This is a bid document and civil plan set for the Raymond James Water Main Extension project, a water redundancy initiative in Tampa, Florida, prepared by Kimley-Horn and Associates, Inc. The project involves the installation of approximately 144 linear feet of private 12-inch PVC water line and 144 linear feet of private 12-inch PVC fire line to provide backup water supply components to Raymond James Stadium located at 4201 North Dale Mabry Highway, Tampa, Florida. The work includes connections to existing 12-inch domestic and fire water mains via tapping sleeves and valves, installation of a private backflow prevention device, meter assembly pad extension, and a private double detector check valve assembly. The construction plans were designed by Kari E. Clark, P.E. (Florida License No. 99191) and are dated January 30, 2026. The project site encompasses 67.15 acres with existing parking of 610 spaces, of which 610 are to remain with one space being removed and replaced.
The contractor is responsible for all materials, labor, equipment, and means necessary to complete the work in accordance with the construction documents and applicable jurisdictional requirements. Key construction requirements include adequate groundwater management and dewatering during wet weather operations, utility location verification prior to work commencement with 48 hours minimum notice to utility companies, clearing and grubbing of disturbed areas, erosion and sediment control measures, water main pressure testing at 150 PSI for two hours, fire line testing per FFPC and NFPA standards, and bacteriological testing for disinfection. The contractor must obtain all required construction permits, provide certified record surveys and as-built drawings, comply with ADA accessibility standards, and coordinate with the City of Tampa Water Department regarding public water facility construction. All work must conform to the latest edition of the City of Tampa Water Department Technical Manual and FDOT standards, with the most stringent requirements governing in cases of discrepancy between contract documents and jurisdictional agency requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W TAMPA BAY BLVD
N H
IM
ES
A
VE
RAYMOND JAMES STADIUM
C-000
C O
VE
R
S H
EE
T
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT.
CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN
PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
Know what's below.
before you dig.Call
R
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
APPROVAL STAMPS:
SITEAERIAL MAP
SCALE: 1" = 1000'
PROJECT LOCATION
KIMLEY-HORN AND ASSOCIATES, INC.
KARI CLARK, P.E.
200 CENTRAL AVENUE, SUITE 600
ST. PETERSBURG, FL 33701
PHONE: (727) 547-3999
PROJECT DESIGN TEAM
CIVIL ENGINEER
FOLIO ID
109073-2125
SECTION: 9 TOWNSHIP: 29S RANGE: 18E
RAYMOND JAMES STADIUM
WATER MAIN EXTENSION
TAMPA, FL
4201 N DALE MABRY HWY, TAMPA, FL 33607
CONSTRUCTION PLANS PREPARED FOR
SITE
AERIAL MAP
SCALE: 1" = 100'
LEGAL DESCRIPTION:
RJS STADIUM A COMMERCIAL CONDOMINIUM COMMON AREA
LIST OF CONTACTS
FLORIDA ONE-CALL - 811 CITY OF TAMPA
306 E JACKSON ST #5E
TAMPA, FL 33602
JUAN ALVIRA
PHONE: 813 344-9298
TAMPA ELECTRIC COMPANY
CSADMIN@TECOENERGY.COM
CITY OF TAMPA
3804 E 26TH AVE
TAMPA, FL 33605
PHONE: 813 622-1901
CITY OF TAMPA
2545 GUY N VERGER BLVD
TAMPA, FL 33605
JACK FERRAS
PHONE: 813 274-8095
LOCATION SERVICES STORMWATER WATER SEWER ELECTRIC
TAMPA SPORTS AUTHORITY
JOSHUA MUNK
4201 N DALE MABRY HWY
TAMPA, FL 33607
PHONE: (813) 350-6519
OWNER/DEVELOPER
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
C-000 COVER SHEET
C-100 GENERAL NOTES
C-200 EXISTING CONDITIONS, DEMOLITION, AND EROSION CONTROL PLAN
C-201 EROSION CONTROL DETAILS
C-300 MASTER SITE, GRADING, DRAINAGE, AND UTILITY PLAN
C-400 CITY OF TAMPA GENERAL DETAILS
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT.
CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN
PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
Know what's below.
before you dig.Call
R
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
C-100
G
EN
ER
AL
N O
TE
S
HISTORIC RESOURCES STATEMENT
THE FOLLOWING REQUIREMENTS APPLY TO ALL BUILDING CONSTRUCTION OR ALTERATION, OR LAND ALTERATION
ACTIVITIES.
A. IF EVIDENCE OF EXISTENCE OF HISTORIC RESOURCES IS DISCOVERED OR OBSERVED AT DEVELOPMENT SITES OR DURING DEVELOPMENT ACTIVITIES AFTER FINAL APPROVAL, ALL WORK SHALL CEASE IN THE AFFECTED AREA.
THE DEVELOPER, OWNER, CONTRACTOR, OR AGENT THEREOF SHALL NOTIFY THE FLORIDA DIVISION OF HISTORICAL RESOURCES WITHIN TWO WORKING DAYS. EXAMPLES OF EVIDENCE OF HISTORIC RESOURCES INCLUDE WHOLE OR FRAGMENTARY STONE TOOLS, SHELL TOOLS, ABORIGINAL OR HISTORIC POTTERY, HISTORIC GLASS, HISTORIC BOTTLES, BONE TOOLS, HISTORIC BUILDING FOUNDATIONS, SHELL MOUNDS, SHELL MIDDENS, OR SAND MOUNDS.
B. IF ANY HUMAN SKELETAL REMAINS OR ASSOCIATED BURIAL ARTIFACTS ARE DISCOVERED AT DEVELOPMENT SITES OR DURING DEVELOPMENT ACTIVITY, ALL WORK IN THE AREA MUST CEASE, AND THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE NEAREST LAW ENFORCEMENT OFFICE. ACCORDING TO CHAPTER 872, FLORIDA
STATUTES, IT IS UNLAWFUL TO DISTURB, VANDALIZE, OR DAMAGE A HUMAN BURIAL.
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE FLORIDA DEPARTMENT OF
TRANSPORTATION (FDOT) "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" (LATEST EDITION) AND FDOT STANDARD INDEXES, AND BECOME FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL OBTAIN A COPY OF THE 2025-26 FDOT STANDARD SPECS. AND FDOT STANDARD INDICES
PRIOR TO COMMENCING WORK. THE STANDARD SPECS CAN BE FOUND AT
HTTP://WWW.DOT.STATE.FL.US/PROGRAMMANAGEMENT/SPECS.SHTM
AND THE FDOT STANDARD INDICES CAN BE FOUND AT
HTTPS://WWW.FDOT.GOV/DESIGN/STANDARDPLANS/CURRENT
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT
AND ALL OTHER DELETERIOUS MATERIAL.
3. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE HE COMMENCES ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED BY THE CONTRACTOR AND THEIR PERMISSION OBTAINED
REGARDING THE METHOD TO USE FOR SUCH WORK.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PROVIDE 48 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING CONSTRUCTION. A LIST OF THE UTILITY COMPANIES WHICH THE CONTRACTOR MUST CALL BEFORE COMMENCING WORK IS PROVIDED ON THE COVER SHEET OF THESE CONSTRUCTION PLANS. THIS LIST SERVES AS A GUIDE ONLY AND IS NOT INTENDED TO LIMIT THE UTILITY COMPANIES WHICH THE CONTRACTOR MAY NEED TO NOTIFY.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED CONSTRUCTION PERMITS AND BONDS
IF REQUIRED PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED
CONSTRUCTION PERMITS.
7. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE
WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER.
8. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE OWNER
AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE TESTING AGENCY.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER A CERTIFIED RECORD SURVEY SIGNED AND SEALED BY A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE STATE OF FLORIDA DEPICTING THE ACTUAL FIELD LOCATION OF ALL CONSTRUCTED IMPROVEMENTS THAT ARE REQUIRED BY THE JURISDICTIONAL AGENCIES FOR THE CERTIFICATION PROCESS. ALL SURVEY COSTS WILL BE THE CONTRACTORS RESPONSIBILITY.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA SHALL BE COLLECTED BY A STATE OF FLORIDA PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE ENGAGED BY THE CONTRACTOR.
11. ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A LICENSED WELL DRILLING
CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES.
12. ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO THE APPROPRIATE
JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER.
14. WATER SUPPLY SHALL BE ESTABLISHED BEFORE ANY VERTICAL CONSTRUCTION BEGINS. SHALL MEET THE
REQUIREMENTS OF NFPA 1 2024 EDITION, CHAPTER 18.
PAVING, GRADING AND DRAINAGE NOTES
1. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL BE REGRADED AND
SODDED/SEEDED.
2. TRAFFIC CONTROL ON ALL FDOT, LOCAL AND COUNTY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
3. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE
STABILIZATION OCCURS.
4. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SODDED/SEEDED UNLESS INDICATED OTHERWISE ON THE
LANDSCAPE PLAN.
5. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL PAVEMENT
SECTIONS AS INDICATED ON THE DRAWINGS.
6. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR SHALL SAW CUT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND
DEPTH OF MATERIAL AS EXISTING OR AS INDICATED.
7. WHERE NEW PAVEMENT MEETS THE EXISTING PAVEMENT, THE CONTRACTOR SHALL SAW CUT THE EXISTING PAVEMENT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND MATCH THE EXISTING PAVEMENT
ELEVATION WITH THE PROPOSED PAVEMENT UNLESS OTHERWISE INDICATED.
8. THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL DRAINAGE STRUCTURES FOR THE DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE
DRAINAGE FLOWS.
9. IF OFFSITE DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS.
THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANY EXCAVATION.
10. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. TOPSOIL MAY BE STOCKPILED
ON SITE FOR PLACEMENT WITHIN LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER.
11. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO FDOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY
REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
12. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN BE SODDED/SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
ALL EARTHEN AREAS WILL BE SODDED/SEEDED AS SHOWN ON THE LANDSCAPING PLAN.
13. ALL CUT OR FILL SLOPES SHALL BE 4 (HORIZONTAL) :1 (VERTICAL) OR FLATTER UNLESS OTHERWISE SHOWN.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL.
THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL
PROTECTION.
15. THE CONTRACTOR SHALL TAKE ALL REQUIRED MEASURES TO CONTROL TURBIDITY, INCLUDING BUT NOT LIMITED TO THE INSTALLATION OF TURBIDITY BARRIERS AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS MUST BE MAINTAINED IN EFFECTIVE CONDITION AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED. THEREAFTER, THE CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL THERE BE ANY OFF-SITE DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS IN
CHAPTER 17-302, FLORIDA ADMINISTRATIVE CODE.
16. SOD/SEED, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 7 DAYS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION
OR TURBID DISCHARGES.
17. THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF THE ENVIRONMENTAL RESOURCE PERMIT COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY WATER
MANAGEMENT DISTRICT REPRESENTATIVES.
18. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF
IN A LEGAL MANNER PER THE INSTRUCTION OF THE ENVIRONMENTAL CONSULTANT.
19. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S
RECOMMENDATIONS.
20. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-OF-WAY SHALL BE CONSTRUCTED BASED ON THE
CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS.
21. PRIVATE CURB RAMPS ON THE SITE (I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAY) SHALL CONFORM TO ADA STANDARDS AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH AND FULL DEPTH OF THE
CURB RAMP, NOT INCLUDING FLARES.
22. ALL ACCESSIBLE ROUTES, GENERAL SITE AND BUILDING ELEMENTS, RAMPS, CURB RAMPS, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA STANDARDS FOR ACCESSIBLE DESIGN, LATEST EDITION.
23. ANY COMPONENTS OF THE PROJECT SERVING MULTIFAMILY DWELLINGS IN BUILDINGS THAT HAVE 4 OR MORE UNITS PER DWELLING SHALL ALSO CONFORM TO THE FAIR HOUSING ACT (FHA), AND COMPLY WITH THE FAIR
HOUSING ACT DESIGN MANUAL BY THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.
24. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE ROUTES. IN NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED
2.0 PERCENT SLOPE IN ANY DIRECTION.
25. CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ADA SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS
WILL BE ACCEPTED FOR ADA SLOPE COMPLIANCE ISSUES.
WATER AND SEWER UTILITY NOTES
1. THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES GRAVITY SEWER LINES AND
DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY
REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
2. ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND COORDINATION IN ACCORDANCE WITH THE NOTES
CONTAINED IN THE GENERAL CONSTRUCTION SECTION OF THIS SHEET.
3. THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS SHOWN OTHERWISE.
4. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED
ACCORDING TO THE PLANS.
5. ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING, LAYING AND BACK FILLING, SHALL BE DONE IN A WORKMANLIKE MANNER. ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY D.I. PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL
BE REPLACED AT THE CONTRACTOR'S EXPENSE.
6. WATER FOR FIRE FIGHTING SHALL BE AVAILABLE FOR USE PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE.
7. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
8. UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF FLORIDA PROFESSIONAL LAND SURVEYOR BEFORE
BACK FILLING.
9. CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER AND JURISDICTIONAL AGENCY AS
REQUIRED.
10. CONTRACTOR SHALL NOT OPERATE OR PRESSURE TEST AGAINST ANY CITY INSTALLED VALVES OR FITTINGS.
11. RECENT FIRE FLOW TEST DATA SHALL BE UTILIZED FOR DESIGN OF ANY REQUIRED FIRE PROTECTION SYSTEM(S) FOR THIS DEVELOPMENT. ANY NECESSARY PUBLIC SYSTEM UPGRADES OR EXTENSIONS SHALL BE PERFORMED BY
THE CITY AT THE EXPENSE OF THE DEVELOPER.
