BID 2022-47 Clarifying Questions 1.pdf
PDF 125 KB Posted
- Solicitation number
- S-C01010-00002880
- Issued by
- Clackamas County, Oregon
About this file
This document is a Response to Clarifying Questions for Invitation to Bid #2022-47 for the Lolo Pass Road Stabilization and Surface Preservation Project, involving Clackamas County and Oregon City in Oregon. The project requires completing the work by September 30, 2022, with a contract termination date of June 30, 2023 to allow for punch list items. The contractor is responsible for the traffic control design, and the ability to close the road has not been determined, with the assumption being that flagging will be required. Fish removal is required and will be provided by the owner.
The pricing terms, set-asides, incumbent information, funding requirements and sources, and other salient financial details are not included in this document. The document focuses solely on clarifying the project details in response to questions submitted by interested firms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2022-47
Lolo Pass Road Stabilization and Surface Preservation Project (“BID”)
RESPONSE TO CLARIFYING QUESTIONS #1
May 17, 2022
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. What is the final completion date? Section 180.5 shows Sept 30 2022 and Project information sheet shows June 30, 2023.
Answer: The work should be completed by Sept 30, 2022. The Date of June 30 is a contract termination date and is to allow for good weather on punch list items if necessary.
2. Is the traffic control contractor design? Are we allowed close the road to through traffic if a detour is provided?
Answer: Traffic control is contractor designed. The ability to close the road has not been determined. Contractor should assume flagging.
3. Is fish removal required and is the owner providing the fish removal?
Answer: Fish removal is required and provided by the owner.