Summary: Fire Station #1 HVAC Removal & Replacement Bid Package

This comprehensive specification document outlines the requirements for the City of Bloomington, Illinois' Bid #2026-37 for Fire Station #1 HVAC Removal & Replacement project. The project encompasses selective demolition, HVAC system modifications, roofing work, and associated building components including gypsum board, acoustical ceilings, interior painting, ductwork, piping systems, electrical work, and equipment installation. The sealed bid submission deadline is Tuesday, April 7, 2026, at 10:00 a.m. CST via the City's e-Procurement Portal (OpenGov). The specifications detail extensive technical requirements across 23 Division sections covering mechanical, electrical, and general construction work, with particular emphasis on variable-refrigerant-flow (VRF) HVAC systems, refrigerant piping, ductwork, equipment supports, controls, and testing and balancing procedures. The project requires coordination among multiple trades, field verification of equipment locations, and adherence to applicable codes including the National Electrical Code (NFPA 70), ASHRAE standards, and local prevailing wage requirements.

The City of Bloomington has adopted a Project Labor Agreement (PLA) requirement for all public works projects exceeding $50,000 in expenditure of public funds, contingent upon the determination that such agreement advances the City's interests in cost, efficiency, quality, safety, timeliness, skilled labor force stability, and minority- and female-owned business participation. The economic standards established by the Illinois Prevailing Wage Act shall govern PLA terms, and no union membership or fair share payment requirements may be imposed on contractor employees. The specifications mandate comprehensive submittals including product data, shop drawings, coordination drawings, quality assurance certifications, and operation and maintenance documentation. Contractor responsibilities include obtaining all necessary permits and licenses, providing warranty coverage (minimum one year from substantial completion with extended warranties on VRF equipment compressors up to ten years), and performing all field testing, startup services, and owner training for mechanical systems. Payment for any damage to the roof system or coating resulting from mechanical contractor operations shall be the responsibility of the mechanical contractor and coordinated with certified roofer services per warranty guidelines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SELECTIVE DEMOLITION

Dewberry Architects, Inc. 50185817 024119 - 1

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. The Work of this Section Includes:

1. Demolition and removal of selected portions of exterior or interior of building or structure and site elements.

2. Removal and salvage of existing items for delivery to Owner and removal of existing items for reinstallation.

B. Related Requirements:

1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.

2. Section 013516 "Alteration Project Procedures" for general protection and work procedures for alteration projects.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner as indicated.

C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage;

prepare for reuse; and reinstall where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.4 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Statements: For refrigerant recovery technician.

024119 - 2

1.6 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Universal certified by an EPA-approved certification program.

1.7 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials:

1. It is not expected that hazardous materials will be encountered in the Work.

a. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

E. On-site sale of removed items or materials is not permitted.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing

024119 - 3 conditions are same as those indicated in Project Record Documents.

3.2 PREPARATION

A. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

B. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location and reinstalled in their original locations after selective demolition operations are complete.

D. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment in accordance with 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 UTILITY SERVICES AND BUILDING SYSTEMS

A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. If disconnection of utilities and building systems will affect adjacent occupied parts of the building, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to those parts of the building.

3. Demolish and remove existing building systems, equipment, and components indicated

024119 - 4 on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment and components.

4. Remove and reinstall/salvage existing building systems, equipment, and components indicated on drawings to be removed and reinstalled or removed and salvaged:

a. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment and components; when appropriate, reinstall, reconnect, and make equipment operational.

b. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and components and deliver to Owner.

3.4 SALVAGE/REINSTALL

A. Removed and Salvaged Items:

1. Clean salvaged items.

2. Store items in a secure area until delivery to Owner.

3. Transport items to Owner's storage area on-site.

4. Protect items from damage during transport and storage.

B. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Protect items from damage during transport and storage.

3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring

024119 - 5 existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

5. Maintain fire watch during and for at least 2 hours after flame-cutting operations.

6. Maintain adequate ventilation when using cutting torches.

7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Comply with requirements specified in Section 017419 "Construction Waste

Management and Disposal."

B. Burning: Do not burn demolished materials.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 1

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

SECTION 075114 - MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions and other

Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Partial roof tear-off.

2. Infill materials.

3. Modified bituminous protected membrane roofing.

4. Roof flashing.

5. Reroofing as required.

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to remain

Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site.

