bid-91-25-award.pdf

PDF 118 KB Posted

Attached to
MODULAR BRIDGE
Solicitation number
Bid 91-25
Issued by
Coos County, New Hampshire

About this file

This is a bid award summary document issued by the New Hampshire Department of Administrative Services, Division of Procurement Support Services, for the procurement of a prefabricated modular bridge for Coos County to be delivered to East Inlet Road in Pittsburg, NH. The solicitation (Bid No. 91-25) requested one unit of a prefabricated modular bridge meeting specific engineering requirements, including a minimum 16-foot clear travel width, 60-foot overall length, and compliance with AASHTO 2012 LRFD Bridge Design Specifications for HL93 loading. The bid closing date was February 7, 2025, at 1:30 PM ET, with the last day for bidder questions on January 31, 2025. Delivery of the bridge is mandated between May 20 and June 15, 2025, with FOB Destination terms including all delivery costs.

The award was made to ADM Welding & Fabrication, LLC at a unit cost of $107,895.00, compared to the competing bid from Hansen Bridge LLC at $182,000.00. Payment will be made via ACH with net 30 days terms following delivery and acceptance. The solicitation required bidders to be bridge manufacturers with a minimum of five years' experience in prefabricated bridge design and fabrication and to provide professionally engineered stamped design certifications, drawings, and calculations. The State of New Hampshire will be responsible for permitting, off-loading, and installation, with the contract being non-exclusive, allowing the state to retain other contractors as needed. Two solicitations were received, with no non-responsive bids reported.

View the file

Other files

File Type Posted
bid_91_25.pdf PDF
bid-91-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Procurement Support Services Bureau of Purchase Property

Bid Summary

Gary S. Lunetta Director

(603) 271-2201

Modular Bridge Agency

91-25 RQ #

Jonah Rosa Bid Closing Indicates Award:

Unit Cost Extended Cost Unit Cost Extended Cost

1 EA

Prefabricated modular bridge as specified in paragraph 25 of the bid document

$107,895.00 $107,895.00 $182,000.00 $182,000.00

$107,895.00 $182,000.00

2/7/2025 at 1:30 pm 246555

Fish & Game

Recommendation Summary

Qty UOM

Bid Description Bid #

Agent Name

Product Description ADM Welding & Fabrication, LLC Hansen Bridge LLC

Special Notes:

Yes

ACH

No

Method of Payment (P-card/ACH) FOB Delivered

Total

D&B Report Attached

Number of Solicitations Received Number of Sourced bidders Number of NIGP Vendors Sourced Number of non-responsive bidders

RFB Bid Tabulation

File details come from the government source that posted it. Updated .