This is Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design & Construction Division for the Lansing Joint Operations Center Fire Alarm Replacement project (File Number 171/22202.HJD). The project involves the replacement of the fire alarm system at the Joint Operations Center located at 615 W Allegan Street, Lansing, Michigan. The professional engineer is Brett Thelen of Matrix Consulting Engineers (Matrix Job Number 22225.07), with Heather DeKorte serving as the DTMB Project Director. The addendum was issued on August 20, 2026, and distributed to all bidders on August 21, 2026. The bid opening date is scheduled for August 26, 2026. The addendum includes three attachments: the Matrix Consulting Engineers Addendum #1 Narrative, a Pre-Bid Meeting Attendee List combined with the addendum narrative, and reissued drawings combined with the addendum narrative. Bidders are required to acknowledge receipt of this addendum on their Bid Form; failure to do so may result in bid rejection.

The addendum provides clarifications and modifications to the original contract documents, including site logistics such as designation of the lower level dock/weight room for material staging, availability of basement restrooms for contractor use, typical working hours from 7:00 AM to 5:00 PM, and notification that no on-site parking is available with the site limited to temporary loading and unloading only. Electrical modifications include a revised speaker strobe layout for wall-mount installation instead of ceiling mount as shown on reissued Sheet E-500. Key contractual requirements include coordination of final Fire Alarm Control Panel, Field Fire Control Panel, Fire Alarm Remote Printer, and other equipment locations with the owner prior to installation; reuse of existing device locations in public spaces subject to owner approval; contractor responsibility for patching, painting, and repairs where existing systems are removed; salvage and inventory of all existing devices to be relinquished to the owner; and compliance with ceiling joist space limitations for ceiling-mounted devices. The addendum specifies that raceway and installation work shall be performed by the electrical contractor, with exposed conduit matching wall color and wire mold acceptable for use on marble surfaces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25) HJD 2026-0821

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 1

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

8/21/2026

PROJECT NAME

Lansing Joint Operations Center – Fire Alarm Replacement

FILE NUMBER

171/22202.HJD

PROFESSIONAL

Brett Thelen, Matrix Consulting Engineers

PROJECT DIRECTOR

Heather DeKorte

BID OPENING DATE:

8/26/2026

ADDENDUM ITEMS:

Attachments:

1. Matrix Consulting Engineers Addendum #1 Narrative dated 8/20/2026.

2. Pre-Bid Meeting Attendee List, combined with Addendum #1 Narrative.

3. Reissued Drawings, combined with Addendum #1 Narrative.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Brett Thelen, Matrix Consulting Engineers DATE: 8/20/2026

APPROVED BY:

PROJECT DIRECTOR: Heather DeKorte, DTMB, DCD DATE: 8/21/2026

544 Cherbourg Drive, LANSING, MI 48917

PHONE: (517) 487-2511

ADDENDUM NO. 1

State of Michigan DTMB Managed Buildings

Joint Operations Center – Fire Alarm Replacement Date:08/20/2026

File Number: 171/22202.HJD Matrix Job Number: 22225.07

OWNER: ENGINEER:

State of Michigan / DTMB Matrix Consulting Engineers 615 W Allegan Street 544 Cherbourg Drive Lansing, MI 48933 Lansing, MI 48917

This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Bid Form in the appropriate location.

General Items/Clarifications

1. Attachment: Sign-in sheet.

2. Lower level dock/weight room shall be used for material staging.

3. Basement restrooms can be used by contractors.

4. Typical working hours are 7:00AM-5:00PM.

5. No on-site parking is available. Site can be used for temporary loading/unloading only.

Electrical

1. Sheet E-500 (Sheet Re-issued):

a. Revised speaker strobe layout for wall-mount installation, instead of ceiling mount.

END OF ADDENDUM 1

H

H

HHH

HH

HH

H

H

C

C

C

H

EQUIPMENT

ELEVATOR

OPERATIONS / MAINT.

STAIR #2

WOMEN'S

MEN'S

UTILITY

OPERATIONS / MAINT.

STAIR #1

ELEVATOR

TUNNEL

F

F

F

UPDN

H

SEX

S

H

1/2W

H

MM

M

M

1 1

1. COORDINATE FINAL LOCATION OF FACP, FFCP, FARP, FAIGD, NACP, & AMP WITH

OWNER PRIOR TO INSTALLATION.

2. NATIONAL TIME TO PROVIDE PIECES, PARTS, & PROGRAMMING.

3. RACEWAY & INSTALLATION BY ELECTRICAL CONTRACTOR.

4. EXPOSED CONDUIT TO MATCH WALL COLOR.

5. WIRE MOLD IS ACCEPTABLE FOR USE WHEN MOUNTING ON MARBLE. WIRE MOLD TO

MATCH SURFACE. REVIEW ALL LOCATIONS WITH OWNER PRIOR TO INSTALLATION.

6. REUSE OF EXISTING DEVICE LOCATIONS IS ACCEPTABLE IN PUBLIC SPACES.

CONTRACTOR SHALL COORDINATE THOSE LOCATIONS WITH OWNER ONCE PROJECT

IS AWARDED. OWNER MUST APPROVE ALL LOCATIONS.

7. CONTRACTOR IS RESPONSIBLE FOR PATCHING, PAINTING, REPAIRS, ETC. WHERE

EXISTING SYSTEMS ARE REMOVED AND NEW DEVICES ARE NOT INSTALLED.

8. SALVAGE ALL EXISTING DEVICES AND RELINQUISH TO OWNER DURING DEMOLITION.

LABEL ALL SALVAGED DEVICES AND SUBMIT AN INVENTORY TO DTMB. INVENTORY OF

SPARE PARTS LIST FOR ALL DEVICES AND EQUIPMENT MUST INCLUDE THE

FOLLOWING INFO: DESCRIPTION, MANUFACTURER, PART NUMBER, AND QUANTITIES

OF EACH ITEM.

9. FOR CEILING MOUNTED DEVICES, ENSURE DEVICE ADHERES TO LIMITATIONS ON

CEILING JOIST SPACE.

GENERAL ELECTRICAL NOTES

E-500

FIRE ALARM

BASEMENT FLOOR PLAN

NEW POWER

N FIRE ALARM - BASEMENT FLOOR PLAN - NEW POWERN

SCALE: 1/8" = 1'-0"

0 1 5 10 20 file no.

checked by drawn by consultant issue date contract order no.

171CODTMB7337

consultant job no.

22225.07

M a t r ix

171/22202. HJD

acct. template sheet description

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

A D

A M

P L

A C

H R

A D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

Y22312

BID SET 07/29/2026

JFS

BTT

ADDENDUM 1 08/20/2026

JOSEPH F.

SOVIS, JR.

ENGINEER

NO.

6201042247

NAGIHCIMFOETATS

LIC

ENSED

PROFESS IONAL ENG

IN

EE

R

File details come from the government source that posted it. Updated .