Bid_#2027-10_Liberty_Trail_Specifications.pdf
PDF 5 MB Posted
- Attached to
- Liberty Trail Resurfacing Project
- Solicitation number
- Bid # 2027-10
- Issued by
- Mclean County, Illinois
About this file
This is a Scope of Work and Special Provisions document for Bid #2027-10, the Liberty Trail Resurfacing Project, issued by the City of Bloomington, Illinois Parks and Recreation Department. The project involves milling and replacing approximately 60,000 square feet of the Liberty Trail (6,000 linear feet by 10 feet wide) located between 1200 S Hershey and 1001 Streid Drive in Bloomington, Illinois, as well as 4,600 square feet of entrance trail. Work includes milling and replacing asphalt to a depth of 3 inches with a slope not exceeding 2 percent to the south, replacing detectable warnings and sidewalks at intersections, repairing and seeding soil 2 feet from the trail edge, and replacing wooden bollards with 52-inch yellow polyethylene bollards. The project also encompasses work on one pedestrian bridge (28 feet by 20 feet) over a spillway, coordination around one storm sewer manhole and one potable water shut-off valve within the work area, and tree canopy clearance as needed. All major work must be completed by October 23, 2026, with ten additional working days permitted for minor items. Sealed bids were due August 26, 2026, via the City's e-Procurement Portal.
The contract is governed by the IDOT Standard Specifications for Road and Bridge Construction (January 1, 2022), supplemented by City of Bloomington standards, and is subject to the Illinois Prevailing Wage Act. Payment terms include progress payments with ten percent retention on the first 50 percent of completed work and potential reduction to five percent retention thereafter at the Engineer's discretion. The contractor is responsible for all utility locating through J.U.L.I.E., storm water drainage maintenance, debris removal within 24 hours, and compliance with Americans with Disabilities Act and Public Rights of Way Accessibility Guidelines requirements. The City reserves the right to add or delete streets and modify quantities throughout the contract period. A project labor agreement may be required if the project exceeds $50,000, subject to prevailing wage standards and without mandatory union membership requirements. Contact for project management is Derri Kerrick, Parks and Recreation Project Manager, at 309-275-1633 or dkerrick@cityblm.org.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Liberty_Trail_Resurfacing_Project_(Addendum_#1_Revision).pdf | ||
| Liberty_Trail_Resurfacing_Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Liberty Trail Resurfacing
Bid #2027-10
Specifications/Scope of Work
Location: Constitution Trail (Liberty Trail)
1200 S Hershey to 1001 Streid Dr Bloomington IL, 61701
1. Mill and replace 60,000 SF of Liberty Trail (6,000 LF x 10' W)
2. Mill and replace 4,600 SF of entrance trail (460 LF x 10' W)
3. Mill and replace to a depth of 3” sloping no more than 2% to the South
4. Liberty Trail has (1) pedestrian bridge, 28’ x 20’, over the spillway between 3104 and 3106 Sable Oaks Rd
5. Liberty Trail has (1) storm sewer manhole and (1) potable water shut off within the area to be milled and replaced.
6. Replace detectable warnings, and sidewalks at intersections per specifications.
7. Repair /grade / seed all soil 2’ out from trail edge.
8. Replace all wooden trail bollards with 52” yellow polyethylene bollards. Bollards
& Bollard Posts - Grainger Industrial Supply
City to clear any tree canopy that will impede with trail replacement. Contractor to show
City which trees will impede.
https://www.grainger.com/category/security/access-barriers-crowd-control/bollards-bollard-covers/bollards?attrs=Product+Type%7CBounce-Back&filters=attrs&searchQuery=collapsable+plastic+bollard&sst=4&tv_optin=true https://www.grainger.com/category/security/access-barriers-crowd-control/bollards-bollard-covers/bollards?attrs=Product+Type%7CBounce-Back&filters=attrs&searchQuery=collapsable+plastic+bollard&sst=4&tv_optin=true
REVISED 04/11/2025SPECIAL PROVISIONS
FY 2026 – GENERAL RESURFACING
City Project 50-01-53001-26-00
TABLE OF CONTENTS OF SPECIAL PROVISIONS
Note: This Table of Contents has been prepared for the convenience of those using this contract with the sole express purpose of locating quickly the information contained herein; and no claims shall arise due to omissions, additions, deletions, etc., as this
Table of Contents shall not be considered part of the contract.