12. CONTRACTOR SHALL SCHEDULE AND MAKE PAYMENT FOR NECESSARY CITY WORK THROUGH THE CITY'S WATER RESOURCES DEPARTMENT. CITY FORCES SHALL PERFORM ALL TAPS AND INSTALL BOTH WATER AND FIRE SERVICE
UP TO AND INCLUDING THE BACK FLOW PREVENTION DEVICES.
13. ALL AT GRADE UTILITY APPURTENANCE SHALL BE ADJUSTED TO MEET FINAL PROPOSED GRADES BY OR AT THE
DIRECTION OF THE UTILITY OWNER.
DEMOLITION NOTES
1. ALL MATERIAL REMOVED FROM THIS SITE BY THE CONTRACTOR SHALL BE DISPOSED OF BY THE CONTRACTOR IN A
LEGAL MANNER PER THE INSTRUCTION OF THE ENVIRONMENTAL CONSULTANT.
2. REFER TO THE TOPOGRAPHIC SURVEY FOR ADDITIONAL DETAILS OF EXISTING STRUCTURES, ETC., LOCATED WITHIN THE PROJECT SITE. SOME ITEMS TO BE REMOVED MAY NOT BE DEPICTED ON THE TOPOGRAPHIC SURVEY.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND DETERMINE THE FULL EXTENT OF ITEMS TO BE REMOVED. IF ANY ITEMS ARE IN QUESTION, THE CONTRACTOR SHALL CONTACT THE OWNER PRIOR TO REMOVAL
OF SAID ITEMS.
ASBUILT AND TESTING NOTES
1. REFER TO STATE AND MUNICIPAL STANDARDS FOR TESTING AND ASBUILT REQUIREMENTS. THESE NOTES ARE
PROVIDED ONLY IN CASE OF ABSENCE OF AGENCY OR OWNER REQUIREMENTS.
2. SIGNED AND SEALED AS-BUILTS SHALL BE PREPARED BY THE CONTRACTOR ACCORDING TO AGENCY CLEARANCE
AND OWNER REQUIREMENTS.
3. TESTING SHALL BE PERFORMED BY THE CONTRACTOR ACCORDING TO ALL APPLICABLE REGULATIONS.
4. IN ADDITION TO THE REQUIREMENTS ABOVE, THE CONTRACTOR SHALL PERFORM THE FOLLOWING TESTS AND
PROVIDE RESULTS TO OWNER AND ENGINEER:
4.1. FOR GRAVITY SANITARY SEWER: AIR TESTED BETWEEN MANHOLES AT 3.5 PSI FOR 5 MINUTES PER ASTM
F1417 FOR PLASTIC PIPES
4.2. FOR SANITARY FORCEMAINS: HYDROSTATIC PRESSURE TEST OF 150 PSI FOR 2 HOURS.
4.3. FOR WATERMAINS AND SERVICE LATERALS: HYDROSTATIC PRESSURE TEST OF 150 PSI FOR 2 HOURS.
4.4. FOR FIRE MAINS: PER FFPC AND NFPA
4.5. FOR LIFT STATIONS: START-UP OBSERVATION REPORT BY PUMP MANUFACTURER.
4.6. FOR CONCRETE PAVEMENT: TEST CYLINDERS (7 DAY AND 28 DAY BREAKS) AT RATE OF 1 PER 100 CY.
4.7. FOR ASPHALT PAVEMENT: CORES TAKEN 3 HEAVY DUTY AND 3 LIGHT DUTY PER DAY OF ASPHALT WORK, LOCATIONS AS SPECIFIED BY OWNER. THE CORES SHALL BE TESTED FOR DENSITY AND CONFORMANCE TO
THICKNESS REQUIREMENTS. CORES SHALL BE HOT-PATCHED BY CONTRACTOR.
4.8. FOR SUBGRADE: DENSITY SHALL BE TESTED BY NUCLEAR METHOD, ASTM D6938. ONE TEST IN EACH LIFT
FOR EACH 10,000 SQ. FT.
4.9. FOR BASE: DENSITY SHALL BE TESTED BY NUCLEAR METHOD, ASTM D6938. ONE TEST IN EACH LIFT FOR EACH 10,000 SQ. FT. OF IN-PLACE BASE MATERIAL AREA. THICKNESS SHALL BE TESTED ONCE FOR EACH 20,000 SQ.
FT. OF IN-PLACE BASE MATERIAL AREA.
4.10. FOR UTILITY TRENCHES: DENSITY TESTS EVERY 300', MINIMUM OF ONE TEST BETWEEN EACH STRUCTURE.
5. IN CASE OF CONFLICT OR DUPLICATION, CONTRACTOR SHALL ISSUE BID QUESTION ACCORDING TO BID REQUIREMENTS. IF NO QUESTION IS ASKED, BASE BID SHALL INCLUDE THE CONFLICTING OR DUPLICATE TESTING.
6. OTHER DOCUMENTS TO BE PROVIDED BY CONTRACTOR:
CONSTRUCTION COST AS MAY BE REQUIRED BY JURISDICTION.
TABULATED CAMS DATA AS MAY BE REQUIRED BY JURISDICTION.
TABULATED NORTHING/EASTING AND GPS DATA AS MAY BE REQUIRED BY JURISDICTION.
7. FDEP SANITARY SEWER TESTING REQUIREMENTS:
LEAKAGE TESTS:
1) THE LEAKAGE EXFILTRATION OR INFILTRATION DOES NOT EXCEED 200 GALLONS PER INCH OF PIPE DIAMETER PER MILE PER DAY FOR ANY SECTION OF THE SYSTEM; 2) EXFILTRATION OR INFILTRATION TESTS BE PERFORMED WITH A MINIMUM POSITIVE HEAD OF 2 FEET; AND 3) AIR TESTS, AS A MINIMUM, CONFORM TO THE TEST PROCEDURE DESCRIBED IN ASTM C-828 FOR CLAY PIPE, ASTM C 924 FOR CONCRETE PIPE, ASTM F-1417 FOR PLASTIC PIPE, AND FOR OTHER MATERIALS APPROPRIATE TEST PROCEDURES. [RSWF 33.93, 33.94, AND 33.95]
DEFLECTION TESTS FOR ALL FLEXIBLE PIPE:
TESTING IS REQUIRED AFTER THE FINAL BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS TO PERMIT STABILIZATION OF THE SOIL-PIPE SYSTEM. 1) NO PIPE SHALL EXCEED A DEFLECTION OF 5%; 2) A RIGID BALL OR MANDREL FOR THE DEFLECTION TEST WITH A DIAMETER NOT LESS THAN 95% OF THE BASE INSIDE DIAMETER OR AVERAGE INSIDE DIAMETER OF THE PIPE, DEPENDING ON WHICH IS SPECIFIED IN THE ASTM SPECIFICATION, INCLUDING THE APPENDIX, TO WHICH THE PIPE IS MANUFACTURED; AND 3) PERFORM THE TEST WITHOUT
MECHANICAL PULLING DEVICES. [RSWF 33.85]
DEWATERING NOTES
1. IF GROUNDWATER WILL BE DISCHARGED TO SURFACE WATERS FROM A NON-CONTAMINATED SITE, CONTRACTOR
SHALL OBTAINED FDEP, FAC 62-621.300(2), GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND WATER
FROM ANY NON-CONTAMINATED SITE ACTIVITY, EFFECTIVE DATE FEBRUARY 14, 2000.
