bid 2475 2476 2478 2477 amendment 1.pdf
PDF 7 MB Posted
- Attached to
- PW PREQUAL Bid 2475 - General Construction for the Replacement of 42nd St Pumping Station Fed Funded
- Solicitation number
- B2727947
- Issued by
- Pennsylvania
About this file
Amendment No. 1 Summary
This amendment modifies Bids 2475-2478 for the Replacement of 42nd Street Pumping Station, a federally funded general construction project issued by the Philadelphia Water Department. The amendment updates contract provisions, drawings, and specifications for Work Order Numbers 75064 (General Construction), 75066 (Electrical Construction), 75067 (Plumbing), and 75068 (HVAC). The project involves complete replacement of the 42nd Street Pumping Station with an estimated value exceeding $5,000,000. The bid opening date is Thursday, October 29, 2026. Key updates include the addition of Appendix II to Part 200 (Contract Provisions for Non-Federal Entity Contracts Under Federal Awards) to Section 00100, Part 1.03, and comprehensive revisions to drawings and specifications as detailed in Addendum No. 1. Sellers must acknowledge receipt of all amendments in the PHLContracts system, as failure to do so may result in bid rejection at the Procurement Commissioner's discretion.
The amendment establishes critical project milestones tied to grant funding requirements, mandating that the low bidder complete the entire project by October 31, 2029, with intermediate milestones including Foundation Completion by December 7, 2027; Transition to Bypass Pumping Phase 2 by August 16, 2028; Structural and Architectural Component Completion by May 25, 2029; and Pumps in Operation by September 5, 2029. Addendum No. 1 includes revisions to 17 civil drawings and the insertion of two new structural drawings (S28A and S29A), reflecting updates to utility plans, pipeline profiles, and structural details. The project involves federal funding from grant sources, necessitating compliance with federal requirements for non-federal entity contracts. Pre-qualification approval is required before invitation to the closed bid solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment no. 1 Dated: October 2, 2026 Bid nos.: 2475-78 Opening Date: Thursday, October 29, 2026
Amendment no. 1 - Page no. 1 of 1
NOTICE
It is the sole responsibility of the Seller to ensure that it has received any and all amendments and the Procurement Commissioner may in his/her sole discretion reject any bid for which all amendments have not been executed and returned.
PROPOSAL FOR
Project no.: 75064 (GC), 75066 (EC), 75067 (PLBG) & 75068 (HVAC) Description: Replacement of 42nd Street Pumping Station
IS AMENDED AS FOLLOWS:
GENERAL
1.) ADD Appendix II to Part 200—Contract Provisions for Non-Federal Entity Contracts
Under Federal Awards in its entirety to Section 00100, Part 1.03.
2.) The drawings and specifications are revised as shown in the attached Addendum no. 1.
AMENDMENT ACKNOWLEDGMENT
Seller must acknowledge receipt of Amendments in PHLContracts.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.ecfr.gov%2Fcurrent%2Ftitle-2%2Fpart-200%2Fappendix-Appendix%2520II%2520to%2520Part%2520200&data=05%7C02%7CAlexander.Fidrych%40phila.gov%7C581e28b69771438cbfe108df1e4ccdbd%7C2046864f68ea497daf34a6629a6cd700%7C0%7C0%7C639262987394935517%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=o9lItAbRt0odLAeGFvTl13vAZQxOJIC%2FsHznoDbTQUo%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.ecfr.gov%2Fcurrent%2Ftitle-2%2Fpart-200%2Fappendix-Appendix%2520II%2520to%2520Part%2520200&data=05%7C02%7CAlexander.Fidrych%40phila.gov%7C581e28b69771438cbfe108df1e4ccdbd%7C2046864f68ea497daf34a6629a6cd700%7C0%7C0%7C639262987394935517%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=o9lItAbRt0odLAeGFvTl13vAZQxOJIC%2FsHznoDbTQUo%3D&reserved=0
PWD Replacement of 42nd Street Pumping Station Addendum 1
ADDENDUM NO. 1
PHILADELPHIA WATER DEPARTMENT
REPLACEMENT OF 42ND STREET PUMPING STATION
SPECIFICATIONS
Work Order Nos. 75064, 75068, 75067 and 75066
1. Specification Section 00100 - Instructions to Sellers.
a. Page 00100-1, Section 1.04.D. Delete this section in its entirety.
b. Page 00100-3, Section 1.11. After this section, add the following:
“1.12 SCHEDULE AND MILESTONES
A. The low Seller must complete the whole of the work by October 31, 2029.
B. The low Seller must adhere to the following milestone dates:
1. Foundation Completion December 7, 2027
2. Transition to Bypass Pumping Phase 2 August 16, 2028
3. Structural and Architectural Component
Completion May 25, 2029
4. Pumps in Operation September 5, 2029
5. Work Completed October 31, 2029
C. The project completion deadline is tied to grant funding, which necessitates that the pumping station be operational by October 31, 2029.
DRAWINGS
Work Order No. 75064
1. Drawing C7 (Sheet 21 of 222). Replace Drawing C7 with revised Drawing C7, Rev 1 a copy of which is attached hereto.
2. Drawing C8 (Sheet 22 of 222). Replace Drawing C8 with revised Drawing C8, Rev 1 a copy of which is attached hereto.
3. Drawing C11 (Sheet 25 of 222). Replace Drawing C11 with revised Drawing C11, Rev 1 a copy of which is attached hereto.
4. Drawing C26 (Sheet 40 of 222). Replace Drawing C26 with revised Drawing C26, Rev 1
PWD Replacement of 42nd Street Pumping Station Addendum 1
5. Drawing S11 (Sheet 53 of 222). Replace Drawing S11 with revised Drawing S11, Rev 1
6. Drawing S13 (Sheet 55 of 222), Replace Drawing S13 with revised Drawing S13, Rev 1
7. Drawing S14 (Sheet 56 of 222). Replace Drawing S14 with revised Drawing S14, Rev 1
8. Drawing S23 (Sheet 65 of 222). Replace Drawing S23 with revised Drawing S23, Rev 1
9. Drawing S28 (Sheet 70 of 222). Replace Drawing S28 with revised Drawing S28, Rev 1
10. Drawing S28A (New Sheet). Insert new Drawing S28A, a copy of which is attached hereto.
11. Drawing S29 (Sheet 71 of 222). Replace Drawing S29 with revised Drawing S29, Rev 1
12. Drawing S29A (New Sheet). Insert new Drawing S29A, a copy of which is attached hereto.
13. Drawing S30 (Sheet 72 of 222). Replace Drawing S30 with revised Drawing S30, Rev 1
14. Drawing S34 (Sheet 76 of 222). Replace Drawing S34 with revised Drawing S34, Rev 1
15. Drawing S35 (Sheet 77 of 222). Replace Drawing S35 with revised Drawing S35, Rev 1
16. Drawing S42 (Sheet 84 of 222). Replace Drawing S42 with revised Drawing S42, Rev 1
17. Drawing M13 (Sheet 126 of 222). Replace Drawing M13 with revised Drawing M13, Rev 1 a copy of which is attached hereto.
X
X
X
X
X
X
X
X
X
X
X
X
X
8"
15"
8"
12"
BB
G
W M
WM WM WM WM WM WM
W M
W M
WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
WM
WM
WM
W M
W M
W M
W M
W M
OE
OE
OE
OE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
W M
X
G M
GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM
Guy
8"
SS SS SS SS SS
SS
SS
SS
WM WM WM WM WM WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WM
WM
WM
SS
ST ST
SS
SS
SS
ST
ST
FM FM FM
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
FM
WV
FH
CO
CO
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
W M
WM
WM WM
WM WM WM
SS
ST
ST
ST
ST
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
U E
UE
UE
UE
STG
M
G M
G M
G V
GM
GM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W V
W V
UE UE UE UE
LPBLPB
LPB
LPB
LPB
CH
CH
+0
10+50
11+00
+5
+0
+5
11+00
11+50
10+00 10+50
10+00
10+50
11+00
10+00
10+50
11+00
10+00
10+50
10+00
10+50
+2
9+80 10+00
+0
12+00
10+00
10+00
+5
+0
+5
10+00
10+00
9+50
10+00
11+00
PHILADELPHIA WATER DEPARTMENT
42ND STREET PUMPING STATION
REPLACEMENT OF THE
PHILADELPHIA, PENNSYLVANIA
CHECKED
DRAWN
DESIGNED
APPROVED REVISION DESCRIPTIONAPPDDATENO. SCALE
DWG
DATE REV
SHEET OF
MAY 2026
T:
\O
\G H
-P H
I\L \D
AT
A\
_P W
D \0
.0 8_
R
EP
LA
C
EM
EN
T
N D
S
TR
EE
T
PU
M
PI
N
G S
TA
TI
O N
\0 4-
D
ES
IG
N
\C
IV
IL
3D
\C D
\0
.0
8_ C
.D
W G
A
LE
XA
N
D
ER
W
IL
D A
6/
/2
:1
AM
BA
R M
EA
SU
RE
S
1"
ON
F
UL
L
SI
ZE
S
HE
ET
S
A TYLin Company
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PA 19103
BYRNE EDWARD REMPHREY
ENGINEER
PE070896
REGISTERED
PROFESSIONALCO
MMONWEA LTH
O F
P E
N N S Y L V A N
I A
SCALE:
UTILITY PLAN
1" = 10'
10 0 FT10 20
1"=10'
EX SOUTHWEST MAIN
GRAVITY INTERCEPTOR
EX 2'-6" X 1'-8"
BRICK SEWER
42ND STREET
43RD STREET
R
D S
TR
EE
T
EX MILL CREEK
INTERCEPTOR
SS MH 1
24" PVC SS
24" SS
SS MH 2
REGULATOR
CHAMBER
36" WET WEATHER
DISCHARGE PIPE 1
METER
VAULT 1
METER
VAULT 2
36" WET WEATHER
DISCHARGE PIPE 2
36" WET WEATHER
DISCHARGE PIPE 3
36" WET WEATHER
DISCHARGE PIPE 4
20" DRY WEATHER
DISCHARGE PIPE 1
20" DRY WEATHER
DISCHARGE PIPE 2
42ND STREET PUMP STATION
(SEE MECHANICAL DWGS FOR PIPELINE CONTINUATION)
DRY WEATHER
DISCHARGE PIPELINE 1
SEE DWG C8 FOR PROFILE
WET WEATHER
DISCHARGE PIPELINE 1
SEE DWG C9 FOR PROFILE
DRY WEATHER
DISCHARGE PIPELINE 2
SEE DWG C8 FOR PROFILE
WET WEATHER
DISCHARGE PIPELINE 2
SEE DWG C9 FOR PROFILE
WET WEATHER
DISCHARGE PIPELINE 3
SEE DWG C10 FOR PROFILE
WET WEATHER
DISCHARGE PIPELINE 4
SEE DWG C10 FOR PROFILE
24" SANITARY SEWER
SEE DWG C11 FOR PROFILE
EX 20" X 13" RCP UE
EX PECO MH
CONNECT NEW 8" WATER MAIN
TO EXISTING WATER MAIN
SEE DWG C11 FOR PROFILE
8" WM
EX 6" WM
EX 8" WM
JUNCTION CHAMBER
(SEE MECHANICAL DWGS FOR
PIPELINE CONTINUATION)
8" SANITARY LATERAL
SEE DWG C11 FOR PROFILE
1-1/2" WM SERVICE
SEE PLUMBING DWGS
FOR CONTINUATION
4" SANITARY LATERAL
SEE DWG C11 FOR PROFILE
SEE PLUMBING DWGS FOR CONTINUATION
8" STORM SEWER 1
SEE DWG C12 FOR PROFILE
SEE PLUMBING DWGS FOR CONTINUATION
SS MH 3
EX SS MH 1
EX INTERCEPTING
CHAMBER
SWITCHGEAR
(SEE ELECTRICAL DWGS)
SS MH 4 - WITH RADAR MOUNTING SYSTEM
SEE DETAIL N13
4" WET WELL DRAIN
SEE DWG C10 FOR PROFILE
SEE MECHANICAL DWGS FOR CONTINUATION
2" GM
SEE DWG C12 FOR PROFILE
EX 6" GM
TAP EX
6" GM
2" GM SERVICE
SEE DWG C12 FOR PROFILE
SEE PLUMBING DWGS FOR
CONTINUATION
PLUG EX 6" WM
SEE PENETRATION
DETAIL ON DWG C14
ST INLET 2
ST INLET 1
ST INLET 3
ST INLET 4
12" STORM SEWER 2
SEE DWG C12 FOR PROFILE
12" STORM SEWER 3
SEE DWG C12 FOR PROFILE
CONC ENCASEMENT
NOTES:
1. RESTRAIN ALL JOINTS.
2. REFER TO VALVE SCHEDULE ON M17 FOR MORE
INFORMATION.
