Bid_#2026-08_Drawings_Fire_Station_#3_HVAC_Replacement.pdf
PDF 3 MB Posted
- Attached to
- Fire Station #3 HVAC Replacement State and local contract opportunity
- Solicitation number
- 2026-08
- Issued by
- Mclean County, Illinois
About this file
These construction documents are for the City of Bloomington Fire Station #3 HVAC Replacement project located at 2301 E. Empire Street in Bloomington, Illinois. The comprehensive set of architectural, mechanical, and electrical drawings detail a complete HVAC system replacement, including demolition of existing mechanical systems and installation of new variable refrigerant flow (VRF) equipment, energy recovery ventilation, and associated electrical infrastructure. The drawings are dated July 3, 2025, and are prepared by Dewberry Architects and Engineers, with the project number 50185817.
The project involves replacing the existing HVAC systems in the fire station, which includes removing old mechanical equipment, installing new fan coil units, condensing units, an energy recovery ventilator, and a dedicated outdoor air system. The electrical scope includes modifications to existing electrical panels, installing new circuit breakers, and providing power to new mechanical equipment. The drawings specify equipment from manufacturers like LG for VRF systems and include detailed specifications for mechanical and electrical components. The project appears to be fully documented with demolition plans, new work plans, mechanical and electrical schedules, control diagrams, and technical details to support a comprehensive HVAC system replacement.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Fire_Station_#3_HVAC_Replacement.pdf | ||
| Bid_#2026-08_General_Project_Specs_Fire_Station_#3_HVAC_Replacement.pdf | ||
| Bid_#2026-08_Specifications_Fire_Station_#3_HVAC_Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED BY
CHECKED BY
A
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
SEAL
REVISIONS
23456
B
C
D
E
F Dewberry Engineers Inc..
401 SW Water Street Suite 701 Peoria IL 61602
309.282.8000 Phone
IL DESIGN FIRM #184.005007
T0.01
COVER SHEET
07/03/25
50185817
FI
R
E
ST
AT
IO
N
- H
VA
C
R
EP
LA
C
EM
EN
T
C ity o f B lo om in gt on
Is su ed fo r B id di ng
E . E
M
PI
R E
ST
R
EE
T
BL
O
O M
IN
G
TO
N
, I L
No. Description Date
CONTACTS
SITE INFORMATION
DRAWING INDEX CITY OF BLOOMINGTON
FIRE STATION #3 - HVAC
REPLACEMENT
BLOOMINGTON, IL 61704
CONSTRUCTION DOCUMENTS
2301 E. EMPIRE STREET
LOCATION MAP
N O
R
TH
O R
IE
N
TE
D
T O
OWNER: CITY OF BLOOMINGTON
2301 E. EMPIRE STREET
BLOOMINGTON, IL 61704
Dewberry Architects, Inc.401 SW Water Street Suite 701 Peoria IL 61602
309.282.8000 Phone
IL DESIGN FIRM #184000358-001
SEAL
Date:7/8/25
EXP:11/30/2025
I LL I NO I S
062-061703
LICENSED
PROFESSIONAL
ENGINEER
OF
J.
M
LEAH
CI S
McTAV
I H
EXP: 11-30-2025
DATE: 07-03-2025
GENERAL NOTES
1. GENERAL NOTES APPLY TO ALL SHEETS.
2. DO NOT SCALE DRAWINGS, REPORT ANY DISCREPANCIES TO THE ARCHITECT IN
WRITING.
1. VISIT SITE AND VERIFY EXISTING CONDITIONS PRIOR TO BID SUBMISSION.
DISCREPANCIES BETWEEN CONSTRUCTION INDICATED ON DRAWINGS AND
ACTUAL SITE CONDITIONS SHALL BE BROUGHT TO ARCHITECT’S ATTENTION
IMMEDIATELY IN WRITING.
2. DEMOLISHED ITEMS NOT INDICATED TO BE “DELIVERED TO OWNER” OR “TO BE
RELOCATED” SHALL BE REMOVED FROM SITE AS SOON AS POSSIBLE UNLESS THEY
ARE TO BE USED FOR REQUIRED PATCHING AND INFILLING OF EXISTING
CONSTRUCTION THAT IS TO REMAIN. NO OTHER DEMOLISHED ITEMS SHALL BE
STORED ON SITE.
3. DEMOLISHED ITEMS NOTED AS “DELIVER TO OWNER” OR “TO BE RELOCATED”
SHALL BE REMOVED OR DISASSEMBLED IN SUCH A MANNER THAT WILL NOT
DAMAGE THE ITEM AND PREVENT IT FROM BEING RELOCATED. REPAIR OR
REPLACE SUCH ITEMS, IF DAMAGED. NOTIFY OWNER’S REPRESENTATIVE
IMMEDIATELY IF DAMAGE HAS OCCURRED, AND SUBMIT A REPAIR SOLUTION TO
ARCHITECT FOR REVIEW.
4. TEMPORARILY STORE ITEMS INDICATED AS “DELIVER TO THE OWNER” IN ONSITE
LOCATION, DESIGNATED BY THE OWNER. OWNER SHALL MOVE ITEM(S), AS
NECESSARY, TO NOT HINDER OR DELAY PERFORMANCE OF WORK IN AREA.
5. TEMPORARILY STORE ITEMS INDICATED AS “TO BE RELOCATED” IN LOCATION
ONSITE AND PROTECT ITEMS FROM DAMAGE PRIOR TO INSTALLATION IN NEW
LOCATION.
6. ITEMS INDICATED “TO REMAIN” THAT ARE DAMAGED DURING THE PERFORMANCE
OF THE DEMOLITION WORK. SUCH DAMAGE SHALL BE REPORTED TO OWNER’S
REPRESENTATIVE IMMEDIATELY, AND SUBMIT A REPAIR SOLUTION TO ARCHITECT
FOR REVIEW.
7. COORDINATE DEMOLITION WORK WITH NEW CONSTRUCTION WORK IN EACH AREA
OF DEMOLITION. EXISTING CONSTRUCTION IN AREAS ADJACENT TO DEMOLITION
WORK SHALL BE PATCHED AND REPAIRED TO MATCH ORIGINAL EXISTING
CONDITION AS REQUIRED TO PROVIDE FOR NEW CONSTRUCTION WORK IN AREA
OF DEMOLITION.
8. ITEMS INDICATED TO BE REMOVED BY OWNER SHALL BE COMPLETED PRIOR TO
COMMENCEMENT OF WORK.
9. AT LOCATIONS WHERE A PORTION OF EXISTING CONSTRUCTION IS TO BE
REMOVED AND PREPARED FOR NEW INFILL CONSTRUCTION, OR AN OPENING IN A
WALL, ROOF, OR FLOOR IS CREATED BY DEMOLITION WORK, CONSTRUCT INFILL
WITH SAME MATERIALS AND METHOD OF CONSTRUCTION AS EXISTING ADJACENT
CONSTRUCTION, UNLESS NOTED OTHERWISE. SEE ARCHITECTURAL DRAWINGS
FOR INFILL CONSTRUCTION. INFILL CONSTRUCTION SHALL SMOOTHLY BUTT
ADJACENT SURFACES AND MATCH THE FINISH, U.N.O.
10. AT LOCATIONS WHERE AN ITEM IS TO BE REMOVED FROM A SURFACE THAT IS TO
REMAIN, PATCH AND REPAIR EXISTING SURFACE TO MATCH EXISTING ADJACENT
SURFACE, UNLESS INDICATED OTHERWISE.
11. EXISTING ITEMS ANCHORED TO CONSTRUCTION THAT IS INDICATED TO BE
DEMOLISHED SHALL BE CONSIDERED A PART OF DEMOLISHED CONSTRUCTION
AND SHALL BE DEMOLISHED WITH THE INDICATED CONSTRUCTION, UNLESS
NOTED OTHERWISE.
12. CONSTRUCT TEMPORARY DUST PARTITIONS TO CONTAIN DEMOLITION WORK AND
PREVENT CONSTRUCTION DUST FROM ENTERING ADJACENT EXISTING
CONSTRUCTION. SUBMIT LOCATIONS OF THESE PARTITIONS FOR APPROVAL BY
OWNER’S REPRESENTATIVE. PARTITION LOCATIONS SHALL NOT IMPEDE OR
HINDER EMERGENCY EGRESS FROM BUILDING. REFER TO SPECIFICATIONS FOR
CONSTRUCTION OF DUST PARTITIONS.
13. IF EXISTING CONSTRUCTION IS REVEALED NOT CONSTRUCTED OR FINISHED IN A
MANNER THAT MATCHES ADJACENT SURFACES, PATCH AREA AS NECESSARY
WITH APPROPRIATE MATERIALS AND METHODS OF CONSTRUCTION TO MATCH
EXISTING ADJACENT FINISH, OR PREPARE SURFACE FOR INSTALLATION OF NEW
FINISH. CONTACT OWNER’S REPRESENTATIVE AS SOON AS POSSIBLE SO THAT
CONCEALED CONSTRUCTION MAY BE IDENTIFIED AND SCOPE OF POSSIBLE
ADDITIONAL WORK DETERMINED.
14. WHEN EXISTING SURFACE IS INDICATED TO BE “PATCHED AND REPAIRED” OR
“PREPARED” TO RECEIVE NEW FINISH MATERIAL, PROVIDE A CONSTRUCTION
SURFACE THAT IS CAPABLE OF RECEIVING NEW FINISH MATERIAL.
15. WHEN THE TERM ‘ENTIRETY’ IS DIRECTED TO A SPECIFIC ITEM OR ASSEMBLY,
DEMOLISH AND REMOVE IDENTIFIED ITEM AND ASSOCIATED CONSTRUCTION
PERTINENT TO THE ITEM, INCLUDING, BUT NOT LIMITED TO UNDERGROUND AND
CONCEALED CONSTRUCTION, SUCH AS FOOTINGS AND FOUNDATIONS, SEWER,
PLUMBING, AND ELECTRICAL WORK. THIS DEMOLITION WORK SHALL BE
COORDINATED WITH THE CIVIL, STRUCTURAL, PLUMBING, MECHANICAL,
ELECTRICAL, AND TECHNOLOGY DRAWINGS.