CITY OF TAMPA WATER DEPARTMENT NOTES
GENERAL
A.WATER SERVICE SHALL BE PROVIDED BY THE CITY OF TAMPA.
B. ALL WORK TO BE PERFORMED ON EXISTING OR ON FUTURE WATER FACILITIES TO BE OWNED AND MAINTAINED BY THE CITY OF TAMPA SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF CITY OF TAMPA WATER DEPARTMENT TECHNICAL MANUAL. ALL CONSTRUCTION DETAILS AND STANDARDS DESCRIBED THERE WITHIN SHALL BE
CONSIDERED TO BE PART OF THE CONTRACT DOCUMENTS FOR THIS PROJECT.
C.CONSTRUCTION OF ANY WATER INSTALLATIONS TO BE OWNED AND MAINTAINED BY THE CITY OF TAMPA SHALL BE COORDINATED WITH THE CITY OF TAMPA CONSTRUCTION ENGINEERING & INSPECTIONS DIVISION (CEI) PRIOR TO THE START OF CONSTRUCTION. A MEETING MAY BE SCHEDULED BY EMAILING CAD-DEVELOPER@TAMPAGOV.NET A MINIMUM OF TEN (10) WORKING DAYS PRIOR TO THE INTENDED CONNECTION DATE TO COORDINATE AND SCHEDULE THE TAP WITH THE CITY. THE EMAIL MUST HAVE “REQUEST PRECON FOR UTL-XX-XXXXXXX” IN THE SUBJECT LINE FOR THE EMAIL TO BE FORWARDED TO THE CORRECT STAFF MEMBERS. IF YOU DO NOT RECEIVE A RESPONSE TO YOUR
EMAIL REQUEST AFTER 3 DAYS, THEN CONTACT THE CEI FRONT OFFICE AT (813) 635-3400.
D.PRIOR TO THE PRE-CONSTRUCTION MEETING WITH THE CITY OF TAMPA REGARDING THE PUBLIC WATER FACILITIES, THE CONTRACTOR SHALL OBTAIN THE LATEST EDITION OF THE CITY OF TAMPA WATER DEPARTMENT TECHNICAL MANUAL. ALL PRIVATELY INSTALLED PUBLIC FACILITIES, INCLUDING CONSTRUCTION, MATERIALS, AND WORKMANSHIP, ARE TO CONFORM WITH THE SPECIFICATIONS OUTLINED IN THE DEPARTMENT'S TECHNICAL MANUAL. IN THE EVENT
OF A DISCREPANCY, THE MOST STRINGENT CRITERIA SHALL APPLY.
E.BENDS SHALL BE INSTALLED ON ALL WATER MAINS AS NECESSARY TO MAINTAIN PROPER ALIGNMENT. JOINT DEFLECTIONS SHALL BE IN ACCORDANCE WITH AWWA C-600 (LATEST EDITION) EXCEPT DEFLECTIONS ALLOWED
SHALL BE LESS 80% OF THE DEFLECTION VALUES GIVEN IN THE AWWA DEFLECTION TABLE.
F. VALVES ON EXISTING CITY OF TAMPA WATER MAINS ARE TO BE OPERATED BY CITY PERSONNEL ONLY.
G.FIRE HYDRANT ASSEMBLIES TO BE OWNED AND MAINTAINED BY THE CITY SHALL BE 5 ¼” DNS.
H. ALL FIRE HYDRANT ASSEMBLIES AND FIRE LINE DOUBLE DETECTOR CHECK VALVES WHICH ARE TO BE PRIVATELY
OWNED AND MAINTAINED SHALL BE PAINTED RED.
I. FOR ANY NEW, ADJUSTED, OR RELOCATED FIRE HYDRANT ASSEMBLY, HYDRANT EXTENSIONS ARE NOT PERMITTED.
FIRE HYDRANT ASSEMBLY INSTALLATIONS MUST CONFIRM WITH THE WATER DEPARTMENT STANDARD. IF A NEW, ADJUSTED, OR RELOCATED FIRE HYDRANT ASSEMBLY IS NOT PROPERLY SIZED, A NEW HYDRANT MUST BE ORDERED
AT THE DEVELOPER'S EXPENSE.
J. THE DEVELOPER SHALL BE RESPONSIBLE TO LOCATE ALL EXISTING PUBLIC WATER SERVICE LINES NO LONGER TO BE SERVING THE PARCEL. THESE SERVICE LINES ARE TO BE REMOVED, AND CUT & CAPPED AT THE PUBLIC WATER MAIN
BY THE DEVELOPER.
K. THE DEVELOPER SHALL INSTALL AND TEST ALL BACKFLOW PREVENTION ASSEMBLY(IES) IN ACCORDANCE WITH THE CITY'S CROSS CONNECTION CONTROL AND PREVENTION MANUAL. A COPY MAY BE FOUND ONLINE AT WWW.TAMPAGOV.NET/WATER. A HOLD ON THE CERTIFICATE OF OCCUPANCY SHALL REMAIN UNTIL THE INSTALLATION OF THE ASSEMBLY(IES) ARE INSPECTED AND APPROVED BY THE WATER DEPARTMENT. TO SCHEDULE AN INSPECTION OF THE BACKFLOW PREVENTION ASSEMBLY(IES), PLEASE CONTACT THE FIELD QUALITY SECTION AT (813) 231-5266 OR
FIELDQUALITY@TAMPAGOV.NET.
L. THE RELIEF VALVE OF ANY INSTALLED REDUCED PRESSURE PRINCIPLE ASSEMBLY SHALL BE INSTALLED A MINIMUM OF 12 INCHES ABOVE THE GRADE OR THE FLOODPLAIN ELEVATION, WHICHEVER IS HIGHER. THE INSTALLATION SHALL
BE MADE SO THAT NO PART OF THE UNIT CAN BE SUBMERGED.
PIPE CLEARANCES
A.ALL WATER MAINS SHALL HAVE A MINIMUM COVER OF 36 INCHES AND SHALL MAINTAIN A MINIMUM OF THREE (3) FEET
HORIZONTAL SEPARATION FROM OTHER UTILITIES, EXCEPT STORM, WASTEWATER, AND GAS WHICH SHALL MAINTAIN
TEN (10) FEET HORIZONTAL SEPARATION, UNLESS OTHERWISE NOTED.
B. WATER MAINS SHALL CROSS ABOVE OTHER PIPES. WHEN WATER MAINS CROSS ANOTHER UTILITY, 18” OF OUTSIDE-TO-OUTSIDE VERTICAL SEPARATIONS SHOULD BE PROVIDED. IN CASES WHERE THE PREFERRED SEPARATION MAY NOT BE MET, A MINIMUM OF 12” OF OUTSIDE-TO-OUTSIDE VERTICAL SEPARATION MUST BE
PROVIDED.