TABLE OF CONTENTS
CONTRACT
DESCRIPTION OF PROJECT
ADDITION OR DELETION OF STREETS & QUANTITIES
PARTIAL PAYMENTS
LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC
PROJECT COMPLETION DATE PLUS WORKING DAYS
COOPERATION BETWEEN CONTRACTORS
RESPONSIBILITIES OF THE CONTRACTOR
STATUS AND LOCATION OF UTILITIES
ABANDONED UTILITIES
SALVAGE MATERIALS
REPAIR AND PREPARATION OF BASE COURSE
EROSION CONTROL
REMOVAL OF UNSUITABLE MATERIALS
EARTH EXCAVATION
LONGITUDINAL JOINT SEALANT
TEMPORARY RAMP
HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX ASPHALT,
N80
HOT-MIX ASPHALT SURFACE COURSE, MIX C, N50
HOT-MIX ASPHALT SURFACE COURSE, MIX C, N50 - TRAIL
SAND MIX, N50, IL-4.75
PAVING SEQUENCE OF OPERATIONS
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8”
PORTLAND CEMENT CONCRETE SIDEWALK, 4”
PORTLAND CEMENT CONCRETE SIDEWALK, 6”
PORTLAND CEMENT CONCRETE SIDEWALK, 6” - TRAIL
PORTLAND CEMENT CONCRETE SIDEWALK, 8”
PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL
PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL - TRAIL
DETECTABLE WARNINGS
DETECTABLE WARNINGS - TRAIL
HOT-MIX ASPHALT SURFACE REMOVAL, 2 ½”
HOT-MIX ASPHALT SURFACE REMOVAL, 3” REVISED 04/11/2025
SIDEWALK REMOVAL
SIDEWALK REMOVAL - TRAIL
WORK ZONE PAVEMENT MARKINGS
TOPSOIL PLACEMENT AND SEEDING
TOPSOIL PLACEMENT AND SEEDING, SPECIAL (SMALL AREA)
TOPSOIL PLACEMENT AND SEEDING, SPECIAL (LARGE AREA)
SIDEWALK REINFORCEMENT, SPECIAL
MANHOLE TO BE ADJUSTED, SPECIAL
INLET TO BE ADJUSTED, SPECIAL
FRAME AND GRATE, TYPE 3
FRAME AND GRATE, TYPE 50
INLET TO BE RECONSTRUCTED, SPECIAL
NEW FRAME AND CLOSED LID (FOR VALVE BOX)
VALVE BOX TO BE ADJUSTED, SPECIAL
STORM SEWER, SPECIAL
COMBINATION CURB AND GUTTER REMOVAL (SPOT REMOVE), SPECIAL
COMBINATION CURB AND GUTTER REMOVAL (SPOT REMOVE), SPECIAL - TRAIL
COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 (SPOT
PLACEMENT), SPECIAL
COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 (SPOT
PLACEMENT), SPECIAL - TRAIL
BARRIER YARD CURB, SPECIAL
BARRIER YARD CURB, SPECIAL - TRAIL
PORTLAND CEMENT CONCRETE SURFACE REMOVAL, 2 ½”
CONCRETE FOUNDATION, TYPE A, SPECIAL REVISED 04/11/2025
TRAFFIC CONTROL COMPLETE
TRAFFIC CONTROL COMPLETE - TRAIL
CONTINGENCY
CONTINGENCY - TRAIL
TRAFFIC CONTROL AUTHORIZATION REQUEST
SPECIAL PROVISIONS
FY 2026 – GENERAL RESURFACING
City Project 50-01-53001-26-00
CONTRACT
This contract shall be administered, and work shall be completed according to these Special Provisions, the Illinois Department of Transportation (IDOT)
“Standard Specifications for Road and Bridge Construction”, and other referenced specifications.
Coordination of contract documents shall be according to Article 105.05. The following table supplements Article 105.05 and states the version to be used:
Hierarchy of the Contract Documents
Priority # Specification Title Version Published By
1 Special Provisions Contract COB
2 Plans (see notes in Article 105.05) Contract COB
3 Recurring Special Provisions January 1, IDOT
4 Supplemental Specifications January 1, IDOT
5 Standard Specifications for Road and Bridge Construction (Standard Specifications)
January 1, IDOT
6 City of Bloomington Manual of Practice for the Design of Public Improvements
July 25, COB
7 Illinois Supplement to the National Manual on Uniform Traffic Control Devices
November
IDOT
8 Manual on Uniform Traffic Control Devices (MUTCD)
December 2023 w/ Revisions
FHWA
9 Manual of Test Procedures of Materials
December 1, 2024
IDOT
Final clarification of any conflict shall be as directed by the City Engineer.
Within these Special Provisions, references to Sections or Articles 101-1106 refer to the IDOT Standard and Supplemental Specifications (4 and 5 in the above table).
DESCRIPTION OF PROJECT
This work consists primarily of the removal of existing pavement surfaces, the placement of asphalt overlay at various locations as shown on the plans, the removal and replacement of curb and gutter and the removal and replacement of sidewalk and sidewalk ramps. The work shall include all labor, materials, tools, and equipment necessary for the proper execution and completion of the work as shown in the plans and as specified. It shall also include all work not specifically mentioned, but which is reasonably and properly inferable and necessary for the completion of the work.
Plan sheets provided are to be used as a guide. Work to be performed on the City Streets will be marked with white or pink paint by a representative from the City.
The paint marks and/or directives given by the Engineer will supersede information provided on plan sheets contained in this contract.
All locations are subject to change within the construction area, and the Contractor shall not proceed at any location without first receiving permission from the Engineer. Locations may be modified, added, or subtracted, throughout the contract period.
ADDITION OR DELETION OF STREETS & QUANTITIES
The City reserves the right to add or remove streets from the list and increase, decrease, add, or delete quantities and pay items in this contract. Any such additions may include an extension of time to the Contractor to complete the work.
PARTIAL PAYMENTS
Add the following after the first paragraph of Article 109.07(a) of the Standard
Specifications:
“The City will deduct from the amount so determined for the first 50 percent of the completed work a sum of ten percent to be retained until after the completion of the entire work to the satisfaction of the Engineer. After 50 percent or more of the work is completed, the Engineer may, at his/her discretion, certify the remaining partial payments with a reduction in retention for the partial payments or without any further retention, provided that satisfactory progress is being made, and provided that the amount retained is not less than five percent of the total adjusted contract price.
When the principal items of the work have been satisfactorily completed, a semi-final estimate may be made with the consent of the surety. Payment to the Contractor under such an estimate shall not exceed 90 percent of the amount retained after making partial payments, but in no event shall the amount retained after making the semi-final payment be less than one percent of the adjusted contract price, nor less than $500.00.”
LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC
Add the following after the first paragraph of Article 107.09:
Construction work shall be planned and executed to minimize inconvenience to residents and businesses regarding access to driveways and alleys. Prior notice of at least 48 hours shall be given to residents and businesses prior to removal of access to entrances, driveways, and alleys.
On-street-parking removal creates a hardship for residents and businesses. The contractor shall plan and execute the work to be done so that on street parking removal is no more than a total of three weeks in one area. Parking removal time span starts when “no parking” signs are installed prior to milling a street and ends when the signs have been removed after the final layer of asphalt has been applied.
Pedestrian access shall be maintained in each direction (east/west and north/south) at each intersection. This will require the curb ramp construction to be staggered or temporary curb ramps be built.
PROJECT COMPLETION DATE PLUS WORKING DAYS
All major items of work shall be completed on or before October 23, 2026. After
October 23, 2026, the Contractor shall be allowed ten (10) working days to complete minor work items. The Contractor is advised that multiple crews may be needed to complete the work by this deadline. All street resurfacing shall be complete by October 23, 2026, and all travel lanes shall be open to traffic by that date. Pavement markings, clean-up, and other minor work items as determined by the Engineer may be completed after October 23, 2026.