CAM
TSM
JHL
C7
CIVIL
UTILITY PLAN
DKGV-08
SEE NOTE 2
DKGV-09
SEE NOTE 2
NEW ELECTRICAL CONDUITS
(SEE ELECTRICAL DWGS)
NEW ELECTRICAL CONDUITS
(SEE ELECTRICAL DWGS)
ELEC HH
ELEC HH
NEW 6" ST DRAIN
CONNECT NEW
8" WATER MAIN TO
EXISTING WATER MAIN
ST INLET 5
12" STORM SEWER 3
SEE DWG C12 FOR PROFILE
12" STORM SEWER 3
SEE DWG C12 FOR PROFILE
4" WM (EAST)
SEE DWG C9
FOR PROFILE
4" WM (WEST)
SEE DWG C9
FOR PROFILE
EX SS MH 2
CONCRETE ENCASEMENT
ADDENDUM#01CM08/03/261
EL
EV
AT
IO
N
IN
F
EE
T
EL
EV
AT
IO
N
IN
F
EE
T
STATION
-10
-5
-10
-5
9+75 10+00 10+50 11+00 11+50 12+00
ST
A
+2
9.
" 2
2.
5°
B
EN
D C
L
EL
.3
ST
A
+9
5.
" 1
1.
° B
EN
D C
L
EL
.3
ST
A
+1
6.
" 4
5° B
EN
D
C L
EL
.3
ST
A
C L
EL
.3
PU
M
P
ST
AT
IO
N
8" DI WM
(CONCRETE ENCASED)
8" PVC SS
M
IN
ST
A
+0
3.
" 4
5° B
EN
D
C L
EL
.3
APPROXIMATE
EXISTING GRADE SEE MECHANICAL DWGS
FOR CONTINUATION TO
JUNCTION CHAMBER
JUNCTION CHAMBER
SEE STRUCTURAL DWGS
ST
A
+5
2.
"X
" T
EE
C
L
EL
.3
42ND ST PUMP STATION
ST
A
+5
5.
" 9
0° B
EN
D
C L
EL
.3
PROPOSED GRADE
ST
A
+3
6.
" 4
5° B
EN
D
C L
EL
.3
20" DRY WEATHER
DISCHARGE PIPELINE 1
2 - 4" UE (CONC ENCASED) 2 - 6" UE IN DUCTBANK
EX 30" X 20" BRICK SS
EL
EV
AT
IO
N
IN
F
EE
T
EL
EV
AT
IO
N
IN
F
EE
T
STATION
-10
-5
-10
-5
9+75 10+00 10+50 11+00 11+50 11+75
ST
A
+1
0.
" 9
0° B
EN
D
C L
EL
.3
ST
A
+0
7.
" 2
2.
5°
B
EN
D C
L
EL
.3
ST
A
+2
3.
" 1
1.
° B
EN
D C
L
EL
.3
ST
A
+0
0.
C L
EL
.3
PU
M
P
ST
AT
IO
N
8" WM
(CONCRETE ENCASED)
20" DRY WEATHER
DISCHARGE PIPELINE 2
APPROXIMATE
EXISTING GRADE
SEE MECHANICAL DWGS
FOR CONTINUATION TO
JUNCTION CHAMBER
JUNCTION CHAMBER
SEE STRUCTURAL DWGS
ST
A
+0
2.
"X
" T
EE
C
L
EL
.3
REGULATOR
CHAMBER
42ND ST PUMP STATION
6" M
IN
ST
A
+9
8.
" 4
5° B
EN
D
C L
EL
.3
ST
A
+5
5.
" 4
5° B
EN
D
C L
EL
.3
ST
A
+4
6.
" 4
5° B
EN
D
C L
EL
.3
PROPOSED GRADE
2 - 6" UE IN DUCTBANK
2 - 4" UE (CONC ENCASED)
2" STEEL GM12
M
IN
24" PVC SS EX 30" X 20" BRICK
CONCRETE
ENCASEMENT
PHILADELPHIA WATER DEPARTMENT
42ND STREET PUMPING STATION
REPLACEMENT OF THE
PHILADELPHIA, PENNSYLVANIA
CHECKED
DRAWN
DESIGNED
APPROVED REVISION DESCRIPTIONAPPDDATENO. SCALE
DWG
DATE REV
SHEET OF
MAY 2026
T:
\O
\G H
-P H
I\L \D
AT
A\
_P W
D \0
.0 8_
R
EP
LA
C
EM
EN
T
N D
S
TR
EE
T
PU
M
PI
N
G S
TA
TI
O N
\0 4-
D
ES
IG
N
\C
IV
IL
3D
\C D
\0
.0
8_ C
-C
.D
W G
A
LE
XA
N
D
ER
W
IL
D A
6/
/2
:2
M
EA
SU
RE
S
1"
ON
F
UL
L
SI
ZE
S
HE
ET
S
A TYLin Company
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PA 19103
BYRNE EDWARD REMPHREY
ENGINEER
PE070896
REGISTERED
PROFESSIONALCO
MMONWEA LTH O
F
P E
N
N S Y L V A N
I A
CAM
TSM
JHL
C8
CIVIL
PIPELINE PROFILES
DRY WEATHER DISCHARGE
10 0 FT10 20
1"=10'
PROFILE - DRY WEATHER DISCHARGE PIPELINE 2
SCALE: 1"=10' HORIZONTAL
1"=5' VERTICAL
5 0 FT5 10
1"=5'
PROFILE - DRY WEATHER DISCHARGE PIPELINE 1
SCALE: 1"=10' HORIZONTAL
1"=5' VERTICAL
NOTES:
1. RESTRAIN ALL JOINTS.
EL
EV
AT
IO
N
IN
F
EE
T
EL
EV
AT
IO
N
IN
F
EE
T
STATION
-20
-15
-10
-5
-20
-15
-10
-5
9+75 10+00 10+50 11+00 11+25
(N E)
4"
P
VC
IN
V
IN
-4
.0
(S E)
2"
P
VC
IN
V
IN
.5
(N W
) 2 4"
P
VC
IN
V
O U
T -4
.7
ST
A
+5
2.
SS
M
H
(D R
O P
M H
Ø R
IM
E
L
.1
(E ) 2
4" P
VC
IN
V
IN
-0 .1
(N
) 8 " P
VC
IN
V
IN
.5
(N
W ) 4
" D
IP
IN
V
IN
.6
(S ) 8
" P
VC
IN
V
IN
.3
(S W
) 2 4"
P
VC
IN
V
O U
T -0
.8
ST
A
+8
4.
SS
M
H
(D O
G H
O U
SE
D
R O
P M
H
Ø
R
IM
E L
.9
(N ) E
X
" X
0"
IN
V
IN
.6
(W ) 2
4" P
VC
IN
V O
U T
1.
(S ) E
X
" X
0" B
R
IC
K
IN
V O
U T
3.
ST
A
+0
3.
EX
S
S M
H
R
IM
E L
.3
36" WET
WEATHER
DISCHARGE
PIPELINES 3 & 4
APPROXIMATE
EXISTING GRADE
(S E)
4"
P
VC
IN
V
IN
-1
0.
ST
A
+0
0.
R
EG
U
LA
TO
R
REGULATOR CHAMBER
PROPOSED GRADE
24" PVC @ 9.96%
24" PVC @ 10.00%
24" PVC @ 10.00%
2 - 6" UE IN DUCTBANK
2 - 4" UE (CONC ENCASED)
(E ) 2
4" P
VC
IN
V
IN
-0 .1
(N
) 8 " P
VC
IN
V
IN
.5
(N
W ) 4
" D
IP
IN
V
IN
.6
(S ) 8
" P
VC
IN
V
IN
.3
(S W
) 2 4"
P
VC
IN
V
O U
T -0
.8
ST
A
+8
4.
SS
M
H
(D O
G H
O U
SE
D
R O
P M
H
Ø
R
IM
E L
.9
(N E)
4"
P
VC
IN
V
IN
-4
.0
(S E)
2"
P
VC
IN
V
IN
.5
(N W
) 2 4"
P
VC
IN
V
O U
T -4
.7
ST
A
+5
2.
SS
M
H
(D R
O P
M H
Ø R
IM
E
L
.1
6" UE
8" DI WM
2" STEEL GM
EL
EV
AT
IO
N
IN
F
EE
T
EL
EV
AT
IO
N
IN
F
EE
T
STATION
-15
-10
-5
-15
-10
-5
9+75 10+00 10+50 11+00 11+50 12+00 12+25
M
IN
M
IN
M
IN
M
IN
ST
A
9+
.0
8"
5° B
EN
D
C L
EL
1.
ST
A
+0
1.
8"
5° B
EN
D
C L
EL
.3
ST
A
+0
9.
8"
5° B
EN
D
C L
EL
.3
ST
A
+1
2.
8"
5° B
EN
D
C L
EL
.3
ST
A
+9
5.
8"
5° B
EN
D
C L
EL
.3
ST
A
+8
8.
8"
5° B
EN
D
C L
EL
.3
ST
A
+0
7.
8"
5° B
EN
D
C L
EL
1.
ST
A
+0
4.
8" X
" T
EE
C
L
EL
1.
ST
A
+0
9.
8" X
" R
ED
U
C
ER
C L
EL
1.
36" DI FM 36" DI FM
36" DI FM 36" DI FM
24" PVC SS
8" PVC SS
APPROXIMATE
EXISTING GRADE
CONCRETE
ENCASEMENT
SEE STANDARD DETAILS
EX 6" WM
EX 8" WM
REGULATOR
CHAMBER
20" DI FM
20" DI FM
START ENCASEMENT
STA 10+00 8" DI WM
ST
A
+4
0.
8"
5° B
EN
D
C L
EL
.3
ST
A
+4
8.
8"
5° B
EN
D
C L
EL
.3
ST
A
+1
5.
8"
5° B
EN
D
C L
EL
.3
ST
A
+9
5.
8"
5° B
EN
D
C L
EL
1.
PROPOSED GRADE
2 - 6" UE IN DUCTBANK
2 - 4" UE (CONC ENCASED)
ST
A
+2
3.
8"
5° B
EN
D
C L
EL
.3
2" STEEL GM
END ENCASEMENT
STA 11+91
ST
A
+5
9.
8" X
" T
EE
C
L
EL
.3
ST
A
+6
8.
8" X
" T
EE
C
L
EL
.3
CONCRETE
ENCASEMENT
EL
EV
AT
IO
N
IN
F
EE
T
EL
EV
AT
IO
N
IN
F
EE
T
STATION
-15
-10
-5
-15
-10
-5
9+75 10+00 10+50 10+75
(W ) 4
" P
VC
IN
V
IN
.4
(N E)
2"
D I I
N V
IN
.4
(N E)
" P
VC
IN
V O
U T
6.