C.ALL WATER MAIN CROSSINGS WILL OTHER UTILITIES SHALL BE ARRANGED SO THAT THE JOINTS OF THE CROSSING PIPES ARE EQUIDISTANT FROM THE POINT OF CROSSING (PIPES CENTERED ON THE CROSSING).
D.CLEARANCE BETWEEN ALL TREES AND WATER MAINS SHALL MEET CITY OF TAMPA PARKS DEPARTMENT LATEST REQUIREMENTS. NO TREE SHALL BE PLANTED WITHIN 10 FEET OF INSTALLED OR EXISTING WATER MAINS.
MATERIAL
A.ALL VALVES SHALL BE RIGHT HAND (CLOCKWISE) OPEN.
B. ALL DUCTILE IRON PIPE (DIP) FITTINGS AND APPURTENANCES SHALL UTILIZE POLYWRAP.
C.ALL HARDWARE SHALL BE, AT MINIMUM, 304 STAINLESS STEEL, UNLESS OTHERWISE NOTED.
D. ALL BELOW GROUND BENDS SHALL BE MECHANICAL JOINT.
E. ALL VALVES AND FITTINGS SHALL BE RESTRAINED.
F. CONCRETE THRUST BLOCKS SHALL NOT BE USED TO PROVIDE THRUST RESTRAINT. RESTRAINT OF PUSH-ON DIP (OTHER THAN FOR FITTINGS AND VALVES) SHALL BE WITH APPROVED PUSH-ON “GRIPPER-TYPE” RESTRAINTS.
FITTINGS AND VALVES SHALL BE CONNECTED TO PIPE WITH MEGA LUGS, OR APPROVED EQUAL.
G.ALL POTABLE WATER SERVICE LATERALS, AIR RELEASE VALVES, AND TEMPORARY SAMPLE POINTS SHALL BE CONSTRUCTED OF BLUE SDR-9 HIGH DENSITY POLYETHYLENE (HDPE) TUBING. ALL HDPE TUBING SHALL BE INSTALLED WITHIN A CASING AS DEFINED IN THE SPECIFICATIONS AND DETAILS OF THE CITY OF TAMPA WATER DEPARTMENT
TECHNICAL MANUAL.
DIRECTIONAL DRILLING
A.HORIZONTAL ALIGNMENT SHALL BE AS SHOWN ON THE DRAWINGS. THE PIPE SHALL HAVE A MINIMUM 48-INCH COVER.
THE MAXIMUM DEPTH SHALL BE DETERMINED BASED ON 36-INCH MINIMUM CLEARANCE UNDER WATER OR GAS LINES AND 24-INCH CLEARANCE UNDER ALL OTHER EXISTING OR PROPOSED UTILITIES TO BE CROSSED. COMPOUND CURVATURES MAY BE USED, BUT SHALL NOT EXCEED THE MAXIMUM DEflECTIONS AS SET FORTH BY THE HDPE PIPE
MANUFACTURE OR AWWA STANDARDS, WHICHEVER IS STRICTER.
B.ENTRY ANGLE SHALL BE 12° - 14° IDEAL (NOT TO EXCEED 15°). EXIT ANGLE SHALL BE 6° - 12° TO FACILITATE
“PULL-BACK”.
C.ENTRY AND EXIT ANGLES ARE DEfiNED AS ANGLES FROM THE HORIZONTAL.
D. A BORING LOG FOR THE VERTICAL AND HORIZONTAL ALIGNMENTS OF THE DIRECTIONAL DRILLED PIPES SHALL BE
PROVIDED AND SUBMITTED ALONG WITH THE AS-BUILT PACKAGE.
TESTING
A.ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL BE
PROPERLY PRESSURE TESTED, WITNESSED, AND ACCEPTED BY THE CITY. PRESSURE TEST TO BE PERFORMED IN ACCORDANCE WITH CITY OF TAMPA WATER DEPARTMENT SPECIFICATIONS. CONTRACTOR TO NOTIFY THE ASSIGNED CITY INSPECTOR A MINIMUM OF THREE (3) WORKING DAYS IN ADVANCE OF PERFORMING TESTS. CONTRACTOR SHALL PRESSURE TEST WATER MAINS AT A MINIMUM OF 150 PSI FOR A PERIOD OF TWO (2) HOURS IN ACCORDANCE WITH AWWA C600-87 STANDARDS. THE CONTRACTOR SHALL MAKE ALL NECESSARY APPLICATIONS AND ARRANGEMENTS.
B. ALL SAMPLE, PRESSURE TEST, AND CHLORINATION POINT PIPING SHALL BE COMPLETELY REMOVED PRIOR TO FINAL
ACCEPTANCE. THE CORPORATION STOP SHALL BE CLOSED AND PLUGGED AT THE MAIN.
C.CONTRACTOR SHALL PERFORM DISINFECTION AND HIRE INDEPENDENT FIRMS TO CONDUCT BACTERIOLOGICAL TESTING AS DEFINED IN F.A.C. 62-55.340. CONTRACTOR SHALL SUPPLY THE CITY WITH AS-BUILTS AND SAMPLE
RESULTS NECESSARY TO OBTAIN DEP CLEARANCES.
RESTORATION
A.ROADWAY RESTORATION SHALL BE IN CONFORMANCE WITH CORRESPONDING JURISDICTIONS LATEST STANDARDS.
B. ALL ASPHALT OPEN CUTS WITHIN CITY RIGHT-OF-WAY SHALL BE FULLY MILLED AND OVERLAYED FROM EDGE OF
PAVEMENT TO EDGE OF PAVEMENT PER THE WATER DEPARTMENT'S STANDARD DETAIL.
C.DISTURBANCE TO ANY PROPERTY, PUBLIC OR PRIVATE, AS PART OF THE CONSTRUCTION OF PUBLIC WATER
FACILITIES, SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
CERTIFICATE OF OCCUPANCY
THE CITY OF TAMPA WATER DEPARTMENT'S HOLD ON THE CERTIfiCATE OF OCCUPANCY WILL NOT BE RELEASED UNTIL ALL CLOSEOUT REQUIREMENTS SET FORTH BY CITY OF TAMPA WATER DEPARTMENT AND CONSTRUCTION ENGINEERING & INSPECTIONS DIVISION HAVE BEEN SATISFIED. THESE REQUIREMENTS MAY INCLUDE, BUT NOT BE LIMITED TO:
A. FINAL INSPECTION IN CONJUNCTION WITH THE CONSTRUCTION ENGINEERING & INSPECTIONS DIVISION PERSONNEL COMPLETED
AND APPROVED.
B. AS-BUILTS, BOTH HARD COPIES AND PDF, HAVE BEEN RECEIVED AND ACCEPTED. ALL RECORD DRAWINGS MUST CONFIRM WITH THE LATEST VERSION OF THE WATER DEPARTMENT'S WATER PIPE NETWORK AS BUILT REQUIREMENTS MANUAL.
