Bid Detail Report PW1502-24.pdf

PDF 10 KB Posted

Attached to
ITB - 2024 Asphalt Concrete Resurfacing of Various Marion County Roads
Solicitation number
S-C25102-00009451
Issued by
Marion County, Oregon

About this file

The document is a Bid Detail Report for a Marion County, Oregon, public works contract for asphalt concrete resurfacing on various roads, specifically along Cascade Highway NE. The project involves multiple line items including temporary removable tape, portable changeable message signs, traffic control, pilot cars, construction survey work, manhole and box adjustments, cold plane pavement removal, aggregate shoulders, asphalt concrete pavement, pavement repair, rumble strips, pavement markings, and temporary centerline delineation. The project has an estimated total value between $3.72 million and $4.12 million, with five bidders submitting proposals. The contract term is not specified.

The report details the unit prices and total amounts bid by the five contractors. Pricing varies significantly across the line items, with the lowest total bid at $3.72 million and the highest at $4.12 million. No information is provided regarding any set-asides, incumbents, or funding sources for the project. The scope indicates this is part of a larger Marion County asphalt concrete resurfacing program, but additional details on the overall program are not included.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH SANTIAM

PAVING CO

K&E PAVING, INC.

dba H&H PAVING

RIVERBEND

CONSTRUCTION

KNIFE RIVERROY HOUCK

CONSTRUCTION

LLC

QUANTITY TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE TOTAL

UNIT

PRICE

03-07-2024 Page 1

2024-101CONTRACT #:

Marion County Public Works Contract Bid Detail Report - E

1PROJECT #:

MARION COUNTY ASPHALT CONCRETE RESURFACING

1PROJECT #: 0 CASCADE HWY NE

.00 .000 .00 .000 .00.000 .00.000 .00.000 .00ACP MATERIAL PRICE

ADJUSTMENT

1.801

120.00 2.000 240.00 5.000 600.003.000 360.0010.000 1200.003.000 360.00TEMPORARY REMOVABLE TAPE225.276

6.00 1800.000 10800.00 4800.000 28800.003000.000 18000.001000.000 6000.002600.000 15600.00PORTABLE CHANGEABLE

MESSAGE SIGNS

225.450

2580.00 .010 25.80 62.000 159960.001.000 2580.0072.500 187050.001.000 2580.00FLAGGERS225.490

1.00 245000.000 245000.00 27400.000 27400.0046705.300 46705.3030000.000 30000.0016000.000 16000.00TRAFFIC CONTROL SUPERVISOR225.494

520.00 .010 5.20 74.000 38480.001.000 520.0086.000 44720.001.000 520.00PILOT CARS225.510

1.00 8888.000 8888.00 19500.000 19500.0025000.000 25000.0012000.000 12000.0012000.000 12000.00CONSTRUCTION SURVEY WORK305.100

1.00 3000.000 3000.00 800.000 800.00210.000 210.00500.000 500.002200.000 2200.00MINOR ADJUSTMENT OF

MANHOLES

490.125

20.00 383.100 7662.00 500.000 10000.00100.000 2000.00125.000 2500.0075.000 1500.00ADJUST BOXES490.300

200700.00 2.350 471645.00 2.900 582030.003.400 682380.002.950 592065.001.000 200700.00COLD PLANE PAVEMENT

REMOVAL

620.101

7350.00 34.650 254677.50 36.500 268275.0012.000 88200.0038.500 282975.0015.000 110250.00AGGREGATE SHOULDERS641.190

34500.00 74.900 2584050.00 81.900 2825550.0088.100 3039450.0076.850 2651325.0096.100 3315450.00LEVEL 3, 1/2" DENSE, PG 64-22, ACP

745.451

175.00 120.300 21052.50 126.000 22050.00168.000 29400.00125.000 21875.00112.000 19600.00LEVEL 3, 1/2" DENSE, PG 64-22, ACP, IN BASE PLUG

745.481

300.00 60.850 18255.00 75.000 22500.0085.000 25500.00155.000 46500.0065.000 19500.0024" ASPHALT CONCRETE

PAVEMENT REPAIR

748.170

2.00 2500.000 5000.00 5000.000 10000.004000.000 8000.001250.000 2500.004900.000 9800.00EXTRA FOR ASPHALT ROAD

CONNECTIONS

749.150

40.00 13.000 520.00 14.000 560.0013.600 544.0020.000 800.0013.000 520.0012'' PAVEMENT BAR, TYPE B850.554

57534.00 .300 17260.20 .320 18410.88.300 17260.20.450 25890.30.300 17260.20CONTINOUS RUMBLE STRIPS857.150

1530.00 14.950 22873.50 16.000 24480.0015.650 23944.5015.000 22950.0015.000 22950.00BI-DIRECTIONAL YELLOW TYPE

IAR MARKERS, RECESSED

860.225

218500.00 .210 45885.00 .250 54625.00.220 48070.00.200 43700.00.210 45885.00LONGITUDINAL PAVEMENT

MARKINGS - PAINT

861.110

3100.00 1.000 3100.00 3.000 9300.00.800 2480.002.500 7750.003.000 9300.00TEMPORARY CENTERLINE

DELINEATION

9999.412

3,719,939.70 3,821,975.20 3,982,300.30 4,060,604.00 4,123,320.88PROJECT SUBTOTAL:

3,719,939.70 3,821,975.20 3,982,300.30 4,060,604.00 4,123,320.88CUMULATIVE TOTAL:

3,719,939.70 3,821,975.20 3,982,300.30 4,060,604.00 4,123,320.88CONTRACT TOTAL:

CONTRACT #: 2024-101 PROJECT #: 1 MARION COUNTY ASPHALT CONCRETE RESURFACINGCASCADE HWY NE

File details come from the government source that posted it. Updated .