOF 1 DEMO PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 1 - DEMO
1/8" = 1'-0"
MEP ROOF 1A DEMO PLAN
1/8" = 1'-0"
MEP ROOF 1C & 1D DEMO PLAN
1/8" = 1'-0"
MEP ROOF 1B DEMO PLAN
KEYNOTES - MECHANICAL DEMOLITION
Key Value Keynote Text
MD1 EXISTING ROOF MOUNTED EXHAUST FAN, CONTROL WIRING & ASSOCIATED ROOF CURB SHALL BE DISCONNECTED & TEMPORARILY REMOVED TO ACCOMMODATE NEW ROOF WORK; COORDINATE WITH THE
ELECTRICAL CONTRACTOR FOR POWER AND CONTROL WIRE DISCONNECTION.
MD2 EXISTING ROOF MOUNTED VENTILATOR, CONTROL WIRING & ASSOCIATED ROOF CURB SHALL BE DISCONNECTED & TEMPORARILY REMOVED TO ACCOMMODATE NEW ROOF WORK; COORDINATE WITH THE
ELECTRICAL CONTRACTOR FOR POWER AND CONTROL WIRING DISCONNECTION.
KEYNOTES - ELECTRICAL DEMOLITION
Key Value Keynote Text
ED1 DISCONNECT AND MAKE SAFE EXISTING WIRING FOR EXISTING MECHANICAL EQUIPMENT CONNECTION.
EXHAUST FAN AND ASSOCIATED DAMPER SHALL BE TEMPORARILY REMOVED TO ACCOMODATE NEW ROOF
WORK. PROTECT WIRING AND RACEWAY IN PLACE DURING DEMOLITION.
ED2 DISCONNECT AND MAKE SAFE EXISTING WIRING FOR EXISTING MECHANICAL EQUIPMENT CONNECTION.
VENTILATOR AND ASSOCIATED DAMPER SHALL BE TEMPORARILY REMOVED TO ACCOMODATE NEW ROOF WORK.
PROTECT ALL WIRING AND RACEWAYS IN PLACE DURING DEMOLITION.
KEYNOTES - PLUMBING DEMOLITION
Key Value Keynote Text
PD1 EXISTING ROOF DRAIN SHALL BE DISCONNECTED FROM STORM PIPING AND REMOVED IN ITS ENTIRETY.
MAINTAIN EXISTING STORM PIPING FOR RECONNECTION TO NEW ROOF DRAIN.
PD2 EXISTING 4" PLUMBING VENTS THROUGH ROOF SHALL BE DISCONNECTED FOR EXTENSION DURING ROOF
REPLACEMENT. MAINTAIN EXISTING VENT PIPING FOR RECONNECTION AND EXTENSION.
PD3 EXISTING SCUPPER DRAIN SHALL BE REMOVED IN ITS ENTIRETY.
REVISIONS
3/MEPD1.02
REFER TO
2/MEPD1.02
PD1
PD3
PD1PD1
PD3PD3
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEPD1.02
MEP ROOF 2 DEMO PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 2 - DEMO
1/8" = 1'-0"
MEP ROOF 2B DEMO PLAN
1/8" = 1'-0"
MEP ROOF 2A DEMO PLAN
KEYNOTES - PLUMBING DEMOLITION
Key Value Keynote Text
PD1 EXISTING ROOF DRAIN SHALL BE DISCONNECTED FROM STORM PIPING AND REMOVED IN ITS ENTIRETY.
MAINTAIN EXISTING STORM PIPING FOR RECONNECTION TO NEW ROOF DRAIN.
PD3 EXISTING SCUPPER DRAIN SHALL BE REMOVED IN ITS ENTIRETY.
REVISIONS
2/MEPD1.03
REFER TO
2/MEPD1.03
PD1
PD1
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEPD1.03
MEP ROOF 3 DEMO PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 3 - DEMO
1/8" = 1'-0"
MEP ROOF 3A DEMO PLAN
1/8" = 1'-0"
MEP ROOF 3B DEMO PLAN
KEYNOTES - PLUMBING DEMOLITION
Key Value Keynote Text
PD1 EXISTING ROOF DRAIN SHALL BE DISCONNECTED FROM STORM PIPING AND REMOVED IN ITS ENTIRETY.
MAINTAIN EXISTING STORM PIPING FOR RECONNECTION TO NEW ROOF DRAIN.
REVISIONS
2/MEPD1.04
REFER TO
3/MEPD1.04
PD1
PD1
PD1
PD1
PD1
PD1
MD3
ED3
PD1
PD1
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEPD1.04
MEP ROOF 4 DEMO PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 4 - DEMO
1/8" = 1'-0"
MEP ROOF 4A DEMO PLAN
KEYNOTES - MECHANICAL DEMOLITION
Key Value Keynote Text
MD3 EXISTING DUST COLLECTOR EXHAUST PENETRATION & ASSOCIATED ROOF CURB SHALL BE DISCONNECTED &
TEMPORARILY REMOVED TO ACCOMMODATE NEW ROOF WORK; COORDINATE WITH THE ELECTRICAL
CONTRACTOR FOR POWER AND CONTROL WIRE DISCONNECTION.