ST
A
+1
8.
SS
M
H
, 4
Ø R
IM
E
L
.6
(S W
) 8 " P
VC
IN
V
IN
.0
(N
) E X
" X
0"
B R
IC
K
IN
V
IN
.4
(E ) 1
2" P
VC
IN
V
IN
.4
(W
) 1 0"
P
VC
IN
V
IN
.2
(S ) E
X
" X
0" B
R
IC
K
IN
V O
U T
5.
ST
A
+5
3.
EX
S
S M
H
R
IM
E L
.8
(N ) 4
" P
VC
IN
V
IN
.5
ST
A
+0
0.
PU
M
P
ST
AT
IO
N
4" PVC @ 0.37% 8" PVC @ 0.38%
20" FM
8" WM
(N W
) 4 " P
VC
IN
V
IN
.4
(E ) 4
" P
VC
IN
V
O U
T 6.
ST
A
+1
4.
4" W
YE
4" PVC @ 0.71%
M
IN
APPROXIMATE
EXISTING GRADE
42ND ST PUMP
STATION
CORE DRILL
HOLE FOR 8" SS
PROPOSED GRADE
2 - 4" UE (CONC ENCASED)
2 - 6" UE IN DUCTBANK
PHILADELPHIA WATER DEPARTMENT
42ND STREET PUMPING STATION
REPLACEMENT OF THE
PHILADELPHIA, PENNSYLVANIA
CHECKED
DRAWN
DESIGNED
APPROVED REVISION DESCRIPTIONAPPDDATENO. SCALE
DWG
DATE REV
SHEET OF
MAY 2026
T:
\O
\G H
-P H
I\L \D
AT
A\
_P W
D \0
.0 8_
R
EP
LA
C
EM
EN
T
N D
S
TR
EE
T
PU
M
PI
N
G S
TA
TI
O N
\0 4-
D
ES
IG
N
\C
IV
IL
3D
\C D
\0
.0
8_ C
-C
.D
W G
A
LE
XA
N
D
ER
W
IL
D A
6/
/2
:3
M
EA
SU
RE
S
1"
ON
F
UL
L
SI
ZE
S
HE
ET
S
A TYLin Company
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PA 19103
BYRNE EDWARD REMPHREY
ENGINEER
PE070896
REGISTERED
PROFESSIONALCO
MMONWEA LTH O
F
P E
N
N S Y L V A N
I A
CAM
TSM
JHL
C11
UTILITY PIPELINE PROFILES
10 0 FT10 20
1"=10'
PROFILE - SANITARY SEWER
SCALE: 1"=10' HORIZONTAL
1"=5' VERTICAL
5 0 FT5 10
1"=5'
PROFILE - WATER MAIN
SCALE: 1"=10' HORIZONTAL
1"=5' VERTICAL
PROFILE - SANITARY LATERAL
SCALE: 1"=10' HORIZONTAL
1"=5' VERTICAL
NOTES:
1. RESTRAIN ALL JOINTS.
X
X
X
X
X
X
X
X
X
X
X
X
8"
15"
8"
12"
BB
G
W M
WM WM WM WM WM WM
W M
W M
WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM WM
WM
WM
WM
W M
W M
W M
W M
W M
OE
OE
OE
OE
UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE
W M
X
G M
GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM GM
Guy
8"
SS
SS
SSWM WM
WM WM WM WM
WM
WM WM WM WM WM WM WM
WM
WM
WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
WV
DYH
SS
ST ST
SS
SS
SS
ST
ST
SS SS SS SS SS
GM
GM
G M
G M
G M
G M
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
SS
FM FM FM
FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM FM
FM
FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM FM FM
FM
FM
FM
FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W V
W V
W V
W V
W M
PHILADELPHIA WATER DEPARTMENT
42ND STREET PUMPING STATION
REPLACEMENT OF THE
PHILADELPHIA, PENNSYLVANIA
CHECKED
DRAWN
DESIGNED
APPROVED REVISION DESCRIPTIONAPPDDATENO. SCALE
DWG
DATE REV
SHEET OF
MAY 2026
T:
\O
\G H
-P H
I\L \D
AT
A\
_P W
D \0
.0 8_
R
EP
LA
C
EM
EN
T
N D
S
TR
EE
T
PU
M
PI
N
G S
TA
TI
O N
\0 4-
D
ES
IG
N
\C
IV
IL
3D
\C D
\0
.0
8_ C
.D
W G
A
LE
XA
N
D
ER
W
IL
D A
6/
/2
:5
M
EA
SU
RE
S
1"
ON
F
UL
L
SI
ZE
S
HE
ET
S
A TYLin Company
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PA 19103
BYRNE EDWARD REMPHREY
ENGINEER
PE070896
REGISTERED
PROFESSIONALCO
MMONWEA LTH
O F
P E
N N S Y L V A N
I A
SCALE:
BYPASS PLAN - PHASE 2
1" = 10'
10 0 FT10 20
1"=10'
SOUTHWEST MAIN
GRAVITY INTERCEPTOR
2'-6" X 1'-8" BRICK
SEWER
EX MH 2
(INTERCEPTING
CHAMBER)
INTERCEPTING
CHAMBER
42ND STREET
43RD STREET
R
D S
TR
EE
T
MILL CREEK
INTERCEPTOR
NEW SS MH 1
NEW 24" PVC SS
NEW 24"
PVC SS
NEW SS MH 2
NEW REGULATOR
CHAMBER
NEW 36" WET WEATHER
DISCHARGE PIPE 1
METER
VAULT 1
METER
VAULT 2
NEW 36" WET WEATHER
DISCHARGE PIPE 2
NEW 36" WET WEATHER
DISCHARGE PIPE 3
NEW 36" WET WEATHER
DISCHARGE PIPE 4
NEW 20" DRY WEATHER
DISCHARGE PIPE 1
42ND STREET PUMP STATION
NEW DRY WEATHER
DISCHARGE PIPELINE 1
NEW WET WEATHER
DISCHARGE PIPELINE 1
NEW DRY WEATHER
DISCHARGE PIPELINE 2
NEW WET WEATHER
DISCHARGE PIPELINE 2
NEW WET WEATHER
DISCHARGE PIPELINE 3
NEW WET WEATHER
DISCHARGE PIPELINE 4
NEW 24" SS
20" X 13" RCP UE
PECO MH
NEW 8" WM
NEW 8" WM
6" WM
8" WM
JUNCTION CHAMBER
NEW 8" SS
NEW 4" SS LATERAL
NEW 8" ST
NEW SS MH 3
EX SS MH 1
40'-0"
8' -0
STANDBY GENERATOR
AND EQUIPMENT AREA
BYPASS POINT 1:
PROVIDE 8 MGD
VERTICAL TURBINE
PUMP (TYP OF 2)
SEE NOTES 1 & 2
BYPASS POINT 2:
PROVIDE 1 MGD
SUBMERSIBLE PUMP
(TYP OF 2) SEE NOTE 3
18" HDPE
BYPASS PIPE
6" HDPE
BYPASS PIPE
18" HDPE
BYPASS PIPE
NOTES:
1. VERTICAL TURBINE PUMPS SHALL BE ANCHORED TO THE
EXISTING CONCRETE TOP SLAB PER PUMP
MANUFACTURER RECOMMENDATIONS.
2. PROVIDE STEEL PLATING OR SUITABLE DAM SYSTEM TO
BLOCK FLOW FROM ENTERING THE PUMP STATION. THE
MAXIMUM WATER SURFACE ELEVATION IN THE
INTERCEPTING CHAMBER SHALL NOT EXCEED EL -3.84
DURING DRY WEATHER PERIODS.
3. PLUG EXISTING 10" DI SEWER. SUBMERSIBLE PUMPS SHALL
BE INSTALLED WITHIN THE NEW MANHOLE.
4. RELOCATE, SUPPORT, AND PROTECT ALL TEMPORARY
DISCHARGE PIPING DURING CONSTRUCTION.
NEW 20" DRY WEATHER
DISCHARGE PIPE 2
NEW SS MH 4
NEW 2" GM
NEW 4" FM
CAM
TSM
JHL
C26
BYPASS PLAN - PHASE 2
TEMPORARY RELOCATED
4" WATER PIPING
BYPASS POINT 3:
BYPASS PIPING
INTO NEW SS MH 4
CONCRETE
ENCASEMENT 11
1 08/03/26 CM ADDENDUM#01
S20
S20
S21
S21
52" THICK MAT FOUNDATION SLAB WITH
#9@8" TOP AND BOTTOM, EACH WAY
BELOW SLOPED FILL
S22
S22
S30
S21
S21
S22
S22
4' - 0" 11' - 4" 3' - 6" 2' - 0" 7' - 0" 30' - 2" 4' - 0"
2' - 0"
S30
S30
S30
NOTE: WET WELL SLOPED FILL NOT SHOWN FOR CLARITY. SEE WET WELL FILL PLAN AND ELEVATION VIEWS FOR EXTENTS OF SLOPED FILL.
S30
8" DIAMETER MICROPILE
(MINIMUM) (TYPICAL)
4' - 0"
/4
/4
4' - 0" 19' - 4" 2' - 0" 30' - 0 1/2" 2' - 7 1/2" 4' - 0"
ROCK ANCHOR EMBED IN
MAT SLAB. SEE TYPICAL
DETAIL (TYP UNO)
132.51°
S30
S30
8'-0" O/C MAX
O /C
M A
X
DESIGNATED PERFORMANCE TEST
LOCATION (SEE ROCK ANCHOR SPEC
FOR ADD'L INFO) (TYP)
S12
S20
S20
WET WELL FILL PLAN
8" DIAMETER MICROPILE
(MINIMUM) (TYPICAL)
8" DIAMETER
BATTERED MICROPILE
(MINIMUM) (TYPICAL)
84" THICK CONC WALL WITH #9@6" O/C
VERT REINF AND #8@6" O/C HORIZ
TEMPERATURE AND SHRINKAGE REINF
(TYP OF ALL 3 EXPOSED VERTICAL
FACES). ADDITIONALLY, PROVIDE #8@6"
O/C REINF, EACH WAY AT TOP
HORIZONTAL FACE OF WALL
FILL INACCESSIBLE
VOID SPACE SOLID
WITH STRUCTURAL FILL
OR FLOWABLE FILL
S8
Sim
S8
Sim
APPROXIMATE EXTENTS OF NOTCH IN MAT
SLAB FOR SLOPED FILL. COORDINATE
EXTENTS OF NOTCH TO PROVIDE A MINIMUM
FILL THICKNESS OF 1" FOR ENTIRE
FOOTPRINT OF SLOPED FILL. SEE TYPICAL
DETAIL FOR ADDITIONAL INFO (TYP)
B A
R M
E A
S U
R E
O N
F U
L L S
IZ
E
S H
E E
T S
CHECKED
DRAWN
DESIGNED APPROVED
SCALE
DWG
SHEET OF
DATE REVF
IL
E
B
IM
/2
S
W W
P C
P P u m p S ta ti o n /0
.0
-P S
H
E .r v t
/4
/2
:4 : 5
P
M
S11
MP
CS
MFW PUMP STATION WET WELL PLAN AT EL. -30.00' MAY 2026
STRUCTURALPHILADELPHIA WATER DEPARTMENT
PHILADELPHIA, PENNSYLVANIA
REPLACEMENT OF THE
42ND STREET PUMPING STATION
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PENNSYLVANIA 19103
SCALE: 3/16" = 1'-0"S11
1 PUMP STATION FOUNDATION PLAN AT EL. -30.00'
SHEET NOTES
GENERAL
1. COORDINATE STRUCTURAL DRAWINGS WITH CIVIL, ARCHITECTURAL, AND
MEP DRAWINGS.