C. ALL NECESSARY TESTING COMPLETED AND CERTIfiED.
D. PAYMENT OF ALL CITY OF TAMPA WATER DEPARTMENT FEES.
E. ISSUANCE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION / HILLSBOROUGH COUNTY HEALTH DEPARTMENT CERTIfiCATION OF COMPLETION APPROVAL (IF APPLICABLE).
F. RECEIPT AND ACCEPTANCE OF ALL REQUIRED EASEMENT DEDICATION DOCUMENTS (IF APPLICABLE).
G.RECEIPT AND ACCEPTANCE OF ALL REQUIRED TRANSFER OF OWNERSHIP DOCUMENTS (IF APPLICABLE).
.0
M
INLET PROTECTION
INLET PROTECTION
CONSTRUCTION FENCE
APPROXIMATE LOCATION
OF EXISTING 12" WATER
METER TO REMAIN
APPROXIMATE LOCATION
OF EXISTING 8" DDCVA
ASSEMBLY TO REMAIN
EXISTING VAN ACCESSIBLE ADA
PARKING SPACES TO REMAIN
EXISTING 4"
UNDERDRAIN
TO REMAIN
EXISTING 18"
STORMWATER
PIPE TO REMAIN
EXISTING 18"
STORMWATER
PIPE TO REMAIN
EXISTING STORMWATER
STRUCTURE TO REMAIN
EXISTING STORMWATER
STRUCTURE TO REMAIN
EXISTING 24" RCP
STORMWATER
PIPE TO REMAIN
EXISTING
STORMWATER
STRUCTURE
TO REMAIN
EXISTING ADA
PARKING SPACE
TO BE REMOVED
EXISTING 30" RCP
STORMWATER
PIPE TO REMAIN
EXISTING 15" RCP
STORMWATER
PIPE TO REMAIN APPROXIMATE LOCATION
OF EXISTING 12" FIRE
WATER LINE TO REMAIN
APPROXIMATE LOCATION
OF EXISTING 8" WATER
LINE TO REMAIN
EXISTING 12" WATER
LINE TO REMAIN
EXISTING 16" WATER
LINE TO REMAIN
EXISTING 12" CAST
IRON WATER LINE
TO REMAIN
APPROXIMATE LOCATION OF
EXISTING 8" WATER METER
ASSEMBLY TO REMAIN
W TAMPA BAY BLVD
N H
IM
ES
A
VEINLET PROTECTION
EXISTING PAVEMENT
TO BE REMOVED
APPROXIMATE LOCATION
OF EXISTING ±40 LF OF
12" DIP WATER MAIN
APPROXIMATE LOCATION OF
EXISTING 12"X12" TAPPING
SLEEVE AND VALVE
APPROXIMATE LOCATION
OF EXISTING 12" WATER
MAIN CAP
APPROXIMATE
LOCATION OF EXISTING
12" WATER MAIN CAP
PERIMETER PAVEMENT BMP
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT.
CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN
PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
Know what's below.
before you dig.Call
R
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT.
CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN
PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
Know what's below.
before you dig.Call
R
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
NORTH
C-200
EX
IS
TI
N
G C
O N
D
IT
IO
N
S, D
EM
O
LI
TI
O N
, A N
D
ER
O
SI
O N
C O
N
TR
O L
PL
AN
PROPERTY LINE
REMOVE ASPHALT
DEMOLITION PLAN LEGEND
FILTER SACK INLET PROTECTION
CONSTRUCTION FENCE
NOTES:
1. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO BEST
AVAILABLE INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME
OF PLAN PREPARATION INCLUDING THE CITY OF TAMPA AS-BUILTS
AND ATLAS MAPS, AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY
THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL
EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE
LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE
ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S
RESPONSIBILITY AND SHALL BE DONE BEFORE THE COMMENCEMENT
OF ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR
SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO
THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE
ANY AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER
WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST
INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF
EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING
AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING
OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT
AFFECTED SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED
REGARDING THE METHOD TO USE FOR SUCH WORK.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE
PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT
WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF
ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY
THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE
WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN
IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION
RELIEVES OWNER OF ANY OBLIGATION TO PAY FOR A RELATED
CHANGE ORDER.
3. PARCEL LINES WERE ACQUIRED THROUGH THE HILLSBOROUGH
COUNTY GIS DATABASE. THE FINAL LOCATION OF ALL PROPERTY LINES
IS SUBJECT TO CHANGE. CONTRACTOR TO ACQUIRE ADDITIONAL
SURVEY AS NECESSARY TO VERIFY EXACT LOCATION OF PROPERTY.
EXISTING CONTOUR
EXISTING WATER PIPE
EXISTING STORMWATER PIPE
PROPOSED LIMITS OF WORK
PERIMETER PAVEMENT BMP. CONTRACTOR
MAY UTILIZE SILT DIKE ON PAVEMENT,
SYNTHETIC WATTLE, OR GRAVEL DIKE FOR
PERIMETER PAVEMENT BEST
MANAGEMENT PRACTICE AS THEIR OPTION.
IP5
INLET PROTECTION FILTER SACK
GRAB TENSILE STRENGTH
GRAB TENSILE ELONGATION
PUNCTURE
MULLEN BURST
TRAPEZOID TEAR
UV RESISTANCE
APPARENT OPENING SIZE
FLOW RATE
PERMITTIVITY
ASTM D-4632
ASTM D-4632
ASTM D-4833
ASTM D-3786
ASTM D-4533
ASTM D-4355
ASTM D-4751
ASTM D-4491
ASTM D-4491
MODERATE TO HIGH FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE
265 LBS
20 %
135 LBS
420 PSI
45 LBS
90 %
20 US SIEVE
200 GAL/MIN/SQ FT
1.5 SEC -1
FOR USE ONLY IN PAVED AREAS WHERE SEDIMENT LOADS ARE
EXPECTED TO BE VERY LOW. FILTER SACK MUST HAVE OVERFLOW
HOLES TO PREVENT PONDING.
N.T.S.
PROPERTIES TEST METHOD UNITSTEST METHOD UNITS
GRAB TENSILE STRENGTH
GRAB TENSILE ELONGATION
PUNCTURE
MULLEN BURST
TRAPEZOID TEAR
UV RESISTANCE
APPARENT OPENING SIZE
FLOW RATE
PERMITTIVITY
ASTM D-4632
ASTM D-4632
ASTM D-4833
ASTM D-3786
ASTM D-4533
ASTM D-4355
ASTM D-4751
ASTM D-4491
ASTM D-4491
300 LBS
20 %
120 LBS
800 PSI
120 LBS
80 %
40 US SIEVE
40 GAL/MIN/SQ FT
0.55 SEC -1
PROPERTIES
LOW TO MODERATE FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE
NOTES:
1. GEOTEXTILE SHALL BE A WOVEN POLYPROPYLENE FABRIC THAT MEETS OR EXCEEDS REQUIREMENTS IN
THE SPECIFICATIONS TABLE.