KEYNOTES - ELECTRICAL DEMOLITION
Key Value Keynote Text
ED3 DISCONNECT AND MAKE SAFE EXISTING WIRING FOR EXISTING MECHANICAL EQUIPMENT CONNECTION. DUST COLLECTOR EXHAUST SHALL BE TEMPORARILY REMOVED TO ACCOMODATE NEW ROOF WORK. PROTECT
WIRING AND RACEWAY IN PLACE DURING DEMOLITION.
KEYNOTES - PLUMBING DEMOLITION
Key Value Keynote Text
PD1 EXISTING ROOF DRAIN SHALL BE DISCONNECTED FROM STORM PIPING AND REMOVED IN ITS ENTIRETY.
MAINTAIN EXISTING STORM PIPING FOR RECONNECTION TO NEW ROOF DRAIN.
1/8" = 1'-0"
MEP ROOF 4B DEMO PLAN
REVISIONS
2/MEP1.01
REFER TO
4/MEP1.01
REFER TO
3/MEP1.01
RD-1
RD-1
SD-1 SD-1
M2 M2
E1 E1
P2
P2
P3 P3
RD-1
RD-1
RD-1
RD-1 RD-1 RD-1 RD-1
P2
P2
P2
P2 P2P2P2
RD-1
RD-1 RD-1
RD-1
RD-1
P1
M2
M1
E1
E1
P2 P2
P2
P2
P2
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEP1.01
MEP ROOF 1 PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 1
1/8" = 1'-0"
MEP ROOF 1A PLAN
1/8" = 1'-0"
MEP ROOF 1B PLAN
1/8" = 1'-0"
MEP ROOF 1C & 1D PLAN
KEYNOTES - PLUMBING
Key Value Keynote Text
P1 EXTENDED EXISTING PLUMBING VENTS THROUGH ROOF SHALL BE CONNECTED TO THE EXISTING VENT PIPING
BELOW ROOF AND EXTEND A MINIMUM OF 18" ABOVE THE FINISHED ROOF.
P2 EXTENDED EXISTING STORM PIPING TO NEW ROOF DRAIN TO FINISHED ROOF ELEVATION. INSTALL NEW ROOF
DRAIN AND INSTALL NEW PIPE AND ROOF DRAIN BODY INSULATION TO RECONNECTION POINT.
P3 REPLACE SCUPPER DRAIN TO MATCH NEW ROOF.
KEYNOTES - ELECTRICAL POWER
Key Value Keynote Text
E1 RECONNECT WIRING TO EXISTING MECHANICAL EQUIPMENT, DAMPERS, AND CONTROLS REPLACED IN SAME LOCATION AFTER NEW ROOF WORK HAS BEEN COMPLETED. EXTEND EXISTING WIRING AND CONDUIT FOR
RECONNECTION OF EQUIPMENT AS REQUIRED.
KEYNOTES - MECHANICAL DUCTWORK
Key Value Keynote Text
M1 FURNISH & INSTALL NEW ROOF CURB FOR EXISTING ROOF MOUNTED EXHAUST FAN; NEW ROOF CURB SHALL BE COMPATIBLE WITH THE FAN'S MANUFACTURER; FIELD VERIFY REQUIRED HEIGHT FOR NEW ROOF CURB ALLOWING FOR NEW INSULATION & MEMBRANE ETC.; RECONNECT FAN, EXHAUST AIR DUCTWORK, DAMPERS &
CONTROLS.
M2 FURNISH & INSTALL NEW ROOF CURB FOR EXISTING ROOF MOUNTED VENTILATOR; NEW ROOF CURB SHALL BE COMPATIBLE WITH THE VENTILATOR MANUFACTURER; FIELD VERIFY REQUIRED HEIGHT FOR NEW ROOF CURB ALLOWING FOR NEW INSULATION & MEMBRANE ETC.; RECONNECT VENTILATOR, DUCTWORK, DAMPERS &
CONTROLS.
REVISIONS
3/MEP1.02
REFER TO
2/MEP1.02
RD-1 RD-1
SD-1 SD-1
P2 P2
P3 P3
RD-1
SD-1
P2
P3
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEP1.02
MEP ROOF 2 PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 2
1/8" = 1'-0"
MEP ROOF 2A PLAN
1/8" = 1'-0"
MEP ROOF 2B PLAN
REVISIONS
NO. DATE DESCRIPTION
KEYNOTES - PLUMBING
Key Value Keynote Text
P2 EXTENDED EXISTING STORM PIPING TO NEW ROOF DRAIN TO FINISHED ROOF ELEVATION. INSTALL NEW ROOF
DRAIN AND INSTALL NEW PIPE AND ROOF DRAIN BODY INSULATION TO RECONNECTION POINT.
P3 REPLACE SCUPPER DRAIN TO MATCH NEW ROOF.