2. SHEETING AND SHORING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL SUBMIT SHEETING AND SHORING PLANS FOR REVIEW
THAT ARE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
COMMONWEALTH OF PENNSYLVANIA.
3. DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL SUBMIT DEWATERING PLANS FOR REVIEW THAT ARE
SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
COMMONWEALTH OF PENNSYLVANIA. DEWATERING SHOULD BE EXPECTED
DURING EXCAVATION.
4. IT IS ANTICIPATED THAT ROCK EXCAVATION SHOULD BE EXPECTED.
5. SEE MEP DRAWINGS FOR PUMP LOCATIONS AND MOUNTING REQUIREMENTS.
6. DO NOT PLACE CONDUITS WITHIN STRUCTURAL SLABS.
7. SEE DRAWINGS S1 THROUGH S10 FOR GENERAL NOTES AND TYPICAL
DETAILS.
FOUNDATION
1. TOP OF MAT FOUNDATION IS AT ELEVATION -30.0'.
2. A GEOTECHNICAL INVESTIGATION REPORT HAS BEEN PROVIDED.
FOUNDATION SIZING IS BASED ON THE RECOMMENDATIONS OF THE
GEOTECHNICAL REPORT. SEE NOTE 1 UNDER SECTION "3.0 FOUNDATIONS"
ON SHEET S1 FOR ADDITIONAL INFORMATION REGARDING THE GEOTECH
REPORT.
3. MAT FOUNDATION SIZES ARE BASED ON ASSUMED FOUNDATIONS BEARING
ON ROCK WITH A BEARING PRESSURE OF 20,000 PSF.
4. MICROPILE FOUNDATION SYSTEMS ARE ASSUMED TO BEAR ON ROCK WITH A
COMPRESSIVE AND TENSILE CAPACITY OF 200 KIPS UNLESS NOTED
OTHERWISE.
5. ROCK ANCHORS SHALL HAVE A MINIMUM UPLIFT CAPACITY OF 200 KIPS.
6. THE FOUNDATION SUBGRADE SHALL BE APPROVED BY THE INSPECTING
GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT. IF THE
SUBGRADE DOES NOT MEET THE DESIGN CAPACITY AS NOTED, SUBGRADE
SHALL BE OVER-EXCAVATED AND BACKFILLED WITH PENNDOT 2A MATERIAL.
CAST-IN-PLACE CONCRETE
1. CONCRETE FOR BELOW GRADE PUMP STATION WALLS SHALL HAVE A XYPEX
CRYSTALLINE ADDITIVE.
2. MEMBRANE WATERPROOFING SHALL BE APPLIED TO THE EXTERIOR OF THE
PUMP STATION WALLS AND BOTTOM SLAB. SEE ARCHITECTURAL DRAWINGS.
3. PERIMETER FOUNDATIONS SHALL HAVE A BOTTOM OF FOOTING ELEVATION
OF 3'-0" MINIMUM BELOW FINISHED GRADE.
DENOTES APPROXIMATE LOCATION OF ROCK ANCHOR EMBED IN MAT SLAB.
SEE TYPICAL DETAIL FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
4 0 4 8 12
3/16" =1' - 0"
FT
SUPPORT OF EXCAVATION NOTES
PUMP STATION AND INTERCEPTING CHAMBER
1. ASSUMPTION IS THAT EXISTING MILL CREEK INTERCEPTOR AND
INTERCEPTING CHAMBER IS BEARING ON ROCK.
2. IF BEARING ON ROCK, IT IS ASSUMED THAT NO UNDERPINNING WILL BE
REQUIRED FOR NEW TIE-IN TO EXISTING INTERCEPTING CHAMBER.
3. EXISTING SUPPORT OF EXCAVATION SYSTEMS FOR EXISTING PUMP STATION
MAY BE ENCOUNTERED DURING EXCAVATION FOR NEW PUMP STATION.
4. EXTENTS OF EXISTING MILL CREEK INTERCEPTOR SHALL BE VERIFIED BY
CONTRACTOR.
5. TIEDBACK SHORING IS ASSUMED TO BE REQUIRED ON THE OPPOSITE
(SOUTH) SIDE OF THE EXISTING MILL CREEK INTERCEPTOR. THIS MAY
REQUIRE AN EASEMENT FROM ST. JOSEPH'S UNIVERSITY.
6. OPEN CUT WITH ROCK BENCH IS ASSUMED TO BE REQUIRED ON THE PUMP
STATION SIDE OF THE EXISTING MILL CREEK INTERCEPTOR.
7. CONTRACTOR'S ENGINEER SHALL VERIFY SHORING ON EITHER SIDE OF
EXISTING MILL CREEK INTERCEPTOR FOR SLIDING. INTENT OF SHORING ON
BOTH SIDES IS TO ALLEVIATE UNBALANCED LOADING.
8. A ROCK BENCH WITH ROCK BOLTS IS ANTICIPATED TO BE USED FOR
EXCAVATION SUPPORT AROUND REMAINING SIDES FOR PUMP STATION
EXCAVATION AWAY FROM THE MILL CREEK INTERCEPTOR.
9. ALL WORK SHALL BE COORDINATED WITH BYPASS PUMPING OPERATIONS
FOR THE DURATION OF CONSTRUCTION.
10. ASSUMPTION IS THAT SITE WILL REQUIRE DEWATERING DURING
EXCAVATION.
MASS CONCRETE / THERMALLY CONTROLLED CONCRETE CONSTRUCTION
NOTES:
1. ANY CONCRETE WITH A SECTION THICKNESS OF 3-FEET OR GREATER
SHALL BE CONSIDERED MASS / THERMALLY CONTROLLED CONCRETE.
2. CONCRETE CONTRACTOR SHALL HAVE AT LEAST 5-YEARS EXPERIENCE
WITH PLACING MASS / THERMALLY CONTROLLED CONCRETE.
3. CONTRACTOR IS RESPONSIBLE TO DEVELOP A MASS / THERMALLY
CONTROLLED CONCRETE ANALYSIS AND REPORT BY A PROFESSIONAL
ENGINEER REGISTERED IN THE COMMONWEALTH OF PENNSYLVANIA.
4. CONTRACTOR IS RESPONSIBLE TO DEVELOP A PLAN TO CONTROL
CONCRETE TEMPERATURES DURING PLACEMENT AND CURING PROCESS.
THE FOLLOW METHODS HAY BE UTILIZED:
A. REDUCTION OF CEMENT CONTENT AND USE OF FLY ASH, SLAG, OR
POZZOLANS.
B. USE OF ADMIXTURES TO SLOW HYDRATION PROCESS.
C. USE OF PRECOOLED AGGREGATE.
D. USE OF CRUSHED ICE IN CONCRETE MIX.
E. CONTROLLING TIME OF PLACEMENT.
F. USE OF EMBEDDED COOLING TUBES.
5. CONTRACTOR SHALL ASSUME, AT MINIMUM, THAT ALL PUMP STATION WALLS
AND MAT FOUNDATION 3-FEET OR GREATER ARE MASS / THERMALLY
CONTROLLED CONCRETE.
NOTE TO CONTRACTOR
ALL WALLS SHOWN ARE DEPENDENT ON THE ELEVATED SLABS FOR STRUCTURAL
SUPPORT. WALLS SHALL NOT BE CONSIDERED SELF-SUPPORTING UNTIL THE
ELEVATED SLABS ARE IN PLACE AND HAVE ACHIEVED THEIR REQUIRED 28-DAY
STRENGTH. PROVIDE TEMPORARY SHEETING, SHORING, AND BRACING SYSTEMS
REQUIRED FOR WALLS UNTIL THE SUPPORTING ELEVATED SLABS HAVE ACHIEVED
THEIR REQUIRED 28-DAY STRENGTH.
NO. DATE APPD DESCRIPTION
1 08/03/26 MP ADDENDUM#01
S20
S21
S21
S22
S22
S21
S21
S22
S22
4' - 0" 11' - 4"
1' - 6" 3' - 0" 5' - 0" 3' - 0" 1' - 6"
4' - 0" 4' - 0" 4' - 0" 1' - 0"
3' - 0"
5' - 0"
3' - 0"
1' - 6" 26' - 8" 4' - 0"
6" (TYP)
/ S28 FOR CONTINUATIONMATCHLINE - SEE DRAWING 1
4' - 0" 13' - 4" 6' - 0" 2' - 0"
SLOPED FILL
BELOW - SEE FILL
PLAN
PROCESS PIPE (SEE
MECHANICAL DRAWINGS) (TYP)
WALL EXTENTS
ABOVE
8" DIAMETER MICROPILE
(MINIMUM) (TYPICAL)
10' - 0" 1' - 0"
21' - 8" 4' - 0"
3' - 6"
3' - 0"
BATTERED
MICROPILE (TYP)
S34
S20
S20
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
S38
S38
S37
S3
EMBED STOP LOG BY MANUF
(SEE PROCESS DWGS) (SEE
TYPICAL DETAIL FOR STOP
LOG FRAME ANCHORAGE)
S13
" 4' - 0" 1' - 0"
WALL EXTENTS
BELOW (TYP)
WALL EXTENTS
BELOW
7' - 0"
12" OR 18" THICK OUTSIDE
CONC CHANNEL WALL WITH
#6@6" O/C VERT AND #7@6"
O/C HORIZ TEMPERATURE
AND SHRINKAGE REINF (TYP
EACH SIDE)
1' - 0"
12" CONC DISTRIBUTION CHAMBER WALL
WITH #6@6" O/C VERT REINF AND #7@6" O/C
HORIZ TEMPERATURE AND SHRINKAGE
REINF (TYP OF 3 WALLS)
48" OR 60" THICK INSIDE CONC CHANNEL WALL
WITH #6@6" O/C VERT REINF AND #8@6" O/C
HORIZ TEMPERATURE AND SHRINKAGE REINF
6" (TYP)
(T Y
P
2'-0" THICK CONCRETE DIVIDING WALL
WITH #8@6" O/C VERT REINF AND #8@6"
O/C HORIZ REINF. AT EXPOSED SIDE FACE
OF WALL AT DISTRIBUTION CHAMBER,
HOOK IN HORIZONTAL BARS FOR FULL
THICKNESS OF WALL AND PROVIDE #8@6"
O/C VERT BARS
12" CONC TROUGH WALL WITH #6@6" O/C VERT
AND #7@6" O/C HORIZ TEMPERATURE AND
SHRINKAGE REINF
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
HSS6X6X3/8
H S
S X
X
/8
H S
S X
X
/8
H S
S X
X
/8
8" DIAMETER MICROPILE
(MINIMUM) (TYPICAL)
8" DIAMETER
BATTERED MICROPILE
(MINIMUM) (TYPICAL)
/1 S12
SLOPED FILL BELOW -
SEE FILL PLAN /1 S12
DRY WEATHER PUMP GUIDE RAIL (SEE MECHANICAL
DRAWINGS). PROVIDE MANUFACTURER'S
STANDARD BRACKET OR GUIDE STEM BRACING
APPARATUS. COORDINATE EACH SUPPORT WITH
MANUFACTURER OF PUMP TO VERIFY
COMPATIBILITY (TYPICAL OF 3 LOCATIONS)
(SS)
(SS)
(SS)
(SS)
(SS)
(SS)
(SS)
(SS)
(SS)
(SS)
(S S
(S
S
8'-0" MAX (TYP)
TYPE 316 STAINLESS STEEL FRAMING FOR LATERAL
BRACING OF DRY WEATHER PUMP GUIDE RAIL. DO NOT
SUPPORT ANY PIPING OR OTHER GRAVITY OR LATERAL
LOADS FROM FRAMING. COORDINATE REQUIRED
ELEVATION OF FRAMING WITH PUMP
MANUFACTURER'S REQUIREMENTS FOR BRACING
ELEVATIONS OF PUMP GUIDE RAIL (TYPICAL OF 3
LOCATIONS)
DESIGN LOADS (UNFACTORED):
• LATERAL: 1.4 KIPS
(S S
(S
S
PROCESS PIPE (SEE
MECHANICAL DRAWINGS) (TYP)
(S S
WET WEATHER PUMP GUIDE RAIL (SEE
MECHANICAL DRAWINGS). PROVIDE
MANUFACTURER'S STANDARD BRACKET OR GUIDE
STEM BRACING APPARATUS. COORDINATE EACH
SUPPORT WITH MANUFACTURER OF PUMP TO
VERIFY COMPATIBILITY (TYPICAL OF 4 LOCATIONS)
TYPE 316 STAINLESS STEEL FRAMING FOR
LATERAL BRACING OF WET WEATHER PUMP
GUIDE RAILS. DO NOT SUPPORT ANY PIPING OR
OTHER GRAVITY OR LATERAL LOADS FROM
FRAMING. COORDINATE REQUIRED ELEVATION
OF FRAMING WITH PUMP MANUFACTURER'S
REQUIREMENTS FOR BRACING ELEVATIONS OF
PUMP GUIDE RAIL (TYPICAL OF 4 LOCATIONS)
DESIGN LOADS (UNFACTORED):
• LATERAL: 2.5 KIPS
48" CONCRETE WALL (TYP)
DISTRIBUTION
CHAMBER
WET WEATHER
WET WELL
DRY WEATHER
WET WELL
(S S
(S
S
(SS)
(SS)
(SS)
(SS)
NOTE: WET WELL SLOPED FILL NOT SHOWN FOR CLARITY. SEE WET WELL
FILL PLAN AND ELEVATION VIEWS FOR EXTENTS OF SLOPED FILL.
