Bid Advert - Track Surface.pdf
PDF 144 KB Posted
- Attached to
- Track Surfacing for Field Events
- Solicitation number
- RFP WDS 190000002483 1
- Issued by
- Oakland County, Michigan
About this file
This is a Request for Proposals issued by Whitehall District Schools for a Track Surfacing Project. The project encompasses the furnishing and installation of track surface material on new high jump, pole vault, and long jump areas at the District's football field. The track surface material must be equal to RSS-100 by Renner Sports Surfaces in Color 'Terra Cotta' to match existing surfaces. Installation locations include a long jump runway measuring 130 feet by 4 feet wide (520 square feet) and a high jump and pole vault area configured in a 'D' shape in the North endzone (10,200 square feet). Line stripping work includes two painted white lines, each 2 inches wide by 150 feet long (300 linear feet total). All work must be completed during the summer prior to school resuming on Tuesday, September 3, 2019. Proposals are due Thursday, June 20, 2019, at 3:00 p.m. Eastern Time, with a public bid opening at that location. There is no pre-bid meeting scheduled. Bids must remain valid for 90 days from opening. Bidders should submit proposals marked "Track Surfacing Project 2019" to Steve Aardema, Director of Finance & Technology, at Whitehall District Schools, 514 E Slocum Street, Whitehall, MI 49461. Technical questions should be directed to Jared Mott, Project Manager at WinBerg Construction, Inc.
The bid form requires contractors to provide a project cost, anticipated start date, and anticipated time for completion. Contractors must submit at least three customer references for track surfacing projects completed within the last 24 months and disclose any litigation involving their business in the past three years. Insurance requirements include Workers' Compensation coverage per Michigan statute, Commercial Liability Insurance of $1,000,000 per occurrence and $2,000,000 aggregate, and Automobile Liability Insurance of $1,000,000 per occurrence, with Whitehall District Schools named as an additional insured and 30-day cancellation notice required. Contractors must certify compliance with Michigan's Iran-Linked Business restrictions and pay for background checks required by law for on-site personnel. Invoicing occurs monthly and must clearly indicate materials received and project progress. The District reserves the right to reject any or all bids and may terminate the contract if services are not performed timely or jeopardize student, staff, or community safety.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
Proposal Information
Proposals should be marked “Track Surfacing Project 2019” and sent to the address below and to the attention of:
Steve Aardema, Director of Finance & Technology
Proposals must be received at:
Whitehall District Schools 514 E Slocum Street Whitehall MI 49461
Proposals are due: Thursday, June 20, 2019; 3:00 p.m. Eastern Time.
A public bid opening will take place at that time. Late bids will not be opened. Bids must remain valid for a period of 90 days from the opening.
There will not be a pre-bid meeting for this work. If there are specific questions pertaining to the scope of work, please contact:
Jared Mott, Project Manager WinBerg Construction, Inc.
8868 Water Street Montague, MI 49437
(231) 894-8409 jared@winbergconstruction.com
SCOPE OF WORK
The project includes the furnishing and installation of track surface material on the new high jump, pole vault, and long jump areas at the District’s football field. All excavation, concrete slabs on grade, irrigation rework and lawn restoration are not to be included.
Track Surface Material:
1. To be equal to RSS-100 by Renner Sports Surfaces – Color ‘Terra Cotta’ to match existing
Locations to be installed:
1. Long jump runway – 130’ x 4’ wide (520 sq. ft.)
2. High jump and pole vault – ‘D’ shape of the North endzone (10,200 sq. ft.)
Line Stripping:
1. Two (2) painted white lines – 2” wide by 150’ long (300 lf total)
ALTERNATE(S)
No alternate proposals are anticipated.
LOCATIONS AND HOURS
All work is anticipated to take place this summer, prior to school starting back up on Tuesday, September 3, 2019. On the Bid Form please indicate anticipated start date and time for completion of the work.
TERM & TERMINATION
The District may terminate the service agreement at any time if it feels the services are not performed in a timely manner or if those services are deemed by the District to jeopardize the safety of the District’s students, staff, and community. In the event of termination, the District will be responsible for only the services and products installed to the date of termination.
Disregard of safety will be reason for immediate termination of any contract.
INSURANCE REQUIRMENTS
The contractor shall provide the District with a certificate of insurance including the following:
Workers’ Compensation coverage per Michigan statute;
Commercial Liability Insurance of $1,000,000 per occurrence and $2,000,000 aggregate;
Automobile Liability Insurance of $1,000,000 per occurrence for all vehicles;
Whitehall District Schools listed as an additional insured; and 30 day cancellation notice.
LEGAL REQUIREMENTS
The District reserves the right to reject any or all bids, in whole or part, to waive any irregularities, and in general, to make the award in any manner deemed in the best interest of the district.
Services shall be provided in compliance according to industry standards as well as with any applicable statues, ordinances, and Board of Education policies.
Smoking or use of tobacco products is not allowed in the school buildings according to State of Michigan law.
School Districts are required by law to conduct background checks on contractors who work on-site for a regular or continuous basis. The Contractor shall pay for and provide these background checks to the District’s Human Resources Office. The District reserves the right to exclude contractor employees if the District deems his/her background or driving record unsatisfactory.
By submitting a proposal, the bidding contractor shall be deemed to have certified that it is not an “Iran-Linked Business” as defined in Act 517 of the Michigan Public Acts of 2012, being MCL
129.311 et. seq.
SAFETY
Safety is always important and especially for public institutions operating with students.
Community, staff, and contractor safety is equally important.
DAMAGES
The Contractor shall be responsible for all damages or changes to existing site that are outside of the scope of work.
INVOICES
Contractor shall invoice district for work on a monthly basis. Invoices shall clearly indicate the materials received and progress to date.
WHITEHALL DISTRICT SCHOOLS
TRACK SURFACING PROJECT 2019
BID FORM
Project Cost: $_________________________
Anticipated Start Date: __________________________
Anticipated Time for Completion: __________________________
Check to acknowledge compliance with non-Iran linked.
References (Organization, Contact, Phone):
Please enclose at least three customer references for track surfacing projects completed in the last 24 months.
1: ________________________________________________________________________
2: ________________________________________________________________________
3: ________________________________________________________________________
Disclose any litigation regarding your business in the past three years.
Bidder Contact and Signature:
Vendor Signature
Address Printed Name & Title
City, State, ZIP Mobile Phone
Office Telephone e-mail jared@winbergconstruction.com Call Out location of 2" painted white lines to define pole vault runway jared@winbergconstruction.com Call Out high jump / pole vault track surface area (10,200 sq. ft.)
jared@winbergconstruction.com Call Out long jump runway (520 sq. ft.)
File details come from the government source that posted it. Updated .