2. PLACE AN OIL ABSORBENT PAD OR PILLOW OVER INLET GRATE WHEN OIL SPILLS ARE A CONCERN.
3. THE WIDTH, "W", OF THE FILTER SACK SHALL MATCH THE INSIDE WIDTH OF THE GRATED INLET BOX.
4. THE DEPTH, "D", OF THE FILTER SACK SHALL BE BETWEEN 18 INCHES AND 36 INCHES.
5. THE LENGTH, "L", OF THE FILTER SACK SHALL MATCH THE INSIDE LENGTH OF THE GRATED INLET BOX.
MAINTENANCE NOTES:
1. INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN. REMOVE TRAPPED
SEDIMENT WHEN BRIGHTLY COLORED EXPANSION RESTRAINT CAN NO LONGER BE SEEN.
2. REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY.
3. INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW-RATES THAT MAY CAUSE
DOWNSTREAM FLOODING.
4. CONTACT THE EOR FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS
OCCURRED.
5. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR
DETERIORATION.
GEOTEXTILE BAG
OVERFLOW HOLES
LOOPS SIZED FOR 1" REBAR.
USE REBAR FOR A HANDLE
TO EMPTY FILTER SACK AT
A SEDIMENT COLLECTION
LOCATION.
LOOPS SIZED FOR
RECTANGULAR BAR 2"X1/4".
LIFT FILTER BAG FROM
INLET USING RECTANGULAR
BAR FOR HANDLES.
2"X2"X3/4" RUBBER
BLOCK (TYP)
(FILTER SACK INSTALLED)
FRAME TO HOLD
FILTER BAG IN PLACE
1/4" BRIGHTLY
COLORED NYLON
ROPE EXPANSION
RESTRAINT
ISOMETRIC VIEW
SECTION VIEW
SECURE RECTANGULAR BAR TO
OR UNDER SURROUNDING
SURFACE.
1/4" BRIGHTLY COLORED
NYLON ROPE EXPANSION
RESTRAINT
FINISH
GRADE
H
INLET GRATE
D
GRAVEL (*) 24"
RUNOFF WATER
WRAPPED WITH SILT FENCE MATERIAL AND
SECURED WITH WIRE TIES OR OTHER
FASTENERS, GRAVEL FILLED**
FILTERED WATER
GRAVEL DIKE (WRAPPED IN FABRIC)
SECTION A-A
N.T.S.GD
* GRAVEL SHALL BE 2"-3" ANGULAR CLEAN STONE
**WEIGHTED EROSION EELS MAY BE USED AS AN ALTERNATE
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
C-201
ER
O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
W TAMPA BAY BLVD
N H
IM
ES
A
VE
P W T
P WTP WTP WTP WTP WTP WTP WTP WTP WTP WTP WTP WTP
W
T P
W T
P W
T
P WTP WTP WTP WTP WTP WT
BFP
P FL
P FL
P FL
D
D C
VA
P FLP FLP FLP FLP FLP FLP FLP FLP FLP FLP FLP
FL
P
FL
P
FL
P FLP FLP FLP FLP FLP FLP FL
P FL
P FL
M
ROLLED 90° BEND
ROLLED 90° BEND
PROPOSED CONNECTION TO EXISTING 12"
DOMESTIC WATER MAIN WITH 12"X12"
TAPPING SLEEVE AND VALVE. CONTRACTOR
TO VERIFY LOCATION OF EXISTING WATER
MAIN AND NOTIFY ENGINEER OF RECORD
IMMEDIATELY IF DIFFERS FROM PLAN.
PROPOSED CONNECTION TO EXISTING 12" METER
ASSEMBLY. PLUG TO BE RETURNED TO COT WATER
DEPARTMENT UPON SERVICE CONNECTION.
EXISTING VAN ACCESSIBLE ADA PARKING
SPACES TO REMAIN. IMPACTS TO THE EXISTING
SPACES ARE NOT PROPOSED DUE TO UTILITY
TRENCHING. CONTRACTOR TO MATCH EXISTING
GRADES OF AT EDGE OF ADA PARKING SPACES.
EXISTING STORM STRUCTURE
UNDERDRAIN INV. EL.: 31.42'
E INV. EL.: 31.90'
W INV. EL.: 31.40'
EXISTING STORM STRUCTURE
UNDERDRAIN INVERT
ELEVATION: 31.42'
N INV. EL.: 32.00'
W INV. EL.: 32.00'
EXISTING 18" RCP
STORMWATER PIPE
EXISTING 24" RCP
STORMWATER PIPE
EXISTING STORM
STRUCTURE
N INV. EL.: 31.55'
E INV. EL.: 30.80'
W INV. EL.: 31.30'
UTILITY CROSSING #1:
WATER AND FIRE PRESSURE PIPE TO BE
ROUTED BELOW EXISTING STORMWATER PIPE.
EXISTING 18" STORMWATER PIPE INVERT
ELEVATION AT 31.90'. MAXIMUM PROPOSED
WATER AND FIRE INVERT ELEVATION AT 28.90'.
PROPOSED 12" PRIVATE BACKFLOW
PREVENTER PER COT STANDARD DETAIL 6.02C
PROPOSED METER ASSEMBLY
PAD EXTENSION PER COT
STANDARD DETAIL 6.02B
UTILITY CROSSING #2:
WATER AND FIRE PRESSURE PIPE TO
BE ROUTED BELOW EXISTING
STORMWATER PIPE. EXISTING 4"
STORMWATER PIPE INVERT ELEVATION
AT 31.42'. MAXIMUM PROPOSED WATER
AND FIRE INVERT ELEVATION AT 29.42'.
90° BEND
85 LF OF PRIVATE 12" PVC WATER LINE
40 LF OF PRIVATE 12" PVC WATER LINE
19 LF OF PRIVATE 12"
PVC WATER LINE
EXISTING 4"
UNDERDRAIN
34.47 ME
34.51 ME
34.53 ME34.34 ME
34.61 ME34.50 ME34.58 ME
34.78 ME
34.22 ME
34.45 ME
34.34 ME
34.65 ME
34.31 ME
EXISTING 15" RCP
STORMWATER PIPE
EXISTING 30" RCP
STORMWATER PIPE
34.53 ME
34.05 ME
APPROXIMATE LOCATION OF
EXISTING 8" DDCVA ASSEMBLY
APPROXIMATE LOCATION
OF EXISTING 8" DOMESTIC
WATER METER ASSEMBLY
EXISTING 12" METER ASSEMBLY
EXISTING 12" WATER MAIN
EXISTING 16" WATER MAIN
EXISTING 12" WATER MAIN
EXISTING 12"
DOMESTIC WATER LINE
EXISTING 12" FIRE LINE
EXISTING 18" RCP
STORMWATER PIPE 34.85 ME
35.00 ME34.81 ME
77 LF OF PRIVATE 12" PVC FIRE LINE
19 LF OF PRIVATE
12" PVC FIRE LINE
48 LF OF PRIVATE
12" PVC FIRE LINE
PROPOSED CONNECTION TO EXISTING 12"
DOMESTIC FIRE MAIN WITH 12"X12" TAPPING SLEEVE
AND VALVE. CONTRACTOR TO VERIFY LOCATION OF
EXISTING WATER MAIN AND NOTIFY ENGINEER OF
RECORD IMMEDIATELY IF DIFFERS FROM PLAN.