3/MEP1.03
REFER TO
2/MEP1.03
RD-1
P2
RD-1
P2
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEP1.03
MEP ROOF 3 PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 3
1/8" = 1'-0"
MEP ROOF 3A PLAN
1/8" = 1'-0"
MEP ROOF 3B PLAN
REVISIONS
NO. DATE DESCRIPTION
KEYNOTES - PLUMBING
Key Value Keynote Text
P2 EXTENDED EXISTING STORM PIPING TO NEW ROOF DRAIN TO FINISHED ROOF ELEVATION. INSTALL NEW ROOF
DRAIN AND INSTALL NEW PIPE AND ROOF DRAIN BODY INSULATION TO RECONNECTION POINT.
2/MEP1.04
REFER TO
3/MEP1.04
RD-1
RD-1
RD-1
RD-1
RD-1
RD-1
M3
E1
P2 P2
P2
P2
P2
P2
RD-1
RD-1
P2
P2
DRAWING NO.
DATE:
STATE PROJECT NO:
DRAWN:
CHECKED:
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
AS NOTED
professional seal
DRAWING TITLE:
PROJECT:
SCALE:
DRAWING PREPARED BY:
CES PROJECT NO:
2025080
CES #2025080.00
09/12/2025
DAS-CTC-688
KWC
EJR
MEP1.04
MEP ROOF 4 PLANS
NAUGATUCK VALLEY - CORE BUILDING
SMALL ROOF REPLACEMENT
750 CHASE PARKWAY
WATERBURY, CT
1/32" = 1'-0"
KEYPLAN MEP ROOF 4
1/8" = 1'-0"
MEP ROOF 4A PLAN
KEYNOTES - ELECTRICAL POWER
Key Value Keynote Text
E1 RECONNECT WIRING TO EXISTING MECHANICAL EQUIPMENT, DAMPERS, AND CONTROLS REPLACED IN SAME LOCATION AFTER NEW ROOF WORK HAS BEEN COMPLETED. EXTEND EXISTING WIRING AND CONDUIT FOR
RECONNECTION OF EQUIPMENT AS REQUIRED.
KEYNOTES - MECHANICAL DUCTWORK
Key Value Keynote Text
M3 FURNISH & INSTALL NEW ROOF CURB FOR EXISTING DUST COLLECTOR PENETRATION THRU ROOF; NEW ROOF CURB SHALL BE COMPATIBLE WITH THE FAN'S MANUFACTURER; FIELD VERIFY REQUIRED HEIGHT FOR NEW ROOF CURB ALLOWING FOR NEW INSULATION & MEMBRANE ETC.; RECONNECT EXHAUST AIR DUCTWORK, DAMPERS & CONTROLS.
1/8" = 1'-0"
MEP ROOF 4B PLAN
REVISIONS
NO. DATE DESCRIPTION
KEYNOTES - PLUMBING
Key Value Keynote Text
P2 EXTENDED EXISTING STORM PIPING TO NEW ROOF DRAIN TO FINISHED ROOF ELEVATION. INSTALL NEW ROOF
DRAIN AND INSTALL NEW PIPE AND ROOF DRAIN BODY INSULATION TO RECONNECTION POINT.
22 10 00 - PLUMBING PIPING
A. DRAIN, WASTE, AND VENT PIPING (STORM)
1. BELOW GRADE: HUB & SPIGOT: ASTM A74 CAST IRON PIPE, WITH ASTM A74 CAST IRON
FITTINGS AND ASTM C564 RUBBER GASKET JOINT DEVICES OR LEAD AND OAKUM.
2. HUBLESS (NO-HUB): CISPI 301 HUBLESS SERVICE WEIGHT CAST IRON PIPE WITH CISPI 310
NEOPRENE GASKET AND STAINLESS STEEL CLAMP AND SHIELD JOINT ASSEMBLIES.
B. MISCELLANEOUS FITTINGS
1. DIELECTRIC WATERWAYS
a. MANUFACTURERS: TYCO/GRINNELL CLEARFLOW, PRECISION PLUMBING PRODUCTS
(PPP) CLEARFLOW, VICTAULIC STYLE 647.
b. GALVANIZED ASTM A53 STEEL, ASTM A395 DUCTILE IRON, OR ASTM A536 DUCTILE
IRON SLEEVE WITH INERT NON-CORROSIVE THERMOPLASTIC LINING, NSF 61 OR
NSF/ANSI 372 CERTIFIED.
2. FLANGES
a. COPPER PIPING: CLASS 150, SLIP-ON BRONZE FLANGES.
b. STEEL PIPING: CLASS 150, SLIP-ON FORGED STEEL FLANGES.
c. GASKETS: 1/16” THICK PREFORMED NEOPRENE GASKETS.
3. UNIONS
a. COPPER PIPING: CLASS 150, BRONZE UNIONS WITH SOLDERED OR BRAZED JOINTS.
b. STEEL PIPING: CLASS 150, MALLEABLE IRON, THREADED.
c. DIELECTRIC CONNECTIONS: UNION WITH GALVANIZED OR PLATED STEEL THREADED
END, COPPER SOLDER END, WATER IMPERVIOUS ISOLATION BARRIER ARE REQUIRED
WHERE TWO DISSIMILAR METAL PRODUCTS ARE CONNECTED WITHIN A SYSTEM.