S36
5' - 0" MAX
S36
SIM
WET WEATHER TROUGH
INTEGRAL CONCRETE
COLUMN (TYP OF 2)
S37
S37
S37
TYP
S37
SIM, TYP
#5@12" ON CENTER HORIZONTAL
#7@12" O/C VERTICAL, EACH FACE
#6@6" ON CENTER
VERTICAL
#8@6" ON CENTER
HORIZONTAL
#8@6" O/C HORIZONTAL
EACH FACE
2' - 0"
EMBED STOP LOG BY MANUF (SEE
PROCESS DWGS) (SEE TYPICAL DETAIL
FOR BLOCKOUT AND CONCRETE REINF
AROUND FRAME) (TYP)
2' - 6" 2' - 6"
MAJOR AXIS
OF ELLIPSE
MINOR AXIS
OF ELLIPSE
CURVED FACE GEOMETRY OF THE
CONCRETE WALL IS DEFINED AS ONE-
HALF OF AN ELLIPSE, WITH ELLIPSE
AXES AS INDICATED ON DRAWING
GRAPHICAL REPRESENTATION
OF THE GEOMETRY OF THE
ELLIPSE
CENTER POINT
OF ELLIPSE
ALIGN MAJOR
AXIS OF ELLIPSE
WITH FACE OF
CONCRETE WALL
(T Y
P
4" (TYP)
B A
R M
E A
S U
R E
O N
F U
L L S
IZ
E
S H
E E
T S
CHECKED
DRAWN
DESIGNED APPROVED
SCALE
DWG
SHEET OF
DATE REVF
IL
E
B
IM
/2
S
W W
P C
P P u m p S ta ti o n /0
.0
-P S
H
E .r v t
/4
/2
:4 : 0
P
M
S13
MP
CS
MFW
PUMP STATION INFLUENT CHAMBER PLAN AT EL.
-17.40' MAY 2026
STRUCTURALPHILADELPHIA WATER DEPARTMENT
PHILADELPHIA, PENNSYLVANIA
REPLACEMENT OF THE
42ND STREET PUMPING STATION
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PENNSYLVANIA 19103
SCALE: 3/16" = 1'-0"S13
1 PUMP STATION INFLUENT CHANNEL PLAN AT EL. -17.40'
SHEET NOTES
GENERAL
1. COORDINATE STRUCTURAL DRAWINGS WITH CIVIL, ARCHITECTURAL, AND
MEP DRAWINGS.
2. SHEETING AND SHORING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL SUBMIT SHEETING AND SHORING PLANS FOR REVIEW
THAT ARE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
COMMONWEALTH OF PENNSYLVANIA.
3. DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL SUBMIT DEWATERING PLANS FOR REVIEW THAT ARE
SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
COMMONWEALTH OF PENNSYLVANIA. DEWATERING SHOULD BE EXPECTED
DURING EXCAVATION.
4. IT IS ANTICIPATED THAT ROCK EXCAVATION SHOULD BE EXPECTED.
5. SEE MEP DRAWINGS FOR PUMP LOCATIONS AND MOUNTING REQUIREMENTS.
6. DO NOT PLACE CONDUITS WITHIN STRUCTURAL SLABS.
7. SEE DRAWINGS S1 THROUGH S10 FOR GENERAL NOTES AND TYPICAL
DETAILS.
FOUNDATION
1. TOP OF MAT FOUNDATION IS AT ELEVATION -30.0'.
2. A GEOTECHNICAL INVESTIGATION REPORT HAS BEEN PROVIDED.
FOUNDATION SIZING IS BASED ON THE RECOMMENDATIONS OF THE
GEOTECHNICAL REPORT.
3. MAT FOUNDATION SIZES ARE BASED ON ASSUMED FOUNDATIONS BEARING
ON ROCK WITH A BEARING PRESSURE OF 20,000 PSF.
4. MICROPILE FOUNDATION SYSTEMS ARE ASSUMED TO BEAR ON ROCK WITH A
COMPRESSIVE AND TENSILE CAPACITY OF 200 KIPS UNLESS NOTED
OTHERWISE.
5. ROCK ANCHORS SHALL HAVE A MINIMUM UPLIFT CAPACITY OF 200 KIPS.
6. THE FOUNDATION SUBGRADE SHALL BE APPROVED BY THE INSPECTING
GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT. IF THE
SUBGRADE DOES NOT MEET THE DESIGN CAPACITY AS NOTED, SUBGRADE
SHALL BE OVER-EXCAVATED AND BACKFILLED WITH PENNDOT 2A MATERIAL.
CAST-IN-PLACE CONCRETE
1. CONCRETE FOR BELOW GRADE PUMP STATION WALLS SHALL HAVE A XYPEX
CRYSTALLINE ADDITIVE.
2. MEMBRANE WATERPROOFING SHALL BE APPLIED TO THE EXTERIOR OF THE
PUMP STATION WALLS AND BOTTOM SLAB. SEE ARCHITECTURAL DRAWINGS.
3. PERIMETER FOUNDATIONS SHALL HAVE A BOTTOM OF FOOTING ELEVATION
OF 3'-0" MINIMUM BELOW FINISHED GRADE.
4 0 4 8 12
3/16" =1' - 0"
FT
1/2" = 1'-0"S13
2 PARTIAL PLAN AT INFLUENT WALLS
42 0 2
1/2" =1' - 0"
FT
DENOTES DIRECTION OF 18" THICK NORMAL WEIGHT CONCRETE
SLAB WITH #7@12" BOTTOM AND #7@12" TOP, EACH WAY.
S3
NO. DATE APPD DESCRIPTION
S20
S21
S21
S22
S22
A
E
C
D
F
G
H
S21
S21
S22
S22
B
H1
1A
2A
3A
4A
6' - 5" 7' - 8" 14' - 0" 14' - 0" 7' - 8" 6' - 5"
/4
/4
MAT FOUNDATION
EXTENTS ABOVE
(TYP OF 2)
36" CONCRETE WALL (TYP)
/ S28 FOR CONTINUATIONMATCHLINE - SEE DRAWING 1
GRADE BEAM AND PILE
CAP EXTENTS ABOVE (TYP)
8" DIAMETER MICROPILE
(MINIMUM) (TYPICAL)
1' - 0"
1' - 11"
1' - 1"
3' - 0" 5' - 0" 3' - 0"
CONCRETE CHANNEL
WALLS BELOW (TYP)
CONCRETE
COLUMN (TYP)
12" CONCRETE
SLAB
WALL OPENING
BELOW (TYP OF 2)
48" CONCRETE WALL
BELOW (TYP)
B10A: 45 x 36 CB
B10A: 48 x 36 CB
B A x
C
B
B A x
C
B
B A x
C
B
B A x
C
B
B A x
C
B
B8A: 24 x 36 CB
B8A: 24 x 36 CB
B8A: 24 x 36 CB
B8A: 24 x 36 CB
B2A: 18 x 36 CB
B2A: 18 x 36 CB
B2A: 18 x 36 CB
B9A: 18 x 36 CB B
A x
C
B
B9A: 20 x 36 CB
B A x
C
B
B A x
C
B
B2A: 18 x 36 CB
B A x
C
B
B2A: 18 x 36 CB
C W
B E
L O
W
CONCRETE SLAB OPENING (TYP UNO)
INFLUENT CHANNELWAY
BELOW
9' - 0"
4' - 0"
1' - 0" 4' - 6"
B A x
C
B
MICROPILES (TYP OF 12
AT EACH METER VAULT)
(4) BATTERED
MICROPILES (EAST
SIDE) CAPABLE OF
RESISTING 50 KIPS
EACH LATERAL
(TENSION), 200 KIPS
EACH VERTICAL
(TYP AT EACH
METER VAULT)
(2) BATTERED MICROPILES
(NORTH AND SOUTH SIDE)
CAPABLE OF RESISTING 35
KIPS EACH LATERAL, 200
KIPS EACH VERTICAL (TYP
AT EACH METER VAULT)
S34
C W
B E
L O
W12" CW BELOW
12" CW BELOW
C W
B E
L O
W
C W
B E
L O
W
(4) CENTER MICROPILES
CAPABLE OF RESISTING
200 KIPS EACH VERTICAL
S37
48" CONCRETE WALL
BELOW (TYP)
B2A: 18 x 36 CB
CONTRACTOR'S OPTION TO TAPER BEAM
TOWARD CORNER OF WALL AS SHOWN
AT THIS LOCATION. BEAM WIDTH
INDICATED IN CALLOUT AND SCHEDULE
IS THE MINIMUM WIDTH REQUIREMENT
S20
S20
HSS8X8X3/8
(GALV) SEE
FOR BASE
ATTACHMENT
DETAIL (TYP OF 3)
/3 S36
HSS6X6X3/8 BEAM FOR GATE STEM
BRACE (GALV) ABOVE (TYP OF 2).
SEE DETAIL .
S36
S36
S36
SIM
S36
SIM
PC2
PC3
PC1
PC1
PC1
S37
S37
S38
S38
S38
9' - 0"
8" THICK CONCRETE STAIR
LANDING ABOVE
(T Y
P
4' - 6"
4' - 0"
19' - 4" 2' - 0" 10' - 0" 1' - 0" 21' - 8"
1' - 0"
1' - 11" 1' - 1"
12' - 10" 2' - 0" 11' - 4 1/4" 1' - 0" 7' - 2 1/4" 2' - 0" 17' - 7 1/2"
1' - 1" 1' - 11"
1' - 0"
12' - 1 1/4"
12' - 1 1/4"
12' - 1 1/4"
1' - 1"
1' - 11"
S14
GRADE BEAM PROVIDED
FOR STAIR POSTS AS
REQUIRED FOR
DELEGATED STAIR
DESIGN.
