This document is an amendment to a bid for the repair of a water tower leak at the Western Illinois Correctional Center in Illinois. The amendment provides responses to vendor questions, including clarifying that the facility will be responsible for draining and refilling the tank, and that the contractor will be responsible for supplying the chemical for disinfection. The repair is expected to require approximately four feet of pipe and material to replace the bowl material around the pipe. The contractor is instructed to coat the repair on the inside with the necessary material for tank protection and paint the exterior of the repair.

The related state and local contract opportunity is a small purchase for service to repair the water tower leak, including painting, refilling, pressure checking, and sanitizing the tower. The contract is for the state of Illinois.

View the file

Other files

File Type Posted
Western Water Tower Leak B-36948 contract~1.docx DOCX document
Document1~1.docx DOCX document
Standard terms and conditions~43.pdf PDF
Water Tower 1.jpg JPG image
Water Tower 2.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOC – Western Illinois Correctional Center – Water Tower Leak Bid #23-426DOC-WESTE-B-36948 Amendment #1 Response to Vendor’s Questions to Contract

Below is the response to the questions that IDOC has received regarding the above Contract:

1. Will the contractor be responsible for draining and filling the tank.

Agency Response: No, facility will be responsible for draining the tower prior to contractor arrival and refilling after work is completed.

1. Is chlorination method #3 acceptable for disinfection requirement on the behalf of the contractor.

Agency Response: Yes, contractor to supply chemical for disinfection. Facility will fill tank and test for service.

1. Specify how much material may be needed for repair requested.

Agency Response: Repair will require approximately four feet of pipe and material to replace bowl material around pipe.

4: What seal is recommended for coating replaced material.

Agency Response: Tank interior has a protective coating, cathodic protection is not required. Coat repair on inside with necessary material for tank protection and paint on exterior of repair.