The attention of each CONTRACTOR is directed to Article 108.09 of the
STANDARD SPECIFICATIONS, which indicates the schedule of deductions for overruns on the Contract time. Article 108.09 shall apply in the event that the
CONTRACTOR fails to complete the project by October 23, 2026.
COOPERATION BETWEEN CONTRACTORS
The Contractor’s attention is called to Article 105.08 of the STANDARD
SPECIFICATIONS.
RESPONSIBILITIES OF THE CONTRACTOR
The Contractor shall so arrange the work site(s) such that no damage will result to the pavements, curbs, gutters, parkway, driveways, adjoining buildings, and adjoining lawns. Equipment used by the Contractor must be able to perform some excavations with precision, using a mechanical excavator (and not a skid steer) operated by a trained equipment operator. The Contractor shall be solely responsible for and shall pay all costs associated with damages caused by the operations of the Contractor. The Contractor shall completely remove and dispose of all debris removed in preparation for construction of sidewalks within 24 hours.
The Contractor shall be responsible for maintaining storm water drainage through the work site through all phases of the work, including the final product.
The work by the contractor shall follow all applicable guidelines of the Public Rights Of Way Accessibility Guidelines (PROWAG) and Americans with Disabilities Act requirements.
Should the contractor fail to comply with the above requirements, the City shall cause the required work to be performed and deduct the actual costs of same from amounts due the Contractor.
STATUS AND LOCATION OF UTILITIES
The Contractor shall be responsible for any damage caused by his/her work. It shall be the Contractor’s responsibility to determine the location of existing utilities by calling J.U.L.I.E. at least 48 hours prior to any excavation.
ABANDONED UTILITIES
Description
This work shall consist of removing and properly disposing of any abandoned utilities encountered during construction which interfere with the proposed improvements.
General
When an abandoned utility which interferes with the proposed improvements is encountered, the Contractor shall be responsible for coordination with the owner of the utility according to Section 107 and the following. The Contractor shall confirm with the owner that the encountered facility is abandoned and gain permission to remove and plug the portions necessary prior to completing this work.
Construction Requirements
Removal and disposal of the abandoned utilities shall be in accordance with the requirements of the utility owner and all other applicable laws and regulations. If only a section of an abandoned utility requires removal, the open ends of the sections left in place shall be plugged with Class SI Concrete to the satisfaction of the engineer.
Revise the last sentence of the first paragraph of Article 107.06 to read:
The Contractor shall, if ordered by the Engineer in writing, make, in a manner approved by the Engineer, all necessary repairs to such openings, and such necessary work ordered by the Engineer will not be paid for separately, but shall be considered as included in the unit bid prices of the contract, and no additional compensation will be allowed.
Revise the last sentence of the first paragraph of Article 107.09 to read:
The cost of all materials required and all labor necessary to comply with the above Provisions will not be paid for separately but shall be considered as included in the unit bid prices of the contract, and no additional compensation will be allowed.
Modify the fourth paragraph of Article 107.19 to read:
Should the disposition of waste material require special procedures by certified personnel, the Department will make arrangements with qualified persons to dispose of the material.
Modify the last paragraph of Article 107.19 to read:
When the Contractor encounters unexpected regulated substances due to the presence of utilities in unanticipated locations, the provisions of Article 107.40 shall apply; otherwise, if the Engineer does not direct a resumption of operations, the provisions of Article 108.07 shall apply. When the Contractor performs necessary work required to dispose of these materials, such work shall be considered as included in the unit bid prices of the contract, and no additional
Revise the last sentence of the sixth paragraph of Article 107.39 to read:
If the utility owner does not field locate their facilities to the satisfaction of the
Engineer, the Engineer will authorize the Contractor in writing to proceed to locate the facilities in the most economical and reasonable manner, subject to the approval of the Engineer. The work shall be considered as included in the unit bid prices of the contract, and no additional compensation will be allowed.
Modify Article 107.40(b) to read:
Compensation. Compensation will not be allowed for delays, inconveniences, or damages sustained by the Contractor from conflicts with facilities. All such work will not be paid for separately but shall be considered as included in the unit bid prices of the contract, and no additional compensation will be allowed.
Delete Article 107.40(c) in its entirety.
Basis of Payment
The cost of this work will not be paid for separately but shall be considered as included in the unit bid prices of the contract, and no additional compensation will be allowed.
SALVAGE MATERIALS
Description
This work shall consist of salvaging materials that are removed when directed by the Engineer.
General
All salvage materials shall become the property of the City of Bloomington, and when so directed by the Engineer, the Contractor shall haul salvaged materials to the City Yards near 401 S. East Street, or a City property to be determined by the
Engineer.
All whole bricks extracted in the process of any excavation shall be separated from the waste debris, shall have loose material removed, and shall be transported to Rivian Motorway south of Six Points Road near Heartland Hills
Subdivision or other location as directed by the Engineer. Any bricks extracted shall be delivered to the storage site the same day of the excavation. The City
Engineer or his designated representative will open the gate at the north end of
Mitsubishi Motorway for deliveries.
The cost of this work will not be paid for separately but shall be considered as included in the unit bid prices of the contract, and no additional compensation will be allowed.
REPAIR AND PREPARATION OF BASE COURSE
It is the Contractor's obligation to prepare existing street surfaces prior to resurfacing according to Article 358. When street sweeping equipment is used, the watering device shall be turned on when directed by the City Engineer. This work will not be paid for separately but shall be considered incidental to the contract.
EROSION CONTROL
Erosion control measures shall be constructed, maintained, removed, and disposed of according to Article 280, or as directed by the City Engineer. At a minimum, inlet filters will be required in all structures with open lids within or immediately downstream of the project area. Any control measures and work necessary per the City Engineer to provide erosion control will not be measured separately but shall be incidental to the contract.
REMOVAL OF UNSUITABLE MATERIALS
Revise the first sentence of the first paragraph of Article 202.03 to read:
“Suitable excavated materials, including material from sewer trenches or other underground construction, which is suitable, shall not be wasted without permission of the Engineer.
Revise the first sentence of the last paragraph of Article 202.03 to read:
“All unstable or unsuitable material, including material from sewer trenches or other underground construction, which is unstable or unsuitable, shall be excavated or removed and replaced with material as directed by the Engineer”
EARTH EXCAVATION
Description
In general accordance with Section 202, this item shall consist of removal of earth, aggregate and miscellaneous landscape items (i.e., timber, bricks, blocks, mulch) at select locations for installation of driveway pavement, sidewalk, curb and gutter, and retaining walls where those items do not currently exist.
Method of Measurement
Replace Article 202.07 with the following:
Measurement for EARTH EXCAVATION shall be in square feet.
Measurement of EARTH EXCAVATION outside of newly proposed sidewalk or ramp locations shall not be measured.
All other EARTH EXCAVATION, including REMOVAL OF UNSUITABLE MATERIALS, shall not be measured separately but shall be incidental to the contract.
Replace Article 202.08 with the following:
This work shall be paid for at the Contract Unit Price per square foot for EARTH EXCAVATION measured in place, and shall include all material, equipment, and labor to complete this work.
LONGITUDINAL JOINT SEALANT
Effective: March 1, 2016
Revised: March 31, 2017
Longitudinal joint sealant (LJS) will be accepted according to the current Bureau of Materials and Physical Research Policy Memorandum, “Performance Graded
Asphalt Binder Acceptance Procedure” with the following exceptions. Articles
3.1.9 and 3.4.1.4 of the policy memorandum will be excluded.
Revise Article 406.06(h)(2) of the Standard Specifications to read:
(2) Longitudinal Joints.
When the use of longitudinal joint sealant (LJS) is specified, it shall be applied below the surface course. The surface to which the LJS is applied shall be dry and cleaned of all dust, debris, and any substances that will prevent the LJS from adhering. Cleaning shall be accomplished by means of a sweeper/vacuum truck, power broom, air compressor or by hand. The LJS may be placed before or after the tack or prime coat. When placed after the tack or prime coat, the tack or prime shall be fully cured prior to placement of the LJS.
LJS
Center Line or Lane to Lane
Existing Surface
HMA lift being placed
Longitudinal Joint W/ W/
The LJS application shall be centered under the joint of the HMA lift being constructed within 2 in. (50 mm) of the joint.
A one-quart sample shall be taken from the pressure distributor or melting kettle at the jobsite once for each contract and sent to the Central Bureau of Materials.
The LJS shall be applied in a single pass with a pressure distributor, melter kettle, or hand applied from a roll for HMA lifts up to 2 in. (50 mm) in thickness. The LJS shall be applied in two passes for HMA lifts between 2 and 4 in. (50 and 100 mm) in thickness. At the time of installation, the pavement surface temperature and the ambient temperature shall be a minimum of 40 °F (4 °C) and rising.
The LJS shall be applied at a width of not less than or greater than 1 ½ in. (38 mm) of the width specified. If the LJS flows more than 2 in. (50 mm) from the initial placement width, LJS placement shall stop, and remedial action shall be taken.
When starting another run of LJS placement, suitable release paper shall be placed over the previous application of LJS to prevent doubling up of thickness of LJS.
The width and minimum application rate shall be according to the following table:
LJS Application Rate Table
Overlay
Thickness
in. (mm)
LJS Width
“W”
in. (mm)
Application
Rate 1/ lb/ft (kg/m)
HMA Mixtures 2/
3/4 (19) 18 (450) 0.88 (1.31)
1 (25) 18 (450) 1.15 (1.71)
1 1/4 (32) 18 (450) 1.31 (1.95)
1 1/2 (38) 18 (450) 1.47 (2.19)
1 3/4 (44) 18 (450) 1.63 (2.43)
2 (50) 18 (450) 1.80 (2.68)
2 1/4 (60) 18 (450) 1.96 (2.92)
2 1/2 (63) 18 (450) 2.12 (3.16)
2 3/4 (70) 18 (450) 2.29 (3.41)
3 (75) 18 (450) 2.45 (3.65)
3 1/4 (83) 18 (450) 2.61 (3.89)
3 1/2 (90) 18 (450) 2.78 (4.14)
3 3/4 (95) 18 (450) 2.94 (4.38)
4 (100) 18 (450) 3.10 (4.62)
SMA Mixtures 2/
1 1/2 (38) 18 (450) 1.26 (1.88)
1 3/4 (44) 18 (450) 1.38 (2.06)
2 (50) 18 (450) 1.51 (2.25)
1/ The application rate has a surface demand for liquid included within it. The nominal thickness of the LJS may taper from the center of the application to a lesser thickness on the edge of the application. The width and weight/foot (mass/meter) shall be maintained.
2/ In the event of a joint between an SMA and HMA mixture, the SMA application rate will be used.
The LJS shall be suitable for construction traffic to drive on without pickup or tracking of the LJS within 30 minutes of placement. If pickup or tracking occurs, LJS placement shall stop, and damaged areas shall be repaired.
Prior to start of paving of pavement course, ensure the paver end plate and grade control device is adequately raised above the finished height of the LJS.
The LJS shall not flush to the final surface of the HMA pavement.”
Add the following paragraph after the second paragraph of Article 406.13(b) of the
Standard Specifications.
“Bituminous material for longitudinal joint sealant will be measured for payment in place in feet (meters).”
Add the following paragraph after the second paragraph of Article 406.14 of the
Standard Specifications.
“Longitudinal joint sealant will be paid for at the contract unit price per foot (meter) for LONGITUDINAL JOINT SEALANT.”
When the LJS is specified, the longitudinal joint density testing for QC/QA, QCP, or PFP will not be required on the joint(s) with the LJS, and the pay adjustments will not be applied.
TEMPORARY RAMP
Temporary Ramps may be used at butt joints, entrances, sidewalk ramps, and other places where smooth access is desired. A preformed temporary ramp may be requested by the engineer at locations where pedestrian traffic is present. All temporary ramps shall be placed according to Article 406.08.
Basis of Payment
This work will be measured in place and shall be paid for at the contract unit price per foot for TEMPORARY RAMP.
HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX
ASPHALT, N80
HOT-MIX ASPHALT SURFACE COURSE, MIX C, N50
HOT-MIX ASPHALT SURFACE COURSE, MIX C, N50 - TRAIL
SAND MIX, N50, IL-4.75
General
This work shall consist of constructing hot-mix asphalt (HMA) binder and/or surface course on a prepared base in accordance with Section 406.
Add the following to the end of 1st Paragraph of Article 1102.03:
“The equipment used to place HMA binder and surface courses on streets shall be equipped with a variable length screed extender which is capable of breaking grade at the edge of pavement (flag of the gutter pan) from -14% (8 degrees below the horizontal), to +2% (1 degree above the horizontal).”
Add the following to Article 406.03:
“(n) Vacuum Sweeper. The vacuum sweeper shall have a minimum sweeping path of 52 in. (1.3 m) and a minimum blower rating of 20,000 cu ft per minute.”
Add the following at the end of the first paragraph of Article 406.05(a):
“All joints and potholes shall be cleaned of all loose material. Repair and preparation of the base shall be completed according to Section 358.”
Revise the eleventh paragraph of Article 406.14 to read:
“If provided as a payment item, the preparation of base will be measured and paid for at locations as directed by the Engineer and as specified in Section 358. The cost of preparation of base will not be paid separately but shall be considered as included in the unit prices for the HMA, and no additional compensation will be allowed.”
Mixture Requirements
Mixture Use
Poly SMA Surface (1.50” to 1.75”)
Binder Course
Surface Course
AC/PG PG 76-22 PG 64-22 PG 64-22
RAP % (Max) 0 (None) 10 10
Design Air Voids
4.0% @ Ndes=80
4.0% @ Ndes=50
4.0% @ Ndes=50
Mix Comp (Gradation) IL 9.5 IL 9.5 IL 9.5
Friction Aggregate Mix D Mix C Mix C
Design Unit Weight
112 lb/sq yd-in
112 lb/sq yd-in
112 lb/sq yd-in
Mixture Use Sand Mix
AC/PG
SBS PG 70-
RAP % (Max) 10
Design Air Voids
4.0% @ Ndes=50
Mix Comp (Gradation) IL 4.75
Friction Aggregate NA
Design Unit Weight
114 lb/sq yd-in
Basis of Payment
This work shall be paid for at the Contract Unit Price per ton as delivered and placed within daily yield checks for HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50, POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX
ASPHALT, N80, HOT-MIX ASPHALT SURFACE COURSE, MIX C, N50, HOT-MIX
ASPHALT SURFACE COURSE, MIX C, N50 – TRAIL, and SAND MIX, N50, IL- 4.75, and shall include all material, equipment and labor to complete this work.
PAVING SEQUENCE OF OPERATIONS
All paving operations shall be sequenced to ensure continuous paver movement.
Unless approved in writing prior to operations by the City Engineer, the street mainline shall be paved through any intersection, side street return, bump out or similar without stopping. Any paving operation of side street returns, bump outs or similar will be completed separately after the mainline pavement operation has been completed. In cases where two intersecting streets are scheduled to be resurfaced, the City Engineer will determine which street is designated as the mainline.
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8”
PORTLAND CEMENT CONCRETE SIDEWALK, 4”
PORTLAND CEMENT CONCRETE SIDEWALK, 6”
PORTLAND CEMENT CONCRETE SIDEWALK, 6” - TRAIL
PORTLAND CEMENT CONCRETE SIDEWALK, 8”
PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL
PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL - TRAIL
DETECTABLE WARNINGS
DETECTABLE WARNINGS - TRAIL
Materials
Materials shall meet the requirements of the IDOT Standard Specifications or as modified by these special provisions. Sidewalk shall be 4" thick except in certain instances. In certain areas, including locations where sidewalk crosses commercial driveways and alleys, the Engineer may require 8” PCC. All sidewalk ramps at street intersections, plus the accompanying sidewalk level landings where needed, shall be 6” PCC. The level landing is the sidewalk area abutting a ramp or within the ramp that is required to have a maximum cross-slope of 2.1 percent in the vertical and horizontal directions.
Width of the new sidewalk shall be equal to width of sidewalk being replaced unless specified by the Engineer.
High-Early-Strength Portland Cement Concrete Sidewalk of the thickness specified shall be used only where directed by the Engineer to minimize the time a sidewalk or driveway entrance is closed. The materials for High-Early-Strength PCC Sidewalk of the thickness specified shall meet the requirements for CLASS “PP1,” “PP2,” “PP3,” or “PP4” Concrete as specified in Section 1020 of the IDOT Standard Specifications as directed by the Engineer.
PCC Sidewalks, PCC Ramps, and Detectable Warnings, shall all be in compliance with Section 424 of the Standard Specifications.
Add the following after the last paragraph of Article 424.04:
Approved material for select granular backfill for fill under sidewalks shall be compacted CA-6, CM-11 or other material as approved by the Engineer. Pea gravel shall not be allowed as material for select granular backfill.
Add the following after the last paragraph of Article 424.06
The Contractor shall use white pigmented curing compound as the curing method, unless otherwise directed by the Engineer or prohibited by Article
1020.13. The cost of this work will not be paid for separately but shall be considered as included in the unit bid prices of the contract, and no additional
When directed by the Engineer, the Contractor shall apply SILENCURE SRT or a similar substance instead of standard curing compound. In such instances, the Contractor shall document the cost difference between standard curing compound and the alternative substance being used. The City will pay additional material cost only, if any, between standard curing compound and the alternative substance, such as SILENCURE SRT. The Contractor must provide documentation to substantiate the additional material cost.
Addition of water to a concrete batch while it is still in a ready-mix truck shall be minimized and monitored by the Contractor. The Contractor must ensure the water content does not exceed the maximum allowable for the mix design. The Contractor shall not begin pouring until the forms and concrete mix are approved by the Engineer.
The use of excess water to aid in finishing the concrete surface is prohibited.
Splattering water onto the concrete (“baptizing” or “blessing”) with a brush or by other means is prohibited. No water shall be added to or sprayed upon or sprinkled upon the concrete or concrete surface once it has been poured unless the Contractor uses an approved mechanical misting device.
Sidewalks with monolithically poured curb/wall shall have the curb/wall delineated from the walk with a troweled contraction joint parallel to and six (6) inches± from the face of curb/wall.
Unless otherwise directed by the Engineer, longitudinal contraction joints shall match adjacent existing joints and be spaced no wider than 7.5 feet.
Revise Article 424.07(a) to read:
Expansion joints shall be placed between the sidewalk and all structures such as light poles, traffic signal poles, traffic poles, subway columns, and adjacent buildings or other permanent structures which extend through the sidewalk.
Insert the following after Article 424.07(c):
(d) Expansion joints adjacent to any building or permanent structure shall consist of DECK-O-FOAM expansion joint filler or approved equal with a semi self-leveling caulk seal or approved equal, which shall be considered as incidental to the contract.
Add the following to the beginning of Article 424.08:
All sidewalk at street intersections must have curb ramps according to Standard
424001, 424006, 424011, 424016, 424021, 424026, or 424031.
Revise the second paragraph of Article 424.08 to read:
Curb ramps and their accompanying level landings shall have a minimum thickness of six (6) inches.
The PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL and PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL – TRAIL pay items refer only to ramps leading to paved intersections and requiring detectable warnings. The level landing is the sidewalk area abutting the ramp or within the ramp in which the maximum cross slope is 2.1 percent in the vertical and horizontal directions.
Add the following to the end of Article 424.09:
The detectable warnings shall be as produced by Armor-Tile, or equal, and approved by the Engineer. Color shall be Federal Standard Color 22144. The cast in place units shall be installed in the concrete while it is plastic. All detectable warning locations shall be cast in place units unless otherwise directed by the Engineer. Replaceable cast in place units shall not be allowed.
Replace Article 424.12 with the following:
This work will be measured for payment in place and the area computed in square feet. Curb ramps and accompanying level landings will not be measured for payment as sidewalk but shall be computed for payment under the PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL and PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL - TRAIL pay items.
Measurement for PORTLAND CEMENT CONCRETE SIDEWALK of the thickness specified will be measured for payment in place and the area computed in square feet.
PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL and PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL - TRAIL will be measured for payment in place and the area computed in square feet. Ramp curbs, flares and level landings will be included in the area computed. The IDOT Standard Details included in the contract show the typical limits of the RAMP pay item. No deduction will be made for detectable warnings located within the ramp.
DETECTABLE WARNINGS and DETECTABLE WARNINGS - TRAIL will be measured for payment in place and the area computed in square feet. Earth excavation will be measured for payment in square feet.
Replace Article 424.13 with the following:
Except for ramps, accompanying flares, curb ramps, and level landings, this work shall be paid for at the Contract Unit Price per square foot for PORTLAND CEMENT CONCRETE SIDEWALK of the thickness specified, measured in place, and shall include all material, equipment, and labor to complete this work.
Ramps and accompanying flares, curb ramps and level landings shall be paid for at the Contract Unit Price per square foot as PORTLAND CEMENT CONCRETE SIDEWALK RAMP, 6”, SPECIAL and PORTLAND CEMENT CONCRETE
SIDEWALK RAMP, 6”, SPECIAL - TRAIL will be measured in place, and shall include all material, equipment and labor to complete this work.
DETECTABLE WARNINGS and DETECTABLE WARNINGS - TRAIL shall be paid for at the Contract Unit Price per square foot and shall include all material, equipment and labor to complete this work.
HOT-MIX ASPHALT SURFACE REMOVAL, 2 ½”
HOT-MIX ASPHALT SURFACE REMOVAL, 3”
Description This work shall consist of the removal of existing hot-mix asphalt surface and at locations as noted on the plan sheets and directed by the Engineer. The depth of removal shall be as shown on the plans, though field conditions may require variable depth removal to maintain proper profile and cross section slopes.
Removal of the hot-mix asphalt surface that has been placed over the existing gutter pan shall be measured and paid for at the contract unit price per square yard for HOT-MIX ASPHALT SURFACE REMOVAL, 2 ½” or HOT-MIX ASPHALT
SURFACE REMOVAL, 3”. Any extra labor, materials, or equipment necessary to remove material from the gutter pan shall be incidental to the contract.
Basis of Payment
This work will be paid for at the contract unit price per square yard for HOT-MIX ASPHALT SURFACE REMOVAL, 2 ½” or HOT-MIX ASPHALT SURFACE
REMOVAL, 3”.
REVISED 04/11/2025
SIDEWALK REMOVAL
SIDEWALK REMOVAL - TRAIL
General
Revise the 4th paragraph of Article 440.07(b):
Sidewalk removal, median removal and median removal partial depth will be measured for payment in place and the area computed in square feet.
If sidewalk is adjacent to a landscaped area, the Contractor shall place clean topsoil from outside the right of way and place grass seed, in accordance with Section 211 of Standard Specifications, along the former location of the forms.
The Contractor also shall regrade and place topsoil and seeding to repair ruts and other landscape disruption caused by construction. Class 1A seed mixture shall be used.
Basis of Payment
Topsoil placement and seeding within two (2) feet of the forms and in order to repair landscape disturbance that occurs during construction shall be incidental to the contract.
SIDEWALK REMOVAL and SIDEWALK REMOVAL – TRAIL will be measured for payment in place and the area computed in square feet.
WORK ZONE PAVEMENT MARKINGS
Work zone pavement markings will be according to applicable portions of Section 703 as modified herein.
Replace the second paragraph of Article 703.04 with the following:
The short-term pavement markings shall be removed and replaced with the required full standard pavement markings consisting of either temporary or permanent pavement marking as soon as possible. The contractor shall be responsible to replace or maintain the short-term pavement markings until permanent markings are in place at his own expense. Payment for short term pavement markings will conclude after the first application.
The contractor has the option of installing temporary pavement markings at his own expense. In the event the contractor chooses to install temporary pavement markings instead of short-term pavement markings, payment will be made as if short term pavement markings were installed.
Replace Article 703.06 with the following:
Method of Measurement. Short term pavement markings of a width of 4 inches will be measured for payment in feet in place and accepted. Lines of other widths will be adjusted proportional to the width of the line. For example, a 10-foot stop bar 24 inches wide will be calculated: 10x6=60 feet of payment.
Short term pavement marking removal will be measured in place pe r foot.
Temporary pavement markings and their removal will not be measured for payment.
Add the following after the third paragraph of Article 703.06:
Permanent pavement markings should be in place prior to a winter shutdown. If this is not accomplished, temporary pavement markings must be applied and maintained by the Contractor at his expense until permanent markings are applied.
Replace Article 703.07
This work will be paid for at the contract unit price per foot for SHORT TERM
PAVEMENT MARKING, 4 INCH.
Removal of short-term pavement markings will be paid for at the contract unit price per foot for SHORT TERM PAVEMENT MARKING REMOVAL.
No payment will be made for temporary pavement markings or their removal.
TOPSOIL PLACEMENT AND SEEDING
Description
This work shall be in general conformance with Sections 211 and 250 of the Standard Specifications and shall consist of topsoil placement and seeding within two (2) feet of the forms and/or in order to repair landscape disturbance.
General
After concrete has set, forms shall be removed in a timely manner. Concrete, asphalt, rocks, and all incidental materials shall be removed from the site. The site and topsoil material shall be free from rocks, sticks, weeds, brush, or stones larger than ½ inch in diameter, and other litter and waste products. As soon as practical and no more than four days after the sidewalk is completed, placement of topsoil and seeding should occur.
If sidewalk is adjacent to a landscaped area, the Contractor shall place clean topsoil from outside the right of way and place grass seed, in accordance with Section 211 of Standard Specifications, along the former location of the forms.
The Contractor also shall regrade and place topsoil and seeding to repair ruts and other landscape disruption caused by construction. Class 1A seed mixture shall be used.
Basis of Payment
Topsoil placement and seeding within two (2) feet of the forms and in order to repair landscape disturbance that occurs during construction shall be incidental to the contract.
TOPSOIL PLACEMENT AND SEEDING, SPECIAL (SMALL AREA)
TOPSOIL PLACEMENT AND SEEDING, SPECIAL (LARGE AREA)
Description
The work shall consist of landscape work not covered above under incidental topsoil placement and seeding. TOPSOIL PLACEMENT AND SEEDING, SPECIAL (SMALL AREA) and TOPSOIL PLACEMENT AND SEEDING (LARGE AREA) includes grading additional areas designated by the Engineer; supplying, preparing, and spreading clean topsoil to those areas; the application of seed;
and placement of erosion control blanket (straw mat). The site and topsoil shall be free from rocks, sticks, weeds, brush, or stones larger than ½ inch in diameter, and other litter and waste products prior to commencement of this work.
General
Topsoil shall be according to Section 211 except as follows: Add the following to the end of Article 211.05:
“If the topsoil thickness is not specified on the plans, the minimum topsoil thickness shall be 6 inches.”
Delete Articles 211.07 and 211.08.
Seeding shall be according to Article 250 except as follows: Delete Articles 250.09 and 250.10.
Class 1A seed mixture shall be used unless otherwise specified by the Engineer.
Seeding will be inspected after a period of establishment. The period of establishment shall be six (6) months minimum, but not to exceed nine (9) months. After the period of establishment, areas not exhibiting 75 percent uniform growth shall be interseeded or reseeded, as determined by the Engineer, at no additional cost to the City. Reseeding will be required until vegetation is established.
The Contractor shall reapply seed as necessary until this requirement is met. No additional compensation will be made for reseeding. Any one area will only be paid once no matter how many seeding applications are necessary to establish vegetation.
Erosion control blanket shall be according to Article 251.04 except the material shall be a knitted straw mat according to 1081.10(b).
Basis of Payment
This work shall be paid for at the contract unit price per square foot for TOPSOIL PLACEMENT AND SEEDING, SPECIAL (LARGE AREA) and TOPSOIL
PLACEMENT AND SEEDING, SPECIAL (SMALL AREA).
Separate pay items have been established for “small areas” (less than 30 square feet) and large areas (30 square feet or greater). The Engineer may add more than one “small area” within the same city block or area to form a “large area” for the purpose of payment. The final determination on whether combined areas are considered a small or large area for basis of payment shall be made by the Engineer.
SIDEWALK REINFORCEMENT, SPECIAL
Description
This work shall be in general conformance with Section 508 and consist of incorporating epoxy coated reinforcement bars into a concrete sidewalk.
Construction Requirements
Where directed by the Engineer, the Contractor shall install #4 epoxy coated reinforcement bars. All reinforcement bars shall be placed and tied securely at the locations and in the configuration shown in the plans prior to the placement of concrete. Reinforcement supports shall meet the approval of the Engineer.
Supports shall be provided in sufficient number and spaced to provide the required clearances. Contact lap splicing of #4 reinforcement bars, when required, shall be at minimum 24”.
Method of Measurement
Measurement of SIDEWALK REINFORCEMENT, SPECIAL shall be by the square foot and include the full area of the sidewalk panel to which the reinforcement has been installed.
Basis of Payment
This work shall be paid for at the Contract Unit Price per square foot for SIDEWALK
REINFORCEMENT, SPECIAL measured in place.
MANHOLE TO BE ADJUSTED, SPECIAL
INLET TO BE ADJUSTED, SPECIAL
FRAME AND GRATE, TYPE 3
FRAME AND GRATE, TYPE 50
Description
These items shall be in general conformance with Sections 602 and 604 of the
Standard Specifications.
All adjustments less than or equal to 6 inches in height for inlets and manholes shall be made with Expanded Polypropylene (EPP) Adjusting Rings.
Material
New frame and grates shall be according to the City of Bloomington Manual of
Practice. A Type 3 frame and grate shall be a bicycle safe Neenah structure R-
3010 with a Type A or L grate or approved equal. A Type 50 frame and grate shall be a bicycle safe Neenah structure R-3067 with a Type A or L grate or approved equal. Type A grates shall be used except that Type L may be used for bypass inlets where required by the Engineer. When the inlet is located in an entrance, or other depressed curb location, the Type 50 frame and grate shall be Neenah R-
3037-C or approved equal. Only cast iron grates will be accepted. The notation
“Dump No Waste – Drains to Water Way” shall be cast or stamped on the top of the frame.
All frames to be adjusted shall be encased in concrete.
Add the following to Article 602.02:
“(t) Expanded Polypropylene (EPP) Adjusting Rings (Note 5) ……………1043.05
Note 5. Riser rings fabricated from EPP shall be used to adjust the frames and grates of drainage and utility structures up to a maximum of 6 in. (150 mm). An adhesive meeting ASTM C 920, Type S, Grade N5, Class 25 shall be used with
EPP adjustment rings.
The top ring of an adjustment stack shall be finish ring with grooves on the lower surface and flat upper surface. The joints between all manhole adjustment rings and the frame and cover shall be sealed using the approved adhesive. In lieu of the use of an adhesive, an internal or external mechanical frame-chimney seal may be used for watertight installation. EPP adjustment rings shall not be used with heat shrinkable infiltration barriers.”
Replace Article 602.09 with the following”
“602.09 Expanded Polypropylene (EPP) Adjusting Rings. All adjustment less than
6 inches thick for inlets and manholes shall be made with expanded polypropylene
(EPP) adjusting rings. EPP adjusting rings and manhole frames shall be set in adhesive or sealant as described in the 602.02(t), Note 5. Angle rings shall be used in place of shims to match the desired grade.”
Revise the second sentence of Article 602.11(b) to read:
“Castings placed on concrete or masonry surfaces shall be set in full mortar beds except where EPP adjusting rings are required according to Article 602.09.”
Revise the second paragraph of Article 602.11(c) to read:
“After the structure has been adjusted, the castings shall be set in full mortar beds except where EPP adjusting rings are required according to Article 602.09.”
Add the following to Section 1043:
“1043.05 Expanded Polypropylene (EPP) Adjusting Rings
The EPP adjusting rings shall be manufactured using high compression molding process to produce a minimum finished density of 7.5 lb/cu ft (120 g/l). The Epp rings shall be made of materials meeting ASTM D 3575 and ASTM D 4819-13.
The grade adjustments shall be designed and tested according to the AASHTO
Standard Specifications for Highway Bridges (AASHTO M 306 HS-25).
Grade rings shall contain upper and lower keyways (tongue and groove) for proper vertical alignment and sealing. The top ring, for use directly beneath the cast iron frame, shall have keyways (grooves) on the lower surface with a flat upper surface.
Adhesive or sealant used for watertight installation of the manhole grade adjustment rings shall meet ASTM C 920, Type S, Grade NS, Class 25, Uses NT, T, M, G, A, and O.
EPP adjustment rings shall have no void areas, cracks, or tears. The actual diameter or length shall not vary more than 0.125 in (3 mm) from the specified diameter or length. Variations in height are limited to ± 0.063 in. (± 1.6 mm).
Variations shall not exceed 0.25 in. (6 mm) from flat (dish, bow, or convoluting edge) or 0.125 in. (3 mm) for bulges or dips in the surface.”
Replace Article 602.16 with the following:
Basis of Payment
When an adjustment is specified and existing frames, grates, and lids are to be used, this work will be paid for at the contract unit price per each for MANHOLE TO
BE ADJUSTED, SPECIAL or INLET TO BE ADJUSTED, SPECIAL. The size and style of the inlet/manhole frame and grate, basin, and/or piping structure will not be differentiated in this pay item.
If a new frame and grate is required, it shall be paid for separately at the contract unit price each for FRAME AND GRATE, TYPE 3 or FRAME AND GRATE, TYPE
50. The existing frame and grate shall be salvaged or disposed of by the Contractor at the direction of the Engineer.
If there is no adjustment to the structure but a new frame and grate is required, it shall be paid for at the contract unit price per each for FRAME AND GRATE, TYPE
3 or FRAME AND GRATE, TYPE 50.
If others have performed an adjustment or installation of a structure except for the final setting of height to match new curb finished grade, the final setting of the casting by the Contractor shall be incidental to the contract.”
INLET TO BE RECONSTRUCTED, SPECIAL
General
This work shall be performed in accordance with Section 602 of the Standard Specifications and shall consist of supplying new Type A, or Type H collection structures. Included in this item is a new City of Bloomington Standard Inlet (Type A or Type H) of variable depth, back filling the inlet in accordance with Articles
208.01 and 208.02 of the Standard Specifications and installing the existing or a new frame and grate. All inlets to be reconstructed shall be encased in concrete.
Expanded polypropylene (EPP) adjusting rings shall be used for all inlet reconstructs. EPP adjusting rings and inlet frames shall be set in adhesive or sealant as described in the IDOT special provision for EPP adjusting rings (above).
Angle rings should be used in place of shims to match the grade of the road and curb.
Shims or lifting devices of any kind, except for riser rings, will not be allowed.
Payment shall compensate the contractor in full for all labor, equipment and material necessary to remove the existing inlet, install a new Type A or H inlet, connect the sewer lead, providing trench backfill as necessary.
Any additional Pavement Patching and/or Combination Curb and Gutter Removal and Replacement, Type B-6.18 (Spot Replace) are not part of this item and shall be paid separately according to their respective items.
This work shall be paid for at the Contract Unit Price per Each for INLET TO BE
RECONSTRUCTED, SPECIAL.
NEW FRAME AND CLOSED LID (FOR VALVE BOX)
General
This work shall be performed in accordance with Section 602 of the Standard Specifications and where the existing valve box and lid are called out in the plans to be replaced, or is broken, or breaks during removal, a new valve box/frame shall be supplied and installed by the Contractor. The new valve box shall be a two-piece, 5¼" shaft, screw type, with lid marked "water", Tyler Pipe 6850 series or approved equal. The new box shall be of sufficient length to extend from the valve to the new pavement surface and no additional payment will be made for extensions.
Basis of Payment
This work shall be paid for at the Contract Unit Price per Each for NEW FRAME
AND CLOSED LID (FOR VALVE BOX).
VALVE BOX TO BE ADJUSTED, SPECIAL
General
Thi…