POSTS ARE ASSUMED TO
BE REQUIRED DUE TO
MULTIPLE LANDING STEPS.
LOCATION TO BE
COORDINATED WITH
POSTS
18" THICK CONCRETE SLAB
WITH #7@12" O/C EACH WAY,
TOP AND BOTTOM (TYP UNO)
12" THICK CONCRETE SLAB
WITH #6@12" O/C EACH
WAY, TOP AND BOTTOM
(TYP UNO)
HSS6X6X3/8
HSS6X6X3/8
HSS6X3X3/8
HSS6X3X3/8
ABOVE (GALV) (TYP OF 6)
ABOVE (GALV) (TYP OF 3)
(GALV) (TYP OF 4)
(GALV) (TYP OF 8)
GALVANIZED STEEL FRAMING FOR LATERAL BRACING OF
WET WEATHER PUMP GUIDE RAILS ABOVE. DO NOT
SUPPORT ANY PIPING OR OTHER GRAVITY OR LATERAL
LOADS FROM FRAMING. COORDINATE REQUIRED
ELEVATION OF FRAMING WITH PUMP MANUFACTURER'S
REQUIREMENTS FOR BRACING ELEVATIONS OF PUMP
GUIDE RAIL (TYPICAL OF 4 LOCATIONS)
GALVANIZED STEEL FRAMING FOR
LATERAL BRACING OF DRY WEATHER
PUMP GUIDE RAILS ABOVE. DO NOT
SUPPORT ANY PIPING OR OTHER
GRAVITY OR LATERAL LOADS FROM
FRAMING. COORDINATE REQUIRED
ELEVATION OF FRAMING WITH PUMP
MANUFACTURER'S REQUIREMENTS
FOR BRACING ELEVATIONS OF PUMP
GUIDE RAIL (TYPICAL OF 3 LOCATIONS)
APPROXIMATE EXTENTS
OF PROCESS PIPE ABOVE
(SEE MECHANICAL AND
CIVIL DRAWINGS). PLACE
2-INCHES OF
COMPRESSIBLE FILLER
ABOVE ALL LENGTHS OF
PIPE THAT RUN BELOW
CONCRETE PILE CAPS AND
GRADE BEAMS.
S36
SIM
S36
SIM
ABOVE
ABOVE
HSS6X6X3/8 BEAM
FOR GATE STEM
BRACE (GALV)
ABOVE (TYP OF 2)
EL. -1.40'
/5 S36
12' - 0"
DIRECTION
OF SHEAR
D
IR
E C
T
IO
N
O F
S H
E A
R D
IR
E
C T
IO
S
H E
A R
S35
S35
S35
1' - 0" 3' - 0" 3' - 4" 8' - 0" 3' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 0"
5" 8"
5"
1' - 6" 5' - 3" 0' - 0"3' - 6" 3' - 0" 5' - 0" 3' - 0" 1' - 6" x
C
B
/4
/4
CONCRETE BEAM (SEE
OVERALL PLAN) (TYP)
CONCRETE COLUMN (SEE
OVERALL PLAN) (TYP)
CONCRETE STEP (SEE
ARCH FOR TREAD AND
RISER DIMENSIONS)
EL. -1.40'
EL. -1.50'
EL. -2.50'
EL. -2.50'
EL. -2.50'
6" 6" 6"
3' - 0"3' - 0"
(T Y
P
3' - 0" 5' - 0" 3' - 0" 1' - 6"
6"
(T Y
P
6" 6" 6"
8" THICK CONCRETE
STAIR LANDING ABOVE
1' - 0"
S4
S4
(S E
S
CONCRETE STEP (SEE
ARCH FOR TREAD AND
RISER DIMENSIONS)
B A
R M
E A
S U
R E
O N
F U
L L S
IZ
E
S H
E E
T S
CHECKED
DRAWN
DESIGNED APPROVED
SCALE
DWG
SHEET OF
DATE REVF
IL
E
B
IM
/2
S
W W
P C
P P u m p S ta ti o n /0
.0
-P S
H
E .r v t
/4
/2
:4 : 0
P
M
S14
MP
CS
MFW
PUMP STATION WET WELL FRAMING PLAN AT EL.
-2.50' MAY 2026
STRUCTURALPHILADELPHIA WATER DEPARTMENT
PHILADELPHIA, PENNSYLVANIA
REPLACEMENT OF THE
42ND STREET PUMPING STATION
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PENNSYLVANIA 19103
SCALE: 3/16" = 1'-0"S14
1 PUMP STATION WET WELL FRAMING PLAN AT EL. -2.50'
SHEET NOTES
GENERAL
1. COORDINATE STRUCTURAL DRAWINGS WITH CIVIL, ARCHITECTURAL, AND
MEP DRAWINGS.
2. SHEETING AND SHORING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL SUBMIT SHEETING AND SHORING PLANS FOR REVIEW
THAT ARE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
COMMONWEALTH OF PENNSYLVANIA.
3. DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL SUBMIT DEWATERING PLANS FOR REVIEW THAT ARE
SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE
COMMONWEALTH OF PENNSYLVANIA. DEWATERING SHOULD BE EXPECTED
DURING EXCAVATION.
4. IT IS ANTICIPATED THAT ROCK EXCAVATION SHOULD BE EXPECTED.
5. SEE MEP DRAWINGS FOR PUMP LOCATIONS AND MOUNTING REQUIREMENTS.
6. DO NOT PLACE CONDUITS WITHIN STRUCTURAL SLABS.
7. SEE DRAWINGS S1 THROUGH S10 FOR GENERAL NOTES AND TYPICAL
DETAILS.
FOUNDATION
1. TOP OF MAT FOUNDATION IS AT ELEVATION -30.0'.
2. A GEOTECHNICAL INVESTIGATION REPORT HAS BEEN PROVIDED.
FOUNDATION SIZING IS BASED ON THE RECOMMENDATIONS OF THE
GEOTECHNICAL REPORT. SEE NOTE 1 UNDER SECTION "3.0 FOUNDATIONS"
ON SHEET S1 FOR ADDITIONAL INFORMATION REGARDING THE GEOTECH
REPORT.
3. MAT FOUNDATION SIZES ARE BASED ON ASSUMED FOUNDATIONS BEARING
ON ROCK WITH A BEARING PRESSURE OF 20,000 PSF.
4. MICROPILE FOUNDATION SYSTEMS ARE ASSUMED TO BEAR ON ROCK WITH A
COMPRESSIVE AND TENSILE CAPACITY OF 200 KIPS UNLESS NOTED
OTHERWISE.
5. ROCK ANCHORS SHALL HAVE A MINIMUM UPLIFT CAPACITY OF 200 KIPS.
6. THE FOUNDATION SUBGRADE SHALL BE APPROVED BY THE INSPECTING
GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT. IF THE
SUBGRADE DOES NOT MEET THE DESIGN CAPACITY AS NOTED, SUBGRADE
SHALL BE OVER-EXCAVATED AND BACKFILLED WITH PENNDOT 2A MATERIAL.
CAST-IN-PLACE CONCRETE
1. CONCRETE FOR BELOW GRADE PUMP STATION WALLS SHALL HAVE A XYPEX
CRYSTALLINE ADDITIVE.
2. MEMBRANE WATERPROOFING SHALL BE APPLIED TO THE EXTERIOR OF THE
PUMP STATION WALLS AND BOTTOM SLAB. SEE ARCHITECTURAL DRAWINGS.
3. PERIMETER FOUNDATIONS SHALL HAVE A BOTTOM OF FOOTING ELEVATION
OF 3'-0" MINIMUM BELOW FINISHED GRADE.
4. REFER TO PUMP STATION BEAM REINFORCEMENT SCHEDULE ON SHEET S3
FOR REINFORCING OF BEAMS DESIGNATED AS 'B#X' ON PLAN.
4 0 4 8 12
3/16" =1' - 0"
FT
HATCHING GRAPHICALLY ILLUSTRATES CONCRETE WALLS LOCATED
BELOW ELEVATION -2.5 FT IN THIS PLAN VIEW TO DIFFERENTIATE WALL
AND BEAM LINEWORK FOR CLARITY. REFER TO THE VARIOUS SECTIONS
AND DETAILS FOR ADDITIONAL CONTEXT AND INFORMATION.
3/16" = 1'-0"S14
PARTIAL PLAN -
PUMP STATION WET WELL FRAMING PLAN AT EL. -2.50'
S4 DENOTES DIRECTION OF 12" THICK NORMAL WEIGHT CONCRETE
SLAB WITH #6@12" BOTTOM AND #6@12" TOP, EACH WAY.
NO. DATE APPD DESCRIPTION
S23
14' - 0"
C O
O R
D W
IT
H
P
IP
E L
O C
A T
IO
N
S
10' - 0" 2' - 0"
S23
THRUST COLLAR
EMBED IN WALL.
SEE PROCESS
DWGS (TYP)
THRUST PROVIDED
IS 40 KIPS
HORIZONTAL AND
VERTICAL UPWARD
(TYP EACH VAULT)
PASS THROUGH
PIPE SLEEVE. SEE
PROCESS DWGS.