1.4 DEFINITIONS

A. Roofing Terminology: See ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and

Waterproofing Manual" for definition of terms related to roofing work in this Section.

B. Existing Membrane Roofing System: Modified bituminous protected roofing membrane, roof insulation, surfacing, and components and accessories between deck and roofing membrane.

C. Roof Re-Cover Preparation: Existing roofing membrane that is to remain and be prepared for reuse.

D. Partial Roof Tear-Off: Removal of a portion of existing membrane roofing system from deck or removal of selected components and accessories from existing membrane roofing system.

E. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.

F. Existing to Remain: Existing items of construction that are not indicated to be removed.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 2

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

1.5 PERFORMANCE REQUIREMENTS

A. General Performance: Installed roofing and base flashings shall withstand specified thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing system and base flashings shall remain watertight.

B. Material Compatibility: Provide roofing materials that are compatible with one another and existing roofing materials under conditions of service and application required, as demonstrated by roofing system manufacturer based on testing and field experience.

1.6 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

1.7 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning membrane roofing removal. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Source Limitations: Obtain components including roof insulation and fasteners for roofing system from same manufacturer as roofing system or approved by roofing system manufacturer.

C. Exterior Fire-Test Exposure: ASTM E 108, Class A; for application and roof slopes indicated, as determined by testing identical roofing system materials by a qualified testing agency. Materials shall be identified with appropriate markings of applicable testing agency.

D. Reroofing Conference: Conduct conference at Project site.

1. Meet with Owner; Architect; Owner's insurer if applicable; roofing system manufacturer's representative; roofing Installer including project manager, superintendent, and foreman;

and installers whose work interfaces with or affects reroofing including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing system tear-off and replacement including, but not limited to, the following:

a. Reroofing preparation, including membrane roofing system manufacturer's written instructions.

b. Temporary protection requirements for existing roofing system that is to remain during and after installation.

c. Existing roof drains and roof drainage during each stage of reroofing, and roof drain plugging and plug removal requirements.

d. Construction schedule and availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

e. Condition and acceptance of existing roof deck and base flashing substrate for reuse.

f. Structural loading limitations of deck during reroofing.

g. Base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that will affect reroofing.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 3

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

h. HVAC shutdown and sealing of air intakes.

i. Shutdown of fire-suppression, -protection, and -alarm and -detection systems.

j. Asbestos removal and discovery of asbestos-containing materials.

k. Governing regulations and requirements for insurance and certificates if applicable.

l. Existing conditions that may require notification of Architect before proceeding.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing manufacturer. Protect stored liquid material from direct sunlight.

1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.

C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.

D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.

1.9 PROJECT CONDITIONS

A. Protect portions of building to be reroofed, adjoining building areas, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.

B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

C. Conditions existing at time of inspection for bidding will be maintained by Owner as far as practical.

D. Limit construction loads on roof to 20 PSF for uniformly distributed loads.

E. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing to be installed according to manufacturer's written instructions and warranty requirements.

F. Hazardous Materials: It is not expected that hazardous materials such as asbestos-containing materials will be encountered in the Work.

1. Hazardous materials will be removed by Owner before start of the Work. Existing roof will be left no less watertight than before removal.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 4

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

2. If materials suspected of containing hazardous materials are encountered, do not disturb;

immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

1.10 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during reroofing, by methods and with materials so as not to void existing roofing system warranty. Notify warrantor before proceeding.

1. Existing roof recoated in 2008.

2. Notify warrantor of existing roofing system on completion of reroofing, and obtain documentation verifying that existing roofing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 INFILL MATERIALS

A. Use infill materials matching existing membrane roofing system materials unless otherwise indicated.

2.2 ROOFING MATERIALS

A. Roofing materials to match and to be compatible with existing roofing system. Selection of materials for reroofing is responsibility of Contractor.

B. Sheathing Paper: Red-rosin type, minimum 3 lb/100 sq. ft. (0.16 kg/sq. m).

C. Base Sheet: ASTM D 4601, Type II, SBS-modified asphalt-impregnated and -coated sheet, with glass-fiber-reinforcing mat, dusted with fine mineral surfacing on both sides.

D. Base Sheet: ASTM D 4601, Type II, nonperforated, asphalt-impregnated and -coated, glass-fiber sheet, dusted with fine mineral surfacing on both sides.

E. Base Sheet: ASTM D 2626, asphalt-saturated and -coated organic felt, dusted with fine mineral surfacing on both sides.

F. Glass-Fiber Felts: ASTM D 2178, Type IV, asphalt-impregnated, glass-fiber felt.

G. APP-Modified Asphalt Roofing Sheet: ASTM D 6222/D 6222M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with polyester fabric) or ASTM D 6223/D 6223M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

H. APP-Modified Asphalt Smooth-Surfaced Roofing Cap Sheet: ASTM D 6222/D 6222M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with polyester fabric) or

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 5

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

ASTM D 6223/D 6223M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

I. SBS-Modified Asphalt Roofing Sheet: ASTM D 6164/D 6164M, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with polyester fabric) or ASTM D 6163, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with glass fibers) or ASTM D 6162, Grade S, Type I or

II, SBS-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

J. SBS-Modified Asphalt Smooth-Surfaced Roofing Cap Sheet: ASTM D 6164/D 6164M, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with polyester fabric) or

ASTM D 6163, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with glass fibers) or ASTM D 6162, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

K. Backer Sheet: ASTM D 4601, Type II, asphalt-impregnated and -coated, glass-fiber sheet, dusted with fine mineral surfacing on both sides.

L. Backer Sheet: ASTM D 2626, asphalt-saturated and -coated organic felt, dusted with fine mineral surfacing on both sides.

M. APP-Modified Asphalt Backer Sheet: ASTM D 6222/D 6222M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with polyester fabric) or ASTM D 6223/D 6223M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

N. SBS-Modified Asphalt Backer Sheet: ASTM D 6164/D 6164M, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with polyester fabric) or ASTM D 6163, Grade S, Type I or II, SBS-modified asphalt sheet (reinforced with glass fibers) or ASTM D 6162, Grade S, Type I or

II, SBS-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

O. APP-Modified Asphalt Smooth-Surfaced Flashing Sheet: ASTM D 6222/D 6222M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with polyester fabric) or

ASTM D 6223/D 6223M, Grade S, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); smooth surfaced; suitable for application method specified.

P. Asphalt Primer: ASTM D 41.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 6

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

Q. Roofing Asphalt: ASTM D 312, Type III or IV.

R. Cold-Applied Adhesive: Roofing manufacturer's standard asphalt based, one- or two-part, asbestos-free, cold-applied adhesive specially formulated for compatibility and use with base flashings that meets or exceeds ASTM D 4479, Type II requirements.

2.3 COATING MATERIALS

A. Roof Coating: ASTM D 1227, Type II, asphalt emulsion, asbestos free.

B. Roof Coating: ASTM D 1227, Type III, asphalt emulsion, nonfibered.

C. Roof Coating: ASTM D 2824, aluminum-pigmented asphaltic coating.

2.4 AUXILIARY REROOFING MATERIALS

A. General: Auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of existing and new membrane roofing system.

B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening roofing components to substrate, tested by manufacturer for required pullout strength, and acceptable to roofing manufacturer.

C. Miscellaneous Accessories: Provide miscellaneous accessories recommended by roofing system manufacturer.

2.5 ROOF INSULATION

A. General: Preformed roof insulation boards manufactured or approved by roofing manufacturer, selected from manufacturer's standard sizes suitable for application, of thicknesses indicated.

B. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope as indicated on the Drawings.

2.6 INSULATION ACCESSORIES

A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatible with roofing system.

B. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FM Approvals 4470, designed for fastening roof insulation to substrate and acceptable to roofing manufacturer.

C. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 7

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system:

1. Verify that roof openings and penetrations are in place and curbs are set and braced and that roof drain bodies are securely clamped in place.

2. Verify that wood cants, blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.

3. Verify that deck is securely fastened with no projecting fasteners and with no adjacent units in excess of 1/16 inch (1.6 mm) out of plane relative to adjoining deck.

4. The existing roof system was replaced in 2025. Review and document current condition of roof system and coating. Maintain current condition of roof system and coating throughout the duration of the project.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Protect existing membrane roofing system that is indicated not to be reroofed.

1. Loosely lay 1-inch- (25-mm-) minimum thick, molded expanded polystyrene (MEPS) insulation over the roofing membrane. Loosely lay 15/32-inch (12-mm) plywood or OSB panels over MEPS. Extend MEPS past edges of plywood or OSB panels a minimum of 1 inch (25 mm).

2. Limit traffic and material storage to areas of existing roofing membrane that have been protected.

3. Maintain temporary protection and leave in place until replacement roofing has been completed. Remove temporary protection on completion of reroofing.

B. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. Cover air-intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.

C. During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain.

D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.

Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.

1. If roof drains are temporarily blocked or unserviceable due to roofing system removal or partial installation of new membrane roofing system, provide alternative drainage method to remove water and eliminate ponding. Do not permit water to enter into or under existing membrane roofing system components that are to remain.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 8

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

E. Verify that rooftop utilities and service piping have been shut off before beginning the Work.

F. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing manufacturer's written instructions. Remove sharp projections.

3.3 ROOF TEAR-OFF

A. Partial Roof Tear-Off: Where indicated, remove existing roofing membrane and other membrane roofing system components down to the deck.

1. Bituminous membranes that are firmly bonded to concrete decks are permitted to remain if felts are dry. Remove unadhered bitumen and membranes.

2. Remove excess asphalt from steel deck. A maximum of 15 lb/100 sq. ft. (0.72 kg/sq. m) of asphalt is permitted to remain on steel decks.

3. Remove fasteners from deck or cut fasteners off slightly above deck surface.

4. With an electrical capacitance moisture-detection meter, spot check cover boards, roof insulation, and any substrate boards that will remain.

5. Remove wet or damp boards and roof insulation. Removal will be paid for by adjusting the Contract Sum.

3.4 DECK PREPARATION

A. If exposed, inspect deck after partial tear-off of membrane roofing system.

B. If broken or loose fasteners that secure deck panels to one another or to structure are observed or if deck appears or feels inadequately attached, immediately notify Architect. Do not proceed with installation until directed by Architect.

C. If deck surface is not suitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify Architect. Do not proceed with installation until directed by Architect.

3.5 INFILL MATERIALS INSTALLATION

A. Immediately after removal of selected portions of existing membrane roofing system, and inspection and repair, if needed, of deck, fill in the tear-off areas to match existing membrane roofing system construction.

1. Install new roofing membrane patch over roof infill area. If new roofing membrane is installed the same day tear-off is made, roofing membrane patch is not required.

B. Comply with membrane roofing manufacturer's written instructions for installing roof insulation.

C. Insulation Cant Strips: Install and secure preformed 45-degree insulation cant strips at junctures of roofing system with vertical surfaces or angle changes greater than 45 degrees.

D. Install tapered insulation under area of roofing to conform to existing slopes.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 9

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

E. Install insulation with long joints of insulation in a continuous straight line with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch

(6 mm) with insulation.

1. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.

F. Install insulation under area of roofing to achieve required thickness. Where overall insulation thickness is 2.7 inches (68 mm) or greater, install two or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches (150 mm) in each direction.

G. Mechanically Fastened and Adhered Insulation: Install first layer of insulation to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type.

1. Fasten first layer of insulation to resist uplift pressure at corners, perimeter, and field of roof.

2. Set each subsequent layer of insulation in a solid mopping of hot roofing asphalt, applied within plus or minus 25 deg F (14 deg C) of equiviscous temperature.

3.6 RE-COVER ROOF PREPARATION

A. Remove blisters, ridges, buckles, mechanically attached roofing membrane fastener buttons projecting above the membrane, and other substrate irregularities from existing roofing membrane that inhibit new roofing membrane from conforming to substrate.

1. Broom clean existing substrate.

2. Coordinate with Owner's inspector to schedule times for tests and inspections.

3. Verify that existing substrate is dry before proceeding with installation. Spot check substrates with an electrical capacitance moisture-detection meter.

4. Remove materials that are wet and damp. Removal will be paid for by adjusting the

Contract Sum.

B. Remove blisters and areas of membrane not fully adhered.

3.7 MODIFIED BITUMINOUS MEMBRANE ROOFING INSTALLATION, GENERAL

A. Install roofing system according to roofing system manufacturer's written instructions and applicable recommendations in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing."

B. Coordinate installation of roofing system so insulation and other components of the roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

1. Provide tie-offs at end of each day's work to cover exposed roofing sheets with a course of coated felt set in roofing cement or hot roofing asphalt, with joints and edges sealed.

2. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 10

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

3. Remove and discard temporary seals before beginning work on adjoining roofing.

C. Asphalt Heating: Heat asphalt to its equiviscous temperature, measured at the mop cart or mechanical spreader immediately before application. Circulate asphalt during heating. Do not raise roofing asphalt temperature above equiviscous temperature range more than one hour before time of application. Do not exceed roofing asphalt manufacturer's recommended temperature limits during roofing asphalt heating. Do not heat roofing asphalt within 25 deg F (14 deg C) of flash point. Discard roofing asphalt maintained at a temperature exceeding finished blowing temperature for more than four hours.

1. Apply hot roofing asphalt within plus or minus 25 deg F (14 deg C) of equiviscous temperature.

D. Asphalt Heating: Heat and apply SEBS-modified roofing asphalt according to roofing system manufacturer's written instructions.

E. Substrate-Joint Penetrations: Prevent roofing asphalt from penetrating substrate joints, entering building, or damaging roofing system components or adjacent building construction.

3.8 BASE-SHEET INSTALLATION

A. Install lapped base-sheet course, extending sheet over and terminating beyond cants. Attach base sheet as follows:

1. Adhere to substrate in a solid mopping of hot roofing asphalt or uniform coating of cold-applied adhesive as required to match existing roofing system.

3.9 BASE-PLY SHEET INSTALLATION

A. Install glass-fiber base-ply sheets according to roofing system manufacturer's written instructions starting at low point of roofing system. Align glass-fiber base-ply sheets without stretching.

Extend glass-fiber base-ply sheets over and terminate beyond cants. Embed each glass-fiber base-ply sheet in a continuous void-free mopping of hot roofing asphalt, to form a uniform membrane without glass-fiber base-ply sheets touching.

3.10 MODIFIED BITUMINOUS MEMBRANE INSTALLATION

A. Install modified bituminous roofing sheet and cap sheet according to roofing manufacturer's written instructions, starting at low point of roofing system. Extend roofing sheets over and terminate beyond cants.

1. Unroll roofing sheets and allow them to relax for minimum time period required by manufacturer.

B. Laps: Accurately align roofing sheets, without stretching, and maintain uniform side and end laps.

Stagger end laps. Completely bond and seal laps, leaving no voids.

1. Repair tears and voids in laps and lapped seams not completely sealed.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 11

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

C. Install roofing sheets so side and end laps shed water.

3.11 FLASHING AND STRIPPING INSTALLATION

A. Install base flashing over cant strips and other sloping and vertical surfaces, at roof edges, and at penetrations through roof, and secure to substrates according to roofing system manufacturer's written instructions and as follows:

1. Prime substrates with asphalt primer if required by roofing system manufacturer.

2. Backer Sheet Application: Mechanically fasten backer sheet to walls or parapets. Adhere backer sheet at cants and to substrate in a solid mopping of hot roofing asphalt or cold-applied adhesive.

3. Flashing Sheet Application: As follows as required to match existing roofing:

a. Adhere flashing sheet to substrate in cold-applied adhesive.

b. Adhere flashing sheet to substrate in asphalt roofing cement.

c. Torch apply flashing sheet to substrate.

d. Adhere flashing sheet to substrate in a solid mopping of hot roofing asphalt applied at not less than 425 deg F (218 deg C). Apply hot roofing asphalt to back of flashing sheet if recommended by roofing manufacturer.

B. Extend base flashing up walls or parapets a minimum of 8 inches (200 mm) above roofing and 4 inches (100 mm) onto field of roofing.

C. Mechanically fasten top of base flashing securely at terminations and perimeter of roofing.

3.12 COATING INSTALLATION

A. Apply coating to base flashings according to manufacturer's written instructions, by spray, roller, or other suitable application method.

3.13 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.

1. The existing roof system was replaced in 2025. Contractor shall protect new roof system and coating. Any damage to the roof system or coating will be at the expense of the mechanical contractor to pay a certified roofer to correct per warranty guidelines.

B. Provide final protection of roof expansion and maintain conditions, in a manner acceptable to manufacturer and Installer, that ensures that roof expansion assemblies are without damage or deterioration at time of Substantial Completion.

MODIFICATIONS TO EXISTING MODIFIED BITUMINOUS ROOFING 075114 - 12

City of Bloomington – FS #1 HVAC

Issued for Bid

February 27, 2026

C. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.

D. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

3.14 DISPOSAL

A. Collect demolished materials and place in containers. Promptly dispose of demolished materials.

Do not allow demolished materials to accumulate on-site.

1. Storage or sale of demolished items or materials on-site is not permitted.

B. Transport and legally dispose of demolished materials off Owner's property.

END OF SECTION 075114

GYPSUM BOARD

092900 - 1

SECTION 092900 - GYPSUM BOARD

1.1 SUMMARY

A. Section Includes:

1. Interior gypsum board.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings:

1. Locations and installation of control and expansion joints, including plans, elevations, sections, and attachment details.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Store materials inside under cover and keep them dry and protected against weather, condensation, direct sunlight, construction traffic, and other potential causes of damage. Stack panels flat and supported on risers on a flat platform to prevent sagging.

1.4 FIELD CONDITIONS

A. Environmental Limitations: Comply with ASTM C840 requirements or manufacturer's written instructions, whichever are more stringent.

B. Do not install paper-faced gypsum panels until installation areas are enclosed and conditioned.

C. Do not install panels that are wet, moisture damaged, or mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

092900 - 2

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain each type of gypsum panel and joint finishing material from single source with resources to provide products of consistent quality in appearance and physical properties.

2.2 PERFORMANCE REQUIREMENTS

A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and construction identical to those tested in assembly indicated on Drawings in accordance with

ASTM E119; tested by a qualified testing agency.

2.3 GYPSUM BOARD, GENERAL

A. Size: Provide panel products in maximum lengths and widths available that will minimize joints in each area and that correspond with support system specified or indicated on Drawings.

2.4 INTERIOR GYPSUM BOARD

A. Gypsum Board, Type X: ASTM C1396/C1396M.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. American Gypsum

b. CertainTeed; SAINT-GOBAIN

c. Georgia-Pacific Gypsum LLC

d. Gold Bond Building Products, LLC provided by National Gypsum Company

e. USG Corporation

2. Thickness: Match Existing.

3. Long Edges: Tapered.

2.5 JOINT TREATMENT MATERIALS

A. General: Comply with ASTM C475/C475M requirements.

B. Joint Tape:

1. Interior Gypsum Board: Paper.

C. Joint Compound for Interior Gypsum Board: For each coat, use formulation that is compatible with other compounds applied on previous or for successive coats.

092900 - 3

1. Prefilling: At open joints and damaged surface areas, use setting-type taping compound.

2. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim flanges, use setting-type taping compound.

a. Use setting-type compound for installing paper-faced metal trim accessories.

3. Fill Coat: For second coat, use setting-type, sandable topping compound.

4. Finish Coat: For third coat, use drying-type, all-purpose compound.

2.6 AUXILIARY MATERIALS

A. Provide auxiliary materials that comply with referenced installation standards and manufacturer's written instructions.

B. Steel Drill Screws: ASTM C1002 unless otherwise specified or indicated on Drawings.

1. Use screws complying with ASTM C954 for fastening panels to steel members from

0.033 to 0.112 inch thick.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and substrates including welded hollow-metal frames and support framing, with

Installer present, for compliance with requirements and other conditions affecting performance of the Work.

B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION AND FINISHING OF PANELS, GENERAL

A. Comply with ASTM C840 requirements.

B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.

C. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch of open space between panels. Do not force into place.

D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.

092900 - 4

E. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally.

1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft. in area.

2. Fit gypsum panels around ducts, pipes, and conduits.

3. Where partitions intersect structural members projecting below underside of floor/roof slabs and decks, cut gypsum panels to fit profile formed by structural members; allow

1/4- to 3/8-inch- wide joints to install sealant.

F. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments. Provide 1/4- to 1/2-inch- wide spaces at these locations and trim edges with edge trim where edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant.

G. Attachment to Steel Framing: Attach panels so leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first.

H. Wood Framing: Install gypsum panels over wood framing, with floating internal corner construction. Do not attach gypsum panels across the flat grain of wide-dimension lumber, including floor joists and headers. Float gypsum panels over these members or provide control joints to counteract wood shrinkage.

3.3 INSTALLATION OF INTERIOR GYPSUM BOARD

A. Install interior gypsum board in the following locations:

1. Gypsum Board, Type X: As indicated on Drawings.

B. Single-Layer Application:

1. On ceilings, apply gypsum panels before wall/partition board application to greatest extent possible and at right angles to framing unless otherwise indicated on Drawings.

2. Fastening Methods: Apply gypsum panels to supports with steel drill screws.

C. Multilayer Application:

1. On ceilings, apply gypsum board indicated for base layers before applying base layers on walls/partitions; apply face layers in same sequence. Apply base layers at right angles to framing members and offset face-layer joints one framing member, 16 inches minimum, from parallel base-layer joints, unless otherwise indicated on Drawings or required by fire-resistance-rated assembly.

2. Fastening Methods: Fasten base layers and face layers separately to supports with screws.

3.4 APPLICATION OF JOINT TREATMENT MATERIALS

A. Finishing Panel Products: Treat joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare panel surfaces for

092900 - 5 decoration. Promptly remove residual joint compound from adjacent surfaces.

B. Prefill open joints and damaged surface areas.

C. Apply joint tape over panel joints, except for trim products specifically indicated as not intended to receive tape.

D. Interior Gypsum Board: Finish panels to levels indicated below and in accordance with ASTM

C840:

1. Level 1: Ceiling plenum areas, concealed areas, and where indicated.

2. Level 5: All other locations exposed to view unless noted otherwise.

a. Primer and its application to surfaces are specified in Section 099123 "Interior

Painting."

3.5 PROTECTION

A. Protect adjacent surfaces from joint compound and promptly remove from floors and other non-gypsum board surfaces. Repair surfaces stained, marred, or otherwise damaged during gypsum board installation and finishing.

B. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.

C. Remove and replace panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 092900

ACOUSTICAL PANEL CEILINGS 095113 - 1

City of Bloomington – FS #1 HVAC

SECTION 095113 - ACOUSTICAL PANEL CEILINGS

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Acoustical panels.

2. Exposed suspension systems for ceilings.

1.3 DEFINITIONS

A. CAC: Ceiling Attenuation Class.

B. LR: Light Reflectance coefficient.

C. NRC: Noise Reduction Coefficient.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated including installation instructions.

B. Coordination Drawings: Reflected ceiling plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved:

1. Ceiling suspension system members.

2. Method of attaching hangers to building structure.

a. Furnish layouts for cast-in-place anchors, clips, and other ceiling attachment devices whose installation is specified in other Sections.

3. Ceiling-mounted items including lighting fixtures, diffusers, grilles, speakers, sprinklers, access panels, and special moldings.

4. Minimum Drawing Scale: 1/8 inch = 1 foot (1:96).

ACOUSTICAL PANEL CEILINGS 095113 - 2

City of Bloomington – FS #1 HVAC

C. Samples for Verification: For each component indicated and for each exposed finish required, prepared on Samples of size indicated below.

1. Acoustical Panel: Set of minimum 6-inch- (150-mm-) square Samples of each type, color, pattern, and texture.

2. Exposed Suspension System Members, Moldings, and Trim: Set of 12-inch- (300-mm-) long Samples of each type, finish, and color.

1.5 QUALITY ASSURANCE

A. Source Limitations:

1. Acoustical Ceiling Panel: Obtain each type through one source from a single manufacturer.

2. Suspension System: Obtain each type through one source from a single manufacturer.

B. Forest certification: Provide wood ceiling produced from wood obtained from forests certified by an FSC-accredited certification body to comply with FSC STD-01-001, “FSC Principles and

Criteria for Forest Stewardship.”

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver acoustical panels, suspension system components, and accessories to Project site in original, unopened packages and store them in a fully enclosed, conditioned space where they will be protected against damage from moisture, humidity, temperature extremes, direct sunlight, surface contamination, and other causes.

B. Before installing, permit products to reach room temperature and a stabilized moisture content.

(at least 72 hours)

C. Handle acoustical panels carefully to avoid chipping edges or damaging units in any way.

D. Handle suspension systems, components, and accessories to avoid damaging in any way.

1.7 PROJECT CONDITIONS

A. Environmental Limitations: Do not install ceilings until spaces are enclosed and weatherproof, wet…