Bid Comparison10-25-24 WWTP ~1.pdf
PDF 109 KB Posted
- Attached to
- WWTP Dechlorination and Ammonia removal Project
- Solicitation number
- S-R29138-00011397
- Issued by
- Tillamook County, Oregon
About this file
This document is a bid comparison for the WWTP Dechlorination and Ammonia Removal project, which is being undertaken by the Port of Tillamook Bay in Tillamook County, Oregon. The project consists of upgrades to the existing wastewater treatment plant to improve the quality of effluent discharge into the Trask River, including the addition of chemical dechlorination, an aerated attached growth system to meet ammonia limits, conversion of a gravity sewer line to a pressure sewer system, replacement of 635 LF of 1-1/4" pipe with 2" PVC, and installation of 575 LF of new 1-1/4" PVC pressure effluent pipe. The bid comparison includes the engineer's estimate and three contractor bids for the various project components, including equipment, electrical work, demolition, and new piping.
The bid comparison shows the unit costs and total costs for each line item, with the three contractor bids ranging from $1,249,245 to $1,625,750. No information is provided regarding set-asides, incumbents, funding requirements, or award dates. The document appears to be a summary of the bid responses received for this state and local contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOITA_WWTP Improvements_Signed.pdf | ||
| Notice of Award_WWTP Dechlorination and Ammonia Removal_Signed.pdf | ||
| 00100 - Invitation For Bids.docx | DOCX document | |
| Addendum 2.pdf | ||
| Addendum 3.pdf | ||
| Addendum 4.pdf | ||
| Clarification 1.pdf | ||
| Notice of Award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT:
2020-020.01
1 Mobilization LS 1 120,000.00$ $ 120,000.00 132,000.00$ $ 132,000.00 100,000.00$ $ 100,000.00
2 Permiting and Special Inspections LS 1 22,500.00$ $ 22,500.00 5,000.00$ $ 5,000.00 20,000.00$ $ 20,000.00
3 Erosion Control, Reseeding, and Restoration LS 1 15,000.00$ $ 15,000.00 5,000.00$ $ 5,000.00 15,000.00$ $ 15,000.00
Furnish and Install Chemical Feed Duplex Pump Skid System, Chlorine Residual
Meter with Sampling Pump, Chemical Dosing/Mixing Tank
LS 1 147,500.00$ $ 147,500.00 150,000.00$ $ 150,000.00 120,000.00$ $ 120,000.00
5 Furnish and Install Flash Mixer LS 1 3,800.00$ $ 3,800.00 45,000.00$ $ 45,000.00 65,000.00$ $ 65,000.00
Furnish and Install Site/building Piping for Dichlorination Improvments including all fittings, valves, supports, hangers, clamps, air releases, drains etc
LS 1 18,000.00$ $ 18,000.00 28,000.00$ $ 28,000.00 40,000.00$ $ 40,000.00
7 Manhole (48'' diameter, Eccentric) EA 2 22,000.00$ $ 44,000.00 15,000.00$ $ 30,000.00 10,000.00$ $ 20,000.00
Furnish and Install dechlorination enclosure, including slab foundation, aggregate, framing, roofing system, etc.
SF 100 365.00$ $ 36,500.00 700.00$ $ 70,000.00 500.00$ $ 50,000.00
9 Design Build Electrical and Heating for dechlorination improvements LS 1 112,945.00$ $ 112,945.00 50,000.00$ $ 50,000.00 140,000.00$ $ 140,000.00
Furnish and Install Attached Growth System w/ Blowers, enclosures, concrete pad, airlines, header, hangers, pipe supports, valves, mooring system etc.