(TYP UNO)
S30
4' - 6" 4' - 0" 4' - 0" 1' - 6"
S34
18" CONCRETE WALL
WITH #8@6" VERTICAL
AND #6@9" HORIZONTAL
24" CONCRETE WALL
WITH #8@8" VERTICAL
AND #6@7" HORIZONTAL
CENTER PIER
END PIER
(TYP)
S23
2' - 0"
2' - 0" x
C
B
S23 x
C
B x
C
B x
C
B
S31
CONCRETE WALL
BELOW (TYP)
S34
S34
5' - 0"
5' - 0"
12' - 0"
30 x 18 CB
30 x 18 CB
S34
S34
SIM
S23
SIM
S23
SIM
S31
30 x 18 CB
30 x 18 CB
19' - 0"
1' - 0" 1' - 0"
5' - 6" 5' - 6"
EL. 15.50
TOP OF SLAB
EL. 4.00
TOP OF FND
32" CONCRETE MAT FOUNDATION
WITH #8@6" EACH WAY TOP AND
BOTTOM
18" CONCRETE WALL WITH
#8@6" VERT AND #6@9"
HORIZONTAL (TYP)
CONCRETE BEAM (TYP)
CONSTRUCTION JOINT
W/ WATERSTOP (TYP)
8" DIAMETER (MINIMUM)
MICROPILE BEYOND (TYP)
COORD WITH
MANUF
COORD WITH
MANUF
S34
SEE TYPICAL DETAIL H-20
HATCH OPENING AT
BEARING LEDGE
30 x 18 CONCRETE BEAM
PARTIALLY INTEGRAL WITH WALL
WITH (5) #6 TOP AND BOTTOM, (2)
#6 SIDE AND #4 TIES @ 12" ON
CENTER. SEE TYPICAL DETAIL
FOR H-20 HATCH OPENING AT
BEARING LEDGE
30"
3' - 5 1/2" 5' - 0" 3' - 6 1/2"
EL. 15.50
TOP OF SLAB
TOP OF FND
EL. 4.00
32" CONCRETE MAT
FOUNDATION (SEE
PLAN)
24" CONCRETE WALL WITH
#8@8" VERT AND #6@7"
HORIZ. SEE FOR
ADD'L REINF
CONCRETE SLAB
(SEE PLAN) (TYP)
CONCRETE BEAM
(TYP)
CONSTRUCTION
JOINT W/ STARTER
WALL AND
WATERSTOP (TYP)
8" DIAMETER (MINIMUM)
BATTERED MICROPILE
COORD WITH
MANUF
S30
8" DIAMETER (MINIMUM)
VERTICAL MICROPILE
S34
SIM
/5 S30
S34
SIM
CONCRETE
RETAINING WALL
(SEE 2/S2)
B A
R M
E A
S U
R E
O N
F U
L L S
IZ
E
S H
E E
T S
CHECKED
DRAWN
DESIGNED APPROVED
SCALE
DWG
SHEET OF
DATE REVF
IL
E
B
IM
/2
S
W W
P C
P P u m p S ta ti o n /0
.0
-P S
H
E .r v t
/4
/2
:4 : 0
P
M
S23
MP
CS
MFW METER VAULT PLANS AND SECTIONS MAY 2026
STRUCTURALPHILADELPHIA WATER DEPARTMENT
PHILADELPHIA, PENNSYLVANIA
REPLACEMENT OF THE
42ND STREET PUMPING STATION
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PENNSYLVANIA 19103
1/4" = 1'-0"S23
1 VAULT FOUNDATION PLAN AT EL. 4.00'
1/4" = 1'-0"S23
2 VAULT TOP SLAB PLAN AT EL. 15.50'
1/4" = 1'-0"S23
3 SECTION
1/4" = 1'-0"S23
4 SECTION
84 0 4
1/4" =1' - 0"
FT
NO. DATE APPD DESCRIPTION
/ S13 FOR CONTINUATIONMATCHLINE - SEE DRAWING 1
S29
2' - 0" 11' - 4 1/4" 1' - 0" 7' - 2 1/4"
2' - 0"
S29
S29
S29
S29
S29
S29
S29
S28
V
IF
V
IF
V
IF
S28
3 4 S28
2' - 0"
CONCRETE
WALL (TYP)
EXST MILL CREEK
INTERCEPTOR TO REMAIN
(SEE CIVIL DWGS) (VIF)
(TYP) MAT
FOUNDATION
BELOW (TYP)
S34
CONCRETE RIM BY
OTHERS (NIC)
STOP LOG FRAME
BY OTHERS (NIC)
(TYP)
S13
2 S28A
/ S15 FOR CONTINUATIONMATCHLINE - SEE DRAWING 1
S29
S29
S29
S29
S29
S29
S29
S29
S28
23' - 6 1/2"
CONCRETE SLAB (TYP)
EXST CONCRETE
SLAB TO REMAIN
(VIF) (TYP)
EXST REMOVABLE
PLANKS TO REMAIN (VIF)
EXST MILL CREEK
INTERCEPTOR TO REMAIN
(SEE CIVIL DWGS) (VIF)
(TYP)
HATCH OPENING
(SEE ARCH)(TYP)
/4 " 11' - 4 1/4"
4' - 6"
EXST ACCESS MANHOLE
TO REMAIN (VIF) (TYP)
MANHOLE BY OTHERS
(NIC) (TYP)
CONCRETE WALL
(TYP)
CONSTRUCTION JOINT
W/ WATERSTOP
SLOPED FILL,
ELEVATION
VARIES. SEE
PLAN FOR INVERT
ELEVATIONS
DOWELS TO MATCH
VERTICAL
REINFORCING
EL. -17.90'
EL. -17.40'
EL. -9.40'
TOP OF OPENING
BOTT OF OPENING
TOP OF FOUNDATION
OPENING
BOTTOM OF
OPENING BEYOND
#7@12" O/C
VERTICAL BARS,
EACH FACE (TYP)
#7@6" O/C
HORIZONTAL BARS,
EACH FACE (TYP)
3' - 3 1/4" ± 6' - 0" MIN VARIES, SEE PLAN
#8@8" O/C EACH
WAY, TOP AND BOTT
S29
S29
S29
S29
S29
V
IF
V
IF
CONCRETE INLET
CHAMBER WALL (TYP)
CONCRETE INLET
CHAMBER WALL
BELOW (TYP)
S L O
P E
S L O
P E
/1
V
IF
MATCH SLOPE OF
WALL TO ADJACENT
EXST WALL FACE (TYP)
EXST CONC WALL TO
REMAIN (TYP)
STOPLOG FRAME
BY OTHERS (NIC)
(TYP)
CONCRETE RIM
BY OTHERS (NIC)
(TYP)
S35
S30
SIM
S28A
S29
S29
S29
S29
S29
CONCRETE RIM
ABOVE BY
OTHERS (NIC)
EXST CONCRETE WALL
AND MAT FOUNDATION TO
REMAIN (VIF)(TYP)
CONCRETE WALL
INFILL BELOW
CONCRETE INLET
CHAMBER WALL (TYP)
6' - 0"
STOPLOG FRAME
BY OTHERS (NIC)
(TYP)
EXTENTS, 6'-0" MIN
CONCRETE BEAM
S29A
BEAM/WALL REINF
DEPICTING END
CONDITION OF
HORIZ BARS (SEE
SECTIONS) (TYP)
B A
R M
E A
S U
R E
O N
F U
L L S
IZ
E
S H
E E
T S
CHECKED
DRAWN
DESIGNED APPROVED
SCALE
DWG
SHEET OF
DATE REVF
IL
E
B
IM
/2
S
W W
P C
P P u m p S ta ti o n /0
.0
-P S
H
E .r v t
/4
/2
:4 : 0
P
M
S28
MP
CS
MFW INTERCEPTING CHAMBER PLANS AND SECTIONS MAY 2026
STRUCTURALPHILADELPHIA WATER DEPARTMENT
PHILADELPHIA, PENNSYLVANIA
REPLACEMENT OF THE
42ND STREET PUMPING STATION
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PENNSYLVANIA 19103
3/16" = 1'-0"S28
1 INTERCEPTING CHAMBER FOUNDATION PLAN
3/16" = 1'-0"S28
2 INTERCEPTING CHAMBER TOP SLAB PLAN
1/2" = 1'-0"S28
5 SECTION
1/4" = 1'-0"S28
3 INLET CHAMBER FOUNDATION PLAN AT EL. -8.92'±
1/4" = 1'-0"S28
4 INLET CHAMBER UPPER FRAMING AT EL. -1.75' ±
4 0 4 8 12
3/16" =1' - 0"
FT
84 0 4
1/4" =1' - 0"
FT
42 0 2
1/2" =1' - 0"
FT
NOTE TO CONTRACTOR
THE CONTRACTOR SHALL ENGAGE A DESIGN ENGINEER
FOR THE DESIGN OF A SHORING SYSTEM TO SUPPORT ALL
EXISTING STRUCTURES AS REQUIRED. SIGNED AND
SEALED SHOP DRAWINGS AND CALCULATIONS SHALL BE
SUBMITTED FOR REVIEW.
EXCAVATION AND EXPOSURE OF THE EXISTING BRICK MILL
CREEK INTERCEPTOR IS ANTICIPATED FOR THE
CONSTRUCTION OF THE PUMP STATION AND
INTERCEPTING CHAMBER. THE CONTRACTOR'S ENGINEER
SHALL DESIGN A SYSTEM TO KEEP THE EXISTING BRICK
MASONRY ARCH STABLE. IT IS ANTICIPATED THAT THE
EXISTING STRUCTURE IS CONSTRUCTED IN ROCK. THE
CONTRACTOR SHOULD ANTICIPATE EXCAVATIONS TO BE
EQUAL ON BOTH SIDES OF THE BRICK MASONRY ARCH SO
AS TO NOT CREATE AN UNBALANCED LOADING CONDITION.
SHEETING AND SHORING MAY BE REQUIRED ON THE
OPPOSITE SIDE OF THE BRICK MASONRY ARCH BETWEEN
THE EXISTING BUILDING TO ALLOW FOR THIS APPROACH.
NOTE: ITEMS DESIGNATED AS "NIC" INDICATES WORK THAT IS
NOT INCLUDED AS PART OF THIS CONTRACT.
NOTE: ITEMS DESIGNATED AS "NIC" INDICATES WORK THAT IS
NOT INCLUDED AS PART OF THIS CONTRACT.
NOTE: ITEMS DESIGNATED AS "NIC" INDICATES WORK THAT IS
NOT INCLUDED AS PART OF THIS CONTRACT.
NOTE: ITEMS DESIGNATED AS "NIC" INDICATES WORK THAT IS
NOT INCLUDED AS PART OF THIS CONTRACT.
NO. DATE APPD DESCRIPTION
1 08/03/26 MP ADDENDUM#01
S29
S29
S29
S29
S29
S29
S29
S28
6' - 0" MIN
3' - 3 1/4" ± (VIF)
(2' - 4" MIN)
2' - 5 1/2" ±
3' - 3 1/4" ±
EL. -14.50'
135.00°135.00°
90.00°
S L O
P E
D O
W N
S L O
P E
D O
W N
INVERT
TOP OF OPENING
2' -
7' - 2 1/4"
B E
A M
/W A
L L A
B O
V E
E X
T E
N T
S O
F C
O N
C R
E T
E
S29A
S29A
CONCRETE INLET
CHAMBER WALL BELOW
(TYP)
S35
Sim
STOPLOG
FRAME BY
OTHERS
(NIC) (TYP)
CONCRETE RIM
BY OTHERS (NIC)
(TYP)
EL. -9.40'
WALL HORIZ REBAR ABOVE
(SEE SECTION). EPOXY DOWEL
ONE END OF HORIZ BAR INTO
EXST CONCRETE WALL WITH
HILTI HIT-RE 500 V3 EPOXY
ADHESIVE OR APPROVED
EQUAL (6" MIN EMBED) (TYP)
S29
S29
S29
______________________5
S29
S29
S5
EL. 13.50'
EL. 15.50'
EL. 13.50'
EL. 12.50'
TOP OF INTERCEPTING
CHAMBER SLAB
TOP OF CONDUIT SLAB
TOP OF REMOVABLE
PRECAST PLANK
TOP OF EXST
CONCRETE SLAB
± (VIF)
± (VIF)
S29A
CONCRETE WALLS
BELOW (TYP)
EXTENTS OF CONCRETE
TOP SLAB (TYP)
EXST INTERCEPTING
CHAMBER TO REMAIN (TYP)
S29
S29
S29
S29
S28
/2
M
IN
/4
2 1/2" ±
EL. -21.40'
EL. -21.40'
EL. -17.40'
EL. -17.90'
TOP OF
FOUNDATION
BOTT OF OPENING
3' - 3 1/4" ±
6' - 0" MIN
3' - 3 1/4" ±
135.00° 135.00°
TOP OF FOUNDATION
EL. -17.40'
5' - 0"
STARTER WALL
W/ WATERSTOP
(SEE SECTION)
BOTT OF OPENING
TOP OF
FOUNDATION
EXTENT OF 30" THICK
MAT FOUNDATION
APPROXIMATE EXTENT
OF FOUNDATION
WALLS ABOVE
S29A
SIM
B A
R M
E A
S U
R E
O N
F U
L L S
IZ
E
S H
E E
T S
CHECKED
DRAWN
DESIGNED APPROVED
SCALE
DWG
SHEET OF
DATE REVF
IL
E
B
IM
/2
S
W W
P C
P P u m p S ta ti o n /0
.0
-P S
H
E .r v t
/4
/2
:4 : 0
P
M
S28A
MP
CS
MFW INLET CHAMBER PARTIAL PLANS MAY 2026
STRUCTURALPHILADELPHIA WATER DEPARTMENT
PHILADELPHIA, PENNSYLVANIA
REPLACEMENT OF THE
42ND STREET PUMPING STATION
1700 MARKET STREET, SUITE 2130
PHILADELPHIA, PENNSYLVANIA 19103
3/8" = 1'-0"S28A
2 INLET CHAMBER PARTIAL SLOPED SLAB PLAN - EL. VARIES
3/8" = 1'-0"S28A
3 INLET CHAMBER PARTIAL TOP SLAB PLAN AT EL. 13.50'±
3/8" = 1'-0"S28A
1 INLET CHAMBER PARTIAL FOUNDATION PLAN AT EL. -17.90'±
SHEET NOTES
GENERAL
1. COORDINATE STRUCTURAL DRAWINGS WITH CIVIL, ARCHITECTURAL, AND MEP DRAWINGS.
2. SHEETING AND SHORING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT SHEETING AND SHORING PLANS FOR REVIEW THAT
ARE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER IN THE COMMONWEALTH OF PENNSYLVANIA.
