Bid Amendment - Vendor questions B-54632.docx

DOCX document 2 MB Posted

Attached to
commercial natural gas water heaters
Solicitation number
27-426DOC-SHERI-B-54632
Issued by
Illinois

About this file

This Bid Amendment document, issued by the Illinois Department of Corrections (IDOC) for Sheridan Correctional Center, responds to vendor questions regarding Bid #27-426DOC-SHERI-B-54632 for the procurement of two commercial natural gas water heaters under a Basic Ordering Agreement. The solicitation requires replacement units with specifications including an 800,000 BTU/hour input capacity, a minimum 83% thermal efficiency rating, 120-volt single-phase operation, and a 600-gallon storage tank. The amendment clarifies that while the existing PVI model 100 N 600A-TP is referenced for informational purposes, the BOA does not mandate a specific brand, and vendors may propose equivalent products meeting the stated specifications, subject to facility approval. All items must be delivered within 30 days of purchase execution to the warehouse receiving dock at 4017 E. 2603rd Rd, Sheridan, Illinois 60551, Monday through Friday between 8:00 a.m. and 2:00 p.m., excluding state holidays. The contract term runs through June 30, 2027, and the State reserves the right to award in whole or in part.

Key requirements established in the amendment include ASME certification for all water heaters with polymer lining, and the vendor must maintain General Commercial Liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate. Pricing is quoted net on an F.O.B. Destination basis with the contractor bearing all transportation costs, and payment is made upon receipt under the State Prompt Payment Act. The amendment explicitly states that the selling vendor will not perform start-up procedures and clarifies that manufacturer-approved replacement models are acceptable provided they meet minimum specifications. Additionally, the amendment confirms that delivery arrangements through authorized distributors do not constitute subcontracting requiring prior approval, as subcontracting rules apply to service contracts only. Nonconforming items must be replaced within three business days of notification, and Standard Illinois Certifications V.26.2 must accompany all bids. The State Agency Contact is Michelle Grogan at 815-496-2181 ext. 32006.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDOC – Sheridan Correctional Center – Commercial Natural Gas Water Heaters Bid #27-426DOC-SHERI-B-54632 Amendment #1 Response to Vendor’s Questions to RFQ (Request for Quote)

Below are the responses to the questions that IDOC has received regarding the above IFB:

1. Vendor 1: Model. Item 1 refers to the existing "PVI 100 L 600A-TP". Please confirm the exact model number and nameplate of the unit being replaced, as the code does not match a standard PVI model designation.

Answer: Model 100 N 600A-TP; Serial 99483084; Part # 88950-1

2. Vendor 1: Capacity wording. The description reads "40*-120 recovery gph 1000 gallon". Please confirm this means a recovery rate of 1,000 gallons per hour at a 40F to 120F temperature rise, with a 600-gallon storage tank.

Answer: Hydrostatic Test PSI 188; Working PSI 126; Recovery 40* to 120* (80* rise) = 1,000 US gallons per hour; Input 800,000 btu/h; 115 volts; 60 hz

3. Vendor 1: Equals. Will the State accept an equivalent product from another manufacturer that meets all listed specifications (600-gallon tank, 800,000 Btu/h input, natural gas, 1/3 hp blower, 120V single phase, minimum 83% efficiency)? If equivalents are accepted, what documentation should accompany the bid?

Answer: The BOA (Basic Ordering Agreement) does not list a required brand. The make/model of the equipment being replaced is for reference only. Required specifications for the new equipment are included. The facility reserves the right to request specs for the proposed equipment prior to contract execution to confirm the minimum standards are met.

4. Vendor 1: Tank construction. Is a particular tank lining or material required (for example polymer-lined or nickel-plated), or any code, safety or low-NOx certification (UL/CSA/ASME)?

Answer: Water heaters must be ASME certified. Polymer lining.

5. Vendor 1: Delivery timing. Delivery is required within 30 days of purchase execution. If the manufacturer's published lead time is longer, will the facility agree to a longer delivery date in writing, as paragraph 2 allows?

Answer: Per the BOA, “All the requested items to be delivered within 30 days of purchase execution unless otherwise agreed upon by the vendor and facility.”

6. Vendor: Receiving. Each unit is expected to weigh roughly 2,700 lb. Can the receiving dock handle units of this size, and does the facility supply a forklift or require a liftgate truck?

Answer: The receiving dock can handle unloading the units at the Warehouse as needed.

7. Vendor: Quantity and award. Please confirm the quantity is 2 each, and that the State may award in whole or in part, as stated in paragraph 5.

Answer: Please review the Basic Ordering Agreement (BOA) for this information.

8. Vendor: Terms. Please confirm the State's standard payment is made after receipt and acceptance, and that no bond is required.

Answer: Please review the Basic Ordering Agreement (BOA) for this information.

9. Vendor 2: Model and specification. The manufacturer's spec sheet for the "100 L 600A-TP" code is the Turbopower 96, model 100 L 600A-TPX. It is rated 1,000,000 Btu/h input, 575 gallons of storage and 96% thermal efficiency, and it is a condensing unit (category IV venting, condensate drain, 120V, 11 amps). The bid lists 800,000 Btu/h input, a 600-gallon tank, a 1/3 hp blower and a minimum 83% efficiency. Please confirm which the State wants: (a) the manufacturer's current replacement for the existing unit, or (b) the specification exactly as listed. If (a), please confirm the State will accept a condensing unit with these ratings.

Answer: The BOA (Basic Ordering Agreement) does not list a required brand. Required specifications for the new equipment are included. The facility reserves the right to request specs for the proposed equipment prior to contract execution to confirm the minimum standards are met.

10. Vendor 2: Delivery time. The factory lead time quoted to us for this unit is 12 to 14 weeks from order, and no expedite is available. The bid asks for delivery within 30 days of purchase execution. Will the State amend the delivery requirement (for example, to 14 to 16 weeks after execution), as paragraph 2 of the BOA allows?

Answer: Per the BOA, “All the requested items to be delivered within 30 days of purchase execution unless otherwise agreed upon by the vendor and facility.”

11. Vendor 2: Start-up. The supplier's quote requires factory start-up. The bid says delivery only, with no installation. Should bidders include factory start-up in their price?

Answer: The selling vendor will not be doing the start-up procedure.

12. Vendor 3: Could you please provide a picture of the existing model so we can ensure that we include any accessories that were supplied with the original model?

Answer:

13. Vendor 4: Are manufacturer-approved replacement models acceptable, or must bidders supply the exact PVI model specified?

Answer: The BOA (Basic Ordering Agreement) does not list a required brand. Required specifications for the new equipment are included. The facility reserves the right to request specs for the proposed equipment prior to contract execution to confirm the minimum standards are met.

14. Vendor 4: Can an authorized distributor ship the equipment directly to Sheridan on behalf of the awarded vendor?

Answer: The method of shipping/delivery is not specified. Please see BOA for details regarding shipping costs and logistics.

15. Vendor 4: Would this supplier-direct delivery arrangement be considered subcontracting requiring prior approval?

Answer: Subcontracting rules apply to contracts for services, not goods.

16. Vendor 4: Is there a historical purchase price or estimated budget available?

Answer: We do not disclose internal pricing estimates.

17. Vendor 4: Are there additional requirements beyond the signed BOA, Standard Illinois Certifications, and electronic pricing response?

Answer: Please see BidBuy for all relevant bid requirements.