EA 1 378,000.00$ $ 378,000.00 350,000.00$ $ 350,000.00 450,000.00$ $ 450,000.00
11 Design Build Aeration Electrical LS 1 50,750.00$ $ 50,750.00 56,000.00$ $ 56,000.00 60,000.00$ $ 60,000.00
12 Remove and Decommision Ex. Pump Station LS 1 2,250.00$ $ 2,250.00 3,600.00$ $ 3,600.00 7,000.00$ $ 7,000.00
13 Furnish and install Grinder Pump Assembly LS 1 45,000.00$ $ 45,000.00 16,000.00$ $ 16,000.00 20,000.00$ $ 20,000.00
Furnish and install 1-1/4" Effluent Transport Pipe with bedding and backfill or use HDPE for horizontal directional drilling
LF 575 36.00$ $ 20,700.00 65.00$ $ 37,375.00 50.00$ $ 28,750.00
15 Furnish and install valves and effluent line appurtenances LS 1 5,400.00$ $ 5,400.00 4,500.00$ $ 4,500.00 30,000.00$ $ 30,000.00
Furnish and Install Grinder, Auger and Screen, including connection to existing electrical
LS 1 78,000.00$ $ 78,000.00 110,000.00$ $ 110,000.00 250,000.00$ $ 250,000.00
17 Furnish and Install Concrete Septic Tanks LS 1 64,800.00$ $ 64,800.00 80,000.00$ $ 80,000.00 65,000.00$ $ 65,000.00
18 Furnish and Install Effluent Pump System LS 1 12,000.00$ $ 12,000.00 20,800.00$ $ 20,800.00 30,000.00$ $ 30,000.00
Furnish and Install 2" Sch. 80 Effluent Transport Pipe with bedding and backfill or
Install HDPE with horizontal directional drilling
LF 700 40.00$ $ 28,000.00 68.00$ $ 47,600.00 50.00$ $ 35,000.00
20 Flow Meters and Misc Mechanical LS 1 12,000.00$ $ 12,000.00 67,000.00$ $ 67,000.00 30,000.00$ $ 30,000.00
Demolition, decomisioning and abandonment. (Ex pump station, pump statetion force main, influent structure etc.)
LS 1 26,000.00$ $ 26,000.00 10,000.00$ $ 10,000.00 25,000.00$ $ 25,000.00
22 Chlorination Building Vent Fan, Louvers etc LS 1 6,100.00$ $ 6,100.00 5,000.00$ $ 5,000.00 25,000.00$ $ 25,000.00
Subtotal
ITEM
NUMBER
ITEM DESCRIPTION UNIT QUANTITY
$1,249,245.00 $1,322,875.00
TOTALUNIT COST TOTAL UNIT COST
2KG Contractors, Inc HP Civil, Inc
Engineer's Estimate Bid Comparison
The project consists of upgrades to the existing Port of Tillamook Bay Wastewater
Treatment Plant to improve the quality of effluent discharge into the Trask River. The
Improvements include the following:
1.) Treatment for chlorine residual using chemical de-chlorination through the addition of sodium metabisulfite (SMBS). This will consist of the construction of a small enclosure to house new chemical feed pumps and effluent sampling, as well as the installation of two manholes on the existing chlorine contact chamber to house the de-chlorination flash mixer and sampling location.
2.) Treatment to meet ammonia limits through an aerated, attached growth system placed at the end of Cell 2. This system consists of floating media modules located within one of the existing lagoons as well as blowers.
3.) This project will also consist of converting the Tillamook County Corrections Facility gravity feed line to a septic tank effluent pump system and the decommissioning of an existing pump station that will no longer be needed after the Tillamook County Corrections
Facility is converted to a septic tank effluent pump system. The pump station will be replaced with a small grinder pump sized for a single bathroom.
4.) The project will replace 635 LF of existing 1-1/4’’ pipe with new 2’’ PVC pressure effluent pipe. It will also include installation of 575 LF of New 1-1/4’’ PVC pressure effluent pipe.
5.) Electrical, building, equipment supply, and piping will be required as indicated on the plans.
6.) Replace existing influent and effluent meters.
KIND OF WORK DATE: 10/24/2024
Engineer's Estimate
WWTP Dechlorination and Ammonia Removal ContractorContractor
ORR, Inc
UNIT COST TOTAL
$1,625,750.00
Contractor
501 E 1st Street Newberg, OR 97132 503-554-9553
File details come from the government source that posted it. Updated .