3. DEWATERING IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL SUBMIT DEWATERING PLANS FOR REVIEW THAT ARE SIGNED AND
SEALED BY A PROFESSIONAL ENGINEER IN THE COMMONWEALTH OF PENNSYLVANIA. DEWATERING SHOULD BE EXPECTED DURING EXCAVATION.
4. IT IS ANTICIPATED THAT ROCK EXCAVATION SHOULD BE EXPECTED.
5. SEE MEP DRAWINGS FOR PUMP LOCATIONS AND MOUNTING REQUIREMENTS.
6. DO NOT PLACE CONDUITS WITHIN STRUCTURAL SLABS.
7. SEE DRAWINGS S1 THROUGH S10 FOR GENERAL NOTES AND TYPICAL DETAILS.
FOUNDATION
1. A GEOTECHNICAL INVESTIGATION REPORT HAS BEEN PROVIDED. FOUNDATION SIZING IS BASED ON THE RECOMMENDATIONS OF THE GEOTECHNICAL
REPORT.
2. MAT FOUNDATION SIZES ARE BASED ON ASSUMED FOUNDATIONS BEARING ON ROCK WITH A BEARING PRESSURE OF 20,000 PSF.
3. MICROPILE FOUNDATION SYSTEMS ARE ASSUMED TO BEAR ON ROCK WITH A COMPRESSIVE AND TENSILE CAPACITY OF 200 KIPS UNLESS NOTED OTHERWISE.
4. ROCK ANCHORS SHALL HAVE A MINIMUM UPLIFT CAPACITY OF 200 KIPS.
5. THE FOUNDATION SUBGRADE SHALL BE APPROVED BY THE INSPECTING GEOTECHNICAL ENGINEER PRIOR TO CONCRETE PLACEMENT. IF THE SUBGRADE
DOES NOT MEET THE DESIGN CAPACITY AS NOTED, SUBGRADE SHALL BE OVER-EXCAVATED AND BACKFILLED WITH PENNDOT 2A MATERIAL.
CAST-IN-PLACE CONCRETE
1. CONCRETE FOR BELOW GRADE PUMP STATION WALLS SHALL HAVE A XYPEX CRYSTALLINE ADDITIVE.
2. MEMBRANE WATERPROOFING SHALL BE APPLIED TO THE EXTERIOR OF THE PUMP STATION WALLS AND BOTTOM SLAB. SEE ARCHITECTURAL DRAWINGS.
3. PERIMETER FOUNDATIONS SHALL HAVE A BOTTOM OF FOOTING ELEVATION OF 3'-0" MINIMUM BELOW FINISHED GRADE.
DENOTES DIRECTION OF 18" THICK NORMAL WEIGHT CONCRETE SLAB WITH #7@10" BOTTOM AND #7@10" TOP, EACH WAY. S5
INLET CHAMBER NOTES:
GENERAL
1. ALL CONSTRUCTION AND SEQUENCING ACTIVITIES MUST BE APPROVED BY PWD.
2. CONTRACTOR SHALL SUBMIT SEQUENCING PLAN TO BE REVIEWED AND APPROVED BY THE DESIGN TEAM AND PWD.
3. CONTRACTOR SHALL SUBMIT SIGNED AND SEALED SHORING PLAN TO BE REVIEWED AND APPROVED BY THE DESIGN
TEAM AND PWD.
4. DETAILED SIGNED AND SEALED SHOP DRAWINGS OF ALL SUPPORT AND PROTECTION SYSTEMS SHALL BE PREPARED
INDICATING ALL WORK TO BE PERFORMED. SUBMIT THE SHOP DRAWINGS AND CALCULATIONS IN ACCORDANCE WITH
THE CONTRACT REQUIREMENTS.
5. SHEETING, SHORING AND BRACING SYSTEMS SHALL BE UNDERTAKEN BY SPECIALTY SUBCONTRACTORS SPECIALIZING IN SUCH SYSTEMS AND HAVING EXPERIENCE IN DESIGNING AND INSTALLING SUCH SYSTEMS UNDER SIMILAR CONDITIONS.
THE SPECIALTY SUBCONTRACTORS SHALL FURNISH EVIDENCE OF THE SUCCESSFUL DESIGN AND INSTALLATION OF
SIMILAR SYSTEMS COVERING A FIVE YEAR PERIOD.
6. RESPONSIBILITY FOR THE ENGINEERING, DESIGN AND IMPLEMENTATION OF ANY SHEETING, SHORING OR BRACING SYSTEMS, INCLUDING ALL APPURTENANCES SUCH AS TIEBACKS, RESTS SOLELY WITH THE CONTRACTOR AND HIS
ENGINEER.
CONSTRUCTION
1. INLET CHAMBER IS INTENDED TO BE CONSTRUCTED PRIOR TO TIE-IN DEMOLITION OF WALL AND BOTTOM SLAB OF
INTERCEPTING CHAMBER.
2. ANY EXCAVATIONS BELOW EXISTING BOTTOM OF INTERCEPTING CHAMBER MUST BE OBSERVED AND APPROVED BY
INSPECTING GEOTECHNICAL ENGINEER.
3. IT IS ANTICIPATED THAT THE EXISTING INTERCEPTING CHAMBER IS CONSTRUCTED ON BEDROCK. INSPECTING
GEOTECHNICAL ENGINEER MUST REVIEW AND APPROVE BEDROCK STABILITY TO VERIFY EXCAVATION CAN EXTEND
BELOW BOTTOM OF EXISTING FOUNDATION WITHOUT UNDERPINNING OR SHORING ACTIVITIES.
4. INLET CHAMBER IS DESIGNED TO SUPPORT PUMP STATION SIDE WALL AND SLAB TRIBUTARY AREA BETWEEN CENTER WALL AND PUMP STATION SIDE WALL OF INTERCEPTING CHAMBER. DOWELS MUST BE INSTALLED AND ALL CONCRETE
MUST REACH IT'S 28-DAY STRENGTH PRIOR TO DEMOLITION ACTIVITIES.
5. EXCAVATION UNDER INTERCEPTING CHAMBER SLAB MUST BE OBSERVED AND APPROVED BY INSPECTING GEOTECHNICAL ENGINEER. UNDERPINNING MAY BE REQUIRED AT BOTTOM SLAB DURING EXCAVATION.
6. CONTRACTOR SHALL ENSURE THAT EXISTING MILL CREEK INTERCEPTOR REMAINS STABLE.
NO. DATE APPD DESCRIPTION
1 08/03/26 MP ADDENDUM#01 2 0 2 4 6
3/8" =1' - 0"
FT
2' - 0"
EL. -17.40'
EL. -9.40'
EL. 15.50'
EL. -21.40'
TOP OF SLAB
TOP OF OPENING
BOTT OF OPENING
TOP OF SLAB
CONSTRUCTION JOINT
W/ WATERSTOP (TYP)
CONCRETE WALL
(TYP)
OPENING SHALL HAVE
(3) #8 AT BOTTOM
WITH HOOKED IN VERT
BARS
4 1/2"
S34
SIM
9 1/2"
20 1/2"
30 x 18 CONCRETE BEAM
PARTIALLY INTEGRAL
WITH WALL WITH (5) #6
TOP AND BOTTOM, (2) #6
SIDE AND #4 TIES @ 12"
ON CENTER. SEE TYPICAL
DETAIL FOR H-20 HATCH
OPENING AT BEARING
LEDGE
SEE TYPICAL DETAIL H-20
HATCH OPENING AT
BEARING LEDGE
24" CONC WALL
WITH #8@12"
VERT AND
HORIZ REINF AS
FOLLOWS
BOT 1/3 - #8@6"
MID 1/3 - #8@8"
TOP 1/3 - #8@12"
S29A
S21
S29
2' - 0"
4' - 6"
2' - 0"
4' - 10 1/4"
1' - 0"
7' - 2 1/4"
2' - 0"
EL. -21.40'
EL. -17.40'
EL. -9.45'
EL. 15.50'
5' - 0"
1' - 0" 1' - 2 1/4"
TOP OF OPENING
BOTT OF OPENING
TOP OF SLAB
TOP OF SLAB
CONSTRUCTION JOINT
W/ WATERSTOP (TYP)
CONCRETE
SLAB (TYP)
HATCH OPENING
(SEE ARCH) (TYP)
CONCRETE SLAB
(SEE PLAN) (TYP)
S34
24" CONC WALL
WITH #8@12" VERT
AND
HORIZ REINF AS
FOLLOWS
BOT 1/3 - #8@6"
MID 1/3 - #8@8"
TOP 1/3 - #8@12"
12" CONC WALL
WITH #8@12" VERT
(HOOK IN VERT
BARS AT TOP AND
BOTTOM OF
OPENING) AND
HORIZ REINF AS
FOLLOWS
BOT 1/3 - #8@6"
MID 1/3 - #8@8"
TOP 1/3 - #8@12"
S29
S29
S29
6' - 0"
EL. -6.50'
TOP OF OPENING
EL. -10.25'
BOTT OF EXST SLAB
± (VIF)
CONCRETE BEAM BY
OTHERS (NIC)
APPROX EXTENTS OF
EXST FOUNDATION TO
BE DEMOLISHED
EXST MILL CREEK
INTERCEPTOR
(SEE CIVIL)
EXST CONCRETE
SLAB TO REMAIN (VIF)
EXST REMOVABLE
PRECAST PLANKS TO
REMAIN (VIF)
S35
STOPLOG BY OTHERS (NIC)
CONCRETE BEAM BY
OTHERS (NIC)
S30
SIM
CONTINUATION OF
INLET CHAMBER
BEYOND
S29A
S28
EL. -17.40'
1' - 6"
" EL. -1.75'
1' - 8" ± (VIF)
20' - 0" ± (VIF)
1' - 8" ± (VIF)
M
IN
EL. -6.50'
24" CONC WALL
WITH #8@12"
VERT AND
HORIZ REINF AS
FOLLOWS
BOT 1/3 - #8@6"
MID 1/3 - #8@8"
TOP 1/3 - #8@12"
CONCRETE BEAM BY
OTHERS (NIC)
EXST CONCRETE SLAB
TO REMAIN (VIF)
EXST CONCRETE
WALL TO REMAIN
(TYP) (VIF)
EXST CONCRETE
FOUNDATION TO
REMAIN (TYP)
(VIF)
EXST CAST-IN
W-BEAM TO
REMAIN (VIF)
EXST CONCRETE
FOUNDATION BEYOND
TO REMAIN (TYP) (VIF)
TOP OF OPENING
1' - 8"
TOP OF OPENING
BOTT OF OPENING
CONDUIT INVERT
BOTT OF OPENING
TOP OF FOUNDATION
ASSUMED BEDROCK
FOUNDATION
V
IF
OPENING
SHALL HAVE
(3) #8 AND
HOOKED IN
VERT BARS
EL. -8.84'
S35
SIM
/9 S29SEE
± (VIF)
EL. -14.50'
EL. -17.90'
S29A
S29A
S29A
SIM
S34
SIM
S29
S29
1' - 0" ± (VIF) CONCRETE RIM BY
OTHERS (NIC)
EXST MILL CREEK
INTERCEPTOR
BEYOND (SEE…