BID ADVERTISEMENT RTU 2 SABBATH W CHANGE TO PRE BID.pdf
PDF 206 KB Posted
- Attached to
- RTU REPLACEMENT - PHASE 2 SABBATH MIDDLE SCHOOL
- Solicitation number
- RFP-RRS-180000002727-2
- Issued by
- Wayne County, Richland Village, Michigan
About this file
This is a Request for Proposal (RFP) issued by the School District of the City of River Rouge, Michigan for the replacement of rooftop units at Clarence B. Sabbath Middle School. The project involves replacing three existing packaged multi-zone rooftop units (RTU-2, RTU-4 & RTU-9), including installation of associated gas piping, electrical, and controls for building HVAC. Sealed proposals are due by 10:00 am local time on June 15, 2018, at 1460 W. Coolidge Highway, River Rouge, MI. A mandatory pre-bid meeting and walk-through for prime mechanical contractors is scheduled for June 8, 2018, at 10:00 am at the school. The project start date is June 21, 2018, with substantial completion required by October 31, 2018.
Bidders must submit a 5% bid bond from an authorized surety company or certified check with their proposal. The selected contractor must provide 100% performance and labor/material bonds. The scope includes pre-demolition airflow testing, final air balance, new DDC and wired thermostats for each system, and connection to the existing Tridium Niagara BMS system. Seasons-4 Direct Replacement Rooftop Units are specified as the approved manufacturer. Bidding documents are available electronically through MacMillan Associates, Inc., the project engineer, via their FTP site. The school district reserves the right to reject any and all bids, and bids must remain valid for 30 days after opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID ADVERTISEMENT RTU 2 SABBATH DUE 6-15-18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
School District of the City of River Rouge
Clarence B. Sabbath Middle School RTU Replacements – Phase 2
The School District of the City of River Rouge at 1460 Coolidge Highway, River Rouge, MI 48218-1118, will be accepting proposals until 10:00 am (local time) on Friday, June 15, 2018, for the Rooftop Unit Replacement Project in accordance with the Specifications set forth.
Proposals shall be placed in a sealed envelope and clearly marked SEALED BID: “River Rouge Clarence B. Sabbath Middle School RTU Replacements – Phase 2” and delivered to the office of The School District of the City of River Rouge, Attn: Karen Donahue, 1460 W. Coolidge Highway, River Rouge, MI 48218-1118.
Proposals will be publicly opened.
Owner: School District of the City of River Rouge 1460 W. Coolidge Hwy.
River Rouge, MI 48218-1118 ATTN: Karen Donahue
Engineer: MacMillan Associates, Inc.
714 East Midland St.
Bay City, Mi. 48706 989-894-4300
Project: Replacement of existing packaged multi-zone rooftop units
Location: Clarence B. Sabbath Middle School 340 Frazier River Rouge, MI 48212
Site Contacts: Mark Pruneau (313 )283-3825 (cell) mark.pruneau@riverrougeschools.org
Bid Due Date: June 15, 2018 by 10:00 am At the office of Karen Donahue. Director of Business & Operations 1460 W. Coolidge Hwy.
River Rouge, MI 48218-1118
Building information and other contract documents may be obtained upon application at the office of MacMillian Associates, Inc.; 989-894-4300. Bidding documents may be obtained electronically from the Engineer at the ftp site address of ftp://ftp.macmillanassociates.com, with log in: 2018-0156, and password: rtureplacement
Pre-Bid Meeting:
A mandatory pre-bid meeting and walk-thru for all prime mechanical contractors will be held Wednesday, June 8, 2018 at 10:00 am at the Clarence B. Sabbath Middle School.
Project Scope of Work:
Replacement of existing packaged multi-zone rooftop units. Install all associated gas piping, electrical and controls to provide working rooftop systems for building HVAC.
Proposal Requirements:
Sealed bid proposals are to be accompanied by a bid bond from an authorized surety company or certified check in the amount of 5% of the bid proposal submitted.
The accepted bidder will be required to furnish a performance bond and labor and material bond, each in 100% of the contract.
Submit copies of license and insurance with your proposal.
Time of Completion:
Project start date June 21, 2018
Substantial Completion October 31, 2018
The School District of the City of River Rouge reserves the right to reject any and all bids and to waive informalities in the bids received whenever such rejection or waiver is in the best interest of the Owner. Proposals shall be made on the forms provided as part of the Bidding Documents. After the time of opening, no bid may be withdrawn for a period of 30 days.
Scope of Work:
Rooftop Unit Base Bid
Replace three existing rooftop units RTU-2, RTU-4 & RTU-9.
Pre-demolition airflow testing and final air balance for each new rooftop system.
Provide and install new DDC and wired thermostats for each new rooftop system.
The Temperature Control Contractor shall connect to the existing BMS for three new rooftop units. The existing control system is a Tridium Niagara System.
Approved manufacturers Seasons-4 Direct Replacement Rooftop Units.
File details come from the government source that posted it. Updated .