13 LF OF PRIVATE
12" PVC FIRE LINE
PROPOSED 12" PRIVATE
DDCVA PER COT
STANDARD DETAIL 6.02A
PROPOSED CONNECTION TO
EXISTING 12" WATER MAIN.
CAP TO BE RETURNED TO
COT WATER DEPARTMENT
UPON SERVICE CONNECTION.
34.49 ME
34.56 ME
34.80 ME
±40 LF OF EXISTING
12" DIP WATER LINE
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT.
CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN
PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
Know what's below.
before you dig.Call
R
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
NORTH
C-300
M
AS
TE
R
S
IT
E, G
R
AD
IN
G
D
R
AI
N
AG
E, A
N D
U
TI
LI
TY
PL
AN
STANDARD DUTY ASPHALTIC
CONCRETE PAVEMENT PER
CITY OF TAMPA DETAIL 2.01A
PROPOSED CONCRETE
PAD PER CITY OF TAMPA
DETAIL 6.08
PROPERTY BOUNDARY
LIMITS OF WORK
PROPOSED WATER LINEP WT P WT
SITE PLAN LEGEND
SITE DATA TABLE
METER PAD EXTENSION AREA:
TRENCH DISTURBANCE AREA:
TOTAL PROJECT DISTURBANCE AREA:
230 SF
1,625 SF
1,858 SF
NOTES:
1. ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) OBTAINED FROM
NOAA NGS TOPOBATHY LIDAR DATED 01/16/2026.
2. ALL SPOT ELEVATIONS ARE TO TOP OF PAVEMENT UNLESS
OTHERWISE NOTED.
3. CONTRACTOR TO VERIFY A.D.A. COMPLIANCE. FOR ANY QUESTIONS
CONTACT CIVIL ENGINEER IMMEDIATELY.
4. GRADES IN ALL SIDEWALK, ACCESSIBLE ROUTES, INCLUDING
DRIVEWAY CROSSINGS, SHALL CONFORM TO ALL APPLICABLE A.D.A.
STANDARDS: NOT TO EXCEED 5.0% ALONG TRAVEL PATH WITH NOT
MORE THAN 2.0% CROSS SLOPE AND NOT TO EXCEED 2.0% IN ANY
DIRECTION IN ACCESSIBLE PARKING AREAS.
5. CONTRACTOR TO ADJUST EXISTING SANITARY SEWER MANHOLES,
ELECTRICAL MANHOLES, FIRE HYDRANTS, VALVE BOXES, WATER
METERS, STORM MANHOLES ETC. TO MATCH PROPOSED FINISHED
GRADES, IF NECESSARY.
6. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE EXISTING
SITE LAYOUT, UTILITY INVERTS, AND GRADE ELEVATIONS AS SHOWN
ON THESE PLANS ARE TAKEN FROM LIDAR PREPARED BY NOAA
DATED 01/16/2026 AND AS-BUILT UTILITY ATLASES PROVIDED BY
CITY OF TAMPA. THE INFORMATION HAS NOT BEEN INDEPENDENTLY
VERIFIED BY THE OWNER OR THE ENGINEER AND IS NOT TO BE
RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR VERIFYING EXISTING INFORMATION
SHOWN PRIOR TO CONSTRUCTION.
7. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS
SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE
CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC
SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR
REVIEW.
8. ALL SITE DRAINAGE PATTERNS MUST BE MAINTAINED.
9. PARCEL LINES WERE ACQUIRED THROUGH THE HILLSBOROUGH
COUNTY GIS DATABASE. CONTRACTOR TO ACQUIRE ADDITIONAL
SURVEY AS NECESSARY TO VERIFY EXACT LOCATION OF
PROPERTY.
10. CONTRACTOR TO MATCH EXISTING PAVEMENT GRADES AT LIMITS
OF UTILITY TRENCH EXCAVATION.
EXISTING STORMWATER PIPE
MATCH EXISTING GRADEXXX.XX ME
EXISTING WATER PIPE
EXISTING CONTOUR
PROJECT NAME: RAYMOND JAMES WATER MAIN EXTENSION
EXISTING USE: PARKING LOT
LOT AREA: 67.15 AC.
EXISTING PROVIDED PARKING: 610 SPACES
STANDARD: 485 SPACES ACCESSIBLE: 125 SPACES
PROPOSED PROVIDED PARKING: 609 SPACES
STANDARD: 485 SPACES ACCESSIBLE: 124 SPACES
REQUIRED ADA PARKING: 2% OF TOTAL (610 X 0.02 = 13 SPACES)
PROPOSED FIRE LINEP FL P FL
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT.
CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN
PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER,
PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER
MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
Know what's below.
before you dig.Call
R
FL
O
R
ID
A C
IT
Y
O F
TA
M
PA
KI
M
LE
Y-
H O
R N
A N
D A
SS
O
C
IA
TE
S, IN
C
C
EN
TR
AL
A
VE
SU
IT
E
0, ST
P
ET
ER
SB
U R
G , F
L
PH
O
N E:
-5
-3
W
W W
.K
IM
LE
Y-
H O
R N
.C O
M R
EG
IS
TR
Y
N O
. 3
144615003
R
AY
M O
N D
J
AM
ES
W
AT
ER
M
AI
N E
XE
N
TI
O
N
01/30/2026
KAR
I E
C
L A R K
L
IC
E
N S
E
F
LO
R
ID
A
PROF ESS
I O
N A
L E
NG
INEER
N o ST
AT
E
O F
SC
AL
E
AS
S H
O W
N
D
ES
IG
N
ED
B
Y
KS
M
SL
S
D R
AW
N
B Y
C H
EC
KE
D B
Y
KE
C
R
EV
IS
IO
N S
N o.
D
AT
E
SHEET NUMBER
PROJECT NO.
DATE
BY
C-400
C
IT
Y O
F
TA
M
PA
G
EN
ER
AL
D
ET
AI
LS
| C-000 COVER SHEET |
| C-100 GENERAL NOTES |
| C-200 EXISTING CONDITIONS, DEMOLITION, AND EROSION CONTROL PLAN |
| C-201 EROSION CONTROL DETAILS |
| C-300 MASTER SITE, GRADING, DRAINAGE, AND UTILITY PLAN |
| C-400 CITY OF TAMPA GENERAL DETAILS |
| 2026-03-06T11:50:00-0500 | |
| Kari E Clark | |
| Kari E. Clark, P.E., State of Florida, Professional Engineer, License No. 99191. This item has been electronically signed and sealed by Kari E. Clark, P.E. using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. |
File details come from the government source that posted it. Updated .