16. REMOVE PORTION OF EXISTING GYP BD. CEILING AS REQUIRED TO COMPLETE
MECHANICAL AND ELECTRICAL WORK ABOVE CEILING. PATCH AND REPAIR WITH
LIKE CONSTRUCTION.
DEMOLITION PLAN GENERAL NOTES
1. SITE WORK SHOWN FOR REFERANCE ONLY, REFER TO LANDSCAPE AND CIVIL
DRAWINGS FOR MORE INFORMATION.
2. REFER TO M.E.P. DRAWINGS FOR ADDITIONAL INFORMATION ON MECHANICAL,
ELECTRICAL, AND PLUMBING WORK.
ANNOTATION PLAN GENERAL NOTES
1. REFLECTED CEILING PLAN GENERAL NOTES APPLY TO ALL REFLECTED CEILING
PLAN SHEETS.
2. ELECTRICAL, MECHANICAL, AND TECHNOLOGY FIXTURES AND DEVICES ARE
SHOWN FOR REFERENCE AND TO COORDINATE PLACEMENT. REFER TO
ENGINEERING DRAWINGS FOR INFORMATION REGARDING TYPE AND OTHER
FIXTURE AND DEVICE INFORMATION.
3. ALL CEILING GRIDS/PANELS SHALL BE CENTERED IN EACH ROOM UNLESS NOTED
OTHERWISE. ESTABLISH PRE-INSTALLATION MEETING WITH ARCHITECT TO
REVIEW STARTING POINT OF CEILING GRID IN EACH AREA/ROOM.
4. GYPSUM CEILINGS & SOFFITS TO BE PAINTED, COLOR: PNT-X, U.N.O.
5. EXPOSED STRUCTURE, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION
COMPONENTS (EXCEPT SPRINKLER HEADS) ARE TO BE PAINTED PNT-X, U.N.O.
6. IN ROOMS WITH EXPOSED CEILINGS, MOUNT LIGHT FIXTURES TO UNDERSIDE OF
STRUCTURE. OTHER MEP/FP ITEMS TO MAINTAIN A MINIMUM CLEARANCE OF 9'-0"
A.F.F.
7. CEILING HEIGHTS SHOWN ON REFLECTED CEILING PLANS ARE FROM FINISHED
FLOOR OF PLAN SHOWN.
8. SEE ELECTRICAL LIGHTING PLANS FOR EMERGENCY LIGHT FIXTURE LOCATIONS.
9. CONTRACTOR TO COORDINATE CEILING FIXTURE LOCATIONS WITH ABOVE-
CEILING WORK TO AVOID CONFLICTS.
10. ELECTRICAL, MECHANICAL, AND TECHNOLOGY FIXTURES AND DEVICES ARE
SHOWN FOR REFERENCE AND TO COORDINATE PLACEMENT. REFER TO
ENGINEERING DRAWINGS FOR INFORMATION REGARDING TYPE AND OTHER
FIXTURE AND DEVICE INFORMATION.
11. ALL SUSPENDED CEILING SYSTEMS SHALL BE SUPPORTED FROM STRUCTURE
ABOVE.
CEILING PLAN GENERAL NOTES
A101
SIM
APC-X
8' - 0"
A
X#XX 1HR
SF01
Area Name
150 SF
FIRST FLOOR
100' - 0"
ROOM NAME
A101
SIM
GB-01
Scale:
View Name 1/8" = 1'-0" 1/A101
A101
SIM
CALLOUT
BUILDING/WALL
SECTION
DETAIL SECTION
ROOM TAG
CEILING TAG
DOOR / BORROWED
LITE TAG
WINDOW TAG
WALL TAG
FURNITURE,
CASEWORK, &
EQUIPMENT TAG
REVISION TAG
KEYNOTE TAG00 00 00.A1
AREA TO BE
ENLARGED
SHEET REF.
PLAN / DETAIL REF.
SECTION REF.
SHEET REF.
DETAIL REF.
SHEET REF.
LEVEL LINE
AREA SQUARE
FOOTAGE
ROOM NUMBER
EXTERIOR
ELEVATION
INTERIOR
ELEVATION
ELEVATION REF.
SHEET REF.A101
A101
1 ELEVATION REF.
SHEET REF.
VIEW NAME
VIEW SCALE
VIEW DESIGNATION
VIEW REF/SHEET REF
WHERE VIEW IS REFERENCED
VIEW TITLE
AREA TAG
CEILING TYPE
CEILING HEIGHT
(ABOVE FINISH FLOOR)
LEVEL NAME
LEVEL ELEVATION
GRID LINE
NORTH INDICATOR
GRID NUMBER OR
LETTER
INDICATES PLAN NORTH
INDICATES TRUE NORTH
A101
SPOT ELEVATION
SYMBOL
ANNOTATION LEGEND
RECESSED LIGHT FIXTURE
PENDANT LIGHT FIXTURE
SUPPLY DIFFUSER
RETURN DIFFUSER
EXIT SIGN
S SPEAKER
A FIRE ALARM
HEAT DETECTOR
SMOKE DETECTOR
LINEAR SLOT DIFFUSER
SPRINKLER HEAD
EMERGENCY LIGHT
RECESSED LIGHT FIXTURE
SUSPENDED ACOUSTICAL PANEL CEILING (APC-#)
GYPSUM BOARD CEILING (GYP BD-#)
CEILING FAN
CEILING MOUNTED PROJECTOR
CEILING MOUNTED MOTORIZED PROJECTION SCREEN
ROLLER SHADE
SUSPENDED OPEN GRID CEILING SYSTEM
DROP IN RESIN PANEL ON SUSPENDED OPEN GRID
CEILING SYSTEM
SURFACE MOUNTED LIGHT FIXTURE
STRIP LIGHT FIXTURE
TRACK LIGHTING
CONTROL JOINTCJ
PLASTER CEILING (PLAS-#)
HORN/STROBE DEVICE
EXHAUST AIR DEVICE
OCCUPANCY SENSOR
CEILING ACCESS PANEL (AP-#)
SEE PLAN FOR TYPE
SUSPENDED WOOD PANEL GRILLE DOWELED
CEILING SYSTEM (WD-#)
WOOD PANEL CEILING SYSTEM (WD-#)
FAUX WOOD PANELS (WD-#)
DAYLIGHTING SENSOR
s SPEAKER/STROBE
STROBE
ES EXPOSED STRUCTURE
NOTE: FOR MEPFP DEVICES, REFER TO MEPFP DRAWINGS.
APC-X
8' - 0"
CEILING TYPE
CEILING HEIGHT
CEILING LEGEND
DRAFTING LEGEND
NEW WALL
EXISTING WALL
EXISTING WALL TO BE DEMOLISHED
NEW DOOR
EXISTING DOOR
EXISTING DOOR TO BE DEMOLISHED
CMU (CONCRETE MASONRY UNIT)
CONCRETE
GYPSUM BOARD
PLASTER
RIGID INSULATION
MATERIAL LEGEND
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602-1585 309.282.8000
IL DESIGN FIRM #184000358-0001
Dewberry Engineers Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602 309.282.8000
IL DESIGN FIRM #184.005007
/3
/2
:4
:2
A M
GENERAL NOTES
DEW
PHT
PHT
7/3/25
50185817
F
IR
E S
T A
T
IO
N
H V
A C
R E
P L A
C E
M E
N T
C it y o f B lo o m in g to n
Is s u e d f o r
B id d in g
E
E M
P
IR
E S
T R
E E
T
B L O
O M
IN
G
T O
N
IL
A-001
AB ANCHOR BOLT
ACST ACOUSTIC(AL)
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING,
ADJUSTABLE
AED AUTOMATED EXTERNAL
DEFIBRILLATOR
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANCH ANCHOR
ANOD ANODIZE(D)
AP ACCESS PANEL
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ASPH ASPHALT
AUTO AUTOMATIC
AVE AVERAGE
AWT ACOUSTICAL WALL TREATMENT
BAL SHT BALANCE SHEET
BC BRICK COLOR
BCS BABY CHANGING STATION
BD BOARD
BG BUMPER GUARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING (WOOD)
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BRK PV BRICK PAVERS
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
CAB CABINET
CB CHALKBOARD
CC CUBICLE CURTAIN
CCT CUBICLE CURTAIN TRACK
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CFMF COLD-FORMED METAL FRAMING
CG CORNER GUARD
CH COAT HOOK
CIP CONC CAST-IN-PLACE CONCRETE
CJ CONTROL JOING, CONSTRUCTION
JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT, CASED OPENING
COL COLUMN
COMB COMBINATION, COMBINED
COMP COMPRESSIBLE
COMPT COMPARTMENT
CONC CONCRETE
CONC CTG CONCRETE COATING
COND CONDITION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPRS COMPRESSIBLE
CPT CARPET
CR CLOSET ROD
CRL CRASH RAIL
CRS COLD-ROLLED STEEL
CTR CENTER(S)
CUH CABINET UNIT HEATER
CUV CABINET UNIT VENTILATOR
CW CURTAINWALL
D DEEP, DEPTH, PENNY NAIL
DC DISPLAY CASE
DET DETAIL
DETN DETENTION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DN DOWN
DP DECORATIVE PANEL
DR DOOR
DS DOWNSPOUT
DWG DRAWING(S)
EHD ELECTRIC HAND DRYER
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT
EMER EMERGENCY
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EQ EQUAL
EQUIP EQUIPMENT
ES EXPOSED STRUCTURE
ETR EXISTING TO REMAIN
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FAB FABRIC
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FHC FIRE HOSE CABINET
FIN FINISH
FLASH FLASHING
FLP FLOOR PATTERN
FLR FLOOR
FRP FIBER REINFORCED PLASTIC
FTG FOOTING
FURG C FURRING CHANNEL
FURN FURNACE
FWC FABRIC WALLCOVERING
GA GAGE, GAUGE
GALV GALVANIZED
GB GRAB BAR
GFRC GLASS-FIBER REINFORCED
CONCRETE
GL GLASS
GL BLK GLASS BLOCK
GLZ CMU GLAZED CONCRETE MASONRY UNIT
GRFG GLASS-FIBER REINFORCED GYPSUM
GT GROUT
GWH GAS FIRED WATER HEATER
GYP BD GYPSUM WALL BOARD
H HIGH, HATCH (ROOF)
HB HOSE BIB
HDNR HARDENER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HTG HEATING
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
ID INSIDE DIAMETER, INSIDE
DIMENSION
IF INSIDE FACE
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INV INVERT
JT JOINT
KD KNOCKED DOWN
KOP KNOCK OUT PANEL
L LONG, ANGLE
LAM LAMINATE(D)
LAV LAVATORY
LH LEFT HAND
LINO LINOLEUM
LKR LOCKER
LL LIVE LOAD, LOW LEVEL
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LVL LEVEL
LVR LOUVER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MARKERBOARD
MBH MOB/BROOM HOLDER
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MI MIRROR
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODEL, MODULE, MODULAR
MSB MOP SERVICE BASIN
MT MOUNT
MTL METAL
NDU NEEDLE DISPOSAL UNIT
NIC NOT IN CONTRACT, NOISE ISOLATION
CLASS
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER, OUTSIDE
DIMENSION
OF OUTSIDE FACE
OFCI OWNER FURNISHED CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFOI OWNER FURNISHED OWNER
INSTALLED
OH OVERHEAD
OH DR OVERHEAD DOOR
OP OPERABLE PARTITION
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OS OVERFLOW SCUPPER
PC PORTLAND CEMENT, POINT
OF CURVE, POLYCARBONATE
PCC PRECAST CONCRETE
PERIM PERIMETER
PJ PROJECTOR
PL PLATE, PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PS PROJECTION SCREEN
PSF POUNDS PER SQUARE FOOT
PT PAINT
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER &
RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PVG PAVING
R RISER, RADIUS, THERMAL
RESISTANCE (R-VALUE)
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN, ROAD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RF RESILIENT FLOORING
RFG ROOFING
RFM REMOVABLE FLOOR MAT
RH RIGHT HAND
RO ROUGH OPENING
RSF RESINOUS FLOORING
RST REINFORCING STEEL
RTF RESILIENT TILE FLOORING
RV ROOF VENT, ROOF VENTILATOR
SC SEALED CONCRETE
SCHED SCHEDULE
SCR SHOWER CURTAIN ROD
SCWD SOLID CORE WOOD DOOR
SD SOAD DISPENSER
SECT SECTION
SF STOREFRONT
SH SHINGLES, SINGLE HUNG (WINDOW)
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SOG SLAB ON GRADE
SPCG SPACING
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS SERVICE SINK , SOLID SURFACING
SST STAINLESS STEEL, SHOWER SEAT
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TR STEEL TRUSS
STN STAIN
STRUCT STRUCTURAL
SUSP SUSPEND
SV SHEET VINYL
SWP SHEET WALL PROTECTION
SYMM SYMMETRICAL
SYNTH SYNTHETIC
T TILE, TREAD
T&G TONGUE AND GROOVE
T/S TUB/SHOWER
TB TOWEL BAR, TACKBOARD
TC TOILET COMPARTMENT
TD TRENCH DRAIN
TER TERRAZZO
THK THICK
TOB TOP OF BEAM
TOC TOP OF CONCRETE, TOP OF CURB
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOS TOP OF SLAB, TOP OF STEEL
TOW TOP OF WALL
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TS TUBE STEEL, TRANSITION STRIP
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W WIDE, WEST
WC WALL COVERING
WD WOOD, WOOD DOOR
WDW WINDOW
WP WALL PATTERN, WATERPROOFING
WT WEIGHT, WINDOW TREATMENT
WWF WELDED WIRE FABRIC
STANDARD ABBREVIATIONS
NO. DESCRIPTION DATE
A A
B B
C
C
D
D
E
E
F
F
024119.01024119.01
024119.01024119.01024119.01024119.01
024119.01024119.01
024119.01024119.01
024119.01024119.01
EXIST.
APPARATUS
BAY
EXIST.
ALARM
EXIST. VEST.
EXIST.
OFFICE
EXIST. REC /
DINING
EXIST.
KITCHEN
EXIST. HALL
EXIST. BATH
EXIST. STOR.
EXIST.
LOCKER
EXIST.
DORMITORY
EXIST.
RUBBER
EXIST. STOR.
EXIST. STOR.
EXIST.
MECHANICAL
EXIST. COR.
024119.03
024119.04
024119.03024119.03
024119.03
024119.05
024119.05
024119.05
024119.05
024119.05
024119.05
024119.05
024119.05
024119.05
024119.05
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602-1585 309.282.8000
IL DESIGN FIRM #184000358-0001
Dewberry Engineers Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602 309.282.8000
IL DESIGN FIRM #184.005007
/3
/2
:3
:3
A
M
FIRST FLOOR
DEMOLITION RCP
DEW
PHT
PHT
7/3/25
50185817
F
IR
E S
T A
T
IO
N
H V
A C
R E
P L A
C E
M E
N T
C it y o f B lo o m in g to n
Is s u e d f o r
B id d in g
E
E M
P
IR
E S
T R
E E
T
B L O
O M
IN
G
T O
N
IL
AD113
KEYNOTES PER SHEET
NOTE DESCRIPTION
024119.01 REMOVE EXISTING ACOUSTIC PANEL CEILING IN ITS ENTIRETY,
INCLUDING GRID, HANGERS, AND ACCESSORIES.
024119.03 REMOVE EXISTING CEILING FAN IN ITS ENTIRETY, SALVAGE AND
REINSTALL IN ORIGINAL LOCATION.
024119.04 REMOVE EXISTING DIVIDER CURTAIN TRACK IN ITS ENTIRETY.
SALVAGE AND REINSTALL IN ORIGINAL LOCATION.
024119.05 REMOVE PORTION OF EXISTING GYP. BD. CEILING AS REQUIRED FOR
INSTALLATION OF MECHANICAL SCOPE OF WORK. PATCH AND
REPAIR AS REQUIRED, PAINT EXTENTS OF CEILING TO EDGE. REFER
TO FINISH LIST.
Scale: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION RCP
APC-1
10' - 0"
APC-1
10' - 0"
APC-1
10' - 0"
111112
ES
APC-1
10' - 0"
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602-1585 309.282.8000
IL DESIGN FIRM #184000358-0001
Dewberry Engineers Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602 309.282.8000
IL DESIGN FIRM #184.005007
/3
/2
:3
:3
A
M
FIRST FLOOR
REFLECTED
CELIING PLAN
DEW
PHT
PHT
7/3/25
50185817
F
IR
E S
T A
T
IO
N
H V
A C
R E
P L A
C E
M E
N T
C it y o f B lo o m in g to n
Is s u e d f o r
B id d in g
E
E M
P
IR
E S
T R
E E
T
B L O
O M
IN
G
T O
N
IL
A-113 Scale: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN
FINISH LIST
FINISH COMMENTS
CEILING FINISHES
ACOUSTIC CEILING TILE (ACT)
ACT-1 USG MARS HEALTHCARE ACOUSTICAL PANELS - SLT. USG DONN
BRAND DX/DXL ACOUSTICAL SUSPENSION SYSTEM.
PAINT (PNT)
PNT-1 SHERWIN WILLIAMS; SW7007 CEILING BRIGHT WHITE.
F
TS
FLOW SWITCH
HOSE END DRAIN VALVEHED
TEMPERATURE SENSOR
PRESSURE GAUGE
MANUAL DAMPER
MECHANICAL SYMBOLS
FIRE DAMPER
HUMIDISTAT
SYMBOL DESCRIPTION
H
GAS COCK
GAS PRESSURE REGULATING VALVE
CO2
CARBON MONOXIDE SENSOR
T THERMOSTAT/TEMPERATURE SENSOR
MOTOR OPERATED DAMPERM
DUCTWORK SYMBOLSPIPING DESCRIPTION
X" CD
CONDENSATE DRAIN
CHILLED WATER RETURN
CHILLED WATER SUPPLY
NATURAL GAS
HEATING WATER RETURN
HEATING WATER SUPPLY
SMOKE DAMPER
FD
SD
REFRIGERANT PIPES (SUCTION/LIQUID)
X = SECTION DETAIL NUMBER
XX = SHEET REFERENCE
X
XX
X = CALLOUT DETAIL NUMBER
XX = SHEET REFERENCE
X
XX
GENERAL
CONNECT TO EXISTING
DIRECTION OF AIR FLOW
VENTURI FLOW METER
BUTTERFLY VALVE
BACKFLOW PREVENTER
1/8" PIPE SLOPE AS NOTED
PRESSURE REGULATING VALVE
PIPE REDUCER OR INCREASER
CONTROL VALVE (3-WAY)
MECHANICAL SYMBOLS
DIRECTION OF FLOW
GATE VALVE
BALANCING VALVE
GLOBE VALVE
Y-STRAINER
PIPE CAP OR PLUG
CHECK VALVE
UNION
PIPE CONTINUES
SYMBOL DESCRIPTION
CONTROL VALVE (2-WAY)
ELBOW UP
ELBOW DOWN
TOP TAKE-OFF
BOTTOM TAKE-OFF
BALL VALVE
BFP
SUPPLY AIR DEVICE
EXHAUST AIR DEVICE
RETURN AIR DEVICE
EQUIPMENT TAG
XXX = TYPE X = NUMBER
(SEE SCHEDULE)
XXX
X
AIR DEVICE TAG
X = TAG XX = CFM
(SEE SCHEDULE)
X
XX
AIR DEVICE SYMBOLS
WALL AIR DEVICE (SUPPLY/RETURN)
SA
TO SPACE
SQUARE ELBOW (WITH TURNING VANES)
RADIUS ELBOW (1.5 DIA. UNLESS NOTED)
SQUARE TO SQUARE/ROUND DUCT 90 DEGREE TAKEOFF
ROUND TO ROUND DUCT 90 DEGREE TAKEOFF
TRANSITION
RECTANGULAR ELBOW UP (SUPPLY)
RECTANGULAR ELBOW DN (SUPPLY)
ROUND ELBOW UP (SUPPLY)
ROUND ELBOW DN (SUPPLY)
VAV BOX (SIZE MAY VARY)
45 DEGREE DUCT TRANSITION UP/DN
FLEX DUCT
X" CHWR
X" CHWS
X" NG
X" HWR
X" HWS
X" RF
LINEAR SLOT CEILING AIR DEVICE
LINEAR SLOT WALL AIR DEVICE
CO
CARBON DIOXIDE SENSOR
GENERAL NOTES
1. NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS DRAWING MAY
BE USED FOR THIS PROJECT.
2. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS NECESSARY
FOR THE INSTALLATION OF THE WORK AND FOR ALL CERTIFICATES OF
INSPECTION AND APPROVAL REQUIRED BY THE AUTHORITIES HAVING
JURISDICTION. NO WORK IS TO PROCEED WITHOUT BUILDING
DEPARTMENT PERMIT.
3. THE CONTRACTOR SHALL MAINTAIN SUCH INSURANCE AS WILL PROTECT
HIMSELF AND/OR THE OWNER FROM DIRECT, ASSUMED AND CONTINGENT
LIABILITY FROM CLAIMS FOR DAMAGES, FOR PERSONAL INJURIES,
INCLUDING DEATH, AND/OR DAMAGE TO PROPERTY, WHICH MAY ARISE
FROM OPERATION UNDER HIS CONTRACT WHETHER SUCH OPERATIONS
BE BY HIMSELF, OR ANY SUB-CONTRACTOR, OR ANYONE DIRECTLY
EMPLOYED BY EITHER OF THEM.
4. THE MECHANICAL CONTRACTOR SHALL BE FAMILIAR WITH ALL CONTRACT
DOCUMENTS FOR ALL TRADES AND COORDINATE WITH OTHER
CONTRACTORS.
5. WHEN CONFLICTS OCCUR IN THE SPECIFICATIONS OR ON THE DRAWINGS
OR BETWEEN EITHER, PROVIDE THE ITEM OF GREATER QUANTITY OR
HIGHER COST, UNLESS WRITTEN INSTRUCTIONS FROM THE OWNER OR
ENGINEER ARE PROVIDED TO RESOLVE THE SPECIFIC CONFLICT.
6. THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, AS
SPECIFIED, ARE PART OF THIS CONTRACT.
7. THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL ELECTRICAL
AND PLUMBING REQUIREMENTS WITH THE ELECTRICAL AND PLUMBING
CONTRACTORS.
8. MECHANICAL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL CODES, AND STANDARDS.
9. THE CONTRACTOR WILL BE HELD TO HAVE VISITED THE PREMISES PRIOR
TO SUBMITTING HIS BID AN TO HAVE THOROUGHLY EXAMINED ALL
EXISTING CONDITIONS INCLUDING ENTRANCE AND EXIT FACILITIES,
HOURS PERMITTED BY THE BUILDING FOR THE TRANSPORTATION OF
EQUIPMENT AND MATERIALS, AS WELL AS THE CONTRACTOR SATISFIED
HIMSELF AS TO THE CONDITIONS AND WORK SHOWN ON THE PLANS OF
THE ARCHITECT WHICH WOULD IN ANY MANNER AFFECT THE WORK
UNDER HIS CONTRACT AND ITS COMPLETION DATE. NO LATER CLAIM FOR
EXTRA COMPENSATION FOR WORK WHICH COULD HAVE BEEN FORESEEN
BY SUCH VISIT OR INVESTIGATION SHALL BE RECOGNIZED. SUBMISSION
OF A BID SHALL BE CONSTRUED AS EVIDENCE THAT SUCH A VISIT HAD
OCCURRED. THE CONTRACTOR SHALL EXAMINE ALL EXISTING
STRUCTURAL CONDITIONS, TAKE ALL NECESSARY MEASUREMENTS FOR
HIS WORK AT THE SITE AND SHALL VERIFY ALL DIMENSIONS GIVEN ON THE
DRAWINGS OF THE WORK AND THE REFERENCE DRAWINGS.
10. THE SCOPE OF WORK SHALL INCLUDE PROVIDING HEATING, VENTILATING
AND AIR CONDITIONING FOR THE PREMISES IN ACCORDANCE WITH THESE
DRAWINGS AND SPECIFICATIONS. DRAWINGS AND SPECIFICATIONS
INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN
THIS CONTRACT, WORK SHALL CONSIST OF FURNISHING ALL ASPECTS
NECESSARY FOR AND INCIDENTAL TO THE EXECUTION AND COMPLETION
OF FULLY FUNCTIONAL HVAC SYSTEMS INDICATED ON THE DRAWINGS
AND SPECIFIED HEREIN.
11. MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
12. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. MECHANICAL
DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE BASED ON ONE
MANUFACTURER'S EQUIPMENT. THEY ARE NOT INTENDED TO SHOW
EVERY ITEM IN ITS EXACT LOCATION, THE EXACT DIMENSIONS, OR ALL
THE DETAILS OF THE EQUIPMENT OR DEVICES. THE CONTRACTOR SHALL
VERIFY THE ACTUAL DIMENSIONS OF THE EQUIPMENT PROPOSED TO
ENSURE THAT THE EQUIPMENT WILL FIT IN THE AVAILABLE SPACE; FINAL
ROUTING OF DUCTWORK, PIPING AND EQUIPMENT LOCATIONS SHALL BE
DETERMINED IN THE FIELD. ADDITIONAL OFFSETS, ELBOWS, ETC., SHALL
BE PROVIDED AND INSTALLED WITHOUT ADDITIONAL COST TO THE
OWNER.
13. IN ORDER TO DEFINE REQUIREMENTS FOR CAPACITY, QUALITY,
FUNCTION, SIZE, GAUGES AND GRADES, THESE MATERIAL
SPECIFICATIONS DESIGNATE MANUFACTURERS, BRANDS, AND OTHER
PERTINENT DATA DESCRIBING PRODUCTS THAT CONFORM TO THIS
PROJECT'S REQUIREMENTS, MATERIALS OR PRODUCTS SPECIFIED BY
NAME OF MANUFACTURER, BRAND OR TRADE NAME OR CATALOG
REFERENCE SHALL BE THE BASIS OF THE BID AND FURNISHED UNDER
THIS CONTRACT. SHOULD THE CONTRACTOR WISH TO PROVIDE AN
ALTERNATE PIECE OF EQUIPMENT HE SHALL BEAR ALL BURDEN OF
RESPONSIBILITY GUARANTEEING SUBSTITUTE UNIT IS EQUAL IN ALL
ASPECTS OF PERFORMANCE, DIMENSIONS ETC. WHERE TWO OR MORE
MATERIALS OR PRODUCTS ARE NAMED, THE CHOICE OF THESE SHALL BE
OPTIONAL WITH THE BIDDER, THE BIDDER SHALL SUBMIT HIS BID BASED
ON THE MATERIAL AND PRODUCTS LISTED IN THIS SPECIFICATION.
14. THE MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL
INCIDENTAL ACCESSORIES NECESSARY TO MAKE THE MECHANICAL WORK
COMPLETE AND READY FOR OPERATION.
15. THE CONTRACTOR SHALL GUARANTEE ALL WORK PERFORMED AND
MATERIALS INSTALLED BY HIM TO BE FREE FROM INHERENT DEFECTS,
AND SHALL REPAIR OR REPLACE ANY DEFECTIVE MATERIALS OR
WORKMANSHIP, FREE OF COST TO OWNER, FOR A PERIOD OF ONE (1)
YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER. ANY DAMAGE OR
LOSS, EXCLUSIVE OF BUILDING CONTENTS DUE TO SUCH DEFECTS WILL
ALSO BE MADE GOOD AT CONTRACTOR'S EXPENSE. DEFECTS WILL BE
REMEDIED AND DAMAGES OR LOSSES WILL BE MADE GOOD WITHIN A
REASONABLE TIME, AS SPECIFIED IN NOTICE BY THE OWNER.
16. ANY LOSS OF, OR DAMAGE TO ANY EQUIPMENT, OR MATERIALS SUPPLIED
BY THE CONTRACTOR, OR BY OWNER FOR INSTALLATION SHALL BE THE
SOLE RESPONSIBILITY OF THIS CONTRACTOR, UNTIL SUCH TIME AS
COMPLETED JOB HAS BEEN APPROVED AND ACCEPTED BY THE OWNER. IF
LOSS, OR DAMAGE SHOULD OCCUR NO CLAIM MAY BE MADE AGAINST THE
OWNER, NOR SHALL COMPLETION DATES BE AFFECTED BY SUCH LOSS,
OR DAMAGE.
17. THE MECHANICAL CONTRACTOR SHALL FURNISH TO THE GENERAL
CONTRACTOR ALL INFORMATION REQUIRED FOR SETTING OF WALL, ROOF
AND PARTITION OPENINGS FOR MECHANICAL WORK.
18. ALL EXTERIOR OPENINGS TO BE PROPERLY CAULKED AND SEALED WITH A
SEALANT OF HIGH QUALITY AND LONG LIFE, TO PREVENT INFILTRATION OF
OUTSIDE AIR INTO CONDITIONED SPACE.
19. CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS OF THE
EQUIPMENT, DUCTWORK IN 3/8" SCALE, PIPING, TEMPERATURE CONTROLS
AND PROVIDE CUTS OF COMPONENTS TO BE FURNISHED BY HIM. ALL
ITEMS SHALL BE SUBMITTED THE ENGINEER FOR HIS APPROVAL. NO
WORK SHALL PROCEED WITHOUT APPROVED SHOP DRAWINGS.
20. CONTRACTOR SHALL FURNISH "AS BUILT" RECORD DRAWINGS AND
OPERATING AND MAINTENANCE INSTRUCTIONS AT THE COMPLETION OF
THE INSTALLATION. DRAWINGS SHALL SHOW:
A. ALL NEW ELECTRICAL AND MECHANICAL WORK INSTALLED
B. MODIFICATIONS AND ADDITIONS TO ORIGINAL DESIGN
C. DIMENSIONAL INFORMATION NECESSARY TO LOCATE BURIED OR
UNDERGROUND PIPING/UTILITIES
21. TEMPORARY WORK TO KEEP NORMAL BUILDING SERVICES IN OPERATION
SHALL BE PART OF THIS CONTRACT. COORDINATE WITH BUILDING
MANAGEMENT AND OBTAIN PERMISSION FOR ANY ALTERATIONS
AFFECTING BUILDING. COORDINATE ALL BUILDING SHUTDOWNS AND
RELOCATIONS OF EXISTING SYSTEMS WITH OWNER. DO NOT PROCEED
WITH WORK AFFECTING BUILDING SYSTEMS AND OPERATION WITHOUT
WRITTEN APPROVAL.
22. CONTRACTOR SHALL COORDINATE HIS WORK WITH ARCHITECT'S
DRAWINGS, LIGHTING, AND WORK OF ALL OTHER TRADES. CONTRACTOR
SHALL PROVIDE ADDITIONAL DUCTWORK TO MAINTAIN CEILING HEIGHTS
AND AVOID WORK OF OTHER TRADES AND EXISTING CONDITIONS, AS
PART OF HIS BASE BID.
23. FIELD OBSERVATION OF EXISTING SYSTEM AND CONDITIONS WAS
ATTAINED VIA LIMITED FIELD SURVEYS. ONLY SYSTEMS AND CONDITIONS
CLEARLY VISIBLE AT THE TIME OF SURVEY ARE SHOWN. CONTRACTOR
SHALL VERIFY EXACT LOCATION OF CONNECTION OF NEW WORK TO
EXISTING.
24. CONTRACTOR TO PROVIDE PRIME AND FINISH PAINTING AS REQUIRED.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND/OR
DISPOSING OF ALL ITEMS THAT ARE NOT NECESSARY IN THE COMPLETION
OF THE PROJECT AND SHALL CLEAN THE AREA OF CONSTRUCTION AFTER
THE COMPLETION OF THE PROJECT.
26. WHERE EXISTING EQUIPMENT IS TO BE RELOCATED, EXTREME CARE
SHALL BE TAKEN TO PREVENT DAMAGE DURING THE REMOVAL AND
REINSTALLATION. WHERE DAMAGE OCCURS, THE EQUIPMENT SHALL BE
REPLACED OR REPAIRED TO THE SATISFACTION OF THE ARCHITECT, AT
NO ADDITIONAL COST TO THE OWNER.
27. PROVIDE COMPLETE ACCESS TO ALL NEW OR RELOCATED AIR HANDLING
UNITS, TERMINAL DEVICES, HEATING COILS, AND FANS AND NOTIFY
ENGINEER OF ANY CONFLICTS PRIOR TO INSTALLATION.
28. FIRE STATION #3 IS A CONTROLLED LOCATION. CONTRACTORS WORKING
WITHIN THE FACILITY WILL NEED TO SUBMIT APPLICATION AND BE
GRANTED SITE BADGES TO OPERATE WITHIN THE FACILITY BY THE
AIRPORT AUTHORITY.
GENERAL NOTES - MECHANICAL HVAC
1. MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
2. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OF
DIFFUSERS, REGISTERS AND GRILLES.
3. VOLUME DAMPERS SHALL BE INSTALLED AT ALL LOW PRESSURE SUPPLY, RETURN
AND EXHAUST DUCTWORK BRANCH TAKE-OFFS.
4. FIRE DAMPERS AND ACCESS PANELS SHALL BE INSTALLED AT FIRE RATED
ASSEMBLIES AND FLOOR PENETRATIONS BY THE GC.
5. SUPPORTS FOR DUCT, FANS, VAV'S, ETC. SHALL BE DIRECTLY FROM BUILDING
STRUCTURE, SUSPENDING ANY OF THE ABOVE FROM ONE ANOTHER IS PROHIBITED.
6. MECHANICAL CONTRACTOR SHALL INSTALL DUCT-MOUNTED SMOKE DETECTORS IN
DUCT AND PROVIDE A 16x16 DUCT ACCESS DOOR FOR EACH. ELECTRICAL
CONTRACTOR WILL FURNISH AND WIRE DETECTORS.
7. THE BUILDING AUTOMATION SYSTEM (BAS) CONTRACTOR SHALL COORDINATE WALL
AND CEILING MOUNTED SENSOR LOCATIONS WITH THE ARCHITECTURAL PLANS. WALL
MOUNTED SENSORS SHALL BE INSTALLED 48" ABOVE FINISHED FLOOR UNLESS
OTHERWISE NOTED.
8. INSULATE THE BACKS OF ALL DIFFUSERS UNLESS NOTED OTHERWISE.
9. PROVIDE ALL NECESSARY DUCT TRANSITIONS FROM THE INDICATED DUCT SIZE TO
THE ACTUAL EQUIPMENT DUCT COLLAR SIZE.
10. EXHAUST AND SUPPLY FANS SHALL BE PROVIDED WITH FLEXIBLE DUCT CONNECTIONS
WHEN ATTACHED TO DUCTWORK.
11. INSTALL EACH FAN WITH THE FAN MOTOR AND DRIVE ORIENTED TO ALLOW ACCESS.
12. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE
BRAIDED COPPER GROUNDING STRIPS.
13. ALL DUCTWORK DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS. DUCTWORK
SIZES SHOWN DO NOT ACCOUNT FOR DUCTWORK LINER OR INSULATION WRAP
THICKNESS.
14. IN FINISHED AREAS, INSTALL ALL DUCTWORK AT THE MAXIMUM ELEVATION POSSIBLE.
PROVIDE ALL FITTINGS, TRANSITIONS AND MATERIALS REQUIRED TO ACHIEVE
MAXIMUM ELEVATION. COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO THE
START OF WORK TO AVOID CONFLICTS. THIS EXCLUDES ALL DUCT NECESSARY TO
KEEP EQUIPMENT AND DAMPERS ACCESSIBLE FOR MAINTENANCE.
15. THE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING POWER TO
THE CONTROL PANELS. ELECTRICAL CONTRACTOR SHALL PROVIDE 120 VOLT CIRCUIT
TO JUNCTION BOX IN EACH MECHANICAL SPACE. THE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR PULLING WIRING FROM JUNCTION BOX TO CONTROL
PANELS. ALL 120 VOLT WIRING SHALL BE INSTALLED IN ACCORDANCE WITH DIVISION
26.
16. TERMINAL UNITS SHALL ME MOUNTED WITHIN 8" AFC WHERE POSSIBLE.
17. ALL RETURN AIR OPENINGS INDICATED ON DRAWINGS ARE LOCATED ABOVE THE
CEILING UNLESS OTHERWISE NOTED. INSTALL ALL RETURN AIR OPENINGS SO THAT
THERE ARE NO OBSTRUCTIONS BLOCKING THE INDICATED RETURN AIR PATH FREE
AREA.
18. FLEXIBLE DUCTWORK SHALL NOT EXTEND THROUGH FULL HEIGHT PARTITIONS.
CONTRACTOR SHALL EXTEND RIGID ROUND DUCTWORK THROUGH FULL HEIGHT
PARTITIONS BEFORE CONNECTING FLEXIBLE DUCTWORK.
19. THE MAXIMUM LENGTH OF FLEXIBLE DUCTWORK SHALL NOT EXCEED 6'-0". WHERE A
LENGTH GREATER THAN 6'-0" OCCURS, CONTRACTOR SHALL EXTEND THE DUCTWORK
WITH EXTERNALLY INSULATED ROUND SHEET METAL OF THE SAME SIZE AS THE
FLEXIBLE DUCT.
20. THE CONTRACTOR SHALL SEAL ALL LEAKS IN NEW DUCTWORK AND EXISTING
DUCTWORK TO REMAIN. THE CONTRACTOR SHALL CAP AND SEAL ALL UNUSED TAPS
AND OPENINGS IN THE EXISTING DUCTWORK.
21. PROVIDE SPIN COLLAR BRANCH FITTINGS, CONSTRUCTED OF GALVANIZED STEEL,
WITH VOLUME DAMPER AT ALL NEW ROUND BRANCH TAPS SERVING ALL SUPPLY AND
EXHAUST AIR CEILING DIFFUSERS. WHERE THE DEPTH OF THE DUCTWORK WILL NOT
PERMIT A SPIN COLLAR FITTING, PROVIDE AN EQUIVALENT FLAT OVAL CONNECTION
WITH MANUAL VOLUME DAMPER AND AN OVAL TO ROUND TRANSITION FOR EACH
DIFFUSER TAP. REFER TO THE SQUARE CEILING DIFFUSER DETAIL FOR EQUIVALENT
FLAT OVAL SIZES. FLANGED AND GASKETED STYLE OF SPIN COLLAR FITTINGS IS NOT
ACCEPTABLE.
22. PROVIDE SCREWED ON ENGRAVED BLACK LAMICOLD SHEET NAMEPLATES FOR
EQUIPMENT, INSTRUMENTS, GAUGES, CONTROL SWITCHES ETC.
23. ALL AIR SYSTEMS SHALL BE BALANCED AND CERTIFIED READINGS SHALL BE
SUBMITTED FOR APPROVAL. THE CONTRACTOR SHALL ALLOW FOR A SECOND VISIT TO
REBALANCE THE SYSTEM TO PROVIDE AIR QUANTITIES INDICATED ON DRAWINGS AND
TO ADJUST AIR THROW ONCE SPACE IS OCCUPIED. THE WORK WILL NOT BE
CONSIDERED COMPLETE WITHOUT APPROVED BALANCING REPORT.
GENERAL NOTES - MECHANICAL PIPING
1. SUPPORTS FOR, PIPING SHALL BE DIRECTLY FROM BUILDING STRUCTURE, SUSPENDING
PIPING FROM ANOTHER ITEM IS PROHIBITED.
2. MINIMUM SIZE OF HOT WATER SUPPLY, HOT WATER RETURN AND CONDENSATE DRAIN
PIPING SHALL BE 3/4" UNLESS OTHERWISE NOTED.
3. PROVIDE 3/4" MANUAL AIR VENTS WITH BALL VALVES AT ALL HIGH POINTS AND ENDS OF
MAIN PIPE RUNS. PIPE TO FLOOR DRAIN IN MECHANICAL ROOMS OR JANITOR CLOSETS WITH
3/4" COPPER PIPING. ALTERNATE LOCATIONS MUST BE APPROVED BY ENGINEER.
4. ALL WATER SYSTEMS SHALL BE BALANCED AND CERTIFIED READINGS SHALL BE SUBMITTED
FOR APPROVAL. THE CONTRACTOR SHALL ALLOW FOR A SECOND VISIT TO REBALANCE THE
SYSTEM TO PROVIDE WATER QUANTITIES INDICATED ON DRAWINGS. THE WORK WILL NOT
BE CONSIDERED COMPLETE WITHOUT APPROVED BALANCING REPORT. HOT AND CHILLED
WATER SYSTEM SHALL BE BALANCED TO FLOW RATES INDICATED.
5. ISOLATION VALVES SHALL BE INSTALLED IN SUPPLY AND RETURN PIPING ON EACH FLOOR, AND IN BRANCH PIPING SERVING MORE THAN ONE PIECE OF EQUIPMENT.
6. NO BULLHEAD TEES IN PIPING SYSTEMS SHALL BE ALLOWED ON THIS PROJECT.
CONTRACTOR SHALL PROVIDED OFFSETS AS NECESSARY TO MEET THIS REQUIREMENT.
7. CONTRACTOR TO PROVIDE IDENTIFICATION OF PIPING WITH SIZE, PURPOSE AND DIRECTION
OF FLOW. APPLY ASME A13.1 COMPLYING MARKERS TO ALL PIPING WITH NAME OR SERVICE,
SPACE EVERY 20 FEET. COLORING OF ARROWS SHALL BE IN ACCORDANCE WITH AMERICAN
STANDARD ASSOCIATION (A.S.A.) REQUIREMENTS.
8. FURNISH AND INSTALL ON EACH VALVE A 2 INCH DIAMETER NUMBERED TAG, FURNISH AND
INSTALL TWO FRAME, GLASS COVERED VALVE CHARTS, LISTING EACH VALVE BY SYSTEM,
FUNCTION AND NUMBER, AS WELL AS ONE LINE FLOW SCHEMATIC.
9. WHEN INSTALLING VALVES, INSURE THE ABILITY TO ACTUATE THE VALVE HANDLE THROUGH
THE FULL RANGE OF OPERATION.
10. IN FINISHED AREAS, INSTALL ALL PIPING AT THE MAXIMUM ELEVATION POSSIBLE. PROVIDE
ALL FITTINGS, TRANSITIONS AND MATERIALS REQUIRED TO ACHIEVE MAXIMUM ELEVATION.
COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO THE START OF WORK TO AVOID
CONFLICTS. THIS EXCLUDES ALL PIPE NECESSARY TO KEEP EQUIPMENT AND VALVES
ACCESSIBLE FOR MAINTENANCE.
GENERAL NOTES - TEMPERATURE CONTROL
1. THE TEMPERATURE CONTROLS CONTRACTOR (TCC) SHALL BE FULLY RESPONSIBLE FOR
THE AUTOMATIC CONTROL, AS DEFINED BY THE SEQUENCE OF OPERATION, OF
EQUIPMENT DOCUMENTED ON THE TEMPERATURE CONTROLS DRAWINGS. THE TCC SHALL
PROVIDE ALL WIRING TO IMPLEMENT THE SEQUENCE OF CONTROL. WIRING SHALL
CONFORM TO THE DIVISION 26 SPECIFICATIONS.
2. UNLESS EXPLICITLY STATED IN THE EQUIPMENT SPECIFICATIONS, THE TCC SHALL
PROVIDE ALL THERMOSTATS AND/OR SPACE SENSORS REQUIRED FOR AUTOMATIC
CONTROL EQUIPMENT.
3. ALL THERMOSTATS AND/OR SPACE SENSORS SHALL BE OF THE SAME COLOR AND LOOK
SIMILAR IN NATURE UNLESS THE SEQUENCE OF OPERATION REQUIRES A SPECIAL OR
COMBINED FUNCTION OF THE DEVICE.
4. SUBMIT THERMOSTAT OR SENSOR COLOR/MATERIAL TO THE BUILDING ARCHITECT FOR
APPROVAL BEFORE DELIVERY OF THE EQUIPMENT TO THE JOB SITE.
5. UNLESS EXPLICITLY STATED IN THE EQUIPMENT SPECIFICATIONS, THE TCC SHALL
PROVIDE ALL HARDWARE AND SOFTWARE REQUIRED FOR AUTOMATIC CONTROL OF THE
EQUIPMENT.
6. THE TCC IS RESPONSIBLE TO OBTAIN AND THOROUGHLY REVIEW THE HVAC EQUIPMENT
SPECIFICATIONS AND SECTION 230900 (DIGITAL CONTROLS AND INSTRUMENTATION) TO
DETERMINE SCOPE OF WORK.
7. THE TCC IS RESPONSIBLE TO REVIEW ALL HVAC, PLUMBING, ELECTRICAL, AND FIRE
PROTECTION DRAWINGS TO DETERMINE SCOPE OF WORK.
8. THESE GENERAL NOTES SHALL SUPERSEDE ANY CONFLICTING INFORMATION FOUND IN
THE PROJECT DRAWINGS, SPECIFICATIONS, AND ADDENDA.
9. THE TCC SHALL BE RESPONSIBLE TO PROVIDE 120V POWER WIRING, CONDUIT AND
CIRCUIT BREAKERS TO EACH CONTROL PANEL AS REQUIRED. WIRING PROVIDED ON THE
PROJECT SHALL COMPLY WITH THE DIVISION 26 SPECIFICATIONS.
10. THE TCC SHALL PROVIDE ELECTRICAL POWER TO ALL VALVE AND DAMPER ACTUATORS
DESCRIBED IN THE SEQUENCE OF OPERATION OR SHOWN IN THE CONTROL SCHEMATIC.
11. THE TEMPERATURE CONTROLS SYSTEM SHALL MONITOR ALL FACTORY STATUS POINTS
AND ALARMS FROM THE EQUIPMENT MANUFACTURER'S CONTROL PANEL.
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602-1585 309.282.8000
IL DESIGN FIRM #184000358-0001
Dewberry Engineers Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602 309.282.8000
IL DESIGN FIRM #184.005007
/8
/2
:2
:3
P M
MECHANICAL
SYMBOLS,
ABBREVIATIONS
& NOTES
JRF
PER
PER
7/3/25
50185817
F
IR
E S
T A
T
IO
N
H V
A C
R E
P L A
C E
M E
N T
C it y o f B lo o m in g to n
Is s u e d f o r
B id d in g
E
E M
P
IR
E S
T R
E E
T
B L O
O M
IN
G
T O
N
IL
M-001
ABBREVIATIONS - MECHANICAL
% PERCENT
(D) DEMOLISH
(E) EXISTING
(R) REMOVE
< LESS THAN
> GREATER THAN
AC AIR CONDITIONING
ACCU AIR COOLED CONDENSING UNIT
ADJ ADJUSTABLE
AF AIRFLOW
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
ARCH ARCHITECTURAL
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATING, AND AIR-CONDITIONING
ENGINEERS
ATC AUTOMATIC TEMPERATURE CONTROL
B BOILER
B&G BELL & GOSSETT
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BI BINARY INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY OUTPUT
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CD CONDENSATE DRAIN
CDWP CONDENSER WATER PUMP
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHW CHILLED WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
CONN CONNECTION
CONT CONTROLS
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
Cv VALVE COEFFICIENT
CW CONDENSER WATER
CWFS CONDENSER WATER FILTRATION SYSTEM
CWP CHILLED WATER PUMP
DB DRY BULB
DBL DOUBLE
DE DISHWASHER EXHAUST
DEF DISHWASHER EXHAUST FAN
DEG DEGREE
DIA DIAMETER
DN DOWN
DOAU DEDICATED OUTDOOR AIR UNIT
DP DIFFERENTIAL PRESSURE (SENSOR)
DPP DUAL PUMP PACKAGE
DRE DRYER EXHAUST
DREF DRYER EXHAUST FAN
DTY DUTY
DWG DRAWING
DWH DOMESTIC WATER HEATER
DX DIRECT EXPANSION
E EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECM ELECTRICALLY COMMUTATED MOTOR
EF EXHAUST FAN
EHC ELECTRIC HEATING COIL
ELEC ELECTRICAL
EMCS ENERGY MANAGEMENT CONTROL
SYSTEM
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETC ETCETERA
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXR EXHAUST REGISTER
Ez ZONE AIR DISTRIBUTION EFFECTIVENESS
F DEGREES FAHRENHEIT
FD FIRE DAMPER OR FLOOR DRAIN
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FP FAN POWERED
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FOOT/FEET
G NATURAL GAS
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GUH GAS FIRED UNIT HEATER
H HUMIDIFIER OR HEIGHT
H2O WATER
HD HEAD
HP HORSEPOWER
HVAC HEATING, VENTILATION, AND
AIR-CONDITIONING
ABBREVIATIONS - MECHANICAL
HVY HEAVY
HW HOT WATER (DOMESTIC)
HWB HOT WATER BOILER
HWP HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWT HOT WATER TEMPERATURE
IN INCH
KEF KITCHEN EXHAUST FAN
KW KILOWATT
L LOUVER
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LD LINEAR DIFFUSER
LF LINEAR FEET
LIN LINEAR
LTDE LOW-LIMIT TEMPERATURE DETECTOR
LWT LEAVING WATER TEMPERATURE
M MOTOR OR MOTORIZED DAMPER OR
METER
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKEUP AIR UNIT
MBH 1,000 BRITISH THERMAL UNITS PER HOUR
MCA MINIMUM CIRCUIT AMPS
MERV MINIMUM EFFICIENCY REPORTING VALUE
MFGR MANUFACTURER
MOCP MAXIMUM OVERCURRENT PROTECTION
N NEW OR NORTH
NC NORMALLY CLOSED OR NOISE CRITERIA
NG NATURAL GAS
NO NORMALLY OPEN OR NUMBER
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTDOOR AIR
OAT OUTDOOR AIR TEMPERATURE
OD OUTSIDE DIAMETER
OS OCCUPANCY SENSOR
P PRESSURE OR PRESSURE SENSOR
P/I PROVIDE AND INSTALL
PA PIPE ANCHOR
PD PRESSURE DROP
PH PHASE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PTAC PACKAGED TERMINAL AIR CONDITIONER
QTY QUANTITY
R RADIUS, RISE, OR REMOVE
RA RETURN AIR
RAD RADIATOR
RAT RETURN AIR TEMPERATURE
RCP REFLECTED CEILING PLAN
RD REFRIGERANT DISCHARGE
RF REFRIGERANT PIPING
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SCH SCHEDULE
SD SLOT DIFFUSER
SEC SECONDS
SF SUPPLY FAN OR SQUARE FOOT
SP STATIC PRESSURE
SS SPLIT SYSTEM OR STAINLESS STEEL
SVAV SERIES FLOW FAN POWERED BOX
SWR SIDEWALL REGISTER
T OR TEMP TEMPERATURE
T&P TEMPERATURE AND PRESSURE
T-STAT THERMOSTAT
TCP TEMPERATURE CONTROL PANEL
TEF TOILET EXHAUST FAN
TON 12,000 BRITISH THERMAL UNITS PER
HOUR COOLING
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UH UNIT HEATER
V OR VOLT VOLTAGE
VAV VARIABLE AIR VOLUME BOX
VEL VELOCITY
VF VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
Voc OUTDOOR AIRFLOW (SPACE)
W WIDTH OR WATTS
W/ WITH
WB WET BULB
WC WATER COLUMN
WCU WATER CHILLING UNIT
WG WATER GAUGE
WH WALL HYDRANT
WHP WATER HEATER PUMP
WL WALL LOUVER
WPD WATER PRESSURE DROP
X UNCORRECTED FRACTION OF OUTDOOR
AIR (SYSTEM)
Y CORRECTED FRACTION OF OUTDOOR AIR
(SYSTEM)
Z FRACTION OF OUTDOOR AIR (CRITICAL
SPACE)
NO. DESCRIPTION DATE
Date:7/8/25
EXP:11/30/2025
EXISTING UFD, ABANDON IN
PLACE (TYP. FOR ALL UFD)
MD101
(E)
(E)
(E)
(E)
EXISTING LOUVER
TO REMAIN
EXISTING HOOD
TO REMAIN
EXISTING HOOD
TO REMAIN
EXISTING WATER
HEATER FLUE
EXISTING UFD, ABANDON IN
PLACE (TYP. FOR ALL UFD)
NG
MD101
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602-1585 309.282.8000
IL DESIGN FIRM #184000358-0001
Dewberry Engineers Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602 309.282.8000
IL DESIGN FIRM #184.005007
/8
/2
:2
:4
P M
MECHANICAL
DEMOLITION
PLANS
JRF
PER
PER
7/3/25
50185817
F
IR
E S
T A
T
IO
N
H V
A C
R E
P L A
C E
M E
N T
C it y o f B lo o m in g to n
Is s u e d f o r
B id d in g
E
E M
P
IR
E S
T R
E E
T
B L O
O M
IN
G
T O
N
IL
MD101
NOTES:
1. UNDERFLOOR DUCTWORK TO BE ABANDONED IN PLACE. CONTRACTOR TO
CAP AND SEAL DUCTWORK THROUGH FLOOR PENETRATIONS IN THE
MECHANICAL ROOM 2" ABOVE THE SURROUNDING CONCRETE.
2. EXISTING FLOOR MOUNTED AIR DEVICES ARE TO BE ABANDONED IN PLACE,
TYPICAL FOR ALL.
3. EXISTING CONDENSING UNITS TO BE REMOVED. REMOVE ALL ASSOCIATED
PIPING, CONDUIT AND WIRING. EXISTING ROOFTOP UNIT SUPPORTS SHALL
REMAIN AND BE ABANDONED IN PLACE. EXISTING ROOFTOP PIPING AND
CONDUIT PENETRATION LOCATION/HOUSING TO BE REMOVED ENTIRELY.
CONTRACTOR TO PATCH ROOF TO MATCH EXISTING, REFER TO
ARCHITECTURAL PLANS FOR ADDITIONAL ROOF PATCHING REQUIREMENTS.
4. EXISTING OVERHEAD SUPPLY AIR DUCTWORK TO BE REMOVED.
CONTRACTOR TO REMOVE ALL ASSOCIATED DUCTWORK INSULATION,
ACCESSORIES, FLEX DUCT, HANGERS AND SUPPORTS, AND AIR DEVICES.
5. EXISTING PLENUM RETURN AIR DEVICES ARE TO BE REMOVED, TYPICAL
FOR ALL.
6. EXISTING DUCTWORK SILENCERS AND ALL ASSOCIATED SUPPORTS ARE TO
BE REMOVED.
7. EXISTING EXHAUST AIR DUCTWORK, EXHAUST FAN, AND CONTROLS TO
REMAIN. REFER TO CONTROLS SHEETS FOR ASSOCIATED NEW WORK.
8. EXISTING AIR HANDLING UNIT TO BE REMOVED. CONTRACTOR TO REMOVE
ALL ASSOCIATED PIPING, DUCTWORK, ACCESSORIES, HANGERS AND
SUPPORTS AND CONTROLS.
9. EXISTING FURNACE FLUE DUCTWORK TO BE REMOVED. REMOVE ALL
ASSOCIATED HANGERS AND SUPPORTS. EXISTING ROOFTOP PENETRATION
TO BE REMOVED. CONTRACTOR TO PATCH ROOF TO MATCH EXISTING,
REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL ROOF PATCHING
REQUIREMENTS.
10. EXISTING 1-1/2" NATURAL GAS BRANCH LINE SERVING THE FURNACE TO BE
REMOVED. REMOVE ALL ASSOCIATED HANGERS AND SUPPORTS.
CONTRACTOR TO REMOVE BRANCH LINE BACK TO MAIN IN THE MECHANCIAL
ROOM AND PROVIDE PIPING STUB AND CAP AT THE MAIN LINE.
11. EXISTING EXHAUST FAN TO REMAIN. COORDINATE DEMOLITION AT UPPER
LEVEL WITH ASSOCIATED NEW WORK AND EXISTING EQUIPMENT TO REMAIN.
12. EXISTING COMBUSTION AIR INTAKE DUCTWORK TO BE REMOVED.
CONTRACTOR TO PROVIDE BLANK-OFF PANEL WHERE DUCTWORK AT
LOUVER IS REMOVED, REFER TO NEW WORK PLAN.
13. EXISTING COMBUSTION AIR INTAKE AND MOTORIZED DAMPER TO REMAIN.
GENERAL NOTES:
1. REFER TO SHEET M-001 FOR GENERAL NOTES, SYMBOLS, & ABBREVIATIONS
APPLICABLE TO THIS DRAWING.
2. REFER TO DIVISION 22 & 23 SPECIFICATIONS.
3. BUILDING TO REMAIN FULLY OCCUPIED DURING CONSTRUCTION. PROVIDE
TEMPORARY COOLING/HEATING EQUIPMENT DURING CONSTRUCTION.
CONTRACTOR TO COORDINATE PROJECT PHASING WITH BUILDING OWNER.
4. FIRE STATION #3 IS A CONTROLLED LOCATION. CONTRACTORS WORKING
WITHIN THE FACILITY WILL NEED TO SUBMIT APPLICATION AND BE GRANTED
SITE BADGES TO OPERATE WITHIN THE FACILITY BY THE AIRPORT
AUTHORITY.
Scale: 1/8" = 1'-0"
MECHANCIAL DEMOLITION FLOOR PLAN
Scale: 1/8" = 1'-0"
MECHANICAL DEMOLITION ROOF PLAN
0 4' 8' 16'
0 2' 4' 8'
0 4' 8' 16'
Scale: 1/4" = 1'-0"
ENLARGED MECHANICAL ROOM DEMOLTION
Scale: 1/4" = 1'-0"
UPPER LEVEL MECHANICAL ROOM DEMOLTION
0 2' 4' 8'
ASBESTOS ABATEMENT NOTES:
IN 2017, THE CITY OF BLOOMINGTON PERFORMED AN INSPECTION OF FIRE
STATION #3 FOR ACCESSIBLE SUSPECT ASBESTOS-CONTAINING MATERIAL
(ACM). AREA ESTIMATES WERE NOTED IN THE REPORT AND ARE AVAILABLE
FOR REVIEW. PRIOR TO CONSTRUCTION OF THE PROPOSED IMPROVEMENTS,
THE CONTRACTOR IS RESPONSIBLE TO REVIEW THE REPORT AND TO ABATE
AND REMOVE ALL ACM THAT WILL CONFLICT WITH THE PROPOSED
IMPROVEMENTS. THE CONTRACTOR SHALL ADHERE TO ALL STATE OF
ILLINOIS REQUIREMENTS AND REGULATIONS INCLUDING BUT NOT LIMITED TO
THE FOLLOWING:
• THE IEPA’S “STATE OF ILLINOIS DEMOLITION/RENOVATION/ASBESTOS
PROJECT NOTIFICATION FORM” SHALL BE SUBMITTED AND A COPY SENT
TO THE ENGINEER. IT SHALL BE UPDATED IF THERE IS A CHANGE IN THE
START AND/OR FINISH DATE OR IF THE QUANTITY OF ASBESTOS
CHANGES BY MORE THAN 20 PERCENT.
• ASBESTOS ABATEMENT WORK SHALL BE PERFORMED BY AN IDPH
LICENSED CONTRACTOR PREQUALIFIED WITH THE ILLINOIS CAPITAL
DEVELOPMENT BOARD WHO HAS AN ON-SITE SUPERVISOR LICENSED BY
IDPH AND EMPLOYS WORKERS LICENSED BY IDPH. THIS WORK SHALL BE
COMPLETED ACCORDING TO THE REQUIREMENTS OF THE U.S.
ENVIRONMENTAL PROTECTION AGENCY (USEPA), IEPA, OSHA, AND LOCAL
REGULATORY AGENCIES.
• THE CONTRACTOR SHALL PERFORM AIR MONITORING DURING ASBESTOS
ABATEMENT ACTIVITIES. AIR SAMPLING SHALL BE CONDUCTED BY A
QUALIFIED AIR SAMPLING PROFESSIONAL.
• PERSONAL MONITORING SHALL BE CONDUCTED PER APPLICABLE OSHA
REGULATIONS.
• WHEN ASBESTOS IS REMOVED PRIOR TO DEMOLITION, CLEARANCE
TESTING PER IDPH SHALL BE CONDUCTED UPON THE REMOVAL OF
ASBESTOS CONTAINING BUILDING MATERIALS (ACBMS).
THE FOLLOWING SUBMITTALS SHALL BE MADE TO THE ENGINEER PRIOR TO
THE START OF THE ASBESTOS ABATEMENT:
• MANUFACTURER’S CERTIFICATION STATING THAT VACUUMS,
VENTILATION EQUIPMENT, AND OTHER EQUIPMENT REQUIRED TO
CONTAIN AIRBORNE FIBERS CONFORM TO ANSI 29.2.
• A LISTING OF THE BRAND NAME, MANUFACTURER, AND SPECIFICATION OF
ALL SEALANTS OR SURFACTANTS TO BE USED.
• PROOF OF ARRANGEMENTS FOR TRANSPORT AND DISPOSAL OF ACMBS
HAVE BEEN OBTAINED (I.E. A LETTER OF AUTHORIZATION TO UTILIZE
DESIGNATED LANDFILL).
• A DETAILED WORK PLAN OF THE CONTRACTOR’S ANTICIPATED
PROCEDURES INCLUDING THE LOCATION AND LAYOUT OF
DECONTAMINATION UNITS, THE SEQUENCING OF WORK, THE
RESPIRATORY PROTECTION PLAN, A SITE SAFETY PLAN, A DISPOSAL
PLAN, AND A DETAILED DESCRIPTION OF THE METHODS TO BE USED TO
CONTROL POLLUTION.
• PROOF OF THE CONTRACTOR’S PREQUALIFICATION WITH THE CAPITAL
DEVELOPMENT BOARD AND EMPLOYEE CERTIFICATIONS WITH IDPH.
SUBMITTALS THAT SHALL BE MADE UPON COMPLETION OF ABATEMENT
WORK:
• COPIES OF WASTE CHAIN-OF-CUSTODIES, TRIP TICKETS, SHIPPING
MANIFESTS, OR DISPOSAL RECEIPTS FOR ASBESTOS WASTE MATERIALS
REMOVED FROM THE WORK AREA.
• COPIES OF EACH DAY’S WORK SITE ENTRY LOGBOOK WITH INFORMATION
ON WORKER AND VISITOR ACCESS.
• LOGS DOCUMENTING FILTER CHANGES ON RESPIRATORS, HEPA
VACUUMS, NEGATIVE PRESSURE VENTILATION UNITS, AND OTHER
ENGINEERING CONTROLS.
• TEST RESULTS OF ANY BULK MATERIAL ANALYSIS AND AIR SAMPLING
DATA COLLECTED DURING THE ABATEMENT INCLUDING RESULTS OF ANY
ON-SITE TESTING BY ANY FEDERAL, STATE, OR LOCAL AGENCY.
NO. DESCRIPTION DATE
M-101
S1
40 CFM
S1
30 CFM
R2
110 CFM
R2
40 CFM
S2
40 CFM
R1
40 CFM
S1
40 CFM
S1
50 CFM
R1
50 CFM
R2
50 CFM
R1
65 CFM
S1
65 CFM
S2
40 CFM
S2
165 CFM
(E)
(E)
(E)
(E)
(E) (E)
(E)
R2
75 CFM
(E)
S2
50 CFM
12/8
8/8
8/6
6ø
6ø
6ø 6ø
6ø
6ø
8/8
6ø
8ø
6/6 6/6
8/6
6/6
14/8
8/8
6/6
6/6
6/6
6/6
6/6
TEST
CU
CU
(E)
16/8
8ø
R2
50 CFM
8ø 8ø
8ø
S2
80 CFM
6ø
8ø
8ø
6ø
S1
35 CFM
DOAS
ERV
10/10
10/10 14/8
14/12
16/8
14/8
EDH
M-101
M-101
24/24
EXISTING LOUVER AT
UPPER LEVEL, SEE
ELEVATION VIEW
10/10
36/407
EXISTING
MOTORIZED DAMPER
EXISTING
EXHAUST FAN
OA
OA
SA
RA
EA
CU
CU
FCU
FCU
FCU
FCU
FCU
DOAS
ERV
FCU
FCU
FCU
FCU
HRU
HRU
T
T
T
T
T
TT
H
H
H
H
H
H H
CU
CU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
FCU
DOAS
ERV
1" CD
1" CD 1" CD
1" CD 1" CD
HRU
HRU
ERV
EDH
EXISTING LOUVER
24/24
10/10
PROVIDE BEVELED TAP
INTO 24"x24"
DUCTWORK PLENUM
A
54321
B
C
D
E
F
SCALE
APPROVED BY
CHECKED BY
SHEET NO.
TITLE
DRAWN BY
DATE
PROJECT NO.
REVISIONS
SEAL
KEY PLAN
Dewberry Architects Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602-1585 309.282.8000
IL DESIGN FIRM #184000358-0001
Dewberry Engineers Inc.
401 Southwest Water Street Suite 701 Peoria, IL 61602 309.282.8000
IL DESIGN FIRM #184.005007
/8
/2
:2
:4
P M
MECHANICAL
NEW WORK
PLANS
JRF
PER
PER
7/3/25
50185817
F
IR
E S
T A
T
IO
N
H V
A C
R E
P L A
C E
M E
N T
C it y o f B lo o m in g to n
Is s u e d f o r
B id d in g
E
E M
P
IR
E S
T R
E E
T
B L O
O M
IN
G
T O
N
IL
M-101
Scale: 1/8" = 1'-0"
MECHANICAL NEW WORK FLOOR PLAN - VENTILATION
Scale: 1/4" = 1'-0"
ENLARGED MECHNANICAL ROOM NEW WORK
FLOOR PLAN - VENTILATION
NOTES:
1. PROVIDE CLEANOUT IN CONDENSATE PIPING.
2. TERMINATE CONDENSATE DRAIN LINES IN MOP SINK. JOIN CONDENSATE LINES INTO A
COMMON VERTICAL PIPE FOR DISCHARGE INTO THE MOP SINK, SHOWN SEPARATELY
FOR CLARITY.
3. PROVIDE EXTERNAL CONDENSATE PUMP FOR WALL MOUNTED FAN COIL. CONDENSATE
PUMP SHALL PROVIDE THE REQUIRED LIFT TO ROUTE PIPING AS SCHEMATICALLY
SHOWN. PROVIDE STAINLESS STEEL DRIP PAN BELOW THE CONDENSATE PUMP. MOUNT
CONDENSATE PUMP DIRECTLY BESIDE THE WALL MOUNTED UNIT. MOUNTING LOCATION
SHALL ALLOW FOR GRAVITY DRAINAGE FROM THE FAN COIL TO THE CONDENSATE
PUMP. PROVIDE LEAK DETECTION SENSOR IN THE CONDENSATE PAN THAT SHALL SEND
AN ALARM SIGNAL TO THE BUILDING DDC SYSTEM IN THE EVENT OF LEAK OR
CONDENSATE PUMP FAILURE. FAN COIL SERVED BY A CONDENSATE PUMP SHALL BE
DISABLED UPON DETECTION OF A LEAK.
4. CONTRACTOR TO PROVIDE NEW BLANK-OFF PANEL ACROSS THE ENTIRETY OF THE
EXISTING LOUVER. BLANK-OFF PANEL SHALL BE A MINIMUM OF 2" OF FIBER-BOARD
INSULATION WITH APPROPRIATE EXTERIOR RATED FINISH. CONTRACTOR TO PROVIDE
WEATHER-TIGHT SEALING BETWEEN THE BLANK-OFF PANEL AND LOUVER. REFER TO
PLANS FOR LOCATIONS OF DUCTWORK PENETRATIONS TO THE LOUVER. COORDINATE
THE REQUIRED OPENING SIZES IN THE BLANK-OFF PANELS PRIOR TO FABRICATION.
5. NEW SPACE THERMOSTAT SUPPLIED BY THE VRF EQUIPMENT PROVIDER. INSTALLED
BY THE MECHANICAL CONTRACTOR. THERMOSTAT SHALL BE INSTALLED ADJACENT TO
THE SPACE LIGHTING CONTROLS AT THE SAME ELEVATION. CONTRACTOR TO
COORDINATE DEVICE LOCATION PRIOR TO INSTALLATION. TYPICAL FOR ALL VRF
THERMOSTATS.
6. CONDENSATE PIPING DOWN TO EXISTING SANITARY WASTE PIPING. COORDINATE
CONDENSATE PIPING ELEVATION WITH RESPECT TO DRAIN POINT PRIOR TO
INSTALLATION.
7. PROVIDE NECK SIZE PLENUM DUCTWORK DOWN FROM EXISTING ROOF HOOD. ERV-1
INTAKE DUCTWORK TO TRANSITION INTO NECK SIZE FOR OUTDOOR AIR INTAKE.
8. REFER TO DEMOLITION PLANS FOR REMOVAL OF EXISTING DUCTWORK IN THIS AREA.
PROVIDE 24"x24" PLENUM FROM THE EXISTING LOUVER TO SERVE FOR ERV-1 OUTDOOR AIR INTAKE. INTAKE DUCTWORK TO ERV-1 TO TAP INTO 24"x24" PLENUM. PROVIDE
BEVELED DUCTWORK CONNECTION.
9. WHERE TWO OR MORE FAN COILS SERVE A SINGLE SPACE, THE FAN COILS SHALL BE
CONTROLLED BY A SINGLE SPACE THERMOSTAT. THE FAN COILS' OPERATING MODE
SHALL BE INTERLOCKED SO THE UNITS ARE ALWAYS OPERATING IN THE SAME MODE.
GENERAL NOTES:
1. BUILDING TO REMAIN FULLY OCCUPIED DURING CONSTRUCTION. PROVIDE TEMPORARY
COOLING/HEATING EQUIPMENT DURING CONSTRUCTION. CONTRACTOR TO COORDINATE
PROJECT PHASING WITH BUILDING OWNER.
2. REFER TO SHEET M-001 FOR GENERAL NOTES, SYMBOLS, & ABBREVIATIONS APPLICABLE
TO THIS DRAWING.
3. REFER TO DIVISION 22 & 23 SPECIFICATIONS.
4. INSTALL BOTTOM OF CASSETTES FLUSH WITH CEILING GRID. IN ORDER TO AVOID
OVERHANGIN A LIGHT FIXTURE, 2x2 FAN COILS…