22 05 00 - COMMON WORK RESULTS FOR PLUMBING
A. IDENTIFICATION FOR PIPING AND EQUIPMENT:
1. MANUFACTURERS: CRAFTMARK IDENTIFICATION SYSTEMS, SAFETY SIGN CO., SETON
IDENTIFICATION PRODUCTS, NORTHTOWN, KOLBI. SUBSTITUTIONS: DIVISION 01 – GENERAL
REQUIREMENTS AND 22 04 00 – GENERAL REQUIREMENTS.
2. PLASTIC NAMEPLATES: LAMINATED THREE-LAYER PLASTIC WITH ENGRAVED BLACK
LETTERS ON LIGHT BACKGROUND COLOR.
3. TAGS
a. PLASTIC TAGS: LAMINATED THREE-LAYER PLASTIC WITH ENGRAVED BLACK LETTERS ON
LIGHT BACKGROUND COLOR, MINIMUM 1-1/2 INCHES DIAMETER.
b. METAL TAGS: ALUMINUM WITH STAMPED LETTERS; TAG SIZE MINIMUM 1-1/2 INCHES
DIAMETER WITH FINISHED EDGES.
c. INFORMATION TAGS: CLEAR PLASTIC WITH PRINTED "DANGER," "CAUTION," OR
"WARNING" AND MESSAGE; SIZE 3-1/4 X 5-5/8 INCHES WITH GROMMET AND SELF-
LOCKING NYLON TIES.
d. TAG CHART: TYPEWRITTEN LETTER SIZE LIST OF APPLIED TAGS AND LOCATION IN
ANODIZED ALUMINUM FRAME.
4. PIPE MARKERS
a. COLOR AND LETTERING TO CONFORM TO ASME A13.1.
b. PLASTIC PIPE MARKERS: FACTORY FABRICATED, FLEXIBLE, SEMI-RIGID PLASTIC, PREFORMED TO FIT AROUND PIPE OR PIPE COVERING. LARGER SIZES MAY HAVE
MAXIMUM SHEET SIZE WITH SPRING FASTENER. MINIMUM INFORMATION INDICATING
FLOW DIRECTION ARROW AND IDENTIFICATION OF FLUID BEING CONVEYED.
c. PLASTIC TAPE PIPE MARKERS: FLEXIBLE, VINYL FILM TAPE WITH PRESSURE SENSITIVE
ADHESIVE BACKING AND PRINTED MARKINGS.
d. PLASTIC UNDERGROUND PIPE MARKERS: BRIGHT COLORED CONTINUOUSLY PRINTED
PLASTIC RIBBON TAPE, MINIMUM 6 INCHES WIDE BY 4 MIL THICK, MANUFACTURED FOR
DIRECT BURIAL SERVICE. TRACE WIRE: MAGNETIC DETECTABLE CONDUCTOR, BRIGHTLY
COLORED PLASTIC COVERING, IMPRINTED WITH COLOR CODE AS FOLLOWS:
1. POTABLE, COOLING, BOILER, FEED, OTHER WATER: GREEN WITH WHITE LETTERS.
2. FIRE QUENCHING FLUIDS: RED WITH WHITE LETTERS.
3. TOXIC AND CORROSIVE FLUIDS: ORANGE WITH BLACK LETTERS.
4. FLAMMABLE FLUIDS: YELLOW WITH BLACK LETTERS.
5. COMBUSTIBLE FLUIDS: BROWN WITH WHITE LETTERS.
6. COMPRESSED AIR: BLUE WITH WHITE LETTERS.
7. HEAT TRACED PIPING: TO MATCH THE COLOR CODE OF THE FLUID OR GAS BEING
USED.
5. CEILING TACKS
a. DESCRIPTION: STEEL WITH 3/4 INCH DIAMETER COLOR-CODED HEAD.
b. COLOR CODE AS FOLLOWS: PLUMBING VALVES: GREEN.
6. LABELS
a. DESCRIPTION: POLYESTER FOR ABOVE GRADE AND LAMINATED MYLAR FOR BELOW
GRADE, SIZE 1.9 X 0.75 INCHES, ADHESIVE BACKED WITH PRINTED IDENTIFICATION.
B. SLEEVES
1. MANUFACTURERS: FLEXICRAFT INDUSTRIES; PIPE WALL SLEEVE, METRAFLEX; PIPE WALL
SLEEVE, CCI PIPELINE; PIPE WALL SLEEVE, GPT – CENTURYLINE SLEEVE SERIES,
GPT/THUNDERLINE LINK-SEAL, INC, METRAFLEX - METRASEAL, BWM – PIPE SEAL/ PS SERIES.
SUBSTITUTIONS: SEE DIVISION 01 - GENERAL REQUIREMENTS AND 22 04 00 – GENERAL
REQUIREMENTS.
22 07 00 - PLUMBING INSULATION
A. GENERAL REQUIREMENTS
1. INSULATION SHALL BE CERTAIN-TEED, KNAUF, MANVILLE, OR OWENS CORNING. MATERIALS
SHALL MEET REQUIREMENTS OF ADHESIVE AND SEALANT COUNCIL STANDARDS AND
SMACNA. INSTALL INSULATION, MASTICS, ADHESIVES, COATINGS, COVERS, WEATHER-
PROTECTION AND OTHER WORK IN STRICT ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS. ASTM E-84 FIRE HAZARD RATINGS SHALL BE 25 FLAME SPREAD, 50
SMOKE DEVELOPED.
2. FITTINGS, VALVES AND FLANGES SHALL BE INSULATED WITH SAME MATERIAL AND TO SAME
THICKNESS AS ADJOINING PIPE INSULATION, WITH PRESENT SECTIONS.
3. FOR STRAINERS AND OTHER VALVES OR FITTINGS WHICH NEED MAINTENANCE, PROVIDE
PREFORMED REMOVABLE INSULATION SECTION.
4. INCREASE PIPE INSULATION AS REQUIRED FOR PIPING WITH HEAT TRACING PER
MANUFACTURER'S REQUIREMENTS.
B. PRODUCTS AND APPLICATIONS
1. INSULATION SHALL BE FIBROUS GLASS PIPE INSULATION WITH FACTORY-APPLIED ASJ WITH
K FACTOR OF AT LEAST 0.23 AT 75F MEAN TEMPERATURE.
2. PROVIDE INSULATION FOR THE FOLLOWING SYSTEMS:
a. STORM PIPING HORIZONTAL ABOVE GROUND WITHIN BUILDING: MINIMUM 1 INCH
THICKNESS.
22 00 00 - GENERAL
A. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND
SUPPLEMENTARY CONDITIONS AND DIVISION 1 SPECIFICATION SECTIONS, APPLY TO THIS
SECTION.
B. THESE SPECIFICATIONS ARE APPLICABLE TO ALL PLUMBING DRAWINGS UNLESS NOTED
OTHERWISE. REVIEW THE ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING
DRAWINGS FOR NOTES, DIMENSIONS, ETC., AND COORDINATE WITH OTHER TRADES INVOLVED.
C. THIS SECTION APPLIES TO ALL DIVISION 22 SPECIFICATION SECTIONS (22 ## ##). WHERE THERE
ARE DIFFERENCES OR DISCREPANCIES BETWEEN THIS SPECIFICATION SECTION AND OTHER
DIVISION 22 SPECIFICATION SECTIONS, THE MORE STRINGENT REQUIREMENT(S) SHALL APPLY.
D. DESCRIPTION
1. THIS PROJECT COMPRISES ALTERATIONS AND RENOVATIONS TO THE EXISTING BUILDING.
THE EXISTING BUILDING IS CURRENTLY OCCUPIED AND THE PROJECT SHALL PROCEED IN A
MANNER THAT MINIMIZES ANY INCONVENIENCE TO THE BUILDING OCCUPANTS.
2. SCOPE OF WORK CONSISTS OF INSTALLATION OF MATERIALS TO BE FURNISHED UNDER THE
CONTRACT DOCUMENTS AND WITHOUT LIMITING GENERALITY THEREOF CONSISTS OF
FURNISHING LABOR, MATERIALS, EQUIPMENT, HOISTING, TRANSPORTATION, RIGGING,
STAGING, APPURTENANCES, AND SERVICES NECESSARY AND/OR INCIDENTAL TO PROPERLY
COMPLETE ALL WORK AS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN.
E. DEFINITIONS: THE FOLLOWING DEFINITIONS APPLY TO THIS CONTRACT
1. FURNISH: THE TERM "FURNISH" MEANS TO "SUPPLY AND DELIVER TO THE PROJECT SITE,
READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS"
2. INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT SITE
INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING,
ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING,
CLEANING, AND SIMILAR OPERATIONS."
3. PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE AND READY
FOR THE INTENDED USE."
4. REMOVE: THE TERM "REMOVE" MEANS TO DISCONNECT FROM ITS PRESENT POSITION,
REMOVE FROM THE PREMISES AND TO DISPOSE OF IN A LEGAL MANNER."
5. SUBSTITUTIONS: "SUBSTITUTIONS" ARE REQUESTS FOR CHANGES IN PRODUCTS, MATERIALS
AND/OR METHODS OF CONSTRUCTION AS PROPOSED BY THE CONTRACTOR AFTER AWARD
OF THE CONTRACT."
F. DRAWINGS
1. DRAWINGS ARE DIAGRAMMATIC. THE FINAL PLACEMENT OF EQUIPMENT OR DEVICES IN THE
FIELD MAY NOT DIRECTLY CORRESPOND TO THAT WHICH IS SHOWN ON THE DRAWINGS.
THOUGH SOME OFFSETS & TRANSITIONS MAY BE SHOWN IN PIPING TO HELP INDICATE THE
PHYSICAL RELATIONSHIP BETWEEN THEM, IT IS NOT THE INTENT OF THE DRAWINGS TO
SHOW ALL PIPING OFFSETS & TRANSITIONS REQUIRED. THE CONTRACTOR SHALL FULLY
COORDINATE THE WORK AND PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR NECESSARY
TO COMPLETE THE WORK OUTLINED ON THESE CONTRACT DOCUMENTS. IF A CONFLICT IN
POSITIONING OCCURS THE CONTRACTOR IS TO NOTIFY THE ENGINEER IMMEDIATELY TO
ASCERTAIN WHAT THE INTENT WAS BY THE DESIGN PROFESSIONAL.
G. CODES AND STANDARDS: WORK SHALL CONFORM TO THE CURRENT EDITIONS OF THE
FOLLOWING:
1. INTERNATIONAL BUILDING CODE
2. INTERNATIONAL PLUMBING CODE
3. INTERNATIONAL MECHANICAL CODE
4. NATIONAL ELECTRIC CODE (NFPA 70)
5. THE LIFE SAFETY CODE (NFPA 101)
H. PERMITS AND FEES:
1. THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS; AND PAY
ALL GOVERNMENT AND STATE SALES TAXES AND FEES WHERE APPLICABLE, AND OTHER
COSTS, INCLUDING UTILITY CONNECTIONS OR EXTENSIONS IN CONNECTION WITH THE
WORK, FILE ALL NECESSARY DRAWINGS, PREPARE ALL DOCUMENTS AND OBTAIN ALL
NECESSARY APPROVALS OF ALL GOVERNMENTAL AND STATE DEPARTMENTS HAVING
JURISDICTION, OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION FOR HIS WORK, AND
DELIVER A COPY TO THE OWNER AND ENGINEER BEFORE REQUEST FOR ACCEPTANCE AND
FINAL PAYMENT FOR THE WORK.
I. EXISTING SYSTEMS AND EQUIPMENT
1. EXISTING TO BE REUSED/RELOCATED EQUIPMENT: REPORT ANY EXISTING EQUIPMENT
DEFICIENCIES TO THE OWNER AND THE ARCHITECT AND/OR ENGINEER.
2. CONNECT WORK TO VARIOUS EXISTING SYSTEMS AS INDICATED ON THE DRAWINGS. WORK
SHALL BE COMPATIBLE WITH THE EXISTING SYSTEM CONDITIONS. ALL WORK SHALL BE
COORDINATED WITH ALL TRADES INVOLVED AS WELL AS WITH EXISTING SYSTEMS, THE
STRUCTURE, AND OTHER OBSTRUCTIONS.
J. SURVEY AND MEASUREMENTS
1. THIS PROJECT INVOLVES CONSTRUCTION INSIDE AN EXISTING STRUCTURE. CONTRACTORS,
BY SUBMITTING A BID, SHALL BE COMPLETELY FAMILIAR WITH THE EXISTING CONDITION OF
THE BUILDING AS IT INFLUENCES THE WORK DESCRIBED. NO COMPENSATION WILL BE
GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT
ARE VISIBLE OR READILY IDENTIFIED BY EXPERIENCED OBSERVERS.
2. DO NOT SCALE DRAWINGS. SCALE INDICATED ON DRAWINGS IS FOR ESTABLISHING
REFERENCE POINTS ONLY. ACTUAL FIELD CONDITIONS SHALL GOVERN ALL DIMENSIONS.
3. PRIOR TO ORDERING ANY MATERIALS AND EQUIPMENT, THOROUGHLY REVIEW THE SITE
CONDITIONS TO DETERMINE IF ADEQUATE CLEARANCES AND ACCESS IS ALLOWED TO
INSTALL THE COMPONENTS. ORDER EQUIPMENT BROKEN DOWN AS NECESSARY TO ALLOW
FOR PROPER RIGGING THROUGH THE PROJECT AREA. PROVIDE ALL NECESSARY
ALTERATIONS TO THE STRUCTURE OF THE BUILDING AS NECESSARY TO RIG THE EQUIPMENT
IN PLACE.
4. CONTRACTORS SHALL VERIFY, LAYOUT AND BE RESPONSIBLE FOR ALL MEASUREMENTS OF
ALL EXISTING CONDITIONS BEFORE COMMENCING WORK AND SHALL NOTIFY ARCHITECT
AND/OR ENGINEER IF A CONDITION EXISTS THAT PREVENTS THE CONTRACTOR FROM
ACCOMPLISHING THE INTENT OF THE DRAWINGS.
K. SUBMITTALS AND SHOP DRAWINGS
1. SUBMIT FOR REVIEW, ELECTRONIC SHOP DRAWINGS IN SEARCHABLE PDF FORMAT FOR THE
FOLLOWING.
a. SUBMITTAL DATA FOR ALL MATERIAL AND EQUIPMENT. CLEARLY IDENTIFY DEVIATIONS
OF THE SUBMITTED PRODUCTS FROM THE DESIGN.
b. SHOP DRAWINGS: DRAWN TO ACCURATE SCALE OF 1/4”=1'0”. HIGHLIGHT, ENCIRCLE, OR
OTHERWISE INDICATE DEVIATIONS FROM THE CONTRACT DOCUMENTS. DO NOT
REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD INFORMATION AS THE BASIS
OF SHOP DRAWINGS. STANDARD INFORMATION PREPARED WITHOUT SPECIFIC
REFERENCE TO THE PROJECT IS NOT CONSIDERED SHOP DRAWINGS.
2. DO NOT USE SHOP DRAWINGS WITHOUT AN APPROPRIATE FINAL STAMP INDICATING ACTION
TAKEN IN CONNECTION WITH CONSTRUCTION.
3. DO NOT ORDER ANY MATERIALS OR EQUIPMENT PRIOR TO RECEIVING FINAL APPROVED
SUBMITTALS.
4. SCHEDULE AT LEAST TEN WORKING DAYS EXCLUSIVE OF TRANSMITTAL TIME, FOR
SUBMITTAL REVIEW.
L. AS-BUILT DRAWINGS
A. MAINTAIN ONE SET OF PRINTS ON THE SITE AND NOTE ALL CHANGES OR DEVIATIONS FROM
THE ORIGINAL DESIGN THEREON. AT THE COMPLETION OF THE PROJECT, INCORPORATE ALL
CHANGES INTO RECORD AS-BUILT DRAWINGS IN ELECTRONIC FORMAT AND SUBMIT FOR
APPROVAL.
M. OPERATION AND MAINTENANCE
1. UPON COMPLETION OF ALL WORK AND TESTS, THE CONTRACTOR SHALL INSTRUCT THE
OWNER OR THE OWNER'S REPRESENTATIVE IN THE OPERATION, ADJUSTMENT AND
MAINTENANCE OF ALL EQUIPMENT FURNISHED. THE CONTRACTOR SHALL GIVE AT LEAST
SEVEN (7) DAYS NOTICE TO THE OWNER AND THE ENGINEER IN ADVANCE OF THIS PERIOD.
2. THE CONTRACTOR SHALL PREPARE THREE (3) COPIES OF A COMPLETE OPERATION AND
MAINTENANCE MANUAL, BOUND IN BOOKLET FORM. ORGANIZE OPERATING AND
MAINTENANCE DATA INTO SUITABLE SETS OF MANAGEABLE SIZE. BIND PROPERLY INDEXED
DATA IN INDIVIDUAL HEAVY-DUTY 3-RING VINYL-COVERED BINDERS, WITH POCKET FOLDERS
FOR FOLDED SHEET INFORMATION AND DESIGNATION PARTITIONS WITH IDENTIFICATION
TABS. MARK APPROPRIATE IDENTIFICATION ON FRONT AND SPINE OF EACH BINDER.
3. MAINTENANCE AND INSTRUCTION MANUALS SHALL BE SUBMITTED TO THE OWNER AT THE
SAME TIME AS THE SEVEN (7) DAY NOTICE IS GIVEN PRIOR TO THE INSTRUCTION PERIOD.
2. VERTICAL PIPING:
a. SLEEVE LENGTH: 1 INCH ABOVE FINISHED FLOOR.
b. PROVIDE SEALANT FOR WATERTIGHT JOINT.
c. BLOCKED OUT FLOOR OPENINGS: PROVIDE 1-1/2 INCH ANGLE SET IN SILICON ADHESIVE
AROUND OPENING.
d. DRILLED PENETRATIONS: PROVIDE 1-1/2 INCH ANGLE RING OR SQUARE SET IN SILICONE
ADHESIVE AROUND PENETRATION.
3. SHEET METAL: PIPE PASSING THROUGH INTERIOR WALLS, PARTITIONS, AND FLOORS,
UNLESS STEEL OR BRASS SLEEVES ARE SPECIFIED BELOW.
4. PIPE PASSING THROUGH BELOW GRADE OR EXTERIOR WALLS:
a. ANCHORED SLEEVE - ZINC COATED OR CAST IRON PIPE.
b. PROVIDE WATERTIGHT SPACE WITH LINK RUBBER OR MODULAR SEAL BETWEEN SLEEVE
AND PIPE ON BOTH PIPE ENDS.
5. CLEARANCES:
a. PROVIDE ALLOWANCE FOR INSULATED PIPING.
b. WALL, FLOOR, FLOOR, PARTITIONS, AND BEAM FLANGES: 1 INCH GREATER THAN
EXTERNAL; PIPE DIAMETER.
c. ALL RATED OPENINGS: CAULKED TIGHT WITH FIRE STOPPING MATERIAL CONFORMING
TO HYPERLINK "HTTP://GLOBAL.IHS.COM/DOC_DETAIL.CFM?
RID=BSD&DOCUMENT_NAME=ASTM E814" ASTM E814-13A IN ACCORDANCE WITH DIVISION
07 THERMAL AND MOISTURE PROTECTION TO PREVENT THE SPREAD OF FIRE, SMOKE,
AND GASES.
6. SLEEVES FOR PIPES THROUGH NON-FIRE RATED FLOORS: 18 GAGE THICK GALVANIZED
STEEL.
7. SLEEVES FOR PIPES THROUGH NON-FIRE RATED WALLS, AND POTENTIALLY WET FLOORS:
STEEL PIPE OR 18 GAGE THICK GALVANIZED STEEL.
8. SEALANT: REFER TO DIVISION 07 THERMAL AND MOISTURE PROTECTION.
9. MECHANICAL SLEEVE SEALS
a. PRODUCT DESCRIPTION: MODULAR MECHANICAL TYPE, CONSISTING OF INTERLOCKING
SYNTHETIC NITRILE RUBBER LINKS SHAPED TO CONTINUOUSLY FILL ANNULAR SPACE
BETWEEN OBJECT AND SLEEVE, CONNECTED WITH BOLTS AND PRESSURE PLATES
CAUSING RUBBER SEALING ELEMENTS TO EXPAND WHEN TIGHTENED, PROVIDING
WATERTIGHT SEAL AND ELECTRICAL INSULATION.
b. PROVIDE NSF 61 CERTIFIED ASSEMBLY WHEN USED IN POTABLE WATER STORAGE TANK
APPLICATIONS.
C. FORMED STEEL CHANNEL
1. MANUFACTURERS: B-LINE SYSTEMS, UNISTRUT CORP., ANVIL INTERNATIONAL,
SUBSTITUTIONS: DIVISION 01 - GENERAL REQUIREMENTS AND 22 04 00 – GENERAL
REQUIREMENTS.
2. PRODUCT DESCRIPTION: GALVANIZED 12 GAGE THICK STEEL. WITH HOLES 1-1/2 INCHES ON
CENTER.
D. GENERAL INSTALLATION REQUIREMENTS FOR PLUMBING
1. CONNECTIONS BETWEEN COPPER & STEEL PIPING SHALL BE MADE WITH DIELECTRIC
WATERWAYS, WITH BRONZE BODY VALVES, OR WITH BRASS ADAPTER FITTINGS.
2. INSTALL AND TEST GAS PIPING IN ACCORDANCE WITH THE FUEL GAS CODE AND NFPA 54.
3. PREPARATION
a. REAM PIPE AND TUBE ENDS. REMOVE BURRS. BEVEL OR GROOVE PLAIN END FERROUS
PIPE.
b. REMOVE SCALE AND DIRT ON INSIDE AND OUTSIDE BEFORE ASSEMBLY.
c. PREPARE PIPING CONNECTIONS TO EQUIPMENT WITH FLANGES OR UNIONS.
d. KEEP OPEN ENDS OF PIPE FREE FROM SCALE AND DIRT. PROTECT OPEN ENDS WITH
TEMPORARY PLUGS OR CAPS.
e. AFTER COMPLETION, FILL, CLEAN, AND TREAT SYSTEM.
E. INSTALLATION REQUIREMENTS FOR PLUMBING PIPING
1. INSTALL PIPING IN ACCORDANCE WITH ALL APPLICABLE PLUMBING CODES, ASME B31.1, AND
ASME B31.9 AS APPLICABLE.
2. ROUTE PIPING PARALLEL TO BUILDING STRUCTURE AND MAINTAIN GRADIENT.
3. INSTALL PIPING TO CONSERVE BUILDING SPACE, AND NOT INTERFERE WITH USE OF SPACE.
4. GROUP PIPING WHENEVER PRACTICAL AT COMMON ELEVATIONS.
5. SLEEVE PIPE PASSING THROUGH PARTITIONS, WALLS AND FLOORS.
6. INSTALL FIRESTOPPING AT PENETRATIONS OF RATED ASSEMBLIES. REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATIONS AND RATINGS OF RATED ASSEMBLIES.
7. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE,
JOINTS, OR CONNECTED EQUIPMENT.
8. PROVIDE ACCESS WHERE VALVES AND FITTINGS ARE NOT EXPOSED.
9. SLOPE DOMESTIC WATER PIPING AND ARRANGE SYSTEMS TO DRAIN AT LOW POINTS. USE
ECCENTRIC REDUCERS TO MAINTAIN TOP OF PIPE ALIGNED.
10. WHERE PIPE SUPPORT MEMBERS ARE WELDED TO STRUCTURAL BUILDING FRAMING,
SCRAPE, BRUSH CLEAN, AND APPLY ONE COAT OF ZINC RICH PRIMER TO WELDS.
11. PREPARE UNFINISHED PIPE, FITTINGS, SUPPORTS, AND ACCESSORIES, READY FOR FINISH
PAINTING.
12. INSTALL VALVES WITH STEMS UPRIGHT OR HORIZONTAL, NOT INVERTED.
F. TESTING
1. TEST PIPING IN ACCORDANCE WITH ALL APPLICABLE PLUMBING CODES, ASME B31.1 AND
ASME B31.9, AS APPLICABLE